agl: the people story of pi and analytics€¦ · •2 x solar power stations (155mw) 0 2000 4000...

33
#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC AGL: The people story of PI and analytics Mark Faith (Manager ODC and Technology)

Upload: others

Post on 24-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

AGL: The people story of PI and analytics

Mark Faith (Manager ODC and Technology)

Page 2: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

2 #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Australian Gas Light Company (AGL)

• We operate the country’s largest electricity generation portfolio, we’re its largest ASX-listed investor in renewable energy, and we have more than 3.6 million customer accounts.

• Proudly Australian, with more than 180 years of experience, we have a responsibility to provide sustainable, secure and affordable energy for our customers.

• Our aim is to prosper in a carbon-constrained world and build customer advocacy as our industry transforms. That’s why we have committed to exiting our coal-fired generation by 2050 and why we will continue to develop innovative solutions for our customers.

AGL is committed to helping shape a sustainable energy future for Australia.

Page 3: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

The AGL Generation Fleet 300-10,000+ MW in 9 Years!

Fast Generation Portfolio Growth via:

• Acquisitions including:

• Southern Hydro (700MW)

• Torrens Island Power Station (1280MW)

• Loy Yang Power Station (2250MW)

• Macquarie Generation (4560MW)

• Build including:

• 9 X Wind Farms (1589MW)

• Bogong Hydro Power Station (150MW)

• 2 X Solar Power Stations (155MW)

0

2000

4000

6000

8000

10000

12000

Som

ert

on

Sou

the

rn H

ydro

Wa

ttle

Po

int

Win

d F

arm

Ha

llet

Win

dfa

rm

To

rre

ns

Isla

nd

Ha

llet

Hill

Win

dfa

rm

Bo

gon

g U

pgr

ad

e

Th

e B

luff

Win

dfa

rm

No

rth

Bro

wn

Hill

Loy

Ya

ng

Oa

kla

nd

s

Ma

cart

hu

r

Ma

cGe

n

Nyn

gan

Bro

ken

Hill

MW

DATE

AGL Generation Growth

Page 4: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Choosing OSIsoft PI and Partner Products

Page 5: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

OSIsoft PI Real Time Data Infrastructure The enabling technology that changes our data culture and gets us better results

OSIsoft PI is our real time data infrastructure solution

› It incudes the high performance PI Server that acts as a highly adaptable and connectable real time data historian that can connect to almost all power station field devices including, but not limited to:

• Distributed Control Systems (DCS) • Programmable Logic Controllers (PLC) • Field Located Digital devices (instruments,

controllers etc.) • Advanced analysis and visualisation tools that

greatly increase the value proposition for AGL. • Mobile data access that is secure for all AGL users. • Many OSI Partner products that easily connect to

OSI PI

Page 6: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

AGL – PI System Architecture Hi-Level Overview

Bu

ffer

ing

Bu

ffe

rin

g

Loy Yang

Torrens

Hydro

Primary (ACTIVE)

Exhibition Street Data centre (ESDC)

Pitt Street Data centre (PSDC)

Disaster Recovery

Central Repository

PI Instances

AF (Redundancy)

Secondary (PASSIVE)

Legend

Metadata links via AGL WAN

Location PI to Central PI via PItoPI interface nodes

SQL Log Shift to PSDC

PI client software user connections to Central PI

Corporate PI Instances

Existing PI client software user connections to GO locations other than AGLM (future decommission)

Network - (Agl.Int) DCS - Network GO Location Corporate Subnet

Torrens, Hydro, Loy Yang, Macquarie AGL Corporate

PI t

o P

I P

I to

PI

PI t

o P

I

PI-to-PI

Network redirect on DR

DCS - Firewalls

GO Location firewalls ( Interface Nodes )

Loy Yang PS

DCS System

Loy Yang MN

Plant A

Plant B

Hydro

Yokogowa

Macroview

Foxborough

Yokogowa

Rockwell

Development UAT Bu

ffe

rin

g

DMZ

Data harvested from Internet Sources

Page 7: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

OSI PI - What is next Adding Value through… • Operational Excellence • Reliability Improvements • Strategy Development • Central Diagnostics

From reactive to proactive

Page 8: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Operational Diagnostic Centre and APR Deployment

Page 9: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Predict It Advanced Pattern Recognition

“Finding failures before they find us”

Operations Diagnostic Centre

Early Warning System

• Providing diagnostic service to Group Operations Business Units

• Foresight through early fault detection (weeks & months vs hours)

Procurement • Four initial tender applications • Predict It software selected • Centralised or Site Diagnostics • 3 month evaluation period……

USA site visit to two advanced pattern recognition users

Page 10: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Challenges -

• Installation

• Resources

• Site engagement

• Model Build

• Communications

Installation of the Software That was the easy bit.

Page 11: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Challenges -

• Installation

• Resources

• Site engagement

• Model Build

• Communications

• One resource – first 6 months

• Three month assistance from Predict It

• Secondment

• Site knowledge

Page 12: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Challenges -

• Installation

• Resources

• Site engagement

• Model Build

• Communications

• Started with Site information sessions – Symposiums

• Engage one on one with engineers

• Types of Engagement • Welcomes the technology and

functionality

• Passive Resistance

• Not Engaged – We don’t need this product

• The most challenging to overcome

Page 13: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Model Build

Model Preliminary

Model Site Engineer

Workshop Model

Refinement Site Engineer Endorsement

Production

Model build must be sustainable Build engineering and site buy in Alarm and build management Morning – Alarm management Afternoon – Model build

0

500

1000

1500

2000

2500

3000

3500

Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18

Total APR Model Count

0

0.5

1

1.5

2

2.5

3

0

1000

2000

3000

4000

5000

6000

7000

Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18

Monthly New Alarm Count

New Alarms Ratio

Page 14: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Communications

Page 15: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Create SAP Notifications Talk to the Engineers

Create Tickets Talk to the Operators

Everybody has an opinion

Don’t talk to the Engineers Talk to Maintenance

We are the experts

You need to do it this way

Don’t talk to Maintenance

I wouldn't do it that way

Let the Sites look after the models

Send Emails

Page 16: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Initial direct communications with site engineer

ODC email address

Nintex Ticket system – Plant Insights • Easily accessible

• Work flow

• History

Communications – Stepped Approach

Page 17: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Nintex - Work Flow

Page 18: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Nintex - Ticketing

Ticket Header information

Free text information

Attached supporting documentation

Page 19: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Page 20: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Nintex - Dashboard

Tailored Dashboards

Business Unit Overview

Engineering Reviews

Page 21: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Value Realisation • VR a must to

stay in Business

• Monthly Reporting

• VR to Date: $18.7M

Page 22: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

1-EFP-1 • 1-EFP-1 Alarm raised

• Initial Investigation

Page 23: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

1-EFP-1 • 1-EFP-1 Alarm raised

• Initial Investigation

Page 24: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

1-EFP-1 • 1-EFP-1 Alarm raised

• Initial Investigation

• Performance Monitoring via PI system

• Vibration increase and Performance loss confirmed

Page 25: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

1-EFP-1 • 1-EFP-1 Alarm raised

• Initial Investigation

• Performance Monitoring via PI system

• Vibration increase and Performance loss confirmed

• Communication with site Engineer and Condition Monitoring Team

• Formal Communications with agreed actions

Page 26: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

1-EFP-1 • 1-EFP-1 Alarm raised

• Initial Investigation

• Performance Monitoring via PI system

• Vibration increase and Performance loss confirmed

• Communication with site Engineer and Condition Monitoring Team

• Formal Communications with agreed actions

• ODC conducts further monitoring as agreed

• Site programs pump overhaul for next available maintenance opportunity

Page 27: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

1-PFM-1 Expansion Joint Alarm Alarm 1: Mill Burner Wind/Box Pressure is trending high (Tag: LYP.U1.063P002.PV)

Alarm 2: Mill Burner Wind/Box To Furnace DP is trending high (Tag: LYP.U1.063D902.PV)

Alarm 3: BAD % Open (%) (Tag: LYP.U1.063U001.PV) is also showing a considerable step change.

• Initial alarm raised in Predict it

• Acknowledged by the ODC

• ODC confirmed alarm with other plant and units

• Ticket raised and business unit notified by email and

phone

Page 28: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

1-PFM-1 Expansion Joint Alarm • Responsible engineer confirmed the

alarm and initiated inspection of the plant.

• Confirmed air leakage from the expansion joint

• Work order for inspection raised by business unit at the upcoming Outage – 3 weeks

• Inspection resulted in repair of expansion joint. Program to be replaced next outage.

• Adverted 2 day forced outage • Est VR $417,200.00 • Learnings documented, to be

evaluated on other sites

Page 29: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

July 17 ODC: Significant Failure Avoided • Loy Yang Station U4 Generator, 560MW, Hydrogen Cooled Stator

| 29

March 2017 Hydrogen outlet #1 temperature rises 8 degrees C above Predict It calculated expectation Alarms raised Site Notified Unit placed under close monitoring regime

June 2017 Hydrogen outlet #1 temperature has risen 15 Deg C above Predict It calculated expectation Instruments calibrated (no fault found) Unit taken out of service and comprehensive inspection actioned

July 2017 Generator Stator found to be damaged and close to thermal run away Unit repaired in situ 4.5 weeks forced outage (Core change out estimated 12-14weeks) Avoided loss $50-70m

Page 30: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

RESULTS CHALLENGE SOLUTION

COMPANY and GOAL

30 #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Operational Diagnostic Centre

Set up of Advanced Pattern Recognition across 10,000MW Centralised Diagnostic Centre to monitor AGL generation Thermal, Hydro, Solar, Wind and Gas assets.

Provide advanced pattern Recognition diagnostics capabilities services to Group Operations BUs.

Priority Model Build and Collaborative approach with site engineering team

Successful deployment of ODC and APR.

Site engineering engagement with engineering team ownership of the models • Predict It

• OSI PI

• Face to Face collaboration

• Overall savings since installation of 18.7M

• Total set up cost $1.2M

• Annual running costs $620k

• Over 2700 models monitoring over 45k critical points every 5 minutes

• Site engagement and buy in

• Model build expectations

• Alarm management

Page 31: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

AGL’s Advance Pattern Recognition Implementation Journey

• Mark Faith • [email protected] • Manager ODC and Technology • AGL

Page 32: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Questions

Please wait for the

microphone before asking

your questions

State your

name & company

Please remember to…

Complete the Online Survey

for this session

Page 33: AGL: The people story of PI and analytics€¦ · •2 X Solar Power Stations (155MW) 0 2000 4000 6000 8000 10000 12000 arm farm d farm e farm l 2 g s r n 2 an l MW DATE AGL Generation

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Optional: Click to add a takeaway you wish the audience to leave with.

Thank You

Merci

Grazie