aklavik airport drainage improvements · aklavik airport drainage improvement project description...

28
Tetra Tech Canada Inc. Box 2244, 201, 4916 - 49 Street Yellowknife, NT X1A 2P7 CANADA Tel 867.920.2287 Fax 867.873.3324 Government of the Northwest Territories Project Description Report: Aklavik Airport Drainage Improvements Revision 02 NOVEMBER 2019 ISSUED FOR USE | REVISION 02 FILE: 704-ENW.EENW03288-01

Upload: others

Post on 24-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

Tetra Tech Canada Inc. Box 2244, 201, 4916 - 49 Street

Yellowknife, NT X1A 2P7 CANADA Tel 867.920.2287 Fax 867.873.3324

Government of the Northwest Territories

Project Description Report: Aklavik Airport Drainage Improvements Revision 02

NOVEMBER 2019 ISSUED FOR USE | REVISION 02 FILE: 704-ENW.EENW03288-01

Page 2: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

Distribution List

Mardy Semmler, Inuvialuit Water Board – Executive Director Bijaya Adhikari, Inuvialuit Water Board – Science and Regulatory Coordinator Moshiur Rahman, Government of the Northwest Territories – Airport Planning Officer Geoff Petzold, CIMA Canada Inc. – Project Manager

Page 3: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

AKLAVIK AIRPORT DRAINAGE IMPROVEMENTS FILE: 704-ENW.EENW03288-01 | NOVEMBER 2019 | ISSUED FOR USE | REVISION 02

iAklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

TABLE OF CONTENTS

1.0 PROJECT TITLE .......................................................................................................................... 1

2.0 CONTACT NAME AND ADDRESS .............................................................................................. 1

3.0 REGULATORY APPROVALS ..................................................................................................... 1

4.0 LOCATION ................................................................................................................................... 1

5.0 DEVELOPMENT SUMMARY ....................................................................................................... 1

6.0 DEVELOPMENT TIMETABLE ..................................................................................................... 2

7.0 NEW TECHNOLOGY ................................................................................................................... 2

8.0 ALTERNATIVES .......................................................................................................................... 2

9.0 TRADITIONAL AND OTHER LAND USES .................................................................................. 2

10.0 ENGAGEMENT ............................................................................................................................ 2

11.0 ENVIRONMENTAL OVERVIEW AND PLANS ............................................................................. 3 11.1 Spill Contingency Plan ........................................................................................................................... 3 11.2 Erosion and Sediment Control Plan ...................................................................................................... 3 11.3 Waste Management Plan ...................................................................................................................... 3 11.4 Closure and Reclamation Plan .............................................................................................................. 3

12.0 CLOSURE .................................................................................................................................... 4

APPENDIX SECTIONS

APPENDICES

Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G

Applications and Approvals Issued for Environmental Review Drawings Consultations Meeting Minutes Spill Contingency Plan Erosion & Sediment Control Plan Waste Management Plan Closure and Reclamation Plan

Page 4: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

AKLAVIK AIRPORT DRAINAGE IMPROVEMENTS FILE: 704-ENW.EENW03288-01 | NOVEMBER 2019 | ISSUED FOR USE | REVISION 02

1Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

1.0 PROJECT TITLE Project Description Report for the Aklavik Airport Drainage Improvements Project (the Project), Revision 02.

2.0 CONTACT NAME AND ADDRESS Moshiur Rahman, Airport Planner Government of the Northwest Territories Department of Infrastructure 5015 – 49 Street Yellowknife, NT, X1A 2L9 Phone: (867) 767-9084 ext. 31079 Fax: (867) 873-0297Email: [email protected]

3.0 REGULATORY APPROVALS The Government of the Northwest Territories (GNWT) is seeking a Water Licence from the Inuvialuit Water Board (IWB). Approvals from the Inuvialuit Environmental Impact Screening Committee (EISC) and the Department of Fisheries and Oceans (DFO) have already been attained for this project. The IWB application, and the EISC and DFO approvals are included in Appendix A of this report.

The EISC approval noted that the Project does meet the definition of development as defined under the Inuvialuit Final Agreement, and that the Project qualifies for an exemption from environmental impact screening under Exclusion Item # 13 of the EISC Guidelines.

The DFO approval noted that the Project will not result in serious harm to fish or prohibited effects on listed aquatic species at risk. As such, DFO stated that an authorization under the Fisheries Act or a permit under the Species at Risk Act is not required.

4.0 LOCATION The site is located at Aklavik Airport (68º13’23.57” N, 135º00’23.03” W) within the Hamlet of Aklavik. The GNWT confirmed in 2018 that this project fell within the Inuvialuit Settlement Region and not the Gwich'in Settlement Region. The GNWT needed to confirm this as the boundary between the two settlement regions passes through the Hamlet of Aklavik (Hamlet).

5.0 DEVELOPMENT SUMMARY CIMA Canada Inc. (CIMA+) was retained by the GNWT as the design engineers to develop a drainage plan to drain two problem areas at the Aklavik Airport (Area 1 and Area 2). Tetra Tech Canada Inc. (Tetra Tech) was retained by CIMA+ to assist with environmental regulatory approvals. Significant portions of the Hamlet and Aklavik Airport flood in the spring during “break-up”. After flood waters recede, Areas 1 and 2 do not drain completely, which has been a problem for the Hamlet and Aklavik Airport. The purpose of this project is to develop a practical plan to drain Areas 1 and 2 by gravity after flood waters subside. A set of stamped “Issued for Environmental Review” drawings are included in Appendix B of this report. The drawings detail the ditch improvements, graded areas, and Peel Channel outfalls. No new culverts are included as part of this project.

Page 5: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

AKLAVIK AIRPORT DRAINAGE IMPROVEMENTS FILE: 704-ENW.EENW03288-01 | NOVEMBER 2019 | ISSUED FOR USE | REVISION 02

2Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

The Project would have Area 1 graded with a perimeter swale constructed around it. The perimeter swale would drain to an existing ditch that runs along the airport runway. The ditch would be reworked to daylight into the Peel Chanel, south of the airport. The Area 1 drainage improvements are shown on Figures 1 and 2 in Appendix B. The block profiles for the ditch improvements are shown on Figures 501 to 505 in Appendix B.

Area 2 would have a swale constructed through the centre of it. The swale would lead to a short ditch that would daylight into the Peel Chanel, north of the airport. The Area 2 drainage improvements are shown on Figures 3 and 4 in Appendix B.

The construction of the swales and ditches would be as follows:

Typically, a 2 metre (m) wide base constructed with 200 millimetre (mm) granular ditch bedding over geotextile.

The swales would have back slopes to match the existing ground elevations to a maximum slope of 3:1.

The ditches would typically have back slopes at 3:1.

The ditch for Area 1 would daylight into the Peel Channel at 68º13’07.35” N, 134º59’57.21” W, and the ditch forArea 2 would daylight into the Peel Channel at 68º13’45.23” N, 135º00’46.44” W.

The length of the ditch from Area 1 to the Peel Channel would be approximately 855 m long.

The length of the short ditch for Area 2 would be approximately 55 m long.

The contractor and heavy equipment used for this project will depend on the result of a forthcoming GNWT request for proposals (RFP). It is anticipated that the contractor will be local, and that the heavy equipment used for this project will include a backhoe.

6.0 DEVELOPMENT TIMETABLE The project timeline is to be determined and is dependent on the selected contractor.

7.0 NEW TECHNOLOGY No new technologies or methods will be employed for this culvert installation Project.

8.0 ALTERNATIVES Initially two drainage improvement routes were considered for this Project by the design engineers. The present approach was chosen by the GNWT as the preferred option.

9.0 TRADITIONAL AND OTHER LAND USES The Project is being completed at Aklavik Airport, which is well within the municipal boundaries of the Hamlet of Aklavik. Impacts to traditional land uses and other land uses are not anticipated from this Project.

10.0 ENGAGEMENT A community stakeholders meeting was held in the Hamlet of Aklavik Chambers on May 30, 2018 with the GNWT, the design engineers, and members of the community. The meeting discussed utilizing local contractors in Aklavik and sources of gravel in town. The minutes from this meeting are included in Appendix C.

Page 6: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

AKLAVIK AIRPORT DRAINAGE IMPROVEMENTS FILE: 704-ENW.EENW03288-01 | NOVEMBER 2019 | ISSUED FOR USE | REVISION 02

3Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

11.0 ENVIRONMENTAL OVERVIEW AND PLANS The Project is located at Aklavik Airport, which is well within the municipal boundaries of the Hamlet Aklavik. The Project will improve the drainage of two relatively small areas at critical locations of the airport infrastructure, particularly the flooding in spring during “break-up”. Environmental impacts are not anticipated from the Project, and the limited potential effects can be mitigated with the environmental plans noted in Sections 11.1 and 11.2 of this report. The drainage improvements largely improve existing ditches in the Hamlet of Aklavik, and the improvements drain flood waters that arise from the Peel Channel back into the Peel Channel.

The approval from the DFO noted that the Project will not result in serious harm to fish or prohibited effects on listed aquatic species at risk. Therefore, significant impacts to fish are not anticipated from this Project.

11.1 Spill Contingency Plan

The Project Spill Contingency Plan (SCP) was updated as a Revision 02 to include comments made by the IWB. The contractor will be required to have a copy of the Project SCP on-site and be knowledgeable of the contents of it. In the unlikely event of a spill incident on site, the contractor will immediately implement the appropriate spill notification, response and mitigation measures as specified in the SCP (Refer to Appendix D).

11.2 Erosion and Sediment Control Plan

The Project will conform with the applicable best management practices of the Erosion and Sedimentation Control Plan (ESCP) where applicable. The contractor will be required to have a copy of the ESCP on-site and be knowledgeable of the contents of it (Refer to Appendix E).

11.3 Waste Management Plan

The IWB requested the inclusion of a Waste Management Plan (WMP) in their review of the original submission. The Project will adhere to the WMP for managing waste management issues, where applicable. The contractor will be required to have a copy of the WMP on-site and be knowledgeable of the contents of it (Refer to Appendix F).

11.4 Closure and Reclamation Plan

The IWB requested the inclusion of a Closure and Reclamation Plan (CRP) in their review of the original submission. The Project will adhere to the CRP for managing closure and reclamation issues, where applicable. The contractor will be required to have a copy of the CRP on-site and be knowledgeable of the contents of it (Refer to Appendix G).

Page 7: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

AKLAVIK AIRPORT DRAINAGE IMPROVEMENTS FILE: 704-ENW.EENW03288-01 | NOVEMBER 2019 | ISSUED FOR USE | REVISION 02

4Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

12.0 CLOSURE We trust this report meets your present requirements. If you have any questions or comments, please contact the undersigned.

Respectfully submitted, Tetra Tech Canada Inc.

FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01 FILE: 704-ENW.EENW03288-01

Prepared by: Reviewed by: Michael Blanchette, P.Eng. Rick A.W. Hoos, R.P.Bio Environmental Engineer Principal Consultant Environment & Water Practice Mining Practice Direct Line: 780.699.9600 Direct Line: 604.608.8914 [email protected] [email protected]

/cee

Page 8: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

AKLAVIK AIRPORT DRAINAGE IMPROVEMENTS FILE: 704-ENW.EENW03288-01 | NOVEMBER 2019 | ISSUED FOR USE | REVISION 02

Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

APPENDIX B ISSUED FOR ENVIRONMENTAL REVIEW DRAWINGS

Page 9: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

223

HAMLET of AKLAVIK, NORTHWEST TERRITORIES

GOVERNMENT of NORTHWEST TERRITORIESAKLAVIK AIRPORT DRAINAGEIN THE

LOCATION PLAN

3 AREA 2 DRAINAGE IMPROVEMENTS & GRADING PLAN

LIST OF DRAWINGS:1

N.T.S.

AREA 1 DRAINAGE IMPROVEMENTS2 AREA 1 GRADING PLAN BLOCK PROFILE - DITCH TO PEEL CHANNEL502

HANSEN ROAD

HAMLETOF

AKLAVIK

BLOCK PROFILE - AREA 1 & DITCH TO PEEL CHANNEL501

SITEAREA 1

ISSUED FOR ENVIRONMENTAL REVIEW

E00724A

Z:\C

ima-

C21

\Pro

ject

s\E

0072

4A -

Akl

avik

Airp

ort D

rain

age

Pla

n\40

0 D

raw

ings

\04

DE

SIG

N\E

0072

4A-X

B-E

NV

IRO

.dw

gS

aved

:201

8-09

-05,

kirk

.dix

on P

lotte

d:9/

6/20

18 9

:56

AM

GARDLUND RO

AD

AKLAVIK AIRPORT RUNW

AY

GORDON ROAD

JJ STEWARD STREET

PEEL CHANNEL

SITEAREA 2

BLOCK PROFILE - DITCH TO PEEL CHANNEL503BLOCK PROFILE - DITCH TO PEEL CHANNEL504BLOCK PROFILE - DITCH TO PEEL CHANNEL & OUTFALL505

4 AREA 2 CROSS SECTIONS

Page 10: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

15.00

6.00

15.00

15.00

22.00

A-A

B-B

15.00

B-B

HIGH

POINT

EX CULVERT600 CMPE INV 3.4W INV 3.3

EX CULVERT1200 CMP

E INV 4.1W INV 4.4

EX CULVERT800 CMPE INV 4.4W INV 4.8

REMOVE & SALVAGE FENCETO AIRPORT OPERATOR

PROPOSED DITCH 0.13%L=883mSEE DETAIL

PROPOSEDAREA 1SITE BOUNDARY

A-A

EX CULVERT600 CMPE INV 3.4W INV 3.3

EX CULVERT1200 CMP

E INV 4.1W INV 4.4

LEGEND

PROPOSED DRAINAGE IMPROVEMENTS

EXISTING DRAINAGE PATH

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue North

Saskatoon, SK S7K 2M2 CANADA

E00724A

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

AS SHOWN

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/06/29

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-XB

-EN

VIR

O.d

wg

Sav

ed:2

018-

09-1

3,ki

rk.d

ixon

Plo

tted:

10/2

/201

8 1:

50 P

M

1

INFRASTRUCTURE

AREA 1DRAINAGE IMPROVEMENTS

1

AREA 1DRAINAGE IMPROVEMENTS

SCALE 1:2000

AREA 1

PEEL CH

ANN

EL

AKLAVIK AIRPORT RUNW

AY

GARDLUND RO

AD

HANSEN ROAD

J.J. STEWARD STREET

DAYLIGHT DITCHTO PEEL CHANNEL

INVERT=2.60

GORDON ROAD

TYPICAL DITCH CROSS SECTIONINSTALLATION DETAIL

NOT TO SCALE

2.00TYP

EXISTING GROUND

3

1

3

1

GEOTEXTILENOTE: GEOGRID SHALL BE INSTALLEDWHERE APPROVED BY ENGINEER.

1.00 1.00

200mm GRANULARDITCH BEDDING

PROPOSED DRAINAGE PATH

PROPOSED SITE BOUNDARYBOUNDARY IS EAST EDGE OFGRAVEL ON HANSEN ROAD & 15mFROM WEST EDGE OF RUNWAYEXCEPT AS SHOWN.

PROPOSED DITCHCROSS SECTION A-A

H 1:250 V 1:50

3

2

4

5

6

3

2

4

5

6

0-10-20-30 10 20 30 40 50

3

1

3

1

EAST EDGEHANSEN ROAD

℄ OF RUNWAY

PROPOSED DITCHSEE DETAIL

PROPOSED DITCHCROSS SECTION B-B

H 1:250 V 1:50

3

1

3

1

PROPOSED DITCHSEE DETAIL

0-10-20-30 10 20 30 40

3

2

4

5

6

3

2

4

5

6EXISTING GROUND

TOP WIDTH VARIES

GPS COORDINATESDMS (DEGREES, MINUTES, SECONDS)NOTE: WESTING IS NEGATIVE

AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
N68°13'31.72" W135°00'41.49"
Page 11: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

HIGH

POINT

REMOVE & SALVAGE FENCETO AIRPORT OPERATOR

4.25

4.41

3.40

3.30

4.204.25

3.40

2.00

BACKSLOPE AT 3:1TIE TO EXISTING GROUND

4.23

4.18

4.16

4.12

3.804.08

4.11

4.17

4.32

4.18

4.20

4.37

4.07

4.11

4.14

4.10

4.40

4.03

A-A

AKLAVIK AIRPORT RUNW

AY

HANSEN ROAD

A-A

4.29

4.22

4.16

4.41

4.73

4.19

EX CULVERT600 CMPE INV 3.4

W INV 3.3

EX CULVERT1200 CMP

E INV 4.1W INV 4.4

B-B

B-B

3.75

5.25

4.50

EX CULVERT600 CMPE INV 3.4

W INV 3.3

EX CULVERT1200 CMP

E INV 4.1W INV 4.4

2.00

LEGEND

FLOW DIRECTION

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue North

Saskatoon, SK S7K 2M2 CANADA

E00724A

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

1:250

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/06/29

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-XB

-EN

VIR

O.d

wg

Sav

ed:2

018-

09-1

3,ki

rk.d

ixon

Plo

tted:

10/2

/201

8 1:

52 P

M

2

INFRASTRUCTURE

AREA 1GRADING PLAN

2

AREA 1GRADING PLAN

SCALE 1:250

PROP DITCH 0.13%

PROP PERIMETER SWALE 0.19%

EXISTING GROUND ELEVATION

DESIGN ELEVATION4.00

4.00

PROP PERIMETER SW

ALE 0.19%

AREA 1CROSS SECTION A-A

H 1:500 V 1:50

3

2

4

5

6

HANSEN ROAD

3

2

4

5

6

PERIMETER SWALE2.0M @ 2.50%

PERIMETER SWALE2.0M @ 2.50%

BACKSLOPE TOEXISTING GROUND @ 3:1

EXISTING GROUND

FILL TO 0.5M FROMBOTTOM OF SWALE

EXISTING CONTOUR 0.25 METRE INTERVAL

EXISTING CONTOUR 1.00 METRE INTERVAL

BACKSLOPE TOEXISTING GROUND @ 3:1

AREA 1CROSS SECTION B-B

H 1:500 V 1:50

3

2

4

5

6

3

2

4

5

6

PROP DITCH 0.13%EXISTING GROUND

PROPOSED PERIMETER SWALE INV 0.19%

TOP OF FILL 1.06%

TOP OF FILL 8.00%

TOP OF FILL 3.50%

SLOPE VARIESSLOPE VARIES

AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
1.00
Page 12: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

EX CULVERT800 CMPE INV 3.0W INV 3.2

3.00

3.20

TOP OF FILL AREAELEVATION 3.00

A-A

A-A

B-B

B-B

LTO 1321

BACKSLOPE TO MATCHEXISTING GROUND

ELEVATION 3.50MAXIMUM 3:1

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue North

Saskatoon, SK S7K 2M2 CANADA

E00724A

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

AS SHOWN

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/06/29

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-XB

-EN

VIR

O.d

wg

Sav

ed:2

018-

09-1

3,ki

rk.d

ixon

Plo

tted:

10/2

/201

8 1:

53 P

M

3

INFRASTRUCTURE

AREA 2DRAINAGE IMPROVEMENTS

&GRADING PLAN

3

DAYLIGHT DITCHTO PEEL CHANNELINVERT=2.50

PEEL CHANNEL

HANSEN ROAD

PROP SWALE 0.17%

PRO

P DI

TCH

0.17

%

PROP SWALE 0.25%

PRO

P SW

ALE

0.17

%

PROP SWALE 0.17%

PROP SWALE 0.25%

PRO

P SW

ALE

0.17

%

TYPICAL DITCH CROSS SECTIONNOT TO SCALE

TYPICAL SWALE CROSS SECTION - AREA 2NOT TO SCALE

2.00

2.00

3

1

3

1

SLOPE VARIES SLOPE VARIES

GEOTEXTILE OR GEOGRIDAS DIRECTED BY ENGINEER

1.00 1.00

200mm GRANULARDITCH BEDDING

GEOTEXTILE OR GEOGRIDAS DIRECTED BY ENGINEER

200mm GRANULARDITCH BEDDING

1.00 1.00

LEGEND

FLOW DIRECTION

EXISTING GROUND ELEVATION

DESIGN ELEVATION4.00

4.00

EXISTING CONTOUR 0.25 METRE INTERVAL

EXISTING CONTOUR 1.00 METRE INTERVAL

AREA 2DRAINAGE IMPROVEMENTS

&GRADING PLAN

SCALE 1:500

EXISTING GROUND

TOP WIDTH VARIES

PROPOSED DITCHL=55m

SEE DETAIL

GPS COORDINATESDMS (DEGREES, MINUTES, SECONDS)NOTE: WESTING IS NEGATIVE

AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
1.00
AutoCAD SHX Text
N68°13'31.72" W135°00'41.49"
Page 13: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue North

Saskatoon, SK S7K 2M2 CANADA

E00724A

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

AS SHOWN

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/06/29

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-XB

-EN

VIR

O.d

wg

Sav

ed:2

018-

09-1

3,ki

rk.d

ixon

Plo

tted:

10/2

/201

8 1:

54 P

M

4

INFRASTRUCTURE

AREA 2CROSS SECTIONS

4

TYPICAL SWALE CROSS SECTION - AREA 2NOT TO SCALE

2.00

SLOPE VARIES SLOPE VARIES

GEOTEXTILE OR GEOGRIDAS DIRECTED BY ENGINEER

200mm GRANULARDITCH BEDDING

1.00 1.00

LEGEND

PEEL CHANNEL

AREA 2CROSS SECTION A-A

H 1:500 V 1:50

3

2

4

5

HANSEN ROAD

AREA 2CROSS SECTION B-B

H 1:500 V 1:50

DIRT TRAIL

PROPOSED SWALESEE DETAIL

FOR INSTALLATION SPECIFICATIONS

2.00

INTERNAL SLOPES VARY

1

3

2

4

5

1

INTERNAL SLOPES VARY

EXISTING GROUNDAT AIRPORT

BACKSLOPE TO MATCHEXISTING GROUNDMAX 3:1

BACKSLOPE TO MATCHEXISTING GROUND

MAX 3:1

AREA 2EXISTING GROUND

BACKSLOPE TO MATCHEXISTING GROUNDMAX 3:1

BACKSLOPE TO MATCHEXISTING GROUND

MAX 3:1

AREA 2EXISTING GROUND

PROPOSED SWALESEE DETAILFOR INSTALLATION SPECIFICATIONS

2.00

INTERNAL SLOPES VARYINTERNAL SLOPES VARY3

2

4

5

1

3

2

4

5

1

Page 14: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

PROP PERIMETER SWALE 0.19%

AKLAVIK AIRPORT RUNWAY

HANSEN ROAD

EX CULVERT600 CMPE INV 3.4W INV 3.3

EX CULVERT1200 CMP

E INV 4.1W INV 4.4

2.00

PROP DITCH 0.13%L=883m

DAYLIGHT TO PEEL CHANNELFOR DETAIL SEE

SHEET 1

PROP PERIMETER SWALE 0.19%

HIG

H P

OIN

T

BACKSLOPE TO MATCHEXISTING GROUND

MAX 3:1

FILL TO 0.5M @ 3:1ABOVE BOTTOM

OF SWALE.

FOR SWALE DETAILSEE SHEET 2

REMOVE & SALVAGE FENCETO AIRPORT OPERATOR

2.00

2.00

EN

D S

WA

LE/S

TAR

T D

ITC

H0+

214.

655

INV

3.7

50

PROPOSED PERIMETER SWALE INV 0.19%

EX GRAVEL ROADEAST EDGE

EXISTING GROUND@ ℄ OF DITCH

EXISTING GROUND

STA

RT

SW

ALE

0+10

7.56

9IN

V 4

.250

PROP DITCH INV 0.13%

TOP

OF

FILL

0+1

21.6

505.

250

TOP

OF

FILL

0+1

92.5

714.

500

TOP OF FILL 1.06%

TOP OF FILL 8.00%

TOP OF FILL 3.50%

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue NorthSaskatoon, SK S7K 2M2 CANADA

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

H 1:500 V 1:100

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/07/10

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-DE

SIG

N P

RO

FILE

S-E

NV

IRO

.dw

gS

aved

:201

8-09

-13,

kirk

.dix

on P

lotte

d:10

/2/2

018

2:01

PM

501

INFRASTRUCTURE

BLOCK PROFILE

5

HAMLET OF AKLAVIKNANANANANA

KRD

JULY 2018

LOCATION PLANSCALE : NTS

PROFILE LOCATION

HAMLET OF AKLAVIK

E00724A

HANSEN ROAD

NOTE :ALL PIPE SIZES ARE INMILLIMETERS AND ALLDIMENSIONS ARE IN METRESUNLESS OTHERWISE NOTED.

LOCATION OF UNDERGROUND STRUCTURES ASSHOWN ARE BASED ON THE BEST INFORMATIONAVAILABLE, BUT NO GUARANTEE IS GIVEN THAT

ALL EXISTING UTILITIES ARE SHOWN ORTHAT THE GIVEN LOCATIONS ARE EXACT.

CONFIRMATION OF EXISTENCE AND EXACT LOCATIONOF ALL SERVICES MUST BE OBTAINED BY CONTRACTOR

FROM THE INDIVIDUAL UTILITIES BEFOREPROCEEDING WITH CONSTRUCTION.

REVOLVED SECTION

JJ STEWARD ROAD

PEEL CHANNEL

AIRPORT RUNW

AY

AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
(FROM STA 0+100.000 TO STA 0+360.000)
AutoCAD SHX Text
AREA 1 SWALE & DITCH TO PEEL CHANNEL
AutoCAD SHX Text
RGE
AutoCAD SHX Text
TWP
AutoCAD SHX Text
th M
AutoCAD SHX Text
QTR
AutoCAD SHX Text
SEC
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
0.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
COORDINATES
AutoCAD SHX Text
NAD 83
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
0+220
AutoCAD SHX Text
0
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
0+240
AutoCAD SHX Text
W
AutoCAD SHX Text
0+200
AutoCAD SHX Text
0+180
AutoCAD SHX Text
0+160
AutoCAD SHX Text
0+140
AutoCAD SHX Text
0+120
AutoCAD SHX Text
0+100
AutoCAD SHX Text
0+320
AutoCAD SHX Text
0+340
AutoCAD SHX Text
0+260
AutoCAD SHX Text
0+280
AutoCAD SHX Text
0+300
AutoCAD SHX Text
7
AutoCAD SHX Text
7
AutoCAD SHX Text
0+360
Page 15: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

HANSEN ROAD

2.00

EX CULVERT800 CMPE INV 4.4W INV 4.8

AKLAVIK AIRPORT RUNWAY

REMOVE & SALVAGE FENCETO AIRPORT OPERATOR

PROP DITCH 0.13%L=883m

DAYLIGHT TO PEEL CHANNELFOR DETAIL SEE

SHEET 1

PROP DITCH INV 0.13%

EX GRAVEL ROADEAST EDGE

EXISTING GROUND@ ℄ OF DITCH

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue NorthSaskatoon, SK S7K 2M2 CANADA

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

H 1:500 V 1:100

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/07/10

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-DE

SIG

N P

RO

FILE

S-E

NV

IRO

.dw

gS

aved

:201

8-09

-13,

kirk

.dix

on P

lotte

d:10

/2/2

018

2:06

PM

502

INFRASTRUCTURE

BLOCK PROFILE

6

HAMLET OF AKLAVIKNANANANANA

KRD

JULY 2018

LOCATION PLANSCALE : NTS

PROFILE LOCATION

E00724A

NOTE :ALL PIPE SIZES ARE INMILLIMETERS AND ALLDIMENSIONS ARE IN METRESUNLESS OTHERWISE NOTED.

LOCATION OF UNDERGROUND STRUCTURES ASSHOWN ARE BASED ON THE BEST INFORMATIONAVAILABLE, BUT NO GUARANTEE IS GIVEN THAT

ALL EXISTING UTILITIES ARE SHOWN ORTHAT THE GIVEN LOCATIONS ARE EXACT.

CONFIRMATION OF EXISTENCE AND EXACT LOCATIONOF ALL SERVICES MUST BE OBTAINED BY CONTRACTOR

FROM THE INDIVIDUAL UTILITIES BEFOREPROCEEDING WITH CONSTRUCTION.

HAMLET OF AKLAVIK

JJ STEWARD ROAD

HANSEN ROAD

PEEL CHANNEL

AIRPORT RUNW

AY

AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
(FROM STA 0+360.000 TO STA 0+640.000)
AutoCAD SHX Text
AREA 1 DITCH TO PEEL CHANNEL
AutoCAD SHX Text
RGE
AutoCAD SHX Text
TWP
AutoCAD SHX Text
th M
AutoCAD SHX Text
QTR
AutoCAD SHX Text
SEC
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
0.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
COORDINATES
AutoCAD SHX Text
NAD 83
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
0+500
AutoCAD SHX Text
0
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
0+520
AutoCAD SHX Text
W
AutoCAD SHX Text
0+480
AutoCAD SHX Text
0+460
AutoCAD SHX Text
0+440
AutoCAD SHX Text
0+420
AutoCAD SHX Text
0+400
AutoCAD SHX Text
0+380
AutoCAD SHX Text
0+600
AutoCAD SHX Text
0+620
AutoCAD SHX Text
0+540
AutoCAD SHX Text
0+560
AutoCAD SHX Text
0+580
AutoCAD SHX Text
7
AutoCAD SHX Text
7
AutoCAD SHX Text
0+640
Page 16: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

HANSEN ROAD

AKLAVIK AIRPORT RUNWAY

2.00

REMOVE & SALVAGE FENCETO AIRPORT OPERATOR

PROP DITCH 0.13%L=883m

DAYLIGHT TO PEEL CHANNELFOR DETAIL SEE

SHEET 1

PROP DITCH INV 0.13%

EX GRAVEL ROADEAST EDGE

EXISTING GROUND@ ℄ OF DITCH

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue NorthSaskatoon, SK S7K 2M2 CANADA

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

H 1:500 V 1:100

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/07/10

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-DE

SIG

N P

RO

FILE

S-E

NV

IRO

.dw

gS

aved

:201

8-09

-13,

kirk

.dix

on P

lotte

d:10

/2/2

018

2:06

PM

503

INFRASTRUCTURE

BLOCK PROFILE

7

HAMLET OF AKLAVIKNANANANANA

KRD

JULY 2018

LOCATION PLANSCALE : NTS

PROFILE LOCATION

E00724A

NOTE :ALL PIPE SIZES ARE INMILLIMETERS AND ALLDIMENSIONS ARE IN METRESUNLESS OTHERWISE NOTED.

LOCATION OF UNDERGROUND STRUCTURES ASSHOWN ARE BASED ON THE BEST INFORMATIONAVAILABLE, BUT NO GUARANTEE IS GIVEN THAT

ALL EXISTING UTILITIES ARE SHOWN ORTHAT THE GIVEN LOCATIONS ARE EXACT.

CONFIRMATION OF EXISTENCE AND EXACT LOCATIONOF ALL SERVICES MUST BE OBTAINED BY CONTRACTOR

FROM THE INDIVIDUAL UTILITIES BEFOREPROCEEDING WITH CONSTRUCTION.

HAMLET OF AKLAVIK

JJ STEWARD ROAD

HANSEN ROAD

PEEL CHANNEL

AIRPORT RUNW

AY

AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
(FROM STA 0+640.000 TO STA 0+920.000)
AutoCAD SHX Text
AREA 1 DITCH TO PEEL CHANNEL
AutoCAD SHX Text
RGE
AutoCAD SHX Text
TWP
AutoCAD SHX Text
th M
AutoCAD SHX Text
QTR
AutoCAD SHX Text
SEC
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
0.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
COORDINATES
AutoCAD SHX Text
NAD 83
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
0+780
AutoCAD SHX Text
0
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
0+800
AutoCAD SHX Text
W
AutoCAD SHX Text
0+760
AutoCAD SHX Text
0+740
AutoCAD SHX Text
0+720
AutoCAD SHX Text
0+700
AutoCAD SHX Text
0+680
AutoCAD SHX Text
0+660
AutoCAD SHX Text
0+880
AutoCAD SHX Text
0+900
AutoCAD SHX Text
0+820
AutoCAD SHX Text
0+840
AutoCAD SHX Text
0+860
AutoCAD SHX Text
7
AutoCAD SHX Text
7
AutoCAD SHX Text
0+920
Page 17: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

HANSEN ROAD

PEEL CHANNEL

2.00

PROP DITCH 0.13%

DAYLIGHT DITCHTO PEEL CHANNEL

INVERT=2.60

2.60

2.72

REMOVE & SALVAGE FENCETO AIRPORT OPERATOR

PROP DITCH 0.13%L=883m

DAYLIGHT TO PEEL CHANNELFOR DETAIL SEE

SHEET 1

PROP DITCH INV 0.13%

EX GRAVEL ROADEAST EDGE

EXISTING GROUND@ ℄ OF DITCH

EXISTING GROUND@ ℄ OF DITCH

BE

ND

1+0

09.5

05IN

V 2

.716

MA

TCH

LIN

E

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue NorthSaskatoon, SK S7K 2M2 CANADA

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

H 1:500 V 1:100

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/07/10

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-DE

SIG

N P

RO

FILE

S-E

NV

IRO

.dw

gS

aved

:201

8-09

-13,

kirk

.dix

on P

lotte

d:10

/2/2

018

2:07

PM

504

INFRASTRUCTURE

BLOCK PROFILE

8

HAMLET OF AKLAVIKNANANANANA

KRD

JULY 2018

LOCATION PLANSCALE : NTS

PROFILE LOCATION

E00724A

NOTE :ALL PIPE SIZES ARE INMILLIMETERS AND ALLDIMENSIONS ARE IN METRESUNLESS OTHERWISE NOTED.

LOCATION OF UNDERGROUND STRUCTURES ASSHOWN ARE BASED ON THE BEST INFORMATIONAVAILABLE, BUT NO GUARANTEE IS GIVEN THAT

ALL EXISTING UTILITIES ARE SHOWN ORTHAT THE GIVEN LOCATIONS ARE EXACT.

CONFIRMATION OF EXISTENCE AND EXACT LOCATIONOF ALL SERVICES MUST BE OBTAINED BY CONTRACTOR

FROM THE INDIVIDUAL UTILITIES BEFOREPROCEEDING WITH CONSTRUCTION.

HAMLET OF AKLAVIK

JJ STEWARD ROAD

HANSEN ROAD

PEEL CHANNEL

AIRPORT RUNW

AY

AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
(FROM STA 0+920.000 TO STA 1+007.780
AutoCAD SHX Text
AREA 1 DITCH TO PEEL CHANNEL
AutoCAD SHX Text
RGE
AutoCAD SHX Text
TWP
AutoCAD SHX Text
th M
AutoCAD SHX Text
QTR
AutoCAD SHX Text
SEC
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
0.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
COORDINATES
AutoCAD SHX Text
NAD 83
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
W
AutoCAD SHX Text
1+000
AutoCAD SHX Text
0+980
AutoCAD SHX Text
0+960
AutoCAD SHX Text
0+940
AutoCAD SHX Text
0+920
AutoCAD SHX Text
7
AutoCAD SHX Text
7
Page 18: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

HAN

SEN R

OAD

2.00

PROP DITCH 0.13%

PROP DITCH 0.13%L=883mFOR DETAILSEE SHEET 1

DAYLIGHT DITCHTO PEEL CHANNELINVERT=2.60

2.60

2.72

REMOVE AND SALVAGE FENCETO AIRPORT OPERATOR

PROP DITCH INV 0.13%

EX GRAVEL ROADEAST EDGE

EXISTING GROUND@ ℄ OF DITCH

EXISTING GROUND@ ℄ OF DITCH

PE

EL

CH

AN

NE

LO

UTF

ALL

1+0

99.2

24IN

V 2

.600

BE

ND

1+0

09.5

05IN

V 2

.716

MA

TCH

LIN

E

PROP DITCH INV 0.13%

STAMPS:

DESIGNER:

DRAFTER:

DRAWING No:

SHEET No:

SHEET TITLE:

of

PROJECT No:

PROJECT NAME:

CLIENT:

ENGINEER:

No. Date Description By

SCALE:

DISCIPLINE:

T 306 653-2462, F 888 478-74204th Floor-333 3rd Avenue NorthSaskatoon, SK S7K 2M2 CANADA

AKLAVIK AIRPORT DRAINAGE

GOVERNMENT ofNORTHWEST TERRITORIES

E00724A

KRD

RFC

- -

H 1:500 V 1:100

9

DESIGNED BY APPROVED BY

APPROVER: APPROVER:

DATE:

2018/07/10

1 2018/10/02 ISSUED FOR ENVIRONMENTAL REVIEW RFC

Z:\C

ima-

C01

\Pro

ject

s\E

093

Gov

of N

W T

errit

orie

s\E

0072

4A A

klav

ik A

irpor

t Dra

inag

e P

lan\

400

Dra

win

gs\0

4 D

ES

IGN

\DW

GS

\201

8 09

13

ISS

UE

D F

OR

EN

VIR

ON

ME

NTA

L R

EV

IEW

\E00

724A

-DE

SIG

N P

RO

FILE

S-E

NV

IRO

.dw

gS

aved

:201

8-09

-13,

kirk

.dix

on P

lotte

d:10

/2/2

018

2:08

PM

505

INFRASTRUCTURE

BLOCK PROFILE

9

HAMLET OF AKLAVIKNANANANANA

KRD

JULY 2018

LOCATION PLANSCALE : NTS

PROFILE LOCATION

E00724A

NOTE :ALL PIPE SIZES ARE INMILLIMETERS AND ALLDIMENSIONS ARE IN METRESUNLESS OTHERWISE NOTED.

LOCATION OF UNDERGROUND STRUCTURES ASSHOWN ARE BASED ON THE BEST INFORMATIONAVAILABLE, BUT NO GUARANTEE IS GIVEN THAT

ALL EXISTING UTILITIES ARE SHOWN ORTHAT THE GIVEN LOCATIONS ARE EXACT.

CONFIRMATION OF EXISTENCE AND EXACT LOCATIONOF ALL SERVICES MUST BE OBTAINED BY CONTRACTOR

FROM THE INDIVIDUAL UTILITIES BEFOREPROCEEDING WITH CONSTRUCTION.

HAMLET OF AKLAVIK

PEEL

CH

ANN

EL

JJ STEWARD ROAD

HANSEN ROAD

PEEL CHANNEL

AIRPORT RUNW

AY

AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
(FROM STA 0+920.000 TO STA 1+007.780
AutoCAD SHX Text
AREA 1 DITCH TO PEEL CHANNEL
AutoCAD SHX Text
RGE
AutoCAD SHX Text
TWP
AutoCAD SHX Text
th M
AutoCAD SHX Text
QTR
AutoCAD SHX Text
SEC
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
0.5
AutoCAD SHX Text
1.0
AutoCAD SHX Text
COORDINATES
AutoCAD SHX Text
NAD 83
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
W
AutoCAD SHX Text
1+100
AutoCAD SHX Text
1+080
AutoCAD SHX Text
1+060
AutoCAD SHX Text
1+040
AutoCAD SHX Text
1+020
AutoCAD SHX Text
7
AutoCAD SHX Text
7
AutoCAD SHX Text
1+000
Page 19: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

AKLAVIK AIRPORT DRAINAGE IMPROVEMENTS FILE: 704-ENW.EENW03288-01 | NOVEMBER 2019 | ISSUED FOR USE | REVISION 02

Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx

APPENDIX C CONSULTATIONS MEETING MINUTES

Page 20: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

4th Floor-333 3rd Avenue North T 306 653-2462 Saskatoon SK S7K 2M2 F 888 478-7420 CANADA cima.ca

MINUTES OF MEETING

CLIENT : Government of Northwest Territories

PROJECT : Aklavik Airport Drainage Plan (File: E00724A 070)

MEETING No : One (1)

DATE OF MEETING : May 30, 2018

LOCATION : Hamlet of Aklavik Chambers

ATTENDEES AND DISTRIBUTION : See attached sign-in sheet

Name Initials Location Attendees Distribution

C.C. TO : Attendees and: Geoff Petzold

Note: If you believe that these minutes are lacking in accuracy, please inform the author who will make the necessary changes within ten (10) days following distribution of the document. After that delay, the minutes will be deemed official and binding for all those involved.

Page 21: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

DISCUSSION TOPICS

ACTION BY

E093-E00724A 2018-05-30 2 Z:\Cima-C01\Projects\E093 Gov of NW Territories\E00724A Aklavik Airport Drainage Plan\070 M.O.M\MIN-2018-05-30-Stakeholder Mtg.docx

1.1 Introductions

• Ryan thanked everyone for attending the meeting.

• Ryan circulated a sign-in sheet and roundtable introductions and all attendees participated.

1.2 Project Overview and Schedule

• Ryan distributed an 11x17 drawing consisting of an aerial photo of the project area and Hamlet of Aklavik.

• Ryan summarized the main objective of the project was to improve drainage at two locations on the airport property.

• Ryan showed the two areas on the drawing as one south of the terminal building and one north of the runway.

• Ryan indicated CIMA+ was in the early stages of engineering and that a solution has not been finalized yet. Ryan summarized a couple of potential solutions involving possibly facilitating drainage by ditching or improving ditching to the Peel Channel, to Pump Lake (Eddie indicated the lake’s name) and/or filling or partially filling in the low areas with fill material. Ryan indicated these solutions could be implemented in combination and acknowledged that the pump Lake option involves Hamlet land.

• Ryan indicated CIMA+ plan to do a site survey with GPS equipment in a couple weeks and the information obtained from that survey will be used to determine the solution.

• Robert asked if this meeting was to for “Consultation”. Ryan indicated the project was in the early stages and legislated consultation requirements were not known yet. Ryan indicated that from a practical perspective this meeting has many features of a formal consultation event and that given the logistics of having a meeting in Aklavik, hoped this meeting would benefit the consultation process regardless of what is actually required as the project advances.

• The project Timeline was discussed. Moshiur indicated design was scheduled for summer 2018 and construction next fiscal year for GNWT/summer 2019.

• Discussion took place regarding the need to haul in building materials like gravel during the winter on the ice road which is February/March on an average year. Dave indicated on the Hamlet drainage improvements that the bottom part of the ditches included a layer of 6 inches of gravel.

• Andrew asked the group that if there was gravel material in town, if that gravel could be used by the project. Ryan indicated this was noted and would be considered. Ryan indicate the noticed gravel stockpiles around town and asked who owned them. There was

Page 22: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

DISCUSSION TOPICS

ACTION BY

E093-E00724A 2018-05-30 3 Z:\Cima-C01\Projects\E093 Gov of NW Territories\E00724A Aklavik Airport Drainage Plan\070 M.O.M\MIN-2018-05-30-Stakeholder Mtg.docx

general inpout that various entities owned various piles such as the hamlet, Band, K+D etc.

• There was discussion about the idea of maybe filling in some of the low areas. Ryan indicated this was being considered but nothing was set yet.

• Ryan asked about property ownership in the Hamlet noting the legal plan made available to CIMA+ showed many lots as LTO and a number with no unique identity. Ryan indicated that the project tea needs to be aware of where any improvements and ditches lie and who owns the land so the proper agreements can be sought. There was an indication from various attendees that the maps on the wall of the chambers had land ownership information.

• ACTION: CIMA+ to do a land titles search for the Hamlet. ASAP

• Ryan discussed possible drainage options to include draining to the Peel Channel, which would likely carry a Water licence implication, ditching to Pump Lake, which attendees noted the new culverts may have to be lowered, or filling the low spots or combinations.

• Dave indicated they have to clean off their gravel pad at the south of the runway after flooding to skim off the silt.

• Moshiur asked who does the maintenance in the Hamlet on the existing ditching. Dave indicated snow melt doesn’t leave behind anything in the ditches but flood water leaves behind silt when the Peel channel backs up in to the ditches, which has to be cleaned out. This is only needed down near the river. The rest of the ditches are not maintained.

• Dave indicated they did a little bit of drainage improvements every year.

• Andrew indicated he’d like to see aerial photos from different times over the years because he’s noticed the shore is eroding closer to the runway at the north end. There was discussion about the large rocks that were placed along the edge of the channel all the way around the south side of the community and up along the runway. Andrew was wondering if rocks or something could be done to keep that part of runway from eroding away.

• Discussion took place about hauling rip rap in, source locations and challenges.

• Andrew asked Moshiur about the extension of the runway. Andrew indicated the Med-evac plane needs a longer runway. Jason and Moshiur indicated they had not heard about this initiative.

Page 23: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

DISCUSSION TOPICS

ACTION BY

E093-E00724A 2018-05-30 4 Z:\Cima-C01\Projects\E093 Gov of NW Territories\E00724A Aklavik Airport Drainage Plan\070 M.O.M\MIN-2018-05-30-Stakeholder Mtg.docx

• Ryan indicated it would still be good to know as the idea of an extension could be a consideration in what drainage option is recommended and used an example that one wouldn’t put silt fill in place below what could eventually support a runway structure.

• ACTION: Moshiur to research and identify if there is a project or goal to extend the runway in Aklavik. ASAP

• The timelines were discussed again. Next GNWT fiscal year starts after March 31, 2019 in other words after this winter ice road can be used, on average, for hauling for anything to be used in construction in 2019.

• Robert indicated ditch along runway used to be dry but not now.

• Dennis indicated that maybe rip rap would be easier to access from Stink Creek. Dave said it’s still a winter haul. Dennis spoke of the rip rap around the entire community.

• Rip rap, the requirements to build roads, distances and need to haul on an ice road and possible source locations was discussed.

• Moshiur indicated any rip rap for the shore and protection of the river bank would be a separate project but such a project doesn’t yet exist.

• Andrew asked if the construction contract would be a negotiated contract. Moshiur indicated GNWT has deemed this project to be tendered with the BIP policies implemented and that this decision comes from the general manager not him.

• There was general discussion about the practicality and benefits of this project being a negotiated contract.

• ACTION: CIMA+ write a letter recommending a negotiated contract and supporting rationale. ASAP

• Andrew introduced Fred Behrens and that he has info on land ownership in town and existing water board licenses.

• Fred indicated the Hamlet is currently involved in a disaster mitigation project, they currently have identifies a preferred proponent and that it includes considerations for flooding.

• Fred indicated the drainage improvements in the Hamlet were constructed 2010-2011-2012.

Page 24: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

DISCUSSION TOPICS

ACTION BY

E093-E00724A 2018-05-30 5 Z:\Cima-C01\Projects\E093 Gov of NW Territories\E00724A Aklavik Airport Drainage Plan\070 M.O.M\MIN-2018-05-30-Stakeholder Mtg.docx

• Ryan raised the ideas of requiring in the contract clauses for requiring the use and providing evidence of using local labour and contractors. Moshiur indicated GNWT has standard templates.

• ACTION: Moshiur to send Ryan standard GNWT local labour and contractor content templates for construction contracts. ASAP

1.3 Roundtable Discussion

• Jason indicated he was here for logistics and highlighted there is an opportunity here with this project to benefit the local economy with a negotiated contract.

• Moshiur indicated this is an airport drainage project and that is what the construction scope is. The erosion near the runway and the possible runway extension are not part of this project scope.

• Andrew indicated there was good discussion and appreciates everyone being notified of the project.

• Lloyd thought the discussion was good and supports local benefits.

• There was discussion about using local resources for the upcoming CIMA+ survey and ideas shared included bear monitoring/safety, supply of canoes or boats, hip waders, hand tools and general escort. Ryan indicated they would use local and it was suggested Dave has the resources. Dave gave his number 867-978-2792.

• Robert indicated he supports the use of local contractors and to consider Dave’s local experience and would like GNWT to consider the advantages of using local resources.

• Eddie indicated he was good with everything discussed.

• Jordan Macleod attended the meeting later and indicated he works with K+D and is on a number of boards and wants to support local.

• Mina spoke to the timeline and said she has always asked about airport drainage because it is affecting the runway. She wants something done sooner rather than later. Jordan noted an 8-10 inch wide crack across the runway and he can show it.

• Dave indicated something has to be done about the fence at south and west side of runway. He spoke about sled riders coming up on runway off the river.

• Dennis noted the Peel Channel is changing because of erosion and to consider that.

• Moshiur indicated he had not heard of a runway extension project and neither had Jason. Moshiur asked if there were any technical reports on this or anything and no one knew. Andrew thought Transportation department has been talking about it. Robert indicated there may be an initiative to upgrade all runways from 75 wide by 2000 long to 100 wide and 3000 long and Andrew mentioned that Med-evac planes are actually landing illegally. Jason indicated Transport Canada can issue exemptions. There was also talk about some engineers coming out one time and saying the runway can’t be expanded because it is too close to the water already and there is no room.

Page 25: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

DISCUSSION TOPICS

ACTION BY

E093-E00724A 2018-05-30 6 Z:\Cima-C01\Projects\E093 Gov of NW Territories\E00724A Aklavik Airport Drainage Plan\070 M.O.M\MIN-2018-05-30-Stakeholder Mtg.docx

• Jason indicated he was here for logistics and highlighted there is an opportunity here with this project to benefit the local economy with a negotiated contract.

• Moshiur indicated this is an airport drainage project and that is what the construction scope is. The erosion near the runway and the possible runway extension are not part of this project scope.

• Andrew indicated there was good discussion and appreciates everyone being notified of the project.

• Lloyd thought the discussion was good and supports local benefits. • There was discussion about using local resources for the upcoming

CIMA+ survey and ideas shared included bear monitoring/safety, supply of canoes or boats, hip waders, hand tools and general escort. Ryan indicated they would use local and it was suggested Dave has the resources. Dave gave his number 867-978-2792.

• Robert indicated he supports the use of local contractors and to consider Dave’s local experience and would like GNWT to consider the advantages of using local resources.

• Eddie indicated he was good with everything discussed.

• Jordan Macleod attended the meeting later and indicated he works with K+D and is on a number of boards and wants to support local.

• Mina spoke to the timeline and said she has always asked about airport drainage because it is affecting the runway. She wants something done sooner rather than later. Jordan noted an 8-10 inch wide crack across the runway and he can show it.

• Dave indicated something has to be done about the fence at south and west side of runway. He spoke about sled riders coming up on runway off the river.

• Dennis noted the Peel Channel is changing because of erosion and to consider that.

• Moshiur indicated he had not heard of a runway extension project and neither had Jason. Moshiur asked if there were any technical reports on this or anything and no one knew. Andrew thought Transportation department has been talking about it. Robert indicated there may be an initiative to upgrade all runways from 75 wide by 2000 long to 100 wide and 3000 long and Andrew mentioned that Med-evac planes are actually landing illegally. Jason indicated Transport Canada can issue exemptions. There was also talk about some engineers coming out one time and saying the runway can’t be expanded because it is too close to the water already and there is no room.

Page 26: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –

DISCUSSION TOPICS

ACTION BY

E093-E00724A 2018-05-30 7 Z:\Cima-C01\Projects\E093 Gov of NW Territories\E00724A Aklavik Airport Drainage Plan\070 M.O.M\MIN-2018-05-30-Stakeholder Mtg.docx

1.4 Summary of Action Items

ACTION: CIMA+ to do a land titles search for the Hamlet. ASAP ACTION: Moshiur to research and identify if there is a project or goal to extend the runway in Aklavik. ASAP ACTION: CIMA+ write a letter recommending a negotiated contract and supporting rationale. ASAP ACTION: Moshiur to send Ryan standard GNWT local labour and contractor content templates for construction contracts. ASAP

Ryan Cadieux, P. Eng. RC/rc

Page 27: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –
Page 28: Aklavik Airport Drainage Improvements · Aklavik Airport Drainage Improvement Project Description Report_Rev 02.docx . Distribution List . Mardy Semmler, Inuvialuit Water Board –