  • The Russian State Atomic Energy Corporation ROSATOM

    Akkuyu NPP

    PROGRESS & DEVELOPMENT KOCAELI, APRIL 22, 2014

  • The Russian State Atomic Energy Corporation ROSATOM 2

    Brief of Akkuyu NPP Project

    3 Years Age Project

    Current Status and Development

    The Way forward

    http://www.google.ru/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&docid=ijMVSgEtsc8umM&tbnid=8hPmpJzGPTC0QM:&ved=0CAUQjRw&url=http://mir-wallpapers.ru/nature/&ei=E3NpUrXGNMmb1AX58oDYAg&bvm=bv.55123115,d.ZG4&psig=AFQjCNEZUJ97YdW81phtfMVbP6rIzl05xw&ust=1382728842269264
  • The Russian State Atomic Energy Corporation ROSATOM 3

    About Akkuyu NPP Project

    http://www.google.ru/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&docid=ijMVSgEtsc8umM&tbnid=8hPmpJzGPTC0QM:&ved=0CAUQjRw&url=http://mir-wallpapers.ru/nature/&ei=E3NpUrXGNMmb1AX58oDYAg&bvm=bv.55123115,d.ZG4&psig=AFQjCNEZUJ97YdW81phtfMVbP6rIzl05xw&ust=1382728842269264
  • The Russian State Atomic Energy Corporation ROSATOM 4

    Project History

    12 May 2010

    Intergovernmental Agreement (IGA)signed

    21 July 2010

    Ratification of IGA in Turkey

    3 December 2010

    Ratification of IGA in Russian Federation

    13 December 2010

    Project Management Company Electricity Generation JSC AKKUYU

    NPP was established in Turkey

  • The Russian State Atomic Energy Corporation ROSATOM 5

    Turkey, Akkuyu NPP

  • The Russian State Atomic Energy Corporation ROSATOM 6

    Turkey, Akkuyu NPP

  • The Russian State Atomic Energy Corporation ROSATOM 7

    General Plan of the Akkuyu NPP

  • The Russian State Atomic Energy Corporation ROSATOM 8

    First Nuclear Power Plant in Turkey

    Design: AES-2006 series (VVER 1200), 4 Units

    Total capacity: 4800 MW (Gross output)

    Construction period: 2011 2023

    Total Project cost: $ 20 B

    Generation output: 35 B kWh/year

    Opportunity for foreign investors participation: up to

    49% shares

    BOO Model (Build-Own-Operate)

    Akkuyu Project Features

  • The Russian State Atomic Energy Corporation ROSATOM

    Russian Technology

    is

    in FOCUS

    The Sea

  • The Russian State Atomic Energy Corporation ROSATOM 10

    Akkuyu NPP Safety Features

    Power Unit electric capacity, least 1200 MW

    Power Unit heat capacity 3300 MW

    Power Unit service lifetime 60 Years

    Availability factor of power unit 93 %

    Power Unit gross efficiency under 37,2 %

    average annual conditions

    Auxiliary power consumption 7 %

    Time of the plant self-contained

    operation in case of BDBA 72 Hours

    Main Technical and Economic Characteristics of the Akkuyu NPP Unit:

  • The Russian State Atomic Energy Corporation ROSATOM 11

    Akkuyu NPP Safety Features

    Akkuyu NPP consists of four units of standard design

    configuration of AES-2006

    The plant unit is of two-circuit

    design

    The primary circuit is radioactive

    entailed by Reactor Coolant

    Piping System

    The secondary circuit is non-

    radioactive consisting the steam

    generating part

    Novovoronezh NPP-2 design (AES-2006) with VVER-1200 reactor has

    been selected as a reference plant for Akkuyu NPP design.

  • The Russian State Atomic Energy Corporation ROSATOM

    The Akkuyu NPP is based on the most recent achievements of the

    Russian nuclear industry in terms of both efficiency and safety

    The Akkuyu NPP each unit consists of reactor VVER-1200 which is

    based on the substantial experience of operation and evolutionary

    development of VVER-1000 reactors

    The Akkuyu NPP is the Generation 3+ reactor meeting advanced safety requirements

    The Akkuyu NPPs design complies with the Russian norms, regulations

    and standards and developed in accordance with the IAEA

    recommendations and the European Utility Requirements (EUR)

    12

    Akkuyu NPP Safety Features

  • The Russian State Atomic Energy Corporation ROSATOM 13

    Akkuyu NPP Safety Features

    The primary circuit includes:

    Steam

    Generator Pressurizer

    Reactor

    Coolant

    Pump set

    Relief

    Tank

    Reactor ECCS

    Accumulators

  • The Russian State Atomic Energy Corporation ROSATOM

    14

    Coolant pressure: 17,6 MPa

    Coolant inlet temperature: 298 C

    Coolant outlet temperature: 329 C

    Reactor coolant flow: 86000 m3/h

  • The Russian State Atomic Energy Corporation ROSATOM

    15

  • The Russian State Atomic Energy Corporation ROSATOM 16

    Floods, storms and Tsunami Protection

    Aircraft crash Crash of the heavy 400 t aircraft falling at a velocity of 200 m/s

    Hurricanes, tornados Design maximum wind speed is 56 m/sec.

    Earthquake Load Maximum earthquake magnitude is up to 9 as per MSK 64 (Comprehensive Intensity Scale)

    Explosions Pressure at shock wave front 30 kPa

    Akkuyu NPP Safety Features

  • The Russian State Atomic Energy Corporation ROSATOM

    Build Own & Operate

    is

    in FOCUS

    The Sea

  • The Russian State Atomic Energy Corporation ROSATOM

    BOO Model

    WHY ?

    Long Project duration period (generation of electricity during 60 years)

    Potential stable profit from power sales

    Forecast for growth of power consumption and capacity deficit

    Electricity market liberalization and electricity price growth in Turkey

    Turkish power market investment attractiveness

    Availability of grid infrastructure and possibility to export power to Europe and the Middle East

    Government support of the project in Turkey and Russia

  • The Russian State Atomic Energy Corporation ROSATOM

    Disadvantages Advantages

    Need to forecast long-term electricity price

    The Project Company bears all risks

    Possibility of unpredictable growth of the construction costs due to economic and political force majeure

    Difficulty to find investors

    Profit from electricity sales after

    pay back period

    Revenue guarantee for Project investors PPA

    Usage of Proven technology

    Operational experience

    Sustainable operation and availability of fuel; spare parts and maintenance services

    Involvement of Turkish industry and Turkish personnel in construction and operation of NPP

    Decommissioning

    BOO Model

    http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=zqxTLseyZk89fM&tbnid=JElsMVvixFfWzM:&ved=0CAUQjRw&url=http://100znakov.ru/catalog/Svetodiodnyje-znaki&ei=Ak6rUarbC8uAPeHigeAC&bvm=bv.47244034,d.ZWU&psig=AFQjCNH8hEmufUub7ckjopB4nzcMMzUG9Q&ust=1370267462723592
  • The Russian State Atomic Energy Corporation ROSATOM

    Disadvantages Advantages

    Need to forecast long-term electricity price

    The Project Company bears all risks

    Possibility of unpredictable growth of the construction costs due to economic and political force majeure

    Difficulty to find investors

    Profit from electricity sales after

    pay back period

    Revenue guarantee for Project investors PPA

    Usage of Proven technology

    Operational experience

    Sustainable operation and availability of fuel; spare parts and maintenance services

    Involvement of Turkish industry and Turkish personnel in construction and operation of NPP

    Decommissioning

    BOO Model

    Involvement of Turkish industry and

    Turkish personnel in construction and

    operation of NPP

    http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=zqxTLseyZk89fM&tbnid=JElsMVvixFfWzM:&ved=0CAUQjRw&url=http://100znakov.ru/catalog/Svetodiodnyje-znaki&ei=Ak6rUarbC8uAPeHigeAC&bvm=bv.47244034,d.ZWU&psig=AFQjCNH8hEmufUub7ckjopB4nzcMMzUG9Q&ust=1370267462723592
  • The Russian State Atomic Energy Corporation ROSATOM 21

    IGA Parties Responsibilities

    NPP engineering and design

    supervision

    Russian Party

    responsibilities

    Both Parties

    responsibilities

    Rad waste management

    Personnel training

    Nuclear Fuel management

    Construction and assembly work

    Issuing project documentation

    Construction management/

    supervision

    Operation, maintenance and upgrade

    Startup and Commissioning

    Decommissioning

    Operation and maintenance

    Emergency planning

    Research & Development

    Infrastructure development

    Physical protection

    Public relations

    Nuclear energy regulation

    and legislation

    development

    Site allocation

    Site infrastructure

    Participation in O&M

    Grid connection

    Construction and assembly

    work

    Provision of materials and

    equipment

    Turkish Party

    responsibilities

    Turkish Industry Supply Chain

  • The Russian State Atomic Energy Corporation ROSATOM 22

    Project CAPEX

    43%

    36%

    4%

    5%

    6% 6%

    Project Cost Breakdown by Activities

    Construction & Erection

    Equipment

    Start-up & Commissioning

    Designing & Engineering

    Project Managemen

Recommended