Air Force Reserve Command Civil Engineer Programs. Lt Col Gregory Ottoman Programs Division Chief Installations and Mission Support Directorate HQ Air Force Reserve Command Robins AFB, GA. 1. Overview. AF Reserve Command (AFRC) Big Picture Energy Programs Contracting. - PowerPoint PPT PresentationTRANSCRIPT
United States Air Force Reserve
Fly, Fight and Win…
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
1
Lt Col Gregory OttomanPrograms Division Chief
Installations and Mission Support DirectorateHQ Air Force Reserve Command
Robins AFB, GA
Air Force Reserve Command Civil Engineer Programs
Overview
• AF Reserve Command (AFRC) Big Picture
• Energy
• Programs
• Contracting
Strategic Planning Guidance
“Plan to better Integrate our Regular, Guard and Reserve units”
“Plan for…expanded use of all variations of associate units”
CSAF: “…a seamless Total Force”
Global StrikeCommand(P)
Air Force Reserve Command
1 of 10 MAJCOMs
Operational Perspective
Installations
5
9 Host Locations – 49 Tenant Locations8 Miscellaneous Locations – 4 Ranges9 Host Locations – 49 Tenant Locations8 Miscellaneous Locations – 4 Ranges
Alaska
Hawaii
Guam 4AF
ARPC
22AF
HQ AFRC
10AF
• AFRC occupies 21,687 acres of land at 69 locations with a replacement value of $6.0B
• 13.1 million Square Feet at 9 AFRC installations worth $4.9B
• 6.4 million square feet at 50 AF/ANG/Navy/Army tenant locations worth $1.1B
• 12 other miscellaneous locations/ranges
Magnitude of Infrastructure
6
AFRC Energy Program
7
• Air Force Strategy
• Current status
• Past efforts
• AFRC Strategy
• Future initiatives
8
AF Facility Energy Strategy
CLEANER
LEANER
SMARTEREnergy Conservation Will Fuel The
AFRC Mission
0
3.23
8.52
14.3 14.0912.69 13.14
11.54 11.5
0
5
10
15
20
25
30
03 04 05 06 07 08 09 10 11 12 13 14 15
% R
educ
tion
in F
ac
BTU
/SF
Cumulative Progress Goal (EISA 2007)
AFRC Energy Reduction Status
Goal: 30% reduction in energy intensity by 2015 (EISA 07)
Metric: increase efficiency 3% per year (baseline 2003)
GOOD
FY
9
0.363.13
15.4
22.1
0
5
10
15
20
25
30
03 04 05 06 07 08 09 10 11 12 13 14 15
% R
educ
tion
in F
ac
Gal
/SF
Cumulative Progress Goal (EO 13423)
AFRC Water Reduction StatusGoal: 16% reduction in water use by 2015
Metric: increase efficiency 2% per year yr (EO 13423)
GOOD
FY
10
AFRC Past Energy Efforts
Conducted energy audits at all installations Accomplished 95% of all projects from those audits $14M of capital investment - saves $1.8M/year
8% decrease in facility energy use Demolished central steam plants Lighting retrofits; HVAC controls Photovoltaic at March ARB, CA – 10% of base energy
Second round of installation audits complete by FY12
AFRC Strategy
12
• Part I – Current Status
• Identify all mandates, goals and regulations
• Projection based on current trends and actions
• Evaluate program effectiveness
• Part II – Strategic Actions: define specific actions, costs and expected results
• Renewable energy
• Sustainable design
• Data management
• Awareness
• Program management
• Energy security
• Water reduction
• Resource prioritizationGOAL: Develop a customized facility energy strategy aligned with the unique mission and operations tempo of the AFRC.
AFRC Audit Schedule
13
Base Year KSF
Pittsburgh FY09 529
Grissom FY10 1,023
Minn St Paul FY10 739
Youngstown FY10 710
Niagara FY11 628
Dobbins FY11 896
Westover FY11 1,432
Homestead FY12 987
March FY12 1,883
AFRC Programs
14
• Air Force Consolidation and Efficiency Efforts (Demo)
• MILCON Program
• AFRC Complex
• SRM Execution
Engineering Circle of Life
15
Identify Requirements
Program Requirements
Execu
te R
esourc
es
16
• Uncertain future AF force structure
• AF 20/20 by 2020 Facility Reduction Goals
• Increasing HAF management of investment accounts
• SRM funding uncertainty (POM vs. execution year)
• Potential “end” of Congressional MILCON inserts
Context / Challenges
AF Consolidation Targets
• VCSAF Memo dated, 14 Feb 2011
• Sustainable Installations and Facility Reduction Goals• Reduce installation operating costs via reduction in Air
Force owned and leased real property inventory
• New construction should include accompanying “demo”
• AF Target is 80 MSF
• AFRC reduction target is 2.4 million SF across our (nine) host Reserve Command installations by the year 2020
• AFRC Tenant Wing facilities are accounted for under their host installation MAJCOM inventory
17
AFRC Current Mission MILCON
Appropriated Programmed
Current As of 21 Apr 11 Includes Current Mission MILCON, P-341, and Design
Funding vs. Requirements
HQ AFRC/A7PD
AFRC FY10 MILCON Projects
19
Youngstown ARS, OHLodging Ph2
Robins AFB, GAAFRC Band Facility
Charleston AFB, SCTFI RED HORSE Sqd
Patrick AFB, FLISO Dock Hgr Addn
Homestead ARB, FLTroop Feeding/CAC
March ARB, CASmall Arms Range
Niagara Falls ARS, NYSmall Arms Range
Travis AFB, CAC-5 Sq Ops/AGS Training
Grissom ARB, INControl Tower
Lackland AFB, TXWing HQ
Pittsburgh ARS, PALodging Ph1
Schriever AFB, COSpace Wing HQ
Lackland AFB, TXC-5 Gnd Tng School Addn
Keesler AFB, MSAerial Port Facility
Hill AFB, UTSquadron Ops/AMU
AFRC FY11/12 MILCON Projects
20
Patrick AFB, FLWeapons Mx Facility
Charleston AFB, SCTFI RED HORSE Sqd
March ARB, CAControl Tower / Base Ops
21
• Robins has approved siting of new AFRC HQ Complex
• AFRC personnel in leased space will be accommodated in a temporary modular facility planned for FY11 award
• Permanent HQ Complex is programmed in phases, beginning in FY13 MILCON (project not currently in President’s Budget)
Future AFRC Complex
AFRC O&M Facility Program
22
Anticipated FY11
Average of 560 projects/year in FY09/10Scope ranged from $2K to $5M each project
Execution Vehicles
23
• A-E Services
• Awarded $47.5M contract to:• Jacobs Engineering Group Inc.
• Gulf Coast Architectural Group Inc.
• CEMS Engineering Inc.
• Toland and Mizell Architects Inc.
• COMPEC Construction Contract; Ceiling of $175.5M awarded to:• AECOM
• Weston Solutions
• Geo-Marine Inc
• CDM/CAPE
• ITSI
• EMR
• Follow-on COMPEC contract• Projected posting of the RFP in June
Dissemination of Information
24
• Request for Information (RFI)
• Sources Sought Synopsis
• Pre-solicitation Notices
• Award Notices
• Requests for Quotes/Proposals• Government-wide Point of Entry (GPE)
• http://www/fedbizopps.gov
• http://www.ebuy.gsa.gov
Questions ?
25