aip grants awarded by state: 2018 · prattville prattville - grouby field general aviation 020...
TRANSCRIPT
-
FAA Airports
AIP Grants Awarded by State: 2018
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alabama
Alabaster Shelby County General Aviation 021 $249,970 Construct Building - T-Hangar Construction (Reimbursement-Phase 1)
Alexander City Thomas C Russell Field General Aviation 018 $162,000 Install Runway Vertical/Visual Guidance System - PAPI installation
Anniston Anniston Regional General Aviation 033 $384,413 Rehabilitate Apron - Terminal area - crack seal and seal coat
Anniston Anniston Regional General Aviation 033 $88,987 Rehabilitate Taxiway - Taxilane - crack seal and seal coat
Ashland/Lineville Ashland/Lineville General Aviation 012 $206,013 Construct Taxiway - Phase 2 - Grading and Drainage
Ashland/Lineville Ashland/Lineville General Aviation 012 $206,013 Construct Apron - Phase 2 - Grading and Drainage
Atmore Atmore Municipal General Aviation 015 $56,089 Update Airport Master Plan Study - Master Plan Update (ALP and Narrative)
Auburn Auburn University Regional General Aviation 031 $832,500 Rehabilitate Taxiway - Rehabilitate Taxiway - Phase 2 (Paving and Marking)
Bay Minette Bay Minette Municipal General Aviation 014 $69,766 Update Airport Master Plan Study - Update Master Plan and ALP
Bay Minette Bay Minette Municipal General Aviation 015 $55,440 Remove Obstructions [APP or DEP] - Ph 1 - Acquire Parcel 12 (22 acres for RW 8 obstruction removal)
Bessemer Bessemer Reliever 017 $122,607 Rehabilitate Runway - Design
Page 1 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alabama
Birmingham Birmingham-Shuttlesworth International
Primary 100 $255,632 Install Runway Distance-To-Go Signs -
Birmingham Birmingham-Shuttlesworth International
Primary 100 $252,356 Improve Airport Erosion Control - Taxiway F
Birmingham Birmingham-Shuttlesworth International
Primary 100 $39,500 Acquire Aircraft Rescue & Fire Fighting Safety Equipment
Birmingham Birmingham-Shuttlesworth International
Primary 100 $183,840 Rehabilitate Runway Lighting
Birmingham Birmingham-Shuttlesworth International
Primary 100 $39,039 Rehabilitate Taxiway
Birmingham Birmingham-Shuttlesworth International
Primary 100 $130,763 Install Miscellaneous NAVAIDS
Birmingham Birmingham-Shuttlesworth International
Primary 100 $316,625 Install Runway Distance-To-Go Signs -
Birmingham Birmingham-Shuttlesworth International
Primary 101 $1,196,966 VALE Infrastructure - Install CNG Facilites
Brewton Brewton Municipal General Aviation 015 $275,541 Rehabilitate Runway Lighting - Rehab Runway 12/30 Lighting System
Brewton Brewton Municipal General Aviation 015 $10,000 Rehabilitate Airport Beacons - Replace Beacon Light Assembly
Camden Camden Municipal General Aviation 012 $156,298 Rehabilitate Runway - Crack Seal, Seal Coat, Marking
Centre Centre-Piedmont-Cherokee County Regional
General Aviation 011 $171,000 Improve Access Road - crack repair and seal coat with isolated full depth repair
Centreville Bibb County General Aviation 012 $279,111 Acquire Land for Development
Clanton Chilton County General Aviation 015 $608,648 Acquire Land For Approaches - (Parcels 39, 53, & 54)
Cullman Cullman Regional-Folsom Field
General Aviation 025 $449,813 Reconstruct Taxiway - Ph 2 - Reconstruct N Partial Parallel TW
Page 2 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alabama
Dauphin Island Jeremiah Denton General Aviation 015 $19,800 Rehabilitate Runway - Runway Rehab (Ph 3 of 3 - Reimbursement)
Dauphin Island Jeremiah Denton General Aviation 015 $153,053 Install Runway Vertical/Visual Guidance System - Install PAPI's
Decatur Pryor Field Regional General Aviation 027 $441,000 Reconstruct Taxiway Lighting
Dothan Dothan Regional Primary 041 $1,569,961 Rehabilitate Apron - Rehabilitate GA Apron (Design and Construction)
Dothan Dothan Regional Primary 041 $80,963 Rehabilitate Taxiway - Crack Seal and Remark Taxiway "B"
Elba Carl Folsom General Aviation 011 $428,404 Construct Building - Hangar Construction
Enterprise Enterprise Municipal General Aviation 020 $662,361 Rehabilitate Taxiway - Rehabilitate Parallel Taxiway
Evergreen Evergreen Regional/Middleton Field
General Aviation 015 $164,035 Remove Obstructions [APP or DEP] - Phase 2 - Remove Obstructions, RW 1/19 RPZ and Departure Surface (construction)
Fairhope H. L. (Sonny) Callahan General Aviation 019 $3,255,318 Construct Taxiway - Phase 3 construction, East terminal area parallel and access taxiways (paving, lighting, utilities)
Foley Foley Municipal General Aviation 016 $258,676 Construct Taxiway - Construct Access Taxiway
Fort Payne Isbell Field General Aviation 023 $57,397 Install Runway Vertical/Visual Guidance System - Replace runway end identifier lights
Fort Payne Isbell Field General Aviation 023 $153,978 Install Weather Reporting Equipment - Replace AWOS 3-P/T Equipment
Greenville MacCrenshaw Memorial General Aviation 014 $3,114,820 Reconstruct Runway - Reconstruct RW 14/32 (Construction)
Gulf Shores Jack Edwards National General Aviation 031 $63,365 Improve Runway Safety Area - RW 9 RSA Drainage Improvements (Force Account - Reimbursement)
Gulf Shores Jack Edwards National General Aviation 031 $65,534 Rehabilitate Taxiway - Remark all taxiways
Page 3 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alabama
Guntersville Guntersville Municipal - Joe Starnes Field
General Aviation 022 $16,679 Construct Runway - Stream Mitigation Monitoring (Year 3 of 5)
Guntersville Guntersville Municipal - Joe Starnes Field
General Aviation 022 $132,560 Construct Taxiway - Construct taxiway to support hangar development (Ph 1)
Guntersville Guntersville Municipal - Joe Starnes Field
General Aviation 022 $130,681 Install Perimeter Fencing not Required by 49 CFR 1542 - Perimeter Fencing
Hartselle Hartselle-Morgan County Regional
General Aviation 015 $317,609 Rehabilitate Runway - Crack repair, isolated surface repair, seal coat & marking
Hartselle Hartselle-Morgan County Regional
General Aviation 015 $17,478 Rehabilitate Taxiway - Crack repair, seal coat & marking
Hartselle Hartselle-Morgan County Regional
General Aviation 015 $69,913 Rehabilitate Apron - Crack repair, isolated full-depth repair, seal coat & marking.
Headland Headland Municipal General Aviation 015 $1,194,342 Construct Taxiway - Construct Partial Parallel Taxiway
Huntsville Huntsville Executive Airport Tom Sharp Jr Field
General Aviation 028 $1,234,700 Acquire Land for Development - Parcel 34-0.5 ac; Parcel 35-1.01 ac; Parcel 36-11.5 ac; Parcel 37-1.0 ac; Parcels 27,28,29 & 30-3.0 ac; Parcels 31 & 32-2.0 ac
Huntsville Huntsville International-Carl T Jones Field
Primary 082 $608,958 Rehabilitate Taxiway - Rehabilitate (overlay) Taxiway J
Huntsville Huntsville International-Carl T Jones Field
Primary 082 $885,232 Rehabilitate Terminal Building - Phase 4-replacement of 12 passenger boarding bridges
Huntsville Huntsville International-Carl T Jones Field
Primary 082 $649,604 Rehabilitate Apron - Concrete joint replacement-69,000 feet
Huntsville Huntsville International-Carl T Jones Field
Primary 082 $499,126 Rehabilitate Terminal Building - Terminal Public Areas Phase-2 (Construct Airline Rear Baggage Handling Canopy)
Huntsville Huntsville International-Carl T Jones Field
Primary 083 $29,115,000 Construct Taxiway - Construct TW C, Phase 4 (from C5 to C7)
Jasper Walker County-Bevill Field General Aviation 020 $121,500 Update Airport Master Plan Study
Page 4 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alabama
Lanett Lanett Municipal General Aviation 015 $1,567,830 Construct Runway - Construct Runway 6/24 (paving)
Lanett Lanett Municipal General Aviation 015 $165,150 Install Runway Lighting
Mobile Mobile Downtown General Aviation 034 $5,449,119 Reconstruct Taxiway - Reconstruct Taxiway H (Construction)
Mobile Mobile Downtown General Aviation 034 $370,908 Install Taxiway Lighting - Install Taxiway H Lighting System
Mobile Mobile Downtown General Aviation 034 $1,409,150 Rehabilitate Runway - Rehab of RW 14/32 (Phase 1 - Rehab RW 18/36 for primary use during shutdown)
Mobile Mobile Regional Primary 056 $82,905 Acquire Friction Measuring Equipment
Mobile Mobile Regional Primary 056 $1,015,208 Improve Airport Drainage - RW 18 Drainage Improvements
Mobile Mobile Regional Primary 056 $89,609 Update Airport Master Plan Study - Study to move commercial traffic from MOB to BFM
Monroeville Monroe County Aeroplex General Aviation 015 $505,016 Rehabilitate Runway - Rehab Runway (Seal Cracks, Sealcoat, Marking)
Montgomery Montgomery Regional (Dannelly Field)
Primary 048 $198,000 Rehabilitate Taxiway - Rehabilitate Taxiway Alpha (Design Only)
Montgomery Montgomery Regional (Dannelly Field)
Primary 048 $1,309,237 Rehabilitate Access Road - Rehabilitate Access Road, Phase 2 (construction reimbursement)
Muscle Shoals Northwest Alabama Regional
Commercial Service
038 $217,740 Rehabilitate Runway - Phase 1-Design rehabilitate (overlay) RW 11/29
Muscle Shoals Northwest Alabama Regional
Commercial Service
038 $37,525 Reconstruct Airfield Guidance Signs - Phase 1-Design for reconstruction of 69 signs
Muscle Shoals Northwest Alabama Regional
Commercial Service
038 $5,403,885 Rehabilitate Runway - Rehabilitate (overlay)(construction phase) RW 11/29
Muscle Shoals Northwest Alabama Regional
Commercial Service
038 $206,815 Reconstruct Airfield Guidance Signs - Phase 1 - Reconstruct 27 Signs
Oneonta Robbins Field General Aviation 012 $34,244 Acquire Land For Approaches - Parcel No. 1 (3.67 acre Avigation Easement) as shown on the Exhibit A property map
Page 5 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alabama
Oneonta Robbins Field General Aviation 012 $424,636 Rehabilitate Runway
Ozark Ozark-Blackwell Field General Aviation 019 $93,086 Rehabilitate Runway - Runway 13/31 Crack Seal and Marking
Prattville Prattville - Grouby Field General Aviation 020 $150,000 Improve Airport Drainage - Drainage Improvements
Reform North Pickens General Aviation 010 $549,723 Construct Taxiway
Russellville Bill Pugh Field General Aviation 014 $74,598 Update Airport Master Plan Study
Selma Craig Field General Aviation 019 $174,519 Rehabilitate Taxiway - Repair Asphalt/Concrete Joint (2,800 lf)
Talladega Talladega Municipal General Aviation 030 $202,208 Rehabilitate Taxiway - Rehabilitate Taxiway A4
Tuscaloosa Tuscaloosa Regional General Aviation 032 $2,705,971 Rehabilitate Apron
Tuscaloosa Tuscaloosa Regional General Aviation 032 $478,414 Conduct Airport Master Plan Study
Tuskegee Moton Field Municipal General Aviation 020 $114,930 Rehabilitate Runway - Crack Seal and Mark Runway 13/31
Tuskegee Moton Field Municipal General Aviation 020 $23,192 Rehabilitate Taxiway - Repair Section, Crack Seal and Mark Taxiway
Union Springs Franklin Field General Aviation 008 $3,139,775 Extend Runway - County Road 177 Relocation and Runway Extension (Grade; Drain; Base)
Wetumpka Wetumpka Municipal General Aviation 019 $22,715 Remove Obstructions [Non-Hazard]
Wetumpka Wetumpka Municipal General Aviation 019 $25,450 Install Miscellaneous NAVAIDS - Install New Wind Cone
Wetumpka Wetumpka Municipal General Aviation 019 $77,731 Install Runway Vertical/Visual Guidance System - Install runway end identifier lights (REILs)
Page 6 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alabama
Alabama $78,600,266
Page 7 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Anchorage Lake Hood Primary 023 $7,406,144 Reconstruct Taxiway - Reconstruct Taxiway V
Anchorage Merrill Field Primary 073 $10,851,564 Reconstruct Apron - Dynamically compact landfill, reconstruct apron.
Anchorage Merrill Field Primary 077 $1,486,220 Reconstruct Taxiway - Dynamically compact fill under TW-G and regrade/replace pavement
Anchorage Ted Stevens Anchorage International
Primary 185 $9,277,485 Widen Taxiway - Phase 2; Widen t/w R
Anchorage Ted Stevens Anchorage International
Primary 185 $8,000,000 Widen Taxiway - Widen Taxiway R (North Section) safety area to meet ADG VI and TDG 7 design standards
Anchorage Ted Stevens Anchorage International
Primary 186 $3,361,227 Acquire Snow Removal Equipment - Snow Removal Equipment
Anchorage Ted Stevens Anchorage International
Primary 187 $334,122 Reconstruct Perimeter Fencing required by 49 CFR 1542 -Reconstruct Security Fencing - East End Phase 1
Anchorage Ted Stevens Anchorage International
Primary 188 $27,265,755 Reconstruct Runway - Reconstruct Runway 15/33 Phase 2
Anchorage Ted Stevens Anchorage International
Primary 189 $205,343 Improve Airport Miscellaneous Improvements - Rehabilitate Airfield Lighting Vault and Replace Regulators
Anchorage Ted Stevens Anchorage International
Primary 190 $312,196 Rehabilitate Terminal Building - This grant will provide funds to replace two escalators in the terminal. The escalators have reached the end of their use lives.�This grant funds a second phase to the escalators
Anchorage Ted Stevens Anchorage International
Primary 192 $169,251 Acquire Equipment - Acquire and Install 27 squitters
Aniak Aniak Primary 011 $500,000 Rehabilitate Apron
Aniak Aniak Primary 011 $15,134,417 Construct Runway - Phase 3
Barrow Wiley Post-Will Rogers Memorial
Primary 016 $9,695,466 Rehabilitate Runway - Phase 1: Design/Mobilization
Barrow Wiley Post-Will Rogers Memorial
Primary 016 $1,000,000 Reconstruct Taxiway - Phase 1: Design/Mobilization
Barrow Wiley Post-Will Rogers Memorial
Primary 016 $1,000,000 Rehabilitate Taxiway - Phase 1: Design/mobilization
Page 8 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Barrow Wiley Post-Will Rogers Memorial
Primary 016 $250,000 Rehabilitate Taxiway Lighting - Phase 1: Design/Mobilization
Barrow Wiley Post-Will Rogers Memorial
Primary 016 $250,000 Rehabilitate Runway Lighting - Phase 1: Design/mobilization
Barrow Wiley Post-Will Rogers Memorial
Primary 017 $787,092 Acquire Aircraft Rescue & Fire Fighting Vehicle - Acquire ARFF Vehicle (Barrow - 1,500-Gallon, Index B) (Replacement for vehicle purchased under 3-02-0200-049-2005)
Birchwood Birchwood General Aviation 007 $1,602,844 Reconstruct Taxiway - Reconstruct TWs B, C, D, E, and G
Birchwood Birchwood General Aviation 007 $224,684 Rehabilitate Runway - Rehabilitate the paved section of STOL runway
Birchwood Birchwood General Aviation 007 $3,924,349 Reconstruct Apron - Reconstruct NE and SE Aprons
Birchwood Birchwood General Aviation 008 $750,000 Update Airport Master Plan Study - AMP Update and aeronautical survey
Dillingham Dillingham Primary 017 $468,750 Update Airport Master Plan Study - Update Airport Master Plan Study
Dillingham Dillingham Primary 018 $2,864,074 Install Perimeter Fencing required by 49 CFR 1542 - Install fencing and access-controlled gates
Fairbanks Fairbanks International Primary 053 $1,201,044 Acquire Snow Removal Equipment - Snow Removal Equipment
Fairbanks Fairbanks International Primary 055 $79,688 Update Airport Master Plan Study - GA Master Plan Phase 2
Galena Edward G Pitka Sr Primary 008 $70,680 Rehabilitate Runway - resurface ski strip
Holy Cross Holy Cross General Aviation 004 $4,000,000 Rehabilitate Runway - Place crushed aggregate on runway surface
Holy Cross Holy Cross General Aviation 004 $235,000 Reconstruct Runway Lighting - Reconstruct Runway 1/19 Lighting
Holy Cross Holy Cross General Aviation 004 $218,904 Rehabilitate Taxiway - Place crushed aggregate on Taxiway surface
Holy Cross Holy Cross General Aviation 004 $90,000 Install Miscellaneous NAVAIDS - Install segmented circle and supplemental windcones
Page 9 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Holy Cross Holy Cross General Aviation 004 $10,000 Improve Airport Miscellaneous Improvements - Replace airfield lighting vault
Holy Cross Holy Cross General Aviation 004 $140,000 Reconstruct Taxiway Lighting - Reconstruction Taxiway Lighting
Holy Cross Holy Cross General Aviation 004 $940,000 Rehabilitate Apron
Homer Homer Primary 015 $2,000,000 Construct Aircraft Rescue & Fire Fighting Building - Construct ARFF building, collocated with SREB facility
Homer Homer Primary 015 $5,570,058 Construct Snow Removal Equipment Building - Construct SREB/ARFF combined facility.
Homer Homer Primary 016 $900,000 Rehabilitate Taxiway - Rehabilitate TW-C to meet standards for TDG
Homer Homer Primary 016 $300,000 Rehabilitate Taxiway - Rehabilitate TW Safety Areas -- TW-B and TW-E
Homer Homer Primary 016 $400,000 Improve Runway Safety Area - Obliterate blast pad and regrads RSA to meet standards.
Homer Homer Primary 016 $2,943,848 Reconstruct Perimeter Fencing not Required by 49 CFR 1542 -Reconstruct perimeter fencing per Part 139 letter of correction item.
Homer Homer Primary 016 $200,000 Remove Obstructions [Hazard] - Relocate primary windcone, segmented circle, and supplemental windcone to meet standards.
Juneau Juneau International Primary 076 $1,801,875 Improve Terminal Building - Add passenger boarding bridge to Gate 2 to support change in aircraft fleet.
Juneau Juneau International Primary 077 $529,688 Construct Sand and Chemical Storage Building - SREF - Sand and Chemical Storage - Phase 1 Design
Juneau Juneau International Primary 078 $634,735 Reconstruct Terminal Building - Design -- North terminal design --infrastructure installed prior to 1994
Juneau Juneau International Primary 079 $9,985,312 Construct Sand and Chemical Storage Building - SREF - Sand and chemical storage building - Ph. 2 Construct
Juneau State of Alaska 024 $200,000 Update Miscellaneous Study - Pavement Management Program
Juneau State of Alaska 024 $1,800,000 Update State System Plan Study
Page 10 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Juneau Various Locations in Alaska 119 $97,177 Acquire Snow Removal Equipment - Acquire Various SRE - Valdez (Loader)
Juneau Various Locations in Alaska 119 $194,343 Acquire Snow Removal Equipment - Acquire Various SRE - Gambell (Loader)
Juneau Various Locations in Alaska 119 $194,343 Acquire Snow Removal Equipment - Acquire Various SRE - Chalkyitsik (Loader)
Juneau Various Locations in Alaska 119 $340,101 Acquire Snow Removal Equipment - Acquire Various SRE - Rampart (Dozer)
Juneau Various Locations in Alaska 119 $347,875 Acquire Snow Removal Equipment - Acquire Various SRE - Kwigillingok (Grader)
Juneau Various Locations in Alaska 119 $388,687 Acquire Snow Removal Equipment - Acquire Various SRE (Pilot Station Grader)
Juneau Various Locations in Alaska 119 $485,859 Acquire Snow Removal Equipment - Acquire Various SRE - Bethel (Snowblower)
Juneau Various Locations in Alaska 119 $485,859 Acquire Snow Removal Equipment - Acquire Various SRE - Aniak (Snowblower)
Juneau Various Locations in Alaska 119 $1,117,476 Acquire Snow Removal Equipment - Acquire Various SRE - King Salmon (Plow with Broom, and Deicer Truck)
Juneau Various Locations in Alaska 119 $145,757 Acquire Snow Removal Equipment - Acquire Various SRE - Ruby (Snowblower)
Juneau Various Locations in Alaska 119 $388,687 Acquire Snow Removal Equipment - Acquire Various SRE - Shageluk (Grader)
Juneau Various Locations in Alaska 120 $310,334 Install Miscellaneous NAVAIDS - Various Visual Aid Replacement (Valdez - Remove and Replace Primary Wind Cone,Secondary Wind Cone, and Segmented Circle)
Juneau Various Locations in Alaska 120 $416,511 Install Miscellaneous NAVAIDS - Various Visual Aids (St. Paul - Install ladder and platform on SREB and Replace Rotating Airport Beacon; Replace Primary and Secondary Wind Cones
Juneau Various Locations in Alaska 120 $40,000 Reconstruct Airport Beacon
Juneau Various Locations in Alaska 120 $42,127 Reconstruct Airport Beacon
Page 11 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Juneau Various Locations in Alaska 121 $61,930 Rehabilitate Runway - Various EDA/EAS Locations - Yakutat (SPM - Crack Seal RWY 2/20, and, incidentally, Aprons A and B)
Juneau Various Locations in Alaska 121 $105,281 Rehabilitate Runway - Various EDA/EAS Locations - Petersburg (SPM - Crack Seal and Re-Marking Runway 5/23, and, incidentally, TWY and Ramp)
Juneau Various Locations in Alaska 121 $113,539 Rehabilitate Runway - Various EDA/EAS Locations - Yakutat (SPM - Re-Marking RWY's 11/29 and 2/20, and, incidentally, TWY's and Ramps)
Juneau Various Locations in Alaska 121 $76,380 Rehabilitate Runway - Various EDA/EAS Locations - Wrangell (SPM - Re-Mark Runway 10/28, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 121 $462,916 Rehabilitate Runway - Various EDA/EAS Locations - Twin Hills (SPM - Resurface RWY 18/36, and, incidentally, TWY and Apron)
Juneau Various Locations in Alaska 121 $67,776 Rehabilitate Runway - Various EDA/EAS Locations - Cordova (SPM - Crack Seal and Marking on RWY 9/27, and, incidentally, Apron and TWY's)
Juneau Various Locations in Alaska 121 $156,408 Rehabilitate Runway - Various EDA/EAS Locations - Gulkana (SPM -Crack Seal and Remarking - Runway 15/33, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 121 $98,467 Acquire Snow Removal Equipment - Various EDA/EAS Locations -Cordova (Acquire SRE: Broom Attachment for Loader)
Juneau Various Locations in Alaska 121 $61,930 Rehabilitate Runway - Various EDA/EAS Locations - Gustavus (SPM -Re-Mark RWY 11/29 and RWY 2/20, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 121 $362,261 Install Airport Beacons - Various EDA/EAS Locations - Yakutat (VISAID Replacement - Replace Rotating Airport Beacon and Airport Beacon Tower)
Juneau Various Locations in Alaska 121 $320,019 Acquire Snow Removal Equipment - Various EDA/EAS Locations -New Stuyahok (Acquire SRE - Grader with Front and Wing Plows)
Juneau Various Locations in Alaska 121 $688,271 Acquire Snow Removal Equipment - Various EDA/EAS Locations -Yakutat (Acquire SRE - Plow Truck with Attachments, and Towed Broom)
Page 12 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Juneau Various Locations in Alaska 122 $146,685 Rehabilitate Runway - Various SPM - Bethel (Provide Markings for RWY 1R/19L, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $101,859 Rehabilitate Runway - Various SPM - Kodiak (Marking and Crack Seal on RWY 1/19, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Ft. Yukon (Resurface and Apply Dust Palliative to RWY 4/22, and, incidentally, Safety Areas, TWY's, and Apron)
Juneau Various Locations in Alaska 122 $122,231 Rehabilitate Runway - Various SPM - Skagway (Crack Seal RWY 2/20)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Kivalina (Resurface and Apply Dust Palliative to RWY 7/25, and, incidentally, Safety Areas, TWY, and Apron)
Juneau Various Locations in Alaska 122 $162,974 Rehabilitate Runway - Various SPM - Unalaska (Marking and Crack Seal to RWY 13/31, and, incidentally, TWY)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Nulato (Resurface and Apply Dust Palliative to RWY 3/21, and, incidentally, Safety Areas, TWY, and Apron)
Juneau Various Locations in Alaska 122 $81,487 Rehabilitate Runway - Various SPM - Iliamna (Marking and Crack Seal - RWY 18/36, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $151,923 Rehabilitate Runway - Various SPM - Homer (Marking for RWY 4/22, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $154,350 Rehabilitate Runway - Various SPM - Tok (Re-Mark and Apply Crack Seal to RWY 7/25,, and incidentally, TWY and Apron)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Savoonga (Resurface and apply Dust Palliative to RWY 5/23, and, incidentally, Safety Areas, TWY, and Apron)
Juneau Various Locations in Alaska 122 $163,694 Rehabilitate Runway - Various SPM - Sitka (Apply Marking and Crack Seal to RWY 11/29, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Bettles (Resurface and Apply Dust Palliative to RWY 1/19, and, incidentally, TWY and Apron)
Juneau Various Locations in Alaska 122 $63,153 Rehabilitate Runway - Various SPM - Cold Bay (Marking RWY 8/26, and, incidentally, TWY's and Aprons)
Page 13 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Juneau Various Locations in Alaska 122 $16,502 Rehabilitate Runway - Various SPM - Seward (Crack Seal RWY 16/34, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $16,722 Rehabilitate Runway - Various SPM - Unalakleet (Marking and Crack Seal on RWY 8/26, and, incidentally, Blast Pad, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $30,646 Rehabilitate Runway - Various SPM - Seward (Crack Seal RWY 13/31, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $31,432 Rehabilitate Runway - Various SPM - Birchwood (Apply Marking and Crack Seal to Runway 20L, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $31,576 Rehabilitate Runway - Various SPM - King Salmon (Rehab Marking on RWY 18/36, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $33,442 Rehabilitate Runway - Various SPM - Nome (Marking RWY 10/28, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $33,443 Rehabilitate Runway - Various SPM - Nome (Marking RWY 3/21, and, incidentally TWY's and Aprons)
Juneau Various Locations in Alaska 122 $38,706 Rehabilitate Runway - Various SPM - Cold Bay (Marking for RWY 8/26, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $41,910 Rehabilitate Runway - Various SPM - Birchwood (Apply Markings and Crack Seal to Runway 2L/20R, and, incidentally, RWY 20L, TWY's, and Apron)
Juneau Various Locations in Alaska 122 $89,636 Rehabilitate Runway - Various SPM - Ketchikan (Marking RWY 11/29, and, incidentally, TWY and Aprons)
Juneau Various Locations in Alaska 122 $50,929 Rehabilitate Runway - Various SPM - Klawock (Crack Seal RWY 2/20, and, incidentally, TWY and Apron)
Juneau Various Locations in Alaska 122 $101,859 Rehabilitate Runway - Various SPM - Kodiak (Markings and Crack Seal on RWY 08/26, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $66,174 Rehabilitate Runway - Various SPM - Barrow (Marking RWY 7/25, and, incidentally, Blast Pads, TWY's and Apron)
Juneau Various Locations in Alaska 122 $66,885 Rehabilitate Runway - Various SPM - Deadhorse (Remarking RWY 5/23, and, incidentally, Blast Pads, TWY's and Apron)
Page 14 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Juneau Various Locations in Alaska 122 $66,885 Rehabilitate Runway - Various SPM - Valdez (Marking Runway 6/24, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $66,885 Rehabilitate Runway - Various SPM - Kotzebue (Remarking Runway 9/27, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $70,283 Rehabilitate Runway - Various SPM - King Salmon (Rehab Markings on RWY 12/30, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $81,487 Rehabilitate Runway - Various SPM - Iliamna (Marking and Crack Seal - RWY 08/26, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Coldfoot (Resurface and Apply Dust Palliative to RWY 1/19, and, incidentally, Safety Areas, TWY, and Apron)
Juneau Various Locations in Alaska 122 $81,487 Rehabilitate Runway - Various SPM - Sand Point (Rehab Markings on RWY 13/31, and, incidentally, TWY's and Apron)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Mountain Village (Resurface and Apply Dust Palliative to RWY 2/20, and, incidentally, Safety Areas, TWY's, and Apron)
Juneau Various Locations in Alaska 122 $50,163 Rehabilitate Runway - Various SPM - Unalakleet (Marking and Crack Seal for RWY 15-33, and, incidentally, Blast Pads, TWY's, and Aprons)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Tanana (Resurface and Apply Dust Palliative to RWY 7/25, and, incidentally, Safety Areas, TWY's, and Apron)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Buckland (Resurface and Apply Dust Palliative to RWY 1/19, and, incidentally, Safety Areas, TWY, and Apron)
Juneau Various Locations in Alaska 122 $458,367 Improve Airport Drainage - Various SPM - Sitka (Improve Airport Drainage - Install trench drain on apron)
Juneau Various Locations in Alaska 122 $419,100 Rehabilitate Runway - Various SPM - Napakiak (Apply aggregate surface course and reshape crown - RWY 16/34, and, incidentally, TWY and Apron)
Page 15 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Juneau Various Locations in Alaska 122 $419,100 Rehabilitate Runway - Various SPM - Napaskiak (Apply crushed aggregate surface course and reshape crown - RWY 2/20, and, incidentally, TWY and Apron)
Juneau Various Locations in Alaska 122 $220,027 Rehabilitate Runway - Various SPM - Bethel (Re-Mark RWY 1L/19R, and, incidentally, TWY's and Aprons)
Juneau Various Locations in Alaska 122 $203,718 Rehabilitate Runway - Various SPM - St. Paul (Rehab Markings for RWY 13/31, and, incidentally, TWY's)
Juneau Various Locations in Alaska 122 $180,075 Rehabilitate Runway - Various SPM - Marshall (Resurface and Apply Dust Palliative ro RWY 7/25, and, incidentally Safety Areas, TWY, and Apron)
Kake Kake General Aviation 007 $250,000 Improve Runway Safety Area - Regrade RSA to meet standards
Kake Kake General Aviation 007 $117,006 Reconstruct Taxiway Lighting - Replace TW lighting, complete replace.
Kake Kake General Aviation 007 $2,000,000 Reconstruct Runway Lighting
Kake Kake General Aviation 007 $7,000,000 Rehabilitate Runway - Repave RW and repair,
Kenai Kenai Municipal Primary 060 $10,619,995 Rehabilitate Terminal Building - Terminal Building Rehab - Roof/Sprinkler, Interior Passenger Access, and Utilities - Construct
Kiana Bob Baker Memorial Commercial Service
004 $750,000 Construct Taxiway - Construct taxiway phase 2
Kiana Bob Baker Memorial Commercial Service
004 $850,000 Rehabilitate Apron - Rehabilitate Apron Phase 2
Kiana Bob Baker Memorial Commercial Service
004 $3,119,685 Reconstruct Runway - Reconstruct Runway Phase 2
Kiana Bob Baker Memorial Commercial Service
004 $500,000 Reconstruct Runway Lighting - Reconstruct Runway Lighting Phase 2
Kiana Bob Baker Memorial Commercial Service
004 $1,300,000 Extend Runway - Extend Runway Phase 2
Page 16 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
King Salmon King Salmon Primary 017 $379,920 Rehabilitate Taxiway - TXY Rehab (A, B, & E)
King Salmon King Salmon Primary 017 $12,429,416 Rehabilitate Runway - RW 12/30 Rehab of 8901 LF of Runway
Kivalina Kivalina Commercial Service
005 $100,000 Acquire Easement For Approaches - Acquire Easement for Runway 30 RPZ
Kivalina Kivalina Commercial Service
005 $11,018,429 Improve Airport Erosion Control - Construct Airport Erosion Protection
Kwigillingok Kwigillingok Commercial Service
004 $2,511,220 Rehabilitate Runway - Place crushed aggregate on runway surface
Kwigillingok Kwigillingok Commercial Service
004 $350,000 Rehabilitate Apron - Place crushed aggregate on apron surface
Kwigillingok Kwigillingok Commercial Service
004 $150,000 Rehabilitate Taxiway - Place crushed aggregate on taxiway surface
Nome Nome Primary 026 $1,780,854 Rehabilitate Runway - selective full-depth repair
Nome Nome Primary 026 $800,000 Rehabilitate Apron - Rehabilitate North Apron
Nome Nome Primary 026 $3,500,000 Rehabilitate Runway - selective full-depth repair
Nome Nome Primary 026 $4,162,500 Install Perimeter Fencing not Required by 49 CFR 1542
Nuiqsut Nuiqsut General Aviation 004 $1,250,000 Rehabilitate Taxiway - Rehabilitate Taxiway (Phase 2 Construction)
Nuiqsut Nuiqsut General Aviation 004 $400,000 Reconstruct Taxiway Lighting
Nuiqsut Nuiqsut General Aviation 004 $800,000 Install Apron Edge Lights - Install Apron Edge Lights Phase 2
Nuiqsut Nuiqsut General Aviation 004 $5,810,739 Rehabilitate Runway - Rehabilitate Runway 5/23 (Phase 3 Construction)
Nuiqsut Nuiqsut General Aviation 004 $1,130,000 Rehabilitate Apron - Rehabilitate Apron (Phase 2 Construction)
Nuiqsut Nuiqsut General Aviation 004 $1,028,125 Reconstruct Runway Lighting - Replace HIRL with MIRL
Page 17 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
Palmer Warren "Bud" Woods Palmer Municipal
General Aviation 022 $518,625 Rehabilitate Taxiway - Apply asphalt sealant and crackseal TWs A, C, D, E, F, & G, approx. 8165 linear feet of TW.
Palmer Warren "Bud" Woods Palmer Municipal
General Aviation 023 $487,200 Acquire Snow Removal Equipment - Acquire snow removal equipment -- blower and blade -- end of life, and no longer supported
Point Hope Point Hope Commercial Service
004 $306,338 Conduct Miscellaneous Study - Erosion Monitoring and Wind Study
Seward Seward General Aviation 006 $468,750 Conduct Airport Master Plan Study - Conduct Airport Master Planning Study
Sitka Sitka Rocky Gutierrez Primary 032 $515,625 Acquire Land for Development - Acquire approx. 3.55 acre between airport fence and airport access road.
Soldotna Soldotna General Aviation 017 $300,000 Rehabilitate Apron - Apply seal coat to central apron
Soldotna Soldotna General Aviation 018 $3,187,500 Construct Snow Removal Equipment Building - Construct snow removal equipment building collocated with sand and chemical storage building.
Valdez Valdez Pioneer Field Primary 011 $279,711 Conduct Aeronautical Survey for RNAV Approach - Conduct aeronautical survey for Master Plan and RNAV approach
Wasilla Wasilla General Aviation 021 $3,735,100 Expand Apron - Expand East Apron Apron E: 18 public use tie downs
White Mountain White Mountain General Aviation 002 $385,000 Rehabilitate Taxiway - Place crushed aggregate on Taxiway surface
White Mountain White Mountain General Aviation 002 $375,000 Rehabilitate Apron
White Mountain White Mountain General Aviation 002 $3,196,367 Rehabilitate Runway - Place crushed aggregate on Runway 15/33
White Mountain White Mountain General Aviation 002 $280,000 Reconstruct Runway Lighting - Reconstruct Runway 15/33 Lighting
White Mountain White Mountain General Aviation 002 $95,000 Install Miscellaneous NAVAIDS - Install Segmented Circle and Supplemental Wind Cones
Page 18 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Alaska
White Mountain White Mountain General Aviation 002 $85,000 Reconstruct Taxiway Lighting
Alaska $243,001,704
Page 19 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
American Samoa
Fitiuta Village Fitiuta Commercial Service
031 $1,000,000 Conduct State System Plan Study - Conduct system plan - airport pavement management for LOC IDs: PPG, FAQ, Z08
Ofu Village Ofu General Aviation 016 $500,000 Acquire Aircraft Rescue & Fire Fighting Vehicle - Rapid Intervention Vehicle (RIV)
Pago Pago Pago Pago International Primary 066 $23,303,667 Rehabilitate Apron - Terminal Apron, phase 3
American Samoa $24,803,667
Page 20 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arizona
Buckeye Buckeye Municipal General Aviation 020 $275,000 Rehabilitate Taxiway - Design
Bullhead City Laughlin/Bullhead International
Primary 049 $347,734 Rehabilitate Taxiway
Chandler Chandler Municipal Reliever 026 $3,671,699 Rehabilitate Apron - Rehabilitate North Transient Apron 55,000 square yards
Colorado City Colorado City Municipal General Aviation 021 $124,220 Acquire Land for Development - Acquire 35 acres for future development and relocation of fencing from the OFA
Douglas Bisbee Bisbee Douglas International
General Aviation 012 $55,500 Reconstruct Runway Lighting - Reconstruct Runway edge lights and upgrade electrical vault (Design only)
Eloy Eloy Municipal General Aviation 014 $450,000 Acquire Land for Development - Acquire 15 acres of land
Flagstaff Flagstaff Pulliam Primary 042 $850,000 Acquire Aircraft Rescue & Fire Fighting Vehicle - Acquire 1,500 Gallon ARFF vehicle
Glendale Glendale Municipal Reliever 027 $1,561,842 Acquire Land For Approaches
Globe San Carlos Apache General Aviation 022 $150,000 Install Apron Lighting - Install Apron Lighting
Globe San Carlos Apache General Aviation 022 $177,856 Rehabilitate Taxiway
Globe San Carlos Apache General Aviation 022 $136,809 Install Miscellaneous NAVAIDS - Wind Cone and Segmented
Goodyear Phoenix Goodyear Reliever 023 $6,168,600 Reconstruct Taxiway - Reconstruct 7,100 feet of Taxiway A
Grand Canyon Grand Canyon National Park Primary 030 $250,000 Rehabilitate Terminal Building - Rehabilitate Terminal Building Restrooms for ADA compliance (Design Only) Phase I
Grand Canyon Grand Canyon National Park Primary 030 $460,600 Construct Runway - Construct 25 feet wide paved shoulders for Runway 3/21 (8,999 foot length)- Design
Grand Canyon Grand Canyon National Park Primary 030 $200,000 Reconstruct Access Road - Reconstruct Primary Airport Access Roadway (Design Only) Phase I
Holbrook Holbrook Municipal General Aviation 017 $310,460 Install Miscellaneous NAVAIDS
Page 21 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arizona
Holbrook Holbrook Municipal General Aviation 017 $100,000 Rehabilitate Runway Lighting
Holbrook Holbrook Municipal General Aviation 017 $100,000 Install Runway Vertical/Visual Guidance System
Kayenta Kayenta General Aviation 010 $204,881 Acquire Snow Removal Equipment
Kingman Kingman General Aviation 028 $450,000 Update Airport Master Plan Study - Update Master Plan ALP with AGIS
Lake Havasu City Lake Havasu City General Aviation 027 $487,684 Update Airport Master Plan Study - ALP update with AGIS.
Marana Marana Regional Reliever 022 $966,000 Rehabilitate Apron - GA Apron (26,745 SY)
Marana Marana Regional Reliever 022 $1,025,794 Rehabilitate Taxiway - Taxiway B (1,686 Feet) - Construct
Marana Marana Regional Reliever 022 $1,171,575 Rehabilitate Apron - Terminal Apron (60,930 SY) - Construct
Marana Marana Regional Reliever 022 $1,334,000 Rehabilitate Apron - Jet Apron (38,300 SY)
Page Page Municipal Primary 032 $486,938 Update Airport Master Plan Study - Update Airport Master Plan and ALP with AGIS Survey
Payson Payson General Aviation 022 $805,506 Rehabilitate Apron
Peach Springs Grand Canyon West Primary 021 $125,000 Rehabilitate Runway - Fog/Crack Seal (5,000 feet x 75 feet)
Peach Springs Grand Canyon West Primary 021 $500,000 Install Perimeter Fencing not Required by 49 CFR 1542 - Install buried chain link fence for wildlife deterrent (20,000 LF).
Peach Springs Grand Canyon West Primary 021 $195,000 Rehabilitate Apron - Fog/Crack Seal Rehabilitate existing Apron (~61,405 SY)
Peach Springs Grand Canyon West Primary 021 $130,000 Rehabilitate Taxiway - Fog/Crack Seal Taxiway A (~5,400 feet x 35 feet)
Peach Springs Grand Canyon West Primary 021 $1,580,725 Rehabilitate Heliport/Helipad - Rehabilitate helipads and stabilize hover lanes (46,880 SY)
Phoenix Phoenix Sky Harbor International
Primary 086 $5,700,000 Reconstruct Apron - Terminal 4 Apron, Phase IV
Page 22 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arizona
Phoenix Phoenix Sky Harbor International
Primary 087 $7,189,395 Reconstruct Apron - Reconstruct 43,600 square yards of Terminal 3 North Inner Apron
Phoenix Phoenix-Mesa Gateway Primary 040 $9,769,733 Extend Taxiway - Extend Taxiway C 3,800 feet (between Taxiway L and Taxiway P)
Phoenix Phoenix-Mesa Gateway Primary 041 $819,540 Update Airport Master Plan Study
Prescott Ernest A Love Field Commercial Service
038 $4,557,837 Rehabilitate Runway - Runway 03R/21L (7,619 feet), including removal of Taxiway C2 (RIM location PRC-HS2)
Prescott Ernest A Love Field Commercial Service
038 $800,000 Rehabilitate Runway Lighting - 7,619 feet of the current Runway 03R/21L
San Manuel San Manuel General Aviation 007 $281,110 Acquire Land for Development - Purchase the airport property (approximately 155 acres)
Scottsdale Scottsdale Reliever 036 $2,441,345 Rehabilitate Apron - Rehabilitate Delta Apron (Approximately 4,500 Square Yards)
Sedona Sedona General Aviation 024 $410,654 Conduct Miscellaneous Study - Drainage Study
Show Low Show Low Regional Commercial Service
027 $2,054,427 Rehabilitate Runway - Rehabilitate Runway 6/24 - Construct
Tucson Ryan Field Reliever 029 $643,510 Update Airport Master Plan Study
Whiteriver Whiteriver General Aviation 013 $91,060 Install Runway Vertical/Visual Guidance System - Design and construction administration
Wickenburg Wickenburg Municipal General Aviation 024 $1,097,043 Construct Apron - 10,000 square yards of Apron
Winslow Winslow-Lindbergh Regional
General Aviation 021 $242,609 Reconstruct Taxiway - Reconstruct parallel Taxiway B and connectors (7,500 feet) - Design
Arizona $60,951,686
Page 23 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arkansas
Almyra Almyra Municipal General Aviation 008 $51,637 Construct Taxiway - Design-only
Arkadelphia Dexter B Florence Memorial Field
General Aviation 017 $435,899 Improve Airport Drainage - Phase 1: Design and Construction
Arkadelphia Dexter B Florence Memorial Field
General Aviation 017 $15,201 Rehabilitate Runway - Phase 1 Preliminary Engineering Report
Ash Flat Sharp County Regional General Aviation 011 $141,975 Install Runway Vertical/Visual Guidance System - PAPIs Runway 4/22
Ash Flat Sharp County Regional General Aviation 011 $136,643 Install Taxiway Lighting - Taxiway A Lighting
Batesville Batesville Regional General Aviation 014 $446,364 Rehabilitate Runway
Berryville Carroll County General Aviation 017 $121,979 Install Runway Vertical/Visual Guidance System - Install PAPIs Runway 7 and Runway 25; Install REILs Runway 7 and Runway 25
Brinkley Frank Federer Memorial General Aviation 011 $585,743 Rehabilitate Runway
Camden Harrell Field General Aviation 017 $103,688 Rehabilitate Apron - Crack Seal and Seal Coat
Carlisle Carlisle Municipal General Aviation 016 $158,322 Construct Service Road
Clarendon Clarendon Municipal General Aviation 011 $141,414 Install Perimeter Fencing not Required by 49 CFR 1542
Clinton Clinton Municipal General Aviation 015 $136,918 Rehabilitate Apron - GA Apron
Colt Delta Regional General Aviation 012 $73,405 Rehabilitate Runway
Corning Corning Municipal General Aviation 021 $64,980 Rehabilitate Runway - Crack-seal and Overlay - Design-only Phase 1
Crossett Z M Jack Stell Field General Aviation 012 $548,413 Rehabilitate Runway - Crack Repair/Overlay - Construction Phase 2
Page 24 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arkansas
De Queen J Lynn Helms Sevier County General Aviation 014 $58,012 Rehabilitate Runway Lighting
De Queen J Lynn Helms Sevier County General Aviation 014 $45,750 Install Runway Vertical/Visual Guidance System - Install REILs
De Queen J Lynn Helms Sevier County General Aviation 014 $52,596 Install Runway Vertical/Visual Guidance System - Install PAPIs
Fayetteville Drake Field General Aviation 046 $1,652,878 Widen Taxiway - Widen Taxiway B
Fayetteville/Spri ngdale/Rogers
Northwest Arkansas Regional
Primary 054 $13,662,332 Rehabilitate Taxiway - Reconstruct North 3,800 ft. of Taxiway B
Fayetteville/Spri ngdale/Rogers
Northwest Arkansas Regional
Primary 055 $2,792,700 Rehabilitate Taxiway - Reconstruct Taxiway B at the intersection of Taxiway M
Flippin Marion County Regional General Aviation 012 $71,116 Wildlife Hazard Assessments
Flippin Marion County Regional General Aviation 012 $79,830 Rehabilitate Runway - Overlay Runway (Design-only - Phase 1)
Fort Smith Fort Smith Regional Primary 047 $701,036 Update Airport Master Plan Study
Harrison Boone County General Aviation 026 $24,175 Rehabilitate Taxiway - Seal-coat Taxiway A; Design-only Phase 1
Harrison Boone County General Aviation 026 $20,000 Rehabilitate Apron - Seal-coat General Aviation Apron; Design-only Phase 1
Heber Springs Heber Springs Municipal General Aviation 014 $1,407,418 Rehabilitate Runway
Helena/West Helena
Thompson-Robbins General Aviation 011 $73,224 Reconstruct Runway - Full-depth Reconstruction of Runway; Design-only Phase 1
Helena/West Helena
Thompson-Robbins General Aviation 011 $235,091 Construct Runway Safety Area - Improve RSA Phase 3; Design and Construction
Hope Hope Municipal General Aviation 012 $502,422 Improve Airport Drainage
Page 25 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arkansas
Hot Springs Memorial Field General Aviation 026 $2,083,683 Reconstruct Taxiway - Reconstruct Taxiway A to meet current standards
Jonesboro Jonesboro Municipal Commercial Service
022 $107,017 Improve Airport Drainage
Little Rock Bill and Hillary Clinton National/Adams Field
Primary 090 $576,039 Reconstruct Runway Lighting
Little Rock Bill and Hillary Clinton National/Adams Field
Primary 091 $515,501 Install Emergency Generator
Little Rock Bill and Hillary Clinton National/Adams Field
Primary 091 $73,038 Rehabilitate Aircraft Rescue & Fire Fighting Building
Little Rock Bill and Hillary Clinton National/Adams Field
Primary 092 $2,989,034 Improve Airport Drainage
Magnolia Ralph C Weiser Field General Aviation 014 $216,067 Improve Airport Drainage - Repair of eroded slopes and drainage pipes.
Malvern Malvern Municipal General Aviation 008 $890,120 Construct Taxiway - Construct Parallel North and South sections
Manila Manila Municipal General Aviation 013 $355,205 Update Airport Master Plan Study
Marianna Marianna/Lee County-Steve Edwards Field
General Aviation 007 $37,800 Install Taxiway Lighting - Install Parallel Taxiway Lighting; Design-only Phase 1
Marianna Marianna/Lee County-Steve Edwards Field
General Aviation 007 $9,000 Install Runway Vertical/Visual Guidance System - PAPIs for Runway 18 and Runway 36; Design-only Phase 1
Marianna Marianna/Lee County-Steve Edwards Field
General Aviation 007 $9,000 Install Airfield Guidance Signs - Design-only Phase 1
Melbourne Melbourne Municipal - John E Miller Field
General Aviation 018 $19,995 Rehabilitate Apron - Seal-coat
Melbourne Melbourne Municipal - John E Miller Field
General Aviation 018 $120,699 Rehabilitate Runway - Seal-coat
Mena Mena Intermountain Municipal
General Aviation 020 $3,723,187 Rehabilitate Taxiway - Reconstruct Taxiway B (Construction)
Page 26 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arkansas
Mena Mena Intermountain Municipal
General Aviation 021 $1,098,529 Rehabilitate Taxiway - Reconstruct Taxiway B from Runway 9 to Runway 35
Morrilton Morrilton Municipal General Aviation 011 $201,627 Update Airport Master Plan Study
Mountain Home Baxter County General Aviation 019 $199,006 Install Taxiway Lighting - Parallel Taxiway
Paragould Kirk Field General Aviation 014 $22,000 Rehabilitate Apron - Crack-Seal
Paragould Kirk Field General Aviation 014 $19,517 Improve Airport Miscellaneous Improvements - Replace Voltage Regulator in Airfield Lighting Vault
Piggott Piggott Municipal General Aviation 012 $98,744 Rehabilitate Runway - Crack-seal and Seal-coat
Piggott Piggott Municipal General Aviation 012 $30,000 Rehabilitate Apron - Crack-seal and Seal-coat
Pine Bluff Pine Bluff Regional Airport Grider Field
General Aviation 014 $149,071 Construct Taxiway - Design-only
Pocahontas Pocahontas Municipal General Aviation 009 $64,800 Extend Taxiway - Design-only
Siloam Springs Smith Field General Aviation 015 $208,317 Construct Taxiway
Springdale Springdale Municipal General Aviation 019 $1,684,052 Rehabilitate Runway - Construction (Ph. II) Overlay
Springdale Springdale Municipal General Aviation 019 $504,499 Reconstruct Runway Lighting - Construction (Ph. II)
Stuttgart Stuttgart Municipal Carl Humphrey Field
General Aviation 025 $996,921 Rehabilitate Runway - Rehabilitate Runway 18-36 - Overlay
Texarkana Texarkana Regional-Webb Field
Primary 043 $419,710 Construct Apron - Phase I: Design of Air Carrier Apron for New Terminal
Walnut Ridge Walnut Ridge Regional General Aviation 014 $75,330 Rehabilitate Runway - Design-only
Page 27 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Arkansas
Warren Warren Municipal General Aviation 006 $81,044 Install Runway Vertical/Visual Guidance System - PAPI For RWY 21
Arkansas $42,119,713
Page 28 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Auburn Auburn Municipal General Aviation 016 $267,293 Rehabilitate Apron - Rehabilitate Tie-Down Aprons TD1 and TD2 (crack fill/seal coat/remark, 43,860 square yards) - Construction
Auburn Auburn Municipal General Aviation 016 $110,056 Rehabilitate Runway Lighting - Install New Runway 7/25 Edge Lighting (3,700 feet) - Construction
Auburn Auburn Municipal General Aviation 016 $33,327 Construct Wash Rack - Pollution Abatement Facility - Construction
Bakersfield Bakersfield Municipal General Aviation 021 $160,610 Update Airport Master Plan Study - Narrative report and ALP
Bakersfield Meadows Field Primary 045 $1,324,694 Rehabilitate Taxiway - Twy A
Big Bear City Big Bear City General Aviation 023 $300,000 Construct Snow Removal Equipment Building - Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy F, Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy B, Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy C, Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy G, Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy H, Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy D, Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy J, Phase I, Design Only
Bishop Bishop General Aviation 020 $37,500 Rehabilitate Taxiway - Twy A, Phase I, Design Only
Burbank Bob Hope Primary 064 $2,000,000 Rehabilitate Apron - GA Ramp
Burbank Bob Hope Primary 064 $3,238,350 Rehabilitate Taxiway - Phase II, Taxiway C & D
Page 29 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Calexico Calexico International General Aviation 017 $236,409 Rehabilitate Taxiway - Twy A, Phase I, Design
California City California City Municipal General Aviation 019 $150,000 Install Perimeter Fencing not Required by 49 CFR 1542 - Phase 1, Design
Chemehuevi Valley
Chemehuevi Valley General Aviation 012 $247,500 Rehabilitate Runway - Phase I, Design Only
Chico Chico Municipal General Aviation 039 $2,586,163 Rehabilitate Taxiway - Phase 2 - Construction
Chowchilla Chowchilla General Aviation 010 $113,400 Rehabilitate Taxiway - Taxiway A Slurry Seal
Chowchilla Chowchilla General Aviation 010 $112,061 Rehabilitate Apron - Tie-down Apron Slurry Seal
Chowchilla Chowchilla General Aviation 010 $104,947 Rehabilitate Runway Lighting - Rehab airfield electrical - Design
Chowchilla Chowchilla General Aviation 010 $117,000 Rehabilitate Runway - Rehab Runway 12/30 - Design
Cloverdale Cloverdale Municipal General Aviation 012 $178,560 Install Runway Vertical/Visual Guidance System - Install PAPI Runway 14 - Phase 2/Construct
Columbia Columbia General Aviation 018 $2,300,000 Reconstruct Taxiway - Reconstruct Main Hangar Area Taxilanes (including marking, 1660 feet) - Construction
Columbia Columbia General Aviation 018 $700,000 Rehabilitate Taxiway - Rehabilitate Hangar Taxilanes (mill and overlay/marking, 850 feet) - Construction
Columbia Columbia General Aviation 018 $300,000 Rehabilitate Apron - Rehabilitate Apron (mill and overlay/marking, 5,333 square yards) - Construction
Columbia Columbia General Aviation 018 $240,868 Rehabilitate Apron - Terminal Apron (joint and crack sealing/replacement of select panels/marking, 3,258 square yards) - Construction
Concord Buchanan Field Reliever 024 $270,000 Construct Aircraft Rescue & Fire Fighting Building - Construct ARFF Building - Design
Page 30 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Crescent City Jack McNamara Field Commercial Service
037 $99,510 Update Airport Master Plan Study - Update Airport Layout Plan Narrative Report with ALP drawing set.
Dunsmuir Dunsmuir Municipal-Mott General Aviation 015 $236,106 Rehabilitate Runway - Reconstruction Runway 14/32 and runway reflectors - Design Phase 1
Fort Jones Scott Valley General Aviation 007 $283,276 Rehabilitate Runway - Rehabilitate Runway 16/34(slurry seal approximately 888 LF )- Design/Construction.
Fresno Fresno Chandler Executive Reliever 025 $111,761 Install Weather Reporting Equipment - AWOS III
Fresno Fresno Yosemite International
Primary 081 $9,119,970 Rehabilitate Taxiway - Reconstruction of Taxiway C - Construction Phase 2
Fresno Fresno Yosemite International
Primary 082 $1,000,000 Noise Mitigation Measures for Residences within 65-69 DNL -
Grass Valley Nevada County General Aviation 020 $29,000 Rehabilitate Apron - Ramp 1 (10,800 SY) - Design
Grass Valley Nevada County General Aviation 020 $17,000 Rehabilitate Apron - Ramp 5 (6,100 SY) - Design
Grass Valley Nevada County General Aviation 020 $29,000 Rehabilitate Apron - Ramp 2 (11,100 SY) - Design
Grass Valley Nevada County General Aviation 020 $55,316 Rehabilitate Taxiway - Taxiway A (4,900 feet) - Design
Hanford Hanford Municipal General Aviation 026 $76,500 Rehabilitate Runway - Pavement Slurry Seal- Design Phase I
Hayward Hayward Executive Reliever 021 $324,000 Improve Runway Safety Area - Design- Sulphur Creek Runway 10L/28R and Runway 10R/28L Safety Areas Improvements
Healdsburg Healdsburg Municipal General Aviation 013 $199,126 Install Perimeter Fencing - Install Perimeter Fence - Construction.
Hollister Hollister Municipal General Aviation 020 $82,620 Construct Taxiway - Construct new connector Taxiway B to eliminate aligned taxiway at Runway 31 end - Design
Hollister Hollister Municipal General Aviation 020 $115,424 Construct Taxiway - Construct new connector Taxiway A to eliminate aligned taxiway at Runway 24 end - Design
Page 31 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Hollister Hollister Municipal General Aviation 020 $172,353 Construct Taxiway - Construct partial parallel Taxiway K to mitigate runway incursions - Design
Inyokern Inyokern General Aviation 031 $566,171 Install Perimeter Fencing not Required by 49 CFR 1542 - Replace 8,700 feet of perimeter fence
King City Mesa Del Rey General Aviation 015 $914,868 Rehabilitate Runway Lighting - Replace existing runway edge lighting system (MIRL) including signage and electrical vault.
Lancaster General Wm J Fox Airfield General Aviation 019 $12,843,245 Reconstruct Runway - Phase 2 - Construct
Lone Pine Lone Pine/Death Valley General Aviation 013 $100,000 Rehabilitate Runway - Including RSA Improvements - Design only
Lone Pine Lone Pine/Death Valley General Aviation 013 $43,375 Rehabilitate Taxiway - Taxiway B - Design Only
Lone Pine Lone Pine/Death Valley General Aviation 013 $43,375 Rehabilitate Taxiway - Taxiway A - Design Only
Los Angeles Los Angeles International Primary 094 $6,000,000 Construct Apron - Bradley East and West Aprons; 3-06-0139-LOI-2008
Los Angeles Los Angeles International Primary 094 $5,000,000 Construct Taxiway - Taxiway T and associated projects; 3-06-0139-LOI-2008
Los Angeles Los Angeles International Primary 095 $25,225,602 Construct Taxiway - C-14
Los Angeles Los Angeles International Primary 096 $20,000,000 Noise Mitigation Measures for Residences within 65-69 DNL -Approx. 700 Homes - Inglewood
Los Angeles Los Angeles International Primary 097 $10,000,000 Noise Mitigation Measures for Residences within 65-69 DNL - Approximately 239 - Los Angeles County
Marina Marina Municipal General Aviation 014 $145,530 Extend Taxiway - Extend Entry Taxiway B approximately 650 feet to align with the Runway End 29 - Design Phase 1.
Mojave Mojave Air and Space Port General Aviation 030 $1,364,086 Extend Taxiway - Taxiway B
Monterey Monterey Regional Primary 067 $1,332,451 Rehabilitate Runway - Rehabilitate/overlay Runway 10L/28R.
Monterey Monterey Regional Primary 067 $100,000 Install Runway Vertical/Visual Guidance System - Install PAPI and REIL - ATO Reimbursable Agreement
Page 32 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Monterey Monterey Regional Primary 067 $200,000 Install Runway Vertical/Visual Guidance System - Install PAPI and REIL - Design/Construct
Napa Napa County Reliever 038 $2,229,812 Rehabilitate Runway - Runway 18L/36R (2,510 x 75 feet) - design/construct
Napa Napa County Reliever 038 $11,705,002 Rehabilitate Runway - Rehabilitate Runway 18R/36L including safety area grading and intersecting portion of Runway 6/24 - Construction
Napa Napa County Reliever 039 $160,650 Rehabilitate Runway - FAA ATO Reimbursable Agreement - Rehabilitate Runway 18R/36L
Oakdale Oakdale General Aviation 016 $564,556 Rehabilitate Taxiway - Rehabilitate Parallel Taxiway (mill/overlay/marking, 2,700 feet) and Rehabilitate Taxiway Connectors A, B, C, D, E, and F (crack seal/seal coat/marking, 765 feet) - Construction
Oakdale Oakdale General Aviation 016 $473,115 Rehabilitate Runway - Rehabilitate Runway 10/28 (crack seal/seal coat/marking, 3,013 feet) - Construction
Oakdale Oakdale General Aviation 016 $400,000 Install Perimeter Fencing not Required by 49 CFR 1542 - Install Perimeter Fencing, Phase 2 (6,100 feet) - Construction
Oakland Metropolitan Oakland International
Primary 079 $200,000 Rehabilitate Service Road - Rehabilitate Tug Road (mill/overlay/marking, 500 feet) - Design/Construction
Oakland Metropolitan Oakland International
Primary 079 $1,244,669 Rehabilitate Taxiway - Rehabilitate Taxiway Tango, Between Sierra and Bravo (mill/overlay/marking, 1,130 feet) - Design/Construction
Oakland Metropolitan Oakland International
Primary 079 $3,030,989 Install Airfield Guidance Signs - Replace and Install 75 Airfield Signs - Design/Construction
Oceano Oceano County General Aviation 009 $216,330 Conduct Environmental Study - EA for runway widening and taxiway A widening to meet standards, pollution control facility
Ontario Ontario International Primary 041 $401,172 Install Runway Lighting - Phase I, Design
Ontario Ontario International Primary 041 $781,445 Rehabilitate Taxiway - Twy S, Phase I, Design
Ontario Ontario International Primary 041 $0 Construct Taxiway - Twy A, Phase I, Design
Ontario Ontario International Primary 042 $3,341,181 Rehabilitate Apron - Terminal 1 Apron (31,460 SY)
Ontario Ontario International Primary 042 $1,670,174 Rehabilitate Apron - South Cargo Apron (48,400 SY)
Page 33 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Ontario Ontario International Primary 044 $709,780 Conduct Miscellaneous Study - Conduct Airport Pavement Management Program Study
Orland Haigh Field General Aviation 007 $205,258 Rehabilitate Runway - Rehabilitate RWY 15/33 (crack/slurry seal, including markings) - approximately 330,000 square feet - Construction - Phase 2
Oroville Oroville Municipal General Aviation 023 $631,690 Construct Taxiway
Palm Springs Jacqueline Cochran Regional General Aviation 025 $750,421 Rehabilitate Runway - Phase II, Construct
Palm Springs Jacqueline Cochran Regional General Aviation 025 $400,000 Rehabilitate Taxiway - Parallel Taxiway F and connectors
Palo Alto Palo Alto Reliever 014 $11,049,587 Reconstruct Apron - Apron Reconstruction - Phase 2
Placerville Placerville General Aviation 019 $545,456 Rehabilitate Taxiway Lighting - Replace Parallel Taxiway A (3,970 feet) and Connector Taxiway B, C, D, and F (400 feet) Edge Lights -Construction
Redding Benton Field General Aviation 020 $383,655 Construct Service Road - Construct New Perimeter Vehicle Service Road ( approx. 1,800 SY) on Northwest Side- Design/Construct
Redding Benton Field General Aviation 020 $720,726 Rehabilitate Taxiway - Rehabilitate Parallel Taxiway "B" (approx. 2,300 feet x 30 feet) including the north and south run-up pads -Construction Phase 2.
Redding Redding Municipal Primary 052 $658,596 Reconstruct Access Road - Reconstruct Terminal Loop Access and Air Cargo Road - Design
Redding Redding Municipal Primary 052 $170,042 Rehabilitate Taxiway - Taxiway H (approx. 1,200 ft long X 50 ft wide - Design
Redding Redding Municipal Primary 052 $170,042 Rehabilitate Runway - Rehabilitate Runway 16/34 including Runway 16 end Blast Pad - Design
Reedley Reedley Municipal General Aviation 019 $221,001 Rehabilitate Runway - Runway 15/33 Crack Seal, Seal Coat and Remarking -Construct
Rio Vista Rio Vista Municipal General Aviation 018 $158,955 Improve Airport Drainage - Phase 3 - Construction - North Apron -Alternative 3 (1 catch basin)
Page 34 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Riverside March ARB Reliever 013 $3,070,228 Construct Taxiway - Taxiway G (cargo apron edge taxilane) realignment
Sacramento State of California 010 $250,240 Update State System Plan Study - CALTRANS Aeronautics Division - Update California Aviation System Plan (CASP)
Salinas Salinas Municipal General Aviation 027 $1,160,916 Rehabilitate Runway - R/W 13/31 Rehab - Construct
San Diego San Diego International Primary 079 $12,169,008 Rehabilitate Taxiway - B1,B4-7,C3-4,C6
San Diego San Diego International Primary 080 $1,119,195 Conduct Noise Compatibility Plan Study - Part 150 Study Update
San Diego San Diego International Primary 081 $12,000,000 Noise Mitigation Measures for Residences within 65-69 DNL - Approx 350 homes
San Diego San Diego International Primary 082 $131,250 Acquire Equipment - Acquire 20 Automatic Dependent Surveillance Broadcast (ADS-B) "Squitter" units
San Diego/El Cajon
Gillespie Field Reliever 030 $84,330 Construct Apron - Environmental Mitigation, El Cajon Air Center - Ambrosia mitigation, final/year 3 to 5 monitoring
San Jose Norman Y Mineta San Jose International
Primary 096 $10,262,904 Reconstruct Apron - Terminal B Apron South Ramp - Construction - Phase 2
San Jose Norman Y Mineta San Jose International
Primary 097 $5,293,994 Rehabilitate Runway Lighting - Design/Construction.
Santa Barbara Santa Barbara Municipal Primary 052 $655,984 Acquire Aircraft Rescue & Fire Fighting Vehicle - 1,500 gallon
Santa Barbara Santa Barbara Municipal Primary 053 $1,958,656 Rehabilitate Apron - Northeast GA Apron, phase 1 (Hangar Areas 1&2 approximately 9,200 SY)
Santa Barbara Santa Barbara Municipal Primary 054 $340,809 Rehabilitate Apron - Northeast GA Apron, phase 2 (Hangar Area 3, approximately 6,650 SY)
Santa Maria Santa Maria Public/Capt G Allan Hancock Field
Primary 036 $3,180,639 Rehabilitate Apron - Terminal Apron, Phase II
Santa Rosa Charles M Schulz - Sonoma County
Primary 054 $1,179,999 Reconstruct Apron - Reconstruct Terminal Apron (15,400 SY) - Phase 1 reimbursement
Santa Rosa Charles M Schulz - Sonoma County
Primary 055 $613,594 Update Airport Master Plan Study - Updated Airport Layout Plan (ALP) Narrative Report.
Page 35 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Shafter Shafter-Minter Field General Aviation 024 $150,000 Construct Taxiway - Construct Box Hangar Taxilane (400' x 25')
South Lake Tahoe
Lake Tahoe General Aviation 041 $587,104 Rehabilitate Apron - Rehabilitate Terminal Apron, (mill/overlay/marking, 4,726 square yards) - Construction
Stockton Stockton Metropolitan Primary 039 $4,345,708 Extend Taxiway - Taxiway B Extension to Runway End 29R -Design/Construction.
Stockton Stockton Metropolitan Primary 040 $2,905,136 Reconstruct Apron - Apron Reconfiguration to eliminate direct access to runways and to allow aircraft to taxi safely behind parked aircraft
Tracy Tracy Municipal General Aviation 019 $1,805,877 Reconstruct Taxiway - Reconstruct T-Hangar Taxilanes (19,314 sq. yd)
Tracy Tracy Municipal General Aviation 019 $40,950 Install Miscellaneous NAVAIDS - Replace airport rotating beacon
Truckee Truckee-Tahoe General Aviation 037 $1,914,736 Rehabilitate Taxiway - Reconstruct Taxilane R - 128,240 Sq. Ft. - Design/Construction.
Truckee Truckee-Tahoe General Aviation 037 $66,987 Rehabilitate Taxiway - Rehabilitate Hangar Taxilanes A, B & C - Design/Construction.
Tulelake Tulelake Municipal General Aviation 013 $83,667 Rehabilitate Taxiway - Rehabilitate Taxiway -A ( Approx. 19'x 915' )-Design Reimbursement and Construction
Vacaville Nut Tree General Aviation 022 $430,765 Install Perimeter Fencing not Required by 49 CFR 1542 - Install 6,700 feet of perimeter fence with wildlife skirting - Construction
Van Nuys Van Nuys Reliever 015 $15,725,738 Reconstruct Taxiway - Taxiway B - Phase 2
Van Nuys Van Nuys Reliever 015 $14,230,187 Reconstruct Taxiway - Taxiway A - Phase 2
Watsonville Watsonville Municipal General Aviation 017 $46,800 Rehabilitate Runway - Runway Rehabilitation (4,000 feet) Runway 09/27 - Design Phase I.
Watsonville Watsonville Municipal General Aviation 017 $520,000 Rehabilitate Runway - Rehabilitate Runway 2/20, Seal cracks and remark - Construct
Watsonville Watsonville Municipal General Aviation 017 $80,000 Install Runway Vertical/Visual Guidance System - REILS - Design/Construct
Page 36 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
California
Watsonville Watsonville Municipal General Aviation 017 $147,028 Install Airfield Guidance Signs - Install Runway 9/27 guidance signs - Design/Construct
Watsonville Watsonville Municipal General Aviation 017 $200,000 Install Airfield Guidance Signs - Replace Runway 2/20 Guidance Signs - Design/Construct
Watsonville Watsonville Municipal General Aviation 017 $261,398 Rehabilitate Taxiway - Rehabilitate parallel Taxiway A and connectors
California $251,429,034
Page 37 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Colorado
Alamosa San Luis Valley Regional/Bergman Field
Commercial Service
023 $2,767,771 Install Perimeter Fencing not Required by 49 CFR 1542
Aspen Aspen-Pitkin County/Sardy Field
Primary 053 $6,008,870 Construct Runway
Boulder Boulder Municipal General Aviation 013 $124,468 Rehabilitate Taxiway
Boulder Boulder Municipal General Aviation 013 $217,032 Rehabilitate Runway
Burlington Kit Carson County General Aviation 014 $295,970 Conduct Airport Master Plan Study
Colorado Springs City of Colorado Springs Municipal
Primary 062 $10,477,921 Reconstruct Taxiway
Colorado Springs City of Colorado Springs Municipal
Primary 063 $480,000 Rehabilitate Taxiway - Design
Colorado Springs City of Colorado Springs Municipal
Primary 064 $10,850,000 Rehabilitate Taxiway
Colorado Springs State of Colorado 015 $250,000 Conduct State System Plan Study
Delta Blake Field General Aviation 012 $324,037 Reconstruct Runway Lighting
Delta Blake Field General Aviation 012 $360,860 Extend Taxiway
Delta Blake Field General Aviation 012 $3,425,108 Reconstruct Runway
Denver Centennial Reliever 051 $600,000 Conduct Airport Master Plan Study
Denver Denver International Primary 092 $500,000 Rehabilitate Taxiway Lighting
Denver Denver International Primary 092 $7,000,000 Rehabilitate Taxiway
Denver Denver International Primary 093 $1,393,606 Rehabilitate Taxiway Lighting
Denver Denver International Primary 093 $3,010,467 Rehabilitate Runway Lighting
Denver Denver International Primary 093 $800,000 Rehabilitate Taxiway
Page 38 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Colorado
Denver Denver International Primary 093 $1,500,000 Rehabilitate Runway
Denver Denver International Primary 094 $2,306,394 Rehabilitate Taxiway
Denver Denver International Primary 095 $1,445,371 VALE Infrastructure
Durango Durango-La Plata County Primary 051 $230,495 Reconstruct Taxiway - Design
Eagle Eagle County Regional Primary 059 $5,659,460 Reconstruct Apron
Erie Erie Municipal General Aviation 018 $616,039 Construct Snow Removal Equipment Building -
Fort Collins/Loveland
Northern Colorado Regional Commercial Service
036 $300,000 Conduct Airport Master Plan Study
Fort Morgan Fort Morgan Municipal General Aviation 013 $110,371 Reconstruct Apron
Fort Morgan Fort Morgan Municipal General Aviation 013 $18,609 Expand Apron
Granby Granby-Grand County General Aviation 012 $160,000 Rehabilitate Runway
Granby Granby-Grand County General Aviation 012 $35,000 Rehabilitate Apron
Granby Granby-Grand County General Aviation 012 $25,000 Rehabilitate Taxiway
Grand Junction Grand Junction Regional Primary 057 $3,225,000 Construct Runway - Relocation of RTR
Grand Junction Grand Junction Regional Primary 058 $1,966,494 Construct Runway - Relocation of 27 1/4 Road
Grand Junction Grand Junction Regional Primary 059 $1,512,000 Rehabilitate Taxiway
Grand Junction Grand Junction Regional Primary 060 $610,383 Construct Runway - Reimbursable for RTR
Grand Junction Grand Junction Regional Primary 061 $900,000 Construct Runway - Design - earthwork, detention ponds, utilities and perimeter road
Gunnison Gunnison-Crested Butte Regional
Primary 054 $617,408 Acquire Snow Removal Equipment
Hayden Yampa Valley Primary 044 $500,000 Rehabilitate Apron
Page 39 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Colorado
Hayden Yampa Valley Primary 044 $3,930,000 Construct Apron
Leadville Lake County General Aviation 013 $5,800,000 Rehabilitate Runway
Limon Limon Municipal General Aviation 013 $303,268 Rehabilitate Runway
Limon Limon Municipal General Aviation 013 $150,000 Construct Taxiway
Longmont Vance Brand General Aviation 016 $457,131 Construct Taxiway
Meeker Meeker Coulter Field General Aviation 013 $150,000 Conduct Airport Master Plan Study
Monte Vista Monte Vista Municipal General Aviation 013 $300,000 Conduct Airport Master Plan Study
Montrose Montrose Regional Primary 050 $530,836 Widen Taxiway
Montrose Montrose Regional Primary 050 $531,000 Expand Apron
Pueblo Pueblo Memorial General Aviation 036 $3,260,528 Rehabilitate Apron
Steamboat Springs
Steamboat Springs/Bob Adams Field
General Aviation 024 $300,000 Conduct Airport Master Plan Study
Wray Wray Municipal General Aviation 016 $282,486 Rehabilitate Runway - Design - funds include FY 16/17
Colorado $86,619,383
Page 40 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Connecticut
Bridgeport Igor I Sikorsky Memorial General Aviation 033 $450,000 Update Airport Master Plan Study
Bridgeport Igor I Sikorsky Memorial General Aviation 034 $170,435 Conduct Noise Compatibility Plan Study - Noise Exposure Map
Danbury Danbury Municipal Reliever 043 $71,370 Conduct Miscellaneous Study - pavement analysis and plan
Meriden Meriden Markham Municipal
General Aviation 021 $4,000 Rehabilitate Taxiway - TW markings
Meriden Meriden Markham Municipal
General Aviation 021 $16,000 Rehabilitate Runway - markings
Meriden Meriden Markham Municipal
General Aviation 021 $89,800 Install Perimeter Fencing not Required by 49 CFR 1542 - replace portion of perimeter fence
New Haven Tweed-New Haven Primary 051 $2,504,946 Noise Mitigation Measures for Residences within 65-69 DNL -
Oxford Waterbury-Oxford General Aviation 027 $228,500 Remove Obstructions [APP or DEP] - R/W 36 Easement Acquisition
Plainville Robertson Field Reliever 009 $800,671 Rehabilitate Apron
Windsor Locks Bradley International Primary 065 $13,181,319 Rehabilitate Taxiway - taxiway C & R south
Connecticut $17,517,041
Page 41 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Delaware
Dover State of Delaware 014 $108,000 Update State System Plan Study
Dover/Cheswold Delaware Airpark General Aviation 021 $346,500 Update Airport Master Plan Study
Dover/Cheswold Delaware Airpark General Aviation 021 $14,310 Wildlife Hazard Assessments - Site Visit
Georgetown Delaware Coastal General Aviation 034 $5,532,528 Install Infrastructure to support RNAV Approach - Construct Parallel Taxiway D (construct)
Wilmington New Castle Reliever 043 $4,133,293 Construct Taxiway - Taxiway B (construction RW 1end)
Wilmington New Castle Reliever 044 $241,509 Construct Taxiway - Taxiway B (reimbursable agreement)
Wilmington New Castle Reliever 045 $1,015,900 Remove Obstructions - Off Airport (design/construct)
Wilmington New Castle Reliever 046 $115,020 Wildlife Hazard Assessments - WHA Update
Delaware $11,507,060
Page 42 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
District of Columbia
Washington Washington Metropolitan Area
015 $250,000 Conduct Metropolitan System Plan Study
District of Columbia $250,000
Page 43 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Florida
Apalachicola Apalachicola Regional-Cleve Randolph Field
General Aviation 009 $282,250 Conduct Airport Master Plan Study - Master Plan and ALP Update
Arcadia Arcadia Municipal General Aviation 006 $635,234 Rehabilitate Taxiway - Rehabilitate T-Hangar Taxilanes (Construction)
Bartow Bartow Municipal General Aviation 036 $411,106 Improve Airport Drainage - Drainage Improvement (Phase 2 West Construction)
Blountstown Calhoun County General Aviation 007 $90,821 Install Taxiway Lighting - Install TW Lighting to North Portion of Parallel Taxiway Construction
Blountstown Calhoun County General Aviation 007 $70,875 Improve Airport Drainage - Improve Airfield Drainage related to North Parallel Taxiway (Construction)
Boca Raton Boca Raton Reliever 023 $32,698 Widen Taxiway - Widen Taxiway F (Design Only)
Boca Raton Boca Raton Reliever 023 $32,698 Widen Taxiway - Taxiway P4 Widening (Design Only)
Boca Raton Boca Raton Reliever 023 $32,699 Construct Taxiway - Relocate Taxiway B (Design Only)
Bonifay Tri-County General Aviation 012 $248,872 Update Airport Master Plan Study - Master Plan and ALP Update
Bonifay Tri-County General Aviation 013 $330,270 Construct Taxiway - Construct Taxilane Designed with AIP in FY15
Brooksville Brooksville-Tampa Bay Regional
General Aviation 021 $491,042 Reconstruct Taxiway - TWY A Reconstruction (Design)
Crystal River Crystal River-Captain Tom Davis Field
General Aviation 008 $21,000 Install Miscellaneous NAVAIDS - Install Segmented Circle and two Wind Cones
Crystal River Crystal River-Captain Tom Davis Field
General Aviation 008 $91,000 Remove Obstructions [Non-Hazard] - Remove obstructions on the approach end of Runway 9.
Daytona Beach Daytona Beach International
Primary 077 $2,560,974 Improve Terminal Building - Bond Repayment for Renovations
Daytona Beach Daytona Beach International
Primary 078 $18,107,970 Rehabilitate Taxiway - Rehabilitate Parallel Taxiway N (Bid Schedule C and D - NW Portion of TW N Approx. 10567 LF.)
DeLand DeLand Municipal-Sidney H Taylor Field
Reliever 022 $768,948 Rehabilitate Apron - Rehabilitate Transient GA Apron
Page 44 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Florida
Fernandina Beach
Fernandina Beach Municipal General Aviation 027 $150,000 Install Weather Reporting Equipment - Install AWOS III
Fort Lauderdale Fort Lauderdale Executive Reliever 031 $295,277 Construct Taxiway - Construct Taxiway Foxtrot (Design)
Fort Lauderdale Fort Lauderdale Executive Reliever 031 $55,724 Install Taxiway Lighting - Install Taxiway F Lighting (Design)
Fort Lauderdale Fort Lauderdale/Hollywood International
Primary 083 $20,402,511 Extend Runway - Extend Runway 10R/28L (Phase 8)
Fort Lauderdale Fort Lauderdale/Hollywood International
Primary 084 $4,270,183 Construct Apron - Terminal 4 Apron
Fort Lauderdale Fort Lauderdale/Hollywood International
Primary 085 $24,065,184 Noise Mitigation Measures for Residences within 65-69 DNL - Noise Mitigation Measures (Phase 6)
Fort Lauderdale Fort Lauderdale/Hollywood International
Primary 085 $19,366,221 Noise Mitigation Measures for Residences within 65-69 DNL - Noise Mitigation Measures (Phase 7)
Fort Myers Southwest Florida International
Primary 054 $1,154,110 Rehabilitate Taxiway - Rehabilitate Taxiway A1,A10,A3,A4,A5,F,G,G1,G2 (Design)
Fort Myers Southwest Florida International
Primary 054 $429,237 Rehabilitate Taxiway Lighting - Rehabilitate Taxiway Lighting A1,A10,A3,A4,A5,F,G,G1,G2 & correct HS2 (Design)
Fort Myers Southwest Florida International
Primary 054 $116,959 Rehabilitate Apron - Rehabilitate North Apron (Design)
Fort Myers Southwest Florida International
Primary 054 $557,264 Rehabilitate Apron - Rehabilitate Cargo (Design)
Fort Myers Southwest Florida International
Primary 054 $442,817 Expand Apron - Expand Concourse D Ramp
Gainesville Gainesville Regional Primary 041 $647,514 Expand Terminal Building - Expand Terminal Building-Construct
Jacksonville Jacksonville Executive at Craig
Reliever 023 $2,378,897 Rehabilitate Runway - Rehab Runway 14/32 PCI 55. Design and Construct
Page 45 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Florida
Jacksonville Jacksonville Executive at Craig
Reliever 023 $1,658,021 Construct Taxiway - Construct Taxiway A3
Jacksonville Jacksonville International Primary 056 $589,767 Update Airport Master Plan Study - Conduct Airport Master Plan Update
Key West Key West International Primary 056 $90,000 Rehabilitate Taxiway Lighting - Rehabilitate Taxiway A Lighting (Design)
Key West Key West International Primary 056 $678,420 Modify Access Road - Modify Airport Access Road (Design and Construction)
Key West Key West International Primary 056 $451,048 Rehabilitate Taxiway - Rehabilitate Taxiway A (Design)
Key West Key West International Primary 057 $4,102,442 Noise Mitigation Measures for Residences within 65-69 DNL - NIP Construction of KWBTS Building C (Phase 1C); Preparation of Final Bid Documents and Bid Process for KWBTS Building A (Phase 1D)
Keystone Heights Keystone Airpark General Aviation 025 $3,613,927 Rehabilitate Taxiway - Rehab Taxiway Alpha-Construct
La Belle La Belle Municipal General Aviation 010 $1,401,192 Rehabilitate Apron - Rehabilitate Apron (Design & Construction)
Lake City Lake City Gateway General Aviation 023 $6,944,432 Rehabilitate Runway - Rehab Runway 10-28 PCI 65
Lake Wales Lake Wales Municipal General Aviation 019 $1,372,386 Rehabilitate Taxiway - Rehabiliate Taxiway "A" - 2,525 ft X 50 ft (Construction)
Lake Wales Lake Wales Municipal General Aviation 019 $698,991 Construct Taxiway - Construct TWY B North (Construction)
Lakeland Lakeland Linder Regional Reliever 041 $2,246,083 Reconstruct Taxiway - Reconstruct Taxiway H (Design and Construct)
Lakeland Lakeland Linder Regional Reliever 041 $2,247,286 Rehabilitate Apron - Rehabilitate Terminal Apron (Construction)
Live Oak Suwannee County General Aviation 013 $140,033 Expand Apron - Expand Apron
Marco Island Marco Island General Aviation 012 $3,553,411 Construct Apron - Construct Apron - Construction Phase
Melbourne Melbourne International Primary 046 $350,000 Remove Obstructions [Hazard] - Remove Obstruction
Page 46 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Florida
Merritt Island Merritt Island General Aviation 020 $234,537 Reconstruct Apron - Reconstruct South Apron
Miami Miami Executive Reliever 013 $942,547 Construct Taxiway - Construct Taxiway H - Hot Spot 1_RIM HS1 (Design)
Miami Miami International Primary 073 $9,763,527 Rehabilitate Apron - Rehabilitate MIA CTRL Base Apron -Construction Phase 1 (Sponsor's Phase 1A Part A)
Miami Miami International Primary 073 $1,526,432 Expand Apron - Expand Cargo Apron - Bldg 716 (Construction)
Miami Miami International Primary 074 $308,625 Acquire Equipment - Acquire 50 ADS-B Squitters
Orlando Executive Reliever 031 $452,499 Rehabilitate Taxiway - Rehab TWY A,J (RIM) Design
Orlando Orlando International Primary 118 $752,171 Rehabilitate Runway - Rehab Runway 18L/36R
Orlando Orlando International Primary 118 $16,081,711 Rehabilitate Runway - Rehabilitate Runway 17R/35L (Construct)
Orlando Orlando Sanford International
Primary 078 $4,371,699 Construct Apron - Construct Terminal Apron
Orlando Orlando Sanford International
Primary 079 $1,031,228 Update Airport Master Plan Study - Conduct Master Plan Update
Ormond Beach Ormond Beach Municipal Reliever 021 $182,003 Extend Runway - Extend Runway 8
Ormond Beach Ormond Beach Municipal Reliever 021 $181,773 Extend Taxiway - Extend Taxiway Alpha
Ormond Beach Ormond Beach Municipal Reliever 021 $1,637,869 Rehabilitate Runway - Rehab Runway 8-26 (Construction)
Ormond Beach Ormond Beach Municipal Reliever 021 $250,000 Rehabilitate Runway Lighting - Rehab Runway Lighting
Palatka Palatka Municipal - Lt Kay Larkin Field
General Aviation 028 $144,747 Install Taxiway Lighting - Install Taxiway Lighting
Palm Coast Flagler Executive General Aviation 019 $190,350 Update Airport Master Plan Study - Update Master Plan - Phase 2
Palm Coast Flagler Executive General Aviation 019 $27,261 Wildlife Hazard Assessments - Wildlife Hazard Management Plan (WHMP)
Panama City Northwest Florida Beaches International
Primary 010 $226,215 Environmental Mitigation - Environmental Mitigation Phase 2 of 8 (Ongoing Mitigation)
Panama City Northwest Florida Beaches International
Primary 011 $1,069,929 Rehabilitate Apron - Rehabilitate small portion of apron (Construction)
Page 47 of 206
-
City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project
Florida
Panama City Northwest Florida Beaches International
Pri