ags project update public meeting st. lawrence lindsay...

37
AGS Project Update Public Meeting St. Lawrence Lindsay Gorrill April 19, 2016

Upload: others

Post on 12-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

AGS Project UpdatePublic Meeting St. Lawrence

Lindsay GorrillApril 19, 2016

Page 2: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Tonight’s Agenda

canadafluorspar.com

• Overview of the AGS Project.

• Break for coffee/tea.

• CFI staff will be at the posters.

• Guests invited to have discussion with staff at posters.

Page 3: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

History of Mining in St. Lawrence

canadafluorspar.com

• As you know St. Lawrence has a long mining history.• 1933 to 1978: continuous mining operations.• 1986 to 1992: mining resumed• 1994 to present: ongoing reserve delineation,

preliminary engineering, pre-feasibility and feasibility analysis.

• Numerous attempts to re-start the mine have failed due to market conditions and high capital costs.

Page 4: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

AGS Discovery

canadafluorspar.com

2013• AGS fluorspar vein (formerly known as Grebes

Nest) discovered through new diamond drilling and identified over 7 million tonnes of fluorspar resources in the Inferred Category.

• AGS is named after the late Arthur Gordon Stollery,  founding and major shareholder of Burin Minerals that became Canada Fluorspar.

2014 • More exploration drilling occurred and mineral

resources at the AGS property was increased to over 9 million tonnes with a significant portion of the resources in the Indicated Category.

Page 5: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Major Fluorspar Veins

canadafluorspar.com

Page 6: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

• CFI 100% owned by Golden Gate Capital.• GGC is a reputable private equity firm based in San

Francisco.• The main components of the Project include:

• Surface and underground mine development of the AGS Vein.

• Mill facility, with a production capacity of up to 200,000 tonnes per year of acid-grade fluorspar concentrate.

• Tailings Management Facility to store 2.8 million tonnes of tailings over the life of the Project.

• Infrastructure to support the mine and mill.• $250 million capital costs, minimum 10 years production.• With the discovery of other fluorspar ore bodies in the vicinity

of AGS, the life of the mine could be significantly extended.

Project Description

canadafluorspar.com

Page 7: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Overall General Arrangement

canadafluorspar.com

Page 8: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Site General Arrangement

canadafluorspar.com

Page 9: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

• Mill Building• Ore storage Building• Transfer Tower• Electrical Building• Concentrate Storage Building• Admin. & Engineering Building• Storage Buildings• Security Building• Flocculent Treatment Building• Laboratory Building• Dryhouse• Maintenance Buildings

Buildings at Site

canadafluorspar.com

Page 10: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Mine General Arrangement

canadafluorspar.com

Page 11: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

3D Model View of Mill Area

canadafluorspar.com

Page 12: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Project Schedule

canadafluorspar.com

Page 13: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Safety • Safety culture is a strong focus.• CFI is developing plans to eliminate or minimize the risks of

human injury or damage to property throughout the life the project; this applies to all components and structures.

• A project specific health and safety manual is being created that will set the expectations for all contractors performing work on the project.

Milestone• CFI employees have worked 57,807 person hours without

recording a medical aid or lost time injury.

canadafluorspar.com

Page 14: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Environment • Safety and environmental stewardship are priorities

for CFI.• Several environmental management plans are

being developed prior to start of construction.• Environmental Management Plans developed and

being implemented:• Environmental Protection Plan• Waste Management Plan• Environmental Effects Monitoring Plan• Water Management Plan• Rehabilitation and Closure Plan

canadafluorspar.com

Page 15: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

• Regulatory approval with conditions received Nov 2015.• CFI subsequently submitted revised information to provincial

government.• Certificate of Approval for Construction received in April from

Department of Environment and Conservation.• Bankable feasibility study completed in March.• CFI currently making plans to secure financing for Project.• Long lead items have been ordered:

• Mill building• Dense Medium Separator.

• Limited site work expected to begin in April.• Once financing is in place, Project will move to construction

phase where majority of contracts will be awarded and employment opportunities will be available.

Project Status

canadafluorspar.com

Page 16: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Fluorspar Market

canadafluorspar.com

Page 17: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Fluorspar Market• Fluorspar market is internationally competitive.• CFI is competing for customers with established mines in

Mexico, South Africa, Vietnam and China.• St. Lawrence will be the only operating fluorspar mine in

Canada and the US.• Location of AGS Project in St. Lawrence is advantageous

– near North American & European markets• While the long term outlook for Fluorspar appears

positive, market prices have dropped putting significant economic pressure on the AGS Project.

• Fluorspar is a product that supports the ‘green’ initiative.

canadafluorspar.com

Page 18: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Fluorspar MarketThe Fluorspar Value Chain > $112 billion*, listed as strategic mineral –USA, China and EU • Aluminum  

• Steel• Aerospace

• Electronic  &  Communication  • Computer  Applications• Flame  Retardant  Apparel• Housewares• Specialty  Coatings

• Fire  Extinguishing  • Refrigerants• Air  Conditioning• High  Performance  Materials• Lithium  Batteries

• Nuclear  Power• Solar  Panels

Fluoropolymers &  Fluorochemicals provide  a  stable  &  growing  source  of  Fluorspar  demand•-­‐ Source  -­‐ SRI  Consulting  

Fluorochemicals

Fluoropolymers

canadafluorspar.com

Page 19: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Tailings Management Facility

canadafluorspar.com

Page 20: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Tailings Management Facility (TMF)• CFI is committed to a project that has the least negative impact

on the environment & surrounding communities.• Tailings are produced as a by product of milling; sand-like texture.• The original environmental assessment application sought the

use of Shoal Cove Pond (SCP) as the preferred TMF.• SCP is an existing tailings pond which commenced use in 1933.• Reactivation of this existing tailings pond would have resulted in

upgrading the facility to current standards.• Fish are present, however, SCP is not used as a recreational

fishery.• November 2015: all areas of the Project were approved, with the

exception of the use of SCP as the TMF.• CFI is appealing this decision through DOEC.

canadafluorspar.com

Page 21: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

• Established as tailings pond in 1933

Shoal Cove Pond Tailings Pond

Shoal  Cove  tailings  pond,   1949

canadafluorspar.com

Page 22: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

• NL Department of Environment and Conservation directed CFI to develop alternative means of proceeding with the deposit and storage of tailings.

• CFI has identified an alternative TMF – AGS East and received regulatory approval in March 2016.

• AGS East will safely store tailings for 10 years.• For future mining operations, Shoal Cove Pond is required for

tailings deposition.• CFI is working hard secure permission to utilize SCP for future

use.

canadafluorspar.com

Tailings Management Facility (TMF)

Page 23: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

AGS East

• The Tailings Management Facility for the AGS Project will be located immediately north of the mill site.

• Tailings will be deposited into the Tailings Impoundment using a perimeter discharge pipeline.

• Excess Water will be transferred from the Tailings Impoundment to the Polishing Pond.

• Water in the Polishing Pond will either be reclaimed for process or discharged.

canadafluorspar.com

Page 24: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Fluorspar Concentrate Transportation

canadafluorspar.com

Page 25: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Transportation Update

• The original AGS Project Description included the construction of a marine terminal in the outer St. Lawrence Harbour for the loading of fluorspar concentrate.

• The construction of a new marine terminal has been determined to be too costly for the Project at this time.

• CFI was forced to investigate other technical & economically viable transportation options to move fluorspar concentrate.

• Studies indicate that having the concentrate shipped from an existing marine facility for the first few years of operation greatly improves the economic viability of the Project.

canadafluorspar.com

Page 26: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Transportation Update• CFI has determined that shipping concentrate from Cow Head is

the most economic transportation for the first few years of production; otherwise the Project would be uneconomic.

• Trucking 45km to Mortier Bay would result in 7 -10 additional trucking related jobs (drivers & load operators) for qualified residents of St. Lawrence, second priority for residents of Burin Peninsula.

• Safety features:• Trucks will be covered to prevent loss of material in transit• Fluorspar concentrate is not regulated under Transportation

of Dangerous Goods (TDG).• Transportation schedule will be designed to avoid school time

and heavier traffic times.• Vessels would load concentrate from Cow Head and proceed to

market.

canadafluorspar.com

Page 27: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Transportation Update

• Our plan is to build a marine terminal. • The Town will assist CFI in acquiring federal

government funding for the construction of a marine terminal shortly after mine operations begin.

• We commit to working diligently with the Town of St. Lawrence to secure the federal funding to build the marine terminal.

canadafluorspar.com

Page 28: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Economic Benefits

canadafluorspar.com

Page 29: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Economic Benefits• AGS Project will have a very positive, significant

impact on St. Lawrence and the Burin Peninsula.• Benefits include:

• 350 - 400 construction jobs for 2 years• 200 full time jobs for 10 years +• 525 additional indirect jobs

• Life of mine is expected to be significantly longer than 10 years.

• Direct salaries of approximately $10 million per year• Gender Equity and Diversity Program being

developed.

canadafluorspar.com

Page 30: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Project Employment – Sample Construction Phase

Pipefitters Electricians Welders

Heavy Equipment Operators

QA/QC Personnel

Project Schedulers

Millwrights Mechanics Insulators

Sheet Metal Workers

Concrete Finishers

Crane Operators

Construction Labourers Carpenters Truck Drivers

Industrial Painters Scaffolders Drillers

Ironworkers

canadafluorspar.com

Page 31: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Project Employment – Sample Operations PhaseGeneralLabourers

Blaster Maintenance planners

Human Resources

Heavy Duty Mechanics

ProcessPlant Operators

Accountants Purchasers

Millwrights LabTechnicians

Admin Support

Others

Electricians HSEpersonnel

Heavy Equipment operators

Haul Truck Drivers

MineEngineers

Geologists

Drillers Surveyors Miners

Warehousepersonnel

Operations Supervisors

Truck Drivers

canadafluorspar.com

Page 32: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Recruitment• Hiring preferences will be aimed at qualified residents within

the local area, the Burin Peninsula and then Newfoundland and Labrador.

• CFI positions are posted on website: www.canadafluorspar.com.

• CFI will expect the same from our contractors, once major contracts are awarded.

• Formed a partnership with Keyin College• Secured St. Lawrence campus to train students for

mining and milling jobs.• Training programs being developed

• Haul Truck drivers in association with training partner KeyinCollege.

• Plant Operators – simulator training• Implementing an apprenticeship program.

canadafluorspar.com

Page 33: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Recruitment• CFI is currently recruiting the following:

– Accountant– Security Officers– HSE Manager– HSE Co-ordinator– Environmental Technician

canadafluorspar.com

Page 34: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Community Relations• CFI is committed to being an exceptional corporate

citizen, embracing community spirit by supporting community initiatives – Solid and respectful working relationship with the Town of St.

Lawrence.

• Committed to communicate important Project information– CFI website launched: www.canadafluorspar.com– Check regularly for Project updates and job postings

canadafluorspar.com

Page 35: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Commitment to Community• CFI is establishing a fund to support

initiatives in St. Lawrence – Initial investment of $100,000 already made:

• Renovation to Rec Centre • Commemoration of 75th Anniversary of Truxtun and Pollux

planned for February 2017• State-of-the-art soccer score clock to St. Lawrence Soccer

Association• St. Lawrence Academy Safe Grad night.

• Fund for construction and operations phases being developed and will be announced publicly.

canadafluorspar.com

Page 36: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Conclusion• Thank you for coming tonight.• CFI is committed to delivering the AGS Project in a

safe and environmentally responsible manner.• Economic benefits to St. Lawrence and the Burin

Peninsula are a priority to us.• AGS Project is moving along. Expect financing to be

in place in 2016.• Committed to being open; Project information

available on website.

canadafluorspar.com

Page 37: AGS Project Update Public Meeting St. Lawrence Lindsay Gorrillcanadafluorspar.ca/wp-content/uploads/FINAL-Public...History of Mining in St. Lawrence canadafluorspar.com • As you

Thank You.

canadafluorspar.com