Sabarmati River Front Development ProjectSabarmati Riverfront Development Corporation Ltd, Ahmedabad
Ahmedabad Municipal Corporation
Sabarmati has been an integral part in the life of Ahmedabad…
• It is an important source of water for the city
•A space for cultural and recreational activities
Project Objectives
1.Reconnect the city to the river2.Create a conducive urban
environment3.Create an identity for the city
Key aspects of the Project
1. Overall environmental improvement
2. Creating high quality public open spaces
3. Providing adequate public access to the river
4. Rehabilitating the slums
5. Creating vibrant urban neighborhoods
6. Providing city level infrastructure
SPV to Execute Sabarmati River Front Development
• Ahmedabad Municipal Corporation (AMC) constituted a SPV in 1997
Sabarmati River Front Development Corporation Ltd (SRFDCL)a Company under the Companies Act.
• Chairman: Municipal Commissioner• Board of Directors :
– Mayor, Chairman Standing Committee, Leader Opposition (AMC), Technical Experts, Collector-Ahmedabad, ED HUDCO, Deputy Commissioner-AMC
Financing of the PROJECT
• Estimated Cost (2005 price) Phase-1= Rs. 824.24 cr. (under construction)Phase-2 = Rs. 462.93 cr.
• Equity of AMC = Rs. 75 cr.• Loan from HUDCO = Rs. 550 cr. • Loan tenure 3 yr moratorium + 8 years• Loan servicing being done by AMC• Source of Revenue: 20% of the reclaimed
land to be allotted for commercial development
Project area
10.5 kms stretch
Railway Bridge
Vasna Barrage
The area is delineated based on• Current extents of the city• Future potentials of the area
Study of Sabarmati River Basin
☺
☺ ☺
☺
DATUM DATUM
RL
IN M
ETE
RS
E2-41.621
E3-42.390
E4-41.439
E1-43.28
E9-39 .783E8-40.338E5-40.715
E11-39.525
E10-40.963
E6-42 .900 E7-42.735
Analysis
•Hydrology review of the Sabarmati river catchments
Study of river hydraulics by NIH Roorkie, IIT Roorkie, M/s. CC Patel Associates
☺
0
0123456789101112131416 15
123456789
10
☺
100 - 120m 100 - 120m275m
30m 30m275m
•Water retention study
•Optimal width of water is 275 mts
Analysis
Construction Work
• Diaphragm wall, Anchor slab & Ghaats
• Earthfilling
• Retaining wall
• Diversion of Sewer
Sardar Bridge to Vasna Barrage (West)7
U/s Of Subhash Bridge to AEC in West & Cantonment in East9 & 10
Gandhi Bridge to Ellis Bridge- East4
Ellis Bridge to Sardar Bridge- East & West5 & 6
Sardar Bridge to Vasna Barrage (East)8
Dudheshwar to Gandhi Bridge- East3
Subhash Bridge to Gandhi Bridge -West2
Gandhi Bridge to Ellis Bridge – West1
LocationStretch
Aerial view after proposed construction of Level-1
Infrastructure
Main trunk sewer
Provision of an integrated storm water and sewage drainage system• Diversion of sewers connecting all sewage outfalls•A main trunk sewer connecting all such outfalls to the STP•Pumping stations at regular intervals
Pumping station
To Sewage treatment plant
West bank
East Bank
Based on Hydrological Study by NIH Roorkie and IIT Roorkiethe clearance height of bridges will be increased by 1 mtr.
•Bring back focus to the centre city
•Reconnect the city to the river
The riverfront holds great potential…
Public access to the riverfront
Establishing and strengthening accessibility to and along the riverfront•Improved pedestrian and bicycle circulation•New transportation systems along the river•Opening up visual vistas
West bank
East Bank
East River street
Slum rehabilitation and informal activities
Rehabilitation of Sunday Market New
rehabilitation housing
New rehabilitation housing
Informal market
New rehabilitation housingInformal
market
Accommodating the project affected section in the overall plan•Reorganizing the existing informal markets and creating new opportunities along the river•Provide new housing as a part of slum rehabilitation
West bank
East Bank
New urban neighborhoods
Creating opportunities for new developments by integrating with the existing•Creating a business district•Commercial / Retail•Residential
West bank
East Bank
Commercial
Business district
Residential
ResidentialCommercial
River Promenade
11 meter wide pedestrian lower promenade
6 meter wide pedestrian lower promenade15 meter wide upper promenade
River Promenade
View of Lower promenade
View of public park
Sabarmati River Front Sabarmati River Front DevelopmentDevelopment
•• Progress of ExecutionProgress of Execution
DIAPHRAGM WALL & ANCHOR SLAB
U/s of Subhash Bridge (East & West)
Sardar Bridge to Vasna Barrage (East)
Sardar Bridge to Vasna Barrage (West)
Ellis Bridge to Sardar Bridge (E & W)
Gandhi Bridge to Ellis Bridge (East)
Dudheshwar to Gandhi Bridge (East)
Subhash Bridge to Gandhi Bridge (West)
Gandhi Bridge to Ellis Bridge (West)
Location
in progress
Started
Started
@ completion
@ completion
@ completion
@ completion
@ completion
Status
8
9 & 10
7
5 & 6
4
3
2
1
Stretch
DIAPHRAGM WALL & ANCHOR SLABStretch 1 - Gandhi Bridge to Ellis Bridge (West)
• Agency : ITD Cementation India Limited• Project Cost: Rs. 22.95 crores• Start Date: 07/02/2005
100.001797RMTAnchor Slab100.002065RMTDiaphragm wall88.88665000CMTEarth filling
% work doneQuantityUnitDescription
DIAPHRAGM WALL & ANCHOR SLABStretch 2 – Subhash Bridge to Gandhi Bridge (West)
• Agency : ITD Cementation India Limited• Project Cost: Rs. 25 crores• Start Date: 07/02/2005
100.002648RMTAnchor Slab100.003029RMTDiaphragm wall97.12280000CMTEarth filling
% work doneQuantityUnitDescription
DIAPHRAGM WALL & ANCHOR SLABStretch 3 – Dudheshwar to Gandhi Bridge (East)
• Agency : Gammon India Limited• Project Cost: Rs. 20.16 crores• Start Date: 07/04/2005
100.001968RMTAnchor Slab100.002176RMTDiaphragm wall89.92200000CMTEarth filling
% work doneQuantityUnitDescription
DIAPHRAGM WALL & ANCHOR SLABStretch 4 –Gandhi Bridge to Ellis Bridge (East)
• Agency : Gammon India Limited• Project Cost: Rs. 20.60 crores• Start Date: 07/04/2005
100.001724RMTAnchor Slab100.001974RMTDiaphragm wall80.20200000CMTEarth filling
% work doneQuantityUnitDescription
DIAPHRAGM WALL & ANCHOR SLABStretch 5 & 6 –Ellis Bridge to Sardar Bridge (East & West)
• Agency : ITD Cementation India Limited• Project Cost: Rs. 33.18 crores• Start Date: 07/02/2006
97.602248RMTAnchor Slab100.002525RMTDiaphragm wall86.45947000CMTEarth filling
% work doneQuantityUnitDescription
DIAPHRAGM WALL & ANCHOR SLABStretch 7 - Sardar Bridge to Vasna Barrage (West)
• Agency : ITD Cementation India Limited• Project Cost: Rs. 45.06 crores• Start Date: 28/05/2007
0.003000RMTAnchor Slab23.203000RMTDiaphragm wall57.63495362CMTEarth filling
% work doneQuantityUnitDescription
DIAPHRAGM WALL & ANCHOR SLABStretch 8 Sardar Bridge to Vasna Barrage (East)
• Agency : ITD Cementation India Limited• Project Cost: Rs. 42.27 crores• Start Date: 28/05/2007
0.003000RMTAnchor Slab3.203000RMTDiaphragm wall
28.85424352CMTEarth filling% work doneQuantityUnitDescription
DIVERSION OF SEWERRAILWAY BRIDGE TO ELLIS BRIDGE (WEST)
• Agency : Alcock Cement Pipes & Concrete Works• Project Cost: Rs. 5.65 crores• Start Date: 15/01/2006
67.456375RMTLaying of Pipeline
% work doneQuantityUnitDescription
DIVERSION OF SEWERRAILWAY BRIDGE TO ELLIS BRIDGE (EAST)
• Agency : Ramky Infrastructure Limited• Project Cost: Rs. 8.22 crores• Start Date: 15/04/2006
40.986100RMTLaying of Pipeline
% work doneQuantityUnitDescription
DIVERSION OF SEWERELLIS BRIDGE TO SARDAR BRIDGE (EAST & WEST)
• Agency : Alcock Cement Pipes & Concrete Works• Project Cost: Rs. 6.08 crores• Start Date: 01/03/2007
37.152530RMTLaying of Pipeline