agenda item summary - palm beach county, florida · 9/9/2014 · recommendation for (a) mv...
TRANSCRIPT
Agenda Item #: 50i PALM BEACH COUNTY
BOARD OF COUNTY COMMISSIONERS \\\..J\£ C-E:fJ-7A\~
'\ \ '. 00 ,*\ AGENDA ITEM SUMMARY
Meeting Date: September 9, 2014 [ ] Consent [x] Regular [ ] Ordinance [ ] Public Hearing
Department: Palm Tran
I. EXECUTIVE BRIEF
Motion and Title: Staff recommends motion to approve: the Selection Committee's recommendation for (A) MV Transportation, Inc. for Run Package A, (B) First Transit, Inc. for Run Package B, and (C) Maruti Fleet & Management, LLC for Run Package C as proposed under the Request for Proposal (RFP No. 14-041/SC) for Palm Tran Connection Paratransit Services.
Summary: On June 27, 2014, the County received 23 proposals from 12 paratransit service providers for three (3) Run Packages. Seven (7) of the 12 proposers were determined to be responsive and forwarded to the Selection Committee for evaluation. On July 28, 2014, the Selection Committee met to hear oral presentations, evaluate written proposals and rank each company. Per prior Board direction, a company could only be awarded one (1) Run Package. MV Transportation, Inc. received the highest rankings for all three (3) Run Packages and is recommended for Run Package A. First Transit, Inc. received the second highest ranking for Run Packages A and 8 and is recommended for Run Package 8. Maruti Fleet & Management, LLC ranked second on Run Package C and is being recommended for Run Package C. . i
MV Transportation, Inc., First Transit, Inc., and Maruti Fleet & Management, LLC will provide 26.1 %, 20.2%, and 100% DBE participation, respectfully. The proposed wages for the three (3) firms meet, or exceed,. the Living Wage requirements. The seven (7) year price proposal for the recommended firms are as follows: MV Transportation, Inc. $72,670,431, First Transit, Inc. $76,201,015 and Maruti Fleet & Management, LLC $35,017,147. If approved by the Board, final contracts will be presented at the October 7, 2014 regular Board of County Commissioners (BCC) Meeting. The Notice to Proceed is anticipated to be November 1, 2014 with a start date of February 1, 2015. Countywide (DR/OW)
Background and Policy Issues: At the January 28, 2014 and the February 25, 2014 meetings, the Board of County Commissioners (BCC) directed Staff to prepare an RFP to seek new contractors to replace the current contractor, Metro Mobility Management Group, LLC (MMMG). On June 27, 2014, 12 proposals were received of which seven (7) were determined to be responsive to the RFP requirements. The seven (7) were First Transit, Inc.; Keolis Transit America, Inc., Maruti Fleet & Management, LLC; MV Transportation, Inc.; National Express Transit Corp., Transportation America, Inc. and Veolia Transportation, Inc.. On July 28, 2014, each firm made an oral presentation to the Selection Committee. The committee reviewed and evaluated the firms based on predetermined selection criteria and ranked the applicants. Letters of Protests were received from four (4) companies. The Director of Purchasing reviewed the letters and did not uphold the protests. No requests for a Hearing before a Special Master were received.
Attachments: 1. Memorandum from Robert Weisman dated July 29, 2014 - Evaluation Summary 2. Run Package A- Summary of Selection Committee Scoring/Ranking 3. Run Package B - Summary of Selection Committee Scoring/Ranking 4. Run Package C - Summary of Selection Committee Scoring/Ranking 5. Run Package A - Individual Scores of Proposals/Oral Presentations 6. Run Package B - Individual Scores of Proposals/Oral Presentations 7. Run Package C - Individual Scores of Proposals/Oral Presentations 8. Staff Presentation 9. Disadvantaged Busines E
Approved By:
~·~·----
II. FISCAL IMPACT ANALYSIS
A- Five Year Summary of Fiscal Impact:
Fiscal Years 2015 2016 2017 2018 2019 Capital Expenditures Operating Costs $161086,048 $24,074,511 $241633,180 $25t827,912 $26,966,166 Debt Service External Revenues Program Income (County) ln .. Kind Match (County)
NET FISCAL IMPACT
No. Additional FTE Positions (Cumulative)
ls Item Included in Plb~ Budget: Yes X No Budget Account No: ::fu.<'C\: \ 1,'-\{) ~\.-. '54() \Jt'\ .\. '. --/().K", o o~ . Reporting Category:
B. Recommended Sources of Funds/Summary of Fiscal Impact: The associated costs for eight months of FY 2015 is part of the FY 2015 Proposed Budget Request. The costs for FY 2020 thru four months of FY 2022 total $66,300}76. The contract end$ in FY 2022.
C.. Depa1tmental Fiscal Review:
C. Other Department Review:
Department Director
(THlS SUMMARY IS NOT TO BE USED AS A BASIS FOR PAYMENT)
County Administration
P.O. Box 1989
West Palm Beach, FL 33402, 1989
(561) 355,2030
FAX: (561) 355,3982
www.pbcgov:com
•
Palm Beach County Board of County Commissioners
Priscilla A. Th.ylor, Mayor
Paulette Burdick, Vice Mayor
Hal R. Valeche
Shelley Vana
Steven L. Abrams
Mary Lou Berger
Jess R. Santamaria
County Administrator
Robert Weisman
'~.n Equai Opportunity Affirmative Action Employer"
Official Electronic Letterhead
MEMORANDUM
TO:
FROM: Robert Weisman, County Adminis.,,.,-,.,.. .. __..f,./J
DATE: July 29, 2014
RE: Evaluation Summary RFP No: 14-041/SC Palm Tran Connection Paratransit Services
On July 28, 2014, the selection committee meeting was held for the purpose of seleqting three (3) vendors to provide services as outlined in the above referenced Request for Proposal. As Chairmau of the selection committee, this memorandum fulfills my responsibility to provide an evaluation summary outlining the basis for the committee's recommendations.
The selection committee recommended the selection of the following three (3) vendors: ·
Run Package A - MV Transportation Run Package B - First Transit Run Package C - Maruti
With respect to Run Package A, the first ranked proposer was MV Transportation receiving five ( 5) first place votes and one (1) second place vote for a total of seven (7) points. The second place firm was First Transit with 12 points. The reason for the recommendation for MV Transportation was that they demonstrated significant experience, qualifications and past performance as it relates to the provision of Paratransit s.ervices as it compared to the other proposers. Secondly, the team members proposed gave the committee significant comfort that they understood the issues. relative to start up and transition activities. And finally, MV had excellent financial strength, met the 20% DBE and Living Wage requirements was the lowest cost for Run Package A.
With respect to Run Package B, the first ranked proposer was MV Transportation receiving five (5):fust place votes and one (1) second place vote for a total of seven (7) points. However, due to the fact that they are being · recommended for Run Package A, they are not eligible to receive Run Package B. The second ranked proposer was First Transit, Inc. with one (1) first place
ATTACHMENT 1
. .· Memorandum to Sharon Cushine, Purchasing Department From: Robert Weisman, County Administrator July 29, 2014 Re: Evaluation Summary-RFP No: 14-041/SC Palm Tran Connection Paratransit Services Page two ·
vote, three (3) second place votes, one (1) third place vote and one (1) fourth place vote for a total of 14 points. The reason for the recommendation for First Transit was that they demonstrated significant experience, qualifications and past performance as it relates to the provision of Paratransit services as compared to the four ( 4) remaining proposers for Run Package B. Secondly, the team members proposed gave the committee significant comfort that they understood the issues relative to start-up and transition activities. And finally, First Transit had an excellent financial strength, met the 20% DBE and Living Wage requirements and was the third lowest cost for Run Package B. ·
With respect to Run Package C, The first ranked proposer was MV ~ ransportation receiving three (3) first place votes and three (3) second place votes for a total of nine (9) points. However, due to the fact that they are being recommended for Run Package A, they are not eligible to receive Run Package C. The second ranked proposer was Maruti with three (3) first place votes and three (3) third place votes for a total of 12 points. The reason for the recommendation for Maruti was they had relevant experience; qualifications and past performance. Secondly, they had the lowest cost for Run Package C. And finally, Maruti will provide 100% DBE participation and they demonstrated reasonable financial strength.
Jt is for these reasons that the selection committee makes these recommendations.
SUMMARY OF SELECTION COMMITTEE SCORING/ RANKING
RFP #~ 14-041/SC TITLE: PALM TRAN CONNECTION PARATRANSIT SERVICES
BUYER: Sharon Cushnie
KEY($} FOR RECOMMENDATION: (PLEASE NOTE YOUR RECOMMENDATION BELOW)
(1} RECOMMENDED AWARD- HIGHEST RANKED RESPONSIVE: ANO RESPONSIBLE PROPOSER
(2} SECOND HIGHEST RANKED RESPONSIVE ANO RESPONSIBLE PROPOSER
(3) THIRD HIGHE:ST RANKED RE:SPONSIVE AND RESPONSIBLE PROPOSER
(4) FOURTH HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER
Name of Proooser RJ
First Transit, Inc. 76.438 84.438
MV Transportation, Inc. 78 87.5
National Express Transit Corporation 71.029 81 .029
Each Evaluator's Scores (lntttals of Ea. Evaluator)
lJ JD
74.938 91.438
86.5 90
64.029 79.029
TJ
69.438
83.5
65.029
Veolia Transportation, Inc. 62.483 64.483 65.983 72.983 69.483
* Tiebreakers, If required, are applied In the following order: Total Score
Sharon Cushnie, Senior Buyer Date I
TB
91.438
95
83.029
74.983
DEE
yes
yes
yes
yes
~otal Score
488.128
520.5
443.174
410.398
RW RJ
2 2
3 3
4 4
RUN PACKAGE A
EVALUATORS:
KVV = Robert Weisman RJ "' Ron Jones IJ - Irwin Jacobowitz Ju = Joe Doucette IJ .. Tonya Johnson lt:I = Terry Brown
Each Evaluator's Rankings {based on each Evaluator's scores)
(Initials of Ea. Evaluator)
IJ JD TJ
2 1 3
1 2 1
4 3 4
3 4 2
TB
2
3
4
Total Of
Evaluators Rankings
12
7
20
21
AWARD RECOMMENDATION
"KEY" ONLY (SEE ABOVE)
RANK
2
3
4
Form K-J.A
ATTACHMENT 2
SUMMARY OF SELECTION COMMITTEE SCORING/ RANKING
RFP #: 14-041/SC TITLE: PALM TRAN CONNECTIQN PARATRANSIT SERVICES
BUYER: Sharon Cushnie
KEY($) FOR RECOMMENDATION: (PLEASE NOTE YOUR RECOMMENDATION BELOW)
(1} RECOMMENDED AWARD-HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER ·(2} SECOND HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER (3} THIRD HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER {4} FOURTH HIGHEST RANKED RESPONSlVE AND RESPONSIBLE PROPOSER (5) FIFTH HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER (6) SIXTH HIGHEST RANKED R.ESPONSNE AND RESPONSIBLE PROPOSER
Each Evaluator's Scores {fnlllals of Ea. Evaluator)
Name of Procoser
~~g/ •:gl~~~~!~f~~i.1
}h~3;\1;;f1+11
:;gi~~;;t2ft•: ~ ~ RW RJ IJ JD
First Transit, Inc. 76.37 84.37 83.37 91.37
Keolis Transit America 74 84.75 70.5 84
MV Transportation, Inc. 77.997 88.997 ·a6.997 89.997
National Express Transit Corporation 71.491 81.491 66.991 79.491
Transportation America 64.467 61.967 68.967 66.967
Veolia Transportation, Inc. 68.438 74.438 67.438· 77.438
* Tiebreakers, if required, are appf[ed in the following order: Total Score
Sharon Cushnie, Senior Buyer
TJ
69.37
72.5
79.497
68.991
63.467
78.938
TB
91.37
88
94.997
83.491
65.967
80.938
DBE
~¥.~ii~it~•.i;t:J\f yes yes
yes
yes
yes
yes
*Total Score
!·!L .... :;.tni'ir;.~,~~>i,~:· 496.22
473.75
518.482
451.946
391.802
447.628
RW
? 3
1
4
6
5
RUN PACKAGE B
EVALUATORS:
KW = Robert Weisman RJ = Ron Jones JJ = IIWin Jacobowitz JD = Joe Doucette lJ = Tonya Johnson TB = TenyBrown
Each Evaluators Rankings {based on each Evaluator's scores)
{Initials of Ea. Evaluator)
RJ JJ JD TJ
3 2 1 4
2 3 3 3
1 2
4 6 4 5
5 4 6 6
6 5 5 2
TB
2
3
4
6
5
Total Of
Evaluators Rankings
14
17
7
27
33
28
----------------·-·----·-·--·-·-····---·-·
AWARD
RECOMMEIIIDA TION
"KEY" ONLY
(SEE ABOVE) RANK
2
3
4
6
5
ATTACHMENT 3
SUMMARY OF SELECTION COMMITTEE SCORING I RANKING
RFP #: 14-041/SC TITLE: PALM TRAN CONNECTION PARATRANSIT SERVICES
BUYER: Sharon Cushnie
KEY(S) FOR RECOMMENDATJON: (PLEASE NOTE YOUR RECOMMENDATlON BELOW)
(1) RECOMMENDED AWARD - HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER {2) SECOND HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER (3) THIRD HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER
(4) FOURTH HIGHEST RANKED RESPONSIVE AND RESPONSIBLE PROPOSER
Name of Proooser ~~:~~~:if:~:;~ 7:~·~:~~:~::~:~~--.::~· ~> ·.· · ... -~ · · · 1f::;: RW
First Transit, Inc. 66.488
Maruti Fleet and 65 Mananagement
MV Transportation, Jnc. 70.844 National Express Transit Corporation 59.02
RJ
74.488
82
81.844
69.02
Each Evaluator's Scores (Initials of Ea. Evaluat?r}
JJ JD
72.988 81.488
78 73
75.844 82.844
54.52 67.02
* Tiebreakers, if required, are applied in !he following order: Total Score
-···-··· ~~- ~. Sharon Cushnie, Senior Buyer
TJ
63.488
74.5
71.344
59.02
TB
81 .. 488
80.5
87.844
71.02
DBE,
yes
yes
yes
yes
~otal Score
440.428
453
470.564
379.62
RW RJ
2 3
3
1 2
4 4
RUN PACKAGE C
EVALUATORS:
rtVV :: Robert Weisman RJ :: Ron Jones IJ = IJWin Jacobowiti:
JU =- Joe Doucette TJ ;::. Tonya Johnson TB = Teriy Brown
Each Evaluators Rankings {based on each evaluator's scores)
{Initials of Ea. Evaluator)
IJ JD TJ
3 2 3
3
2 1 2
4 4 4
TB
2
3
1
4
Total Of
Evaluators Rankings
15
12
9
24
AWARD RECOMMENDATION
"KEY'' ONLY
(SEE ABOVE) RANK
3
2
4
Form K-1.A
ATTACHMENT 4
Attachment 5
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
/ RFP No. 14-041/SC
Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: I X 1.0 =
RATIONALE: M ,Av -f'1A 1Cf""" c.cr2,rJf11vv t ~
2. Project Approach and Start Up Plan Information (Section 3.2)
(10-9) (8-7-6) (5-4-3-2-1)
Points: )
Weight 15% (15 pts)
(0)
Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: £ X 1.5 = Points: er RATIONALE: knc-,.,,--rz~.,J a r fa1 M t, /!,!di.ff'
, / ..,
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ 7__,_ __ RATIONALE: . }J, }A..V-
4. Maintenance Plan and Facility (Section 3.4)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: 6 RATIONALE: .f rA µJII ~
X
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ 'l_·-=-----
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_Cf_,_ __ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_First Transit {A).doc
. ' '
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package A
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: 6 RATIONALE: .f'{A-.>11)/J<A,A
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:-'b=-----
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
,~.._,-I, fl !Jf-'J \) J (/VI.A \, L c.c NI I'" A 11
Evaluator {Print) Signature Date ,
H:\CONTRACTS\Sharon\2014\14-041 - Patm Tran\Selection Committee\SC Score Sheet 14-041-SC_Flrst Transit (A).doo
' Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:. __ ___,_q_· __ X 1.0 =
RATIONALE:
o Qro ti 'o'{"')_s ___
2. Project Approach and Start Up Plan Information -(Section 3.2)
Points: __ q-'----S faTe w, 'de
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 9 X 1.5 = Points: /3 • 5'
RATIONALE: bood out/ i"ne, and Schedule f:or ~+urt-u.,,t8, Vevy 300d f-ec..J,nt·ea I boct-<3rovndJ 'Su_r_e,eC?;sf'u I ,-n o-tner locat-,·D 0 w i t-h stccr-f-u p, i-ots C)f' boc.,,/-?.-uio Tes.ou<"'ces. P loY"\ ,s c_leo.r; &rec i- Q._() d 1na-cd: de-ta,· led \ nf'orrna Tlr an. br\ver w0---3e ®Ver GI le), ,J hour. bl'1~E c_;f..JVJ,
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package A
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
PointsAssigned: CJ X 1.0 = Points:_9...:.·· __ _
RATIONALE: Local s.mfP )o{,nnWYl w Palm 13eacA a c)r)tyi au h_ave; 300 d b::='<8 ro u re) , CJ er"Le,a.._ I trJanag e,, · f°(n own to Pa-Im I ro n t;;oocl +r-a In VV\S{
P-ror11Q__;'rr) 1 Svrport JlroYr) reaion_aJ <z>¥o.ff (lVQI fe,tble,. Dec~ b<_/ "10,
4. Maintemmce Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: q X 1.5 = Points: / ::,.,. S:
RATIONALE: G--ood_ bock3-rour-id In YY\Q.1 n1enccnce o.nd operat,·ons, t-+~'> fjcJ~d technology ,/ \nci0d-e.s. a~sey'\ e.r mob, l 0-. s )1a.s '2:iell CL e loc0--i-,'on tiJy Ru0 'lr; '
1
and ~, 1/L er Bectch - neCL, J:-C/5 h:>-et"we,en (D lue., iw c9n (bt ,J d ' on d . rv O,t-'h t.-a, ~.e. '\
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_First_TransiL(A).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page3 of3
5. Financial and Business Stability (Section 3.5)
Run Package A
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
PointsAssigned: ~ X 1.0 = Points: __ g __ _ ~ T1ONALE: Very la. rg e,,, ,, CQ) vn pa, riy - some / { e_n,s /
Judq m ex>TS \ /Vo fa; led or-fe_r-m rhc,cted 6'.)m,aci-S · · li·sfe-J; howt:.N:e'rj did rvo, retoDr+ b>-reo.-ch o,.P CDA1-r0-c+ w 1-,f,\ m t3 rA -pd,d $1~3 Mi/11lJn -settl em,,e,n i- 2--0 1 z . 6. Price Proposal ? Weight 40% (40 pts)
(Section 3.6)
· Points to be determined by Purchasing Points: 38.438
l':"Y &:~d" ~:ie:e.,,, SeQ..ond h \3 he_~-r ,PO i r1ts
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 9 /, 'f 3& / OVERALL RATIONALE:_~-'-=-er_y_,____e_-;,_,p!-'-=e_r--~i e=--'-n'-'c.ed-=_,_-.L..-f a---'-r-rlg_e'--✓-C,om, pa 11 1.
. 1El<~8R&tv' Evaluator(rint)
~ .•· d@:-•·"_. __ _ Sig~ .
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_First_TransiUA).doc
' ! ,,
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: !J X 1.0 = Points:_..o::-ff:....._ __
RATIONALE: (r)e,,+ q lw,· f·ct?uh'ofJs 1
~ f)ul' .enc e cl,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_----'5=----- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
1, < Points:_..,___-..J=----
RATIONALE: _ __,('.,p"'-"-=O ol::....::..._-'Sti,~"'-(-'-f_,u.p=--'-f_:.../ a.n-'--'-,=-------'--N_e_a s_o_n_a,,_b_/,e,, ___ _
o.pproa CA -lo CL-OSorl::>inJ e.arre.n+ vYJplogee s etrJo/
I V
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: & X
RATIONALE: fi){, pen'-VJC e J '
fuun
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
Points Assigned:
· (8-7-6) Exceeds Standards
5" X
(5-4-3-2-1) (0) Meets Standards Unacceptable
1.0 = Points: (p
CU'ld ljnp toyce- focused,
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 7-S-
RATIONALE:. ____ (};-v~·...cod.,'---.,_'f_/a..n __ , __________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC:_First Transit (A).doo
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package A
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 6 X 1.0 = Points: S RATIONALE: · '---Rnanchtl s "'- a..,;;.1·ne-:5o S1-1cb,· l,· t-y 9 cool
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: 38.438
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: s I id propoSvU...,'
~~a.. 1)cw!o Johnq)() Eval tor (Print)
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Salection Committee\SC Score Sheet 14-041-SC_FJrst Transit (A).doi:;
Dat~ 1
\ '
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
/ NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed beiow: ~
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ___ '7--+-- X 1.0 = Points: 7 RATIONALE:
wecg: (7ant /41/ffh..d:r / (),~ cf!wc6#z ,#u{.
( I ;
,(v,,sr/- p,w@~. r;;t,~ M<rC:.,f! ,_/(
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ({) X 1.5 = Points:+
RATIONALE: /f\1-,1:1 f 1t/J()c., a+r.( , Q/al4[ ~f: ff#7 { In C ( (,/ tAc,~ t// 'f--Jpr-0 £ci£@c__ ~ l ~ (', /~~Le
AL<u[Z;_~, J(>a-~~"' -1:::z;;;::~P±P~ £911.1/V ~ c/4t.-l'?_1 ;;: -~- _ ~ ~ 2-
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(1 0s9) (8-7-6) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: 7 Points Assigned: · '=7 X
RATIONALE: ~ h,g-t ~12&: ~ (CJ,.t~- ~JJr?,,,_rff,04;-
/'1~ r-. ~ f/1,/l'( 't!S _{q-lJa,-e/<: #11 qlvr~ Ng r~
~ v:7~ ~,<df- / fc4(ffJuh£, ,t~.s[p -~ ~ .~~~-- 5,& 1.e:a-tr
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional ·
(8-7-6) (5-4-3-2-1) (0) Exceeds Standards Meets Standards Un.acc?ab~>
Points Assigned: ____ 7.f'- X 1.5 = Points: ~ wk- ~v11-1na~ j </Jblf~ Y,{i -z Lf"~? RATIONALE:
Je/} u4; a c.- p~ 1/ptO
H:\CONTRACTS\Sharon\2014114-041 - Palm Tran\Select!on Commlttee\SC Score Sheet 14-041-SC_First Transit (A).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package A
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: {); X 1.0 = Points:~(D~---
RATIONALE: Ac~e Pi0--~c:.e t~r 5cft,,, "_)&J~ di~ , . ~t)c;
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 38.438
p!"t U, ,DvJpt1c?02- l J' / {_-, ~ Au-&;f(,p "
c/ ~~ I -f__ CJ1 nzr ~ ~ _ Z: ~ --) ~ '7 ~ 0 ;).___ TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 7 3/! ~ 3,g" OVERALL RATIONALE: _ _,Q....,.. ~&---~=· _=::_....,,:;>12 __ ,_,,q--+tt~g ____ _ t-1
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content. Outlook\4CIW!BU7\SC Score Sheet 14-041-SC _First Tran sit (A).doc
' I Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References Weight 10% (10 pts) (Section 3.1)
(10-9) Exceptional
✓ (8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptatile
Points Assigned:______ X 1.0 = Points: ___ IP_ I Lil) >(lhj/h~ . ... . • . ·(
RATIONALE:\,;;,\_ ,.,,ti ~R,.l[\, Y,,,f - I 'f > S' f/11.' --zr ~,,,.., .••. ,.,.... J !/lM, '"·
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
. (10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ----RATIO NALE:_J11,,="eq.i....L.e::r,t:::t"'1!!.l!.'.L""'11=<.""-'·-'''---"V3"-')5'"--"-d''-f..:..A..:..tJ.e:,;, ,t./cc....,·;1.o::·'....:t...:..I.::.." _;_y._,,..:..l....:11.::..c::::..s _,<!.::,c.f::..::Jc.:.:lv:._+>:.::..,.,.-!.'-Y'.:....'
I
ule..,,'iJi he4, C,,7 S,•f(l,.f ,J;J,,:i.d) 0c, ... ,'J.,s-/;, wr,11 {½ ./ Ci,\,r
I
/
\
Name of Firm: First Tran!i .. , ,he. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
\ I Run Package A
3. Key Personnel and Operations Information Weight 10% (10 pts) o/ction 3.3)
(10-9) Exceptional
(8-7-6) Exceeds Standards
4. Maintenance Plan and Facility (Section 3.4)
(10-( (8-7-6) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
C:\Usars\JDoucetl\AppOatallocal\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62VQMOL8\SC Score Sheet 14-041-SC_Firsl Transit (A) (2).doc
' ' -- '\
Name of Firm: First Trans,., ,lie. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
\ I Run Package A
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
.J ~ (10 9 Exe ptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ____ 7.,__
6. Price Proposal Weight 40% (40 pts) (Section 3.6)
Points to be determined by Purchasing
\] ;z <{;j, ~ j,1,_/ ·:o ,;/1~;~) (. <;;1>,,1
TOTAL POSSIBLE POINTS= 100
Points: 38.438
GRAND TOTAL POINTS:
OVERALL RATl~NALE:__,_/..,;,,;n/4'-· .....:....:/Y/,ri,,;,)r'--fe_' .,-'-J,"",,✓i:..::../'94-,J~-----~----
~~ -~~}Ji~ %4)A,b~~
Evaluator (Print) Date
C:\Users\JDoucell\App•ata\local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62VQM0L8\SC Score Sheet 14-041-SC_First Transit (A) (2).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
. RFP No. 14-041/SC Palm Tran-Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. ExperiencefQualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
i!' X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ~ RATIONALE:@,~ /4-H,o c,u, axpLr,.,.ct! 4,/d t"'A'"'" uJ~ c•A~r,,11e,..s.,
@ti ,e ,11FM-~½.w (),,_, / 4/C/"'"' (1 c.XI Vl.!.r ti•
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ~ X V.,. '/ fp,.,, ,L
RATIONALE: f,>49 ~ 6t.:-, ~ - 11-, f '
,x e..,J.J j Jf-!) g,.1:,
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ~ / Ji
,-
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 'if,._ __
RATIONALE: e70s.J./ V Loc._l • Io "/4 > kJ; v (:, o & J
l
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_.c(:..... __ _
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional ·
(8-7-6) Exceeds Standards
Points Assigned : __ 'ff,.,__ __ X
(5-4-3-2-1) Meets Standards
1.5 =
I RATIONALE:('1..:,al. /11~1'1€,f,cC rz Cro .... l.
\J t ,. y G "',, ,1 /'1 ,.,. I /Jr o tpc ~ f""? • v Gm,, ,j p. c, /,l,1 f-oec. I, o,.J
J
H:\CONTRACTS\Sheron\2014\14-041 - Palm Tran\Selectlon Committee\SC Score Sheet 14-041-SC_First Transit (A).doc
(0) Unacceptable
Points:___.._l brc..-, __
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
~ Run Package A
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
X 1.0 = Points:_-',e::_ __ Points Assigned:_---'(..,o<---
RATIONALE: .Al~ V/IC' f/1 <v,Jl /cUral,I -r s&l,/,Jy
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points:3 8'., 1 _; O
GRAND TOTAL POINTS:
OVERALL RATIONALE:. __________________ _
~ iYccllct't
.~---H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Flrst Transit (A).doc
· Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service ✓
NAME OF FIRM: MV Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below: ·
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: 7 X
RATIONALE: ~'14,4~"'-.11e,t_,c:..t=;
(5-4-3-2-1) Meets Standards
1.0 =
2. Project Approach and Start Up Plan Information (Section 3.2)
(10-9) (8-7-6) (5-4-3-2-1)
(0) Unacceptable
Points:. __ 7 __ _
Weight 15% (15 pts)
(0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: b X
RATIONALE: f'Jo 0-f1 r-( Ir ,.rr;;,~
" fV't""'- ,V... W'- ~ -efA_,r /Nv\O._j.J. "'--( ~.NE' "' P~o/\. c!a,O rJ-r,,_,, C::C""'--\r-- (;..,.:,~ .r,~ ~rc.,;,,,P G-('0\.~
~ ()4 Ji./ '2Vdlr-J£ { c...,ufJf'IIWL A QJot.1/rv:)
~·· L~iJCr -r,t("W' ./nJ(f',[v..,..(
1.5 =
ov,-
~ v ,j \ ,. ,J ...., lex .c' \.1-l <SW c~
!, ~/J IC✓ r,c9-p. / ,-A .J t..- i-\ I rJ !".'.> tJ <:> -r ) ~ J JJ'~ .f/171/\-WJ 1'~..f (?tJ(l\ (< o"1 ( ~0-,k.11#4 ,J r/(.J'f v{'II f,
Points: 9
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ 7_;__ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ ]_._ __
RATIONALE: ______________________ _
c{'-.tA,,,yt.-NCn:? <F/Ar-',C ~V\.(f" rr/ j?./'C,
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ .,..{,..,_~_ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: j. 9
H:ICONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_MV Transportation (A).doc
. . .
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package A
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ·~&~-- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_(, ___ _
RATIONALE: __ J~rr_A_J_/J/_'1'_111.'7~· ~· _____________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts) '] 7
Points: 40. oco
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 1<:P,o t>O
OVERALL RATIONALE: __________________ _
{J '(j < v,.,c,(~ //'II ft fli,-,v cJ,f- /r/\. \C 'IE ~,N~ ~]( ,9t.'V'\.( \(",II/ C..i,--'
( rJ f 1)-vv\ I)~~ ~""""°'ti' '1 ~ffi ti (,- V O o J/),
Evaluator (Print) Signature Date
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_MVTransportation (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 9 X 1.0 = Points:_~9.__ __
RA TIONALE:gacd po.dt3round w; 1-h k'nvwled3e o~ ra f-ro.-ns i t-c;,,nd
cavre, +or pa~-erz:per.s ~ q oDct t-echn ica.J r:ackgrovnol, 1'Gaob 11 refere_nc.ee,: tl ve(::J ~ahs+,ed»fmostly°J, Gperares man!f !a rge c;,orrfrac:ts
2. Project Approach and Start Up PJan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
PointsAssigned: 9 X 1.5 = Points: /3,5;'
RATIONALE:GDocl plo.n wi+-h c»s1om6r out-reo.-c.,h,
'be-r0-,· tee! stort-up schedule.;,
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of3
3. Key Personnel and Operations Information (Section 3.3)
Run Package A
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 'f X 1.0 = Points:__,?~--
RATIONALE: @Jursrar1cL1125., s -ta ff /:>ack[}round) ex peri-snc.ed. Good f--,a,vi,ZJ and ct1spa;rcJ, p ~a.n,
Dr3E. - ;;J_&J ¾ - 'D,ive, w~ge., over ~1~. / hour. G oocl lo-e.ne -F, +s.
' ' 4. Maintenance Plan and Facility
(Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
PointsAssigned: '7 X 1.5 = Points: 13. S:
RATIONALE: r-0a1r1-re11a.oce/Focili+-y-2?~ / &L«.dl<.o/t/1::...S Ver-j ~odd 01.Jt /1 ne) for'" rY\Q.ln ,ena. nee' !J.JA-j
Greo..-t- loco..-t,on, \Je-.j 300d c;a_fe+7 ree,_.o•rd-
L No /oelle gta_de, '2.1'+-e for ''0" /Electron~c.,s \"L°'j)
C:\Users\TERRY\Downloads\SC_ Score_Sheet_ 14-041-SC_MV _ Tr~nsportation_(A).doc
,,
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package A
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
PointsAssigned: /0 X 1.0 = Points:~/_0 __ _
RATIONALE:Good c<eoi-r <"e-fu,renc.eS '- Low r\s~ ,ra.·n ~· [email protected] opemtiot"iS or1 nanona I Leve/,
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
n "A', I'\ ll'("\ '
Weight 40% (40 pts)
Points: 40.00
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALLRATIONALE: \Je.,rj, e,')(per1-e'("IC:ed C.omra.ny\.
Has good Y"t~f?UTt:Af-1on\ 1-{now n iD Po,,I vn
20ttJ4o/Y Date
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041¥SC_MV_Transportalion_(A).doc
., Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.0 = Points:~8~--
RATIONALE: E~+en--01Ve, upenence. a__r-J t)enC,1-\ . 'Re#feoce-.s ~~ t?ofr::nded W<=«- gtcd. 'P~ (j&rf;cfDCUlce, w [ P<3(:,,;
~ol a~ &+tLble a.14e.r- ,-ri'-Ha.1v C,l,,-v;t.,l \ei'.Jo/5 a..dc:lre 56<:ct.
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: B X 1.5 = Points: l.l...,
RATIONALE: 1:Lnderd-iuwY1j ~c n-eedo of 'P~ CU""\cl. plo.n ccpp<.w:::=i bo l i cl,, r]),.e.,vi ou.s 61a;h;7j
/
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ '7;..._ __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ JL.,_ __ _
RATIONALE: Ex:f?rienceo\ +eCU"") ru.of Gl/'e.,v,Ll I o~on;>
ttin,. ~e ~ need':,, of <::pee,
4. Maintenance Plan and Facility Weight 15% (15 pts) (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: __ ..____ X 1.5 = Points: 10,5
RATIONALE: 6o1 ,d loc.0.zrfcn\..S f d «1-t-1-k-e:Gt,t'r'l prvp?.$eU-5.
C:\Users\tgrimsle\AppData\local\Microsoft\Windows\T emporary Internet Flles\Content.Outlook\886I3BKN\SC Score Sheet 14-041-SC _MV Transportation (A).doc
'
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses
Run Package A
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: lp
Weight 10% (10 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
X 1.0 = Points:,_....,UJ"'----
RATIONALE: ~na,ncials ¢{?~-h,J ~,e_ffecJ- s~ f'rt}L,
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: 40.00
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: fi3 ,5
OVERALL RATIONALE: ~ ~ w!-}h [ure¥101,CS
,.etif.e.tience-. ~
aator (Print)
C:\Users\tgrlms!e\AppData\Local\Mlcrosoft\Wlndows\T emporary !ntemel Files\Content.Outlook\BB6138KN\SC Score Sheet 14-041-SC _ MV Transportation (A).doc
' '. Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
✓
Points Assigned: 1 . X 1,0 = Points:--+,f __ _
RATIONALE: f},tJ @ ~1 df /4J~r/wdi trf¼.{ riif"'r~= ~/ ~/4/ /lt kt!( :f'5 I 4t,'fr Is- ,P~~ f;142ct,r·t ~ le- (?(d~._
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptabl
5 Points: ) C •
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) (8-7-6) Exceptional Excee~andards
Points Assigned: X
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
~-6) g~eeds Standards
Points Assigned: t(' X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:'?
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ~ ~
C:\Users\ljacobow\AppDatallocal\Microsofl\Windows\T emporary Internet Files\Contenl. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ MV Transportation (A).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses . RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package A
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: .. 1 . . X 1.0 =r Ii( . Points: '7 RATIONALE: ~/-:), /4i.s~ ?cA/~ ~?/, ;)_ h1/L1 ll't:..,, _
fJIJ (3: ~ UJlz &<14/4&2 r:1F!v1~ di:Jo _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
~t;:K~;ff:/43~~
Weight 40% (40 pts)
Points: 40.00
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: £>f-zf: S-- .;?6, )// :f/:o
JA{Lw,v 5t\tP~M·:K. Evaluator (Print) Sig
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\T emporary Internet Files\Content. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _MV Transportation (A).doc
Run Package A i
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References Weight 10% (10 pts)
(o/tion 3.1)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:______ X 1.0 = Points: ·1 RATIONALE: q/< r,(i,c,.,,,r- . 34)/fsro. - 4,,;.f~ ,:!. ffl.,Cc, '/.!..., 1n..-.
v'~ ~,:i C, ;Jd,1Mft~· f 1M,ti1), ~~ IP e,d/4,,,d f c!~~ _,
2. Project Approach and Start Up Plan Information Weight 15% (15 pts)
(Section 3.2) /
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
/
Points Assigned: ____ _ X 1.5 = Points: ___ /_Z-_
RA TIO NALE: '),.\"''lo/ c;L \..,jjt
/ \ \ Name of Firm: MV Transpc.. _Jtioi,, .,le. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information Weight 10% (10 pts) (Section 3.3)
(10-9) Exceptional
✓ (8-7-6) Exceeds Standards
Points Assigned: _____ _
(5-4-3-2-1) Meets Standards
X 1.0 =
(0) Unacceptable
Points: ____ &_.-_
RATIONALE:&, Ytt.., ~h I Off' zj-..::- f;-L,,b ,.VMY? o/i={f/n /l !/\ ,,,J , i t>f ,, r a,e ~~ 5,v,,., , ~ ( 1 5;</,-}. Pdd ,p_A_ £Mu;,,_ .,,,,_J,,l/20
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
,/ (8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:_____ X 1.5 = Points: /"2---RATIONALE: 1',,,Wtrvt..l!--- /µ_,/,;,._ ~/ad~cd f ch,1, /. }?le ti;.._, 'h0/,z C-tJ>/- qrft°,(
~ I /
C:\Users\JDoucelt\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62VQMDL8\SC Score Sheet 14-041-SC_MV Transportation (A).doc
, "\
Name of Firm: MV Transpt. .. Jtiot,, .iic. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package A
5. Financial and Business Stability Weight 10% (10 pts) (Section 3.5)
(10-9) Exceptional
I (8-7-6) Exceeds Standards
Points Assigned: _____ _
(5-4-3-2-1) Meets Standards
X 1.0 =
(0) Unacceptable
Points: ___ __,_f_
RATIONALE: Wi10I own,JlubJ:oc~- ' ·· ~s'f-~ g,,1 €P 2,1,.
6. Price Proposal Weight 40% (40 pts) (Section 3.6)
Points to be determined by Purchasing Points: 40.00
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: tppl= ..{!.r
~ 11h:p~- t. ~ f 1< q, w o/n~:., !t)'ir 4 ~
Evaluator (Print) s;~ Date
C:\Users\JDoucett\App•ata\Local\Microsofl\Windows\T emporary Internet Files\Content. Outlook\62VQM0L8\SC Score Sheet 14-041-SC _ MV Transportation (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _,_{--=O'---- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: / 0
RATIONALE: ______________________ _
C
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _ ___Jft"'-. __ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: / a-,, RATIONALE:, ______________________ _
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ q--1-, __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ "!...._ __
RATIONALE: _______________________ _
4. Maintenance Plan and Facility · (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:. _ _,,~"'--'7 __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: / 0, s RATIONALE: ____________ ~----------
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selectlon Committee\SC Score Sheet 14-041-SC_MV Transportation (A).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(8-7-6) (5-4-3-2-1)
Run Package A
Weight 10% (10 pts)
(0) (10-9) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned:
RA TIO NALE: /IJ,
6. Price Proposal (Section 3.6)
(p X
0' t1t:, ti"> r,1 ril
Points to be determined by Purchasing
1.0 =
~f ... L/,;..y, '
Points: r;
Weight 40% (40 pts)
Points: t./0
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
::2/2c;r/li Evaluator (Print) .t.1/ I I
Date
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selectlon Committee\SC Score Sheet 14-041-SC_MV Transportation (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC /. Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ___,.~.,__ __
RATIONALE: 1:(,,.0{ c...;1 l X
(5-4-3-2-1) Meets Standards
1.0 =
2. Project Approach and Start Up Plan Information (Section 3.2)
(10-9) (8-7-6) (5-4-3-2-1)
(0) Unacceptable
Points: _ _,,,.b.,__ __
Weight 15% (15 pts)
(0)
Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: (, X 1.5 = Points: Cf
RATIONALE: f"-e f'l C#f (_
,- ' -,-,..C,-"'-- ( 'f(\. <...v C<>M,0ArJ'f Ul.,c,JIIG-\{ G'-A(.Jt'( ~1,J~
•'wC✓f"/4f,.A--<,14$l.i,4...~=:\--.J-.J\~;?....!..1'i..'.!tj-~~~c...!itf"':....!......!.'1....!hN.~. :::~:.:;:J.ftJ=-~--,------1-AJ, N--1 <-<..t C/J'("'J f .MV"f\-<>t:"1-l'-'1 ~(l,t,Js.<
'',A.r ,A \• _--,A(r,-,t\._-=-------1-----. ------~--------, "fY I ,-, -> /4,1..,AA • C.:,..J/of-r-f
J"1?t,,1_,f' J/J ~,.o~, = "a: ( ' 1.. -.F.., .rn "'-r"' _,-f'.1U ",,. ir J , t<-- -ro, ,J77J rP
(,,VV~-K.fvAce" tfc.,...., f 111.K: ... t,('
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _ ____,6,e<... __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ "'b"-. __
RATIONALE:._~fi,___,_,_~_l_~_l.;::__ ______________ _ '
4. Maintenance Plan and Facility (Section 3.4)
(8-7-6) Exceeds Standards
(10-9) Exceptional
Points Assigned: _ __;b ___ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 9 -----RATIONALE: _ ___,1'_'-_;.l_,_f?_1 _C/J_L ______________ _
H:\CONTRACTS\Sharon\2014\14-041 • Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_National Express (A).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: __ ....:b::...... __ X 1.0 =
Run Package A
Weight 10% (10 pts)
Points:....:..;,b.,__ __ _
RATIONALE: ______________________ _
,('--{ Pt C-,fL
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
> t. Points: J.;. C> '2... 't
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: '") I .,o2'1
OVERALL RATIONALE: __ ~------------~--
hor.l> ~,Allf',1,.t'-f, tJ1;:,1Vt~rJ<:r--£ fA.,JII.[ ovr
~ Evaluator (Print) Signature Date
H:ICONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_Nationa\ Express (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
I
Points Assigned: c:l X 1.0 = Points:_=S~-
RATIONALE: large, envnpany with home ofrtc.v 1n &vr3/c,tf>d {;ood bus.ine_,.,s v-efe<ence -h'ol"n rn8,A, Ve?f div~r<;;e /oca:rion_S, Greot..t para trans it- exper~€Y\ce.J and ba_ci<-3,CJt11'\d'" GD~d ~ +y record,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: '6 X 1.5 = Points:_/_;2. __ _
RATIONALE: loriJer Wccae l)v<e.(" $/GJ.,/hf?. ($-id,S~)
Ond 3ooci benef',•t- perc.en"ta[je, ( q~d?'~), . Very ~ood r::,fv-rt-up plC-1.n a.nd sta-f:F1t13 oi.Jt-f1ne,;\
Ver ood ou+l1h& ond /ow-Char+ ~Dr o p<?-n:r+; r\-5~ b6E: i~-CoO <rfo
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: IS X 1.0 = Points:._.....,8..._ __
RATIONALE: Good re-Perence-S fbr opero:t1ons m9R. and v eJ"' 1 c,I e,, VhCL, n 1"' en a r"I c e-- m3 ~ ..
Good (J"J'rD(? o&ed ~alary plof),
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ___ ~-- Points: /~
RATIONALE ~ -,,rc,..f[,~ (e ,ref - ,rerj de:ta,'led prever\ t, v-v ma, n -n n a nee, plan ,
X 1.5 =
P, Vi e-ro...) r3 c--11 [ DcaTt'DQ f\l o l3Q lie,~ k,_de loca-1-,' on,
C:\Users\TERRY\Downloads\SC_Score_SheeL14-041-SC_National_Express_(A).doc
,. Name of Firm: National Express Transit Corp. Individual Scores/Written Responses
Run Package A
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: __ fJ'"""-_ X
RATIONALE: Alo ere d i'-1-{Va 1na.nc i' a. risk
6. Price Proposal (Section 3.6)
Weight 10% (10 pts)
1.0 = Points:_~g~--
('i't,e rences available,~ reA +,.; a ✓a, la ble ,
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 35.029
Rank # 3 ou, of' L/-, (di C?3 o ti-to,, '7J-'f V>r ore_ aver
sev-e)n {"1J ~ears Compared -to f<ank #-I
( $ ~ 149) 5 3d. morr/.._ Ci ve -rage, /YB aver ~--evey'\ {?) y fJ.S))~ Ht[lh houri'-{ rC-Lte..~ · J
TOJAL POSSIBCE POINTS= 100 GRAND TOTAL POINTS: 1? 3, ().;;_,C/ ovERALL RATIONALE: Very ~ ood GD VY\ r., a. 11 T (JV-ee c·ct / I -. ~ { d_ f? 'tDV1 cJ 0 re i.,u t ire_d,
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_NalionaLExpress_(A).doc
'!
i
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ S ___ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: S ----RATIONALE: letV:0 ¥e.::ierrreol a..p~a (o :to V"l::LVe ~fPJea::e.,.., ~vl.Jn.g :--\be ce.qu.e6-ted ~ce5.1<efe,i,WYe,s ¥32v:lded :for VMtv\ We.rq,, uc.eJ\en-1, ... Inou.+.{;;e,,ier,½- re.ferenceo f,{ 6:fv1
•
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:,_....,-5._-__ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 7.5 RATIONALE: '.'J?cv pose-.:, f> \a,() meet::, -w,e. Y-P qt-u leA'Y)l.m fr Stal
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_~5 __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ S=---RATIONALE: ~¥ p«oo.neJ pmf?se.d 0fpea-i: +o meet- ---1+-ie nced6 of
'7>-re,,.
4. .Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
5 X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 1, S"
RATIONALE: __ -'=b3-"'-"-"-u"""d ..... _,.,pdc.,..:.:CI.J'L.-=--=-·-------------
C:\Users\tgrimsle\AppData\Local\Mlcrosoft\Wlndows\T emporary Internet Files\Content.Outlook\886138KN\SC Score Sheet 14-041-SC _National Express (A).doc
Name of Firm: National Express Transit Corp. Individual Scores/written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
Points Assigned:. _ ___.5"---- X 1.0 =
Run Package A
Weight 10% (10 pts)
Points:__,<5.,__ __
RATIONALE:. ___ fvj:...__u..e;t:,__...,,_erf"-'c.J.1]""-?vi-""Cl"'--'--• _________ _
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 35.029
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: &,5'. Qc2 9 OVERALL RATIONALE: Srrl1' d pvqxzsa.J ,
~a. Tu,vi.::, J;\'WJ6on Evaluator (Print)
7/,:)8 Date
C:\Users\tgrimsle\AppOata\Local\Mlcrosoft\Windows\T emporary Internet Files\Content.OuUook\886I38KN\SC Score Sheet 14-041-SC _National Express (A),doc
SELECTION COMMITTEE MEMBER SCORING
RFP No. 14-041 /SC TITLE: Palm Tran Connection Paratransit Services
PROPOSER TOTAL SCORE RANK A B C A B C
1. First Transit, Inc., Cincinnati, OH
2. Keolis Transit America, Los Angeles, CA
3. National Express Transit Corp., Cincinnati, OH
4. Maruti Fleet & Management, Jacksonville, FL
5. MV Transportation, Inc., Vacaville, CA
6. Transportation America, Miami, FL
7. Veolia Transportation, Inc., Lombardi, IL
Name of Evaluator (Print)
Signature Date
C:\Users\tgrimsle\AppOata\Local\Mlcrosoft\Wlndows\T emporary Internet Flles\Content.OuUook\88613BKN\SC Score Sheet 14-041-SC _National Express (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: p RATIONALE: (YOf ft/ A 11 1/ r~+/'Uifr.J-. ~c/•7k;~
(5-4-3-2-1) Meets Standards
(0) Unacceptable
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
I
Points Assigned: r X 1.5 = Points:-----'6'-'C...·--
RATIONALE: Pl¼ c1C cu>b ti.., f ~ /V' JJi t:t-J ./ * r q
Name of Firm: National Express Transit Corp. individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: C... X 1.0 = Points:~r:;.,,e;_ __ _
RATIONALE: (kM ~Ad 0 .1J. r-Uf'd~ ~ ~fJ ~ p17{ ;' ft r(rJ"',A /J .lr/i- r/4 ~ i.
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\T amporary Internet Files\Content. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ National Express (A).doc
Name of Firm: National Express Transit Corp. individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package A
5. Financial and Business Stability Weight 10% (10 pts) (Section 3.5)
Points Assigned: 1✓ X 1.0 = Points: ?{: RATIONALE: ()JC, 0afcu..e ~- J c?t, 72~ deb ~rq, c (~ s>e;, e;1a10
}&-7 ;;?,di?, ." &rwf- U"ro/ le., ~( ,r°'-t-tAtf--
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points: 35.029
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: {)(${I:- :::. d-:J-cC:CJ'?P VVPJt 1f>a(~ 4~ Gw4t ,,,, Qy-a~iP-c:,,,. :
~,w;wc.,,,,,cf;. ~ ~ Evaluator (Print) ~~s Sig~:
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\ Temporary Internet Files\Content. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ National Express (A).doc
\
I Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS '·
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED.CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References Weight 10% (10 pts) (Section 3.1)
(10-9) Exceptional
✓ (8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
(0) Unacceptable
7
2. Project Approach and Start Up Plan Information Weight 15% (15 pts)
(Section 3.2) /
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ____ /'v_
RATIONALE)/e,.,/,;(/ ,p,:,/,,,,.,.li;l.hve:, /7~,~JA;,.~ . .f°'ffJ dry c!.,.f £ i r/ ,
/1,,ov?tl' . /)1'~,~,tJ,.,,.' ,-,f-;l, ,, Jck.,d ?>et4uJ,,,/ rhffb,h-c,(/,1fr;-, ,
I I
V!i'l<flA1
v,r/t[J (I t~l'/4 >fak/{;,;e,ce«,,,, £
~
/
\
Name of Firm: National Ex,.,.Jss Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
\ I Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
./ (8-7-6) Exceeds Standards
Points Assigned: _____ _ X
RATIONALE: 1,,,, o/, . om ' If Vr'l fY< ' 1 ~-1, vs •
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ____ 8'_
1?--,Zp:Sd-ve/!, ~ )'¥'1 tl,J;, fl!,..,._ ~/eM~t, .r-/4k,,-/ k r'llf"'~ bk t'"'~I
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
/ (8-7-6) Exceeds Standards
Points Assigned: _____ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ___ __,_o/_
RATIONALE: _________ ~--'------------
<;)/:f:0) ~ fl""'- . ))k tivu-1::r<4,J,, ~A, Q t1·, - ~\'1\- S&J1 ~.,J.,i~ \
C:\Users\JDoucett\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62VQMOL8\SC Score Sheet 14-041-SC_National Express (A).doc
Name of Firm: National Ex,..Jss Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: _____ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
X 1.0 =
\ I Run Package A
Weight 10% (10 pts)
Points: -----
Weight 40% (40 pts)
Points: 35.029
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:, __________________ _
./);,,(; ~ 1-Ylr ~ ~ ~~., -111~k,
Evaluator (Print) Signature Date
C:\Users\JDoucetl\AppData\Local\Microsoft\Windows\Temporary Internet Filas\Content.Ou!look\62VQMOL8\SC Score Sheet 14-041-SC_National Express (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: ____ \_.__ X 1.0 =
RATIONALE: r1..Pct9(1ee_> 5 op cl ;wJ- A,2 /rr':)4 e ,'/\}'r,:;..e--J.?
(0) Unacceptable
Points: ·1
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ]( X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: I :Z.,
RATIONALE:___,,(:.__::_,5_L _ _,y;'-',--'""'=Nlu«-,t.:..5~-------------
0?tPO 4 5J.vt -vf /?( cd
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key .Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:. ___ V'\__,_,,-- X
RATIONALE: If 5 F ff 'Y\l'le,..3 0 e> e J2 6::r r"7
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ '\_,__
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: <f' X 1.5 = Points:_1!,...'.6~--
RATIONALE: &700£ II) Ce- hr;AI rJ-/- b" ?--
0 IPR j_ l'r e1f,1 J pl~
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14..041-SC_National Express (A).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned:_~{r-"' __ _ X 1.0 =
Run Package A
Weight 10% (10 pts)
(o Points:~
RA TIONALE:.--'/41'-"'~"----'=-t:.""fl/l'-'--"'C-'-'l.."-/.L/1,__..::,...,."-''c.c,J{,..:.e....-L.f<£0._,:ll_,_,,,.,,µL-...,_oCLC_">zj"--'-Fe:..c::cJ,!...., !L/r....:.1---.,IL✓----
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: -3,S. 0.,2 ")
GRAND TOTAL POINTS:
OVERALL RATIONALE: __ ~---------------
Uv:f boo J
Evaluator (Print) .d-H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selectlon Committee\SC Score Sheet 14-041-SC_National Express (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ __;_6_· __ X
(5-4-3-2-1) Meets Standards
1.0 · -
(0) Unacceptable
Points: 6
/
RATIONALE:_~T.J--'-1:..Lfi..:....I c...1-~--=L==----· -------------
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.5 = Points: 9
RATIONALE: 1 'i. J> I ~ L
C 'l c.. f'o--1. u.; s ~ l., L ½✓ Al'it '<J
/!ttr C-/11\ rt' ~rJtlfsum (fe._,c~ tfr'r JVcD'I) -/J13J1/J tJV:w ("'A,f(/)4J'-/:/!lr
- ).,{t'b{..J.-i<€LJ ..rJ}s · / ~V~t>._,I«) ''JtJlll,J,.'f!A/4,0~~
f"uM/1./ fo 1'lor-l - Al ffl!1lt'-d) . (Jtt"tA
(i ~ /JtJ-11,J Ir y~ Cl#~ ! !
4::'. ('A,'1,J'('~ ~(I?\_ /l»JJA (JIJ/)v'\,- fn'-f ..JNV:0 rfL1il!P'--.[ i~v\. ,~l'i/t ~ f "'",J(..tf O
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ b __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: _ _,,(.,_ __
RATIONALE:, _ ___:"f_'f....:...!....,p,_~v/f-'_(=-----------------
4. Maintenance Plan and Facility (Section 3.4)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: {;,
RATIONALE: '['-tfJ( cA L.'
X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ 9..:_ __
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Se!eclion Committee\SC Score Sheet 14-041-SC_Veolla (A),doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: ___ (; __ _ X 1.0 =
Run Package A
Weight 10% (10 pts)
Points: __ £ __ _ RATIONALE: ______________________ _
rf''{.Pt~L
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
3 -' Points: 1. b • '1 f 3
(. "2 .l..tPJ'
GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
G....D.J ~A.,u-1. JV o 7)-fWCr-- J'7/i.,/1,A.( 0 J 1 ~ 0
Evaluator (Print)
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Commitlee\SC Score Sheet 14-041-SC_Veolia (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 8' X 1.0 = Points: ~
!
RATIONALE: G-recct boc1igrc0nd ond ex 1pe-rience ✓ 1 1 'Goo b
II bus I nee;,~ r et ere n ces , Ver!f lo fj e. CoYV? pan y -h:>-r\ Jle s rnci. ny ( a rge__ CJDn-fro c T--9 ·
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 9 X 1.5 = Points: /"3, 5
RATIONALE: bnvec u,Jt).ge over $/.;?,,/AR. (!lc;;,a3), G oc:cl ber1er,·1s perc en1clge,., ( '39 d7c __ ) ,
V.er:3 gore/ +ra,n,Ylj pl01.n. bB E:. !)tr& 73 &to,
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package A
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: g X 1.0 = Points:_~---
RATIONALE: /rery 900d re.-:Perenc_e -Po r vehi'de rna;ntenance,,
m . - Ve~ 2,.t-ron ~a 'sre o osed ~l,en-r Amh_ ssq cloY' ,o,o{Jra.Yn.- VerJ yood tdecv, Vtsioa 1ab)e:f-- +echno/03 v,
I
·· 4, Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.5 = Points: / ;;;...__
RATIONALE: k/est Id Im 8ch. / oca t[ o 17 1,JeSJt- c-P TuRnJ(); l<eJ- no-r near r-95 \ Had a_ /BJelle- 3tade locdtioY>, VerJ 3ooc:L veh,'civ mconrenance__, p/CAn,
C:\Users\TERRY\Downloads\SC _Score_ SheeL 14-041-SC _ Veolia_(A).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package A
Weight 10% (10 pts)
Points Assigned: 'J X 1.0 = Points:_,_z __ _
RATIONALE: l.Jsred aS a.- ''mode,rQ1e...,, '<l's.k :> (;Dcd cred i-f r ef'e, en c__e._S > ; n cJ u d ,' 2J ~atJ~
o-P Awier,c.a... ,
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
ta I lJSa J, a k 11- 7, Hi h -t oar /0 ro.. $ . II · eiven --tA { '7~
!tear c://s 907 :rr5 )nD,e_ 1A an Rank. tFf ... (<1/ 8'/f 3)g84/ C{ veraae,_, f')'lD'(e/ yea.,,,
TOTAL POSSIBLE POINTS = 100 GRAND TOTAL POINTS: o/'z' ~ t°f }l 5 ovERALL RATIONALE: GoDd uDm f)a.n v, Y,rc.,e IS. ~o h' , Ver- 1'm rt:~sECl/ wi-Hi
C:\Users\TERRY\Downloads\SC _ Score_ Shoot_ 14-041-SC_ Veolia _(A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 9;i X 1.0 = Points:_--=B'----
RATIONALE: , kxmbl-eol -h:AfD hCL6 e.Jc.f-en-6ive U~en::e)
~ q U£lll £ CCLiltm.S. CRe ~~ '51-dcm \~ CLppetLR:ct ·-t:>
\r)g. rvJeflfj<- · ~ ?12r~e <i- q1w1ftCtL-+i'o]A.2, ~:je-~~
a.bJ !® -6 m_e,t-~ YYed.s of {)~ 2. Project Approach and Start Up Plan Information
(Section 3.2) Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: Cb X 1.5 = Points: I ::0
RATIONALE: ] J,ede.x6~ <j --the rt:eds of: 'Pr-!:L- 1 fc«b ~·decJeA a_ <-1-f mcl~ p\a o 4e> iocl"LC/e a ~~ >k~~OVt- 1 ncius;ve._ of- 'D& fn,n etru;l Cl.<'eess t6 R \J A- skff-,
/
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: 7 X 1.0 =
RATIONALE: -Koowl-edjw-e ~
(0) Unacceptable
Points: __ 7.,__ __
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:, _ ___,G=<---
(5-4-3-2-1) Meets Standards
X 1.5 =
(0) Unacceptable
Points: __ Cj....:.._ __ _
RA TIONALE: _ _,J,_._,oc.i..c ..... t1 .... J-ru., -'-o""'o.__._-'ofl.'-l--· -'-flJ<'-.1.c..a.J..J.IG..,_·~-~fi::-n:,:...=....,..-vi""1d"'""e=15"'--Cle-=""ee""G=s __
<m,tl oJose prn::vjmi13
C:\Users\tgrimsle\AppDala\local\Microsoft\Windows\T emporary Internet Fi!es\Contenl.OuUook\8B6138KN\SC Score Sheet 14-041-SC _ Veolia (A).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned:
RATIONALE:
6. Price Proposal (Section 3.6)
7 X 1.0 =
mvt re9L,v{ ({UY){Y)15.
Points to be determined by Purchasing
Run Package A
Weight 10% (10 pts)
Points:. __ 7L---·ft> c419 f-h/.
Weight 40% (40 pts)
Points: 26.483
TOTAL POSSIBLE POINTS = 100 GRAND TOTAL POINTS: VJ q, '+f23 OVERALL RATIONALE: S-o;;; pmposa.JG. offir:eot addJfr(J)t£{)
Su-vices -fo uisure ucJW ws.--himer £Lrvl'Ce etnd_
I d-i~Cl 'Tuv\.s ~hn-::,cn Evalu tor (Print) Date
C:\Users\tgrimsle\AppData\local\Mlcrosoft\Windows\Temporary Internet Flles\Content.OuUook\8B6I38KN\SC Score Sheet 14-041-SC _ Veolia (A).doc
'
SELECTION COMMITTEE MEMBER SCORING
RFP No. 14-041/SC TITLE: Palm Tran Connection Paratransit Services
PROPOSER TOTAL SCORE RANK A B C A B C
1. First Transit, Inc., Cincinnati, OH
2. Keolis Transit America, Los Angeles, CA
3. National Express Transit Corp., Cincinnati, OH
4. Maruti Fleet & Management, Jacksonville, FL
5. MV Transportation, Inc., Vacaville, CA
6. Transportation America, Miami, FL
7. Veolia Transportation, Inc., Lombardi, IL
Name of Evaluator (Print)
Signature Date
C:\Users\tgrimsle\AppData\Local\Microsoft\Wlndows\Temporary Internet Files\Content.OuUook\8B6138KN\SC Score Sheet 14-041-SC _ Veolia (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
/
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 1 X 1.0 = Points:_7_,_ __
RATIONALE: fypf;,JI/~ Wt ff f\ // f rtrf3/<e ) tl-~ Uqh~ pa "Pl-rJzt,1,v,h '!: '¥:f~ ~/ cc (\fd...f.- rJ Jo/ _f'l/1-tJ"'(p ti~
(Cd,{ Pfl"itfl/ I
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 7 X 1.5 = Points:
RATIONALE: 1Jl4 _f i~ vvc r/_, t/4-c 1/eJW"_,.-
Ji ✓,;. '
()ro ctJ( titfe pr0 W'( t ,( ,:{ -L '/- oJ {- I e-t
Name of Firm: Veolia Transportation, Inc. ' Individual Scor!ls/Written Responses
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 7 X 1.0 = Points: 7 RATIONALE: (?~f- ,,o;F~ h..Af-V'7 J'fn--qj 1- J--l1A~ ~ ~f-\i,i.J'.;Jv'c,«.<-- fll,(~h ~ (Wt1µJ N.fl*uc!!@cti,k ~~ ~c-"'
rfiP4 /4Ji.£ pk½ I~ ffttf1Vl/4/ ~v<;t .
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points:_1-1----
C:\Users\ljacobow\App•ala\Local\Microsofl\Windows\Temporary Internet Files\Content. Outlook\4C IWIBU7\SC Score Sheet 14-041-SC _ Veolia (A).doc
Name of Firm: Veolia Transportation, Inc. ' Individual Scores/Written Responses
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
6. Price Proposal (Section 3.6)
Run Package A
Weight 10% (10 pts)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 26.483
1J; rfCf/f 7/;'f --- /-1, ~ WJ:r/--- P4Pt£f~, c'7C11 5 G'j :::z'
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: D ~ (t:.,::::. if 2 , X o/t1 '
C:\Usars\ljacobow\AppOata\Local\Microsoft\Windows\T emporary Internet Files\Content. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ Veolia (A).doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
/ RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References Weight 10% (10 pts) (Section 3.1) /"
(10-9) (8-7-6) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
PointsAssigned:______ X 1.0 =
RATIONALE: 7/r~¾+, ::,,-5• ~11'(F.);..#r-M
Points: ____ <;_
2. Project Approach and Start Up Plan Information Weight 15% (15 pts) (Section 3.2)
/ (8-7-6) (10-9)
Exceptional Exceeds Standards
Points Assigned: ____ _
• I ('
X
· (5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ -'-/7,.,'--. . '
14-d:t•-4 /1!:#s 1 rU
'1
Name of Firm: Veolia Trar •• ,,brtation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
/ (10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned:_____ X 1.0 =
RATIONALE:bl"'C~y11 ~ M,~ * f t-M , l fa(~
(0) Unacceptable
Points: ___ __,1c...
~ f ~ ~ S1 t&,,,J, ✓ - r,,.,,,,.,d,. /4 t t % ~ l'..,n,1-. - 5 k,r,, t21 l,,, .__ ,. 1,.,,/Jvrwfv~lv(.; 1k),t;,1. /4VlL_ / k,l.,;k,y t. fbd.L { "''f"~· k:r:o /¼,j
1
,e/4,/,,;., I /;:,,life/,. esMt,,,,1./ -/2,~·1 t u-, le,,,d, 4,,,i, ~
4. Maintenance Plan and Facility (Section 3.4) /
(10-9) Exceptional
(8-7-6) Exceeds Standards
V
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:_____ X 1.5 = Points: __ ____e_/_lJ"-, {_
RATIONALE: ~ /ht,,~/ (/!!f[W,,,- ,.s),,;blc1k/ C 1-j lJ: ~5'1,}JIM,<. 8 e,j,,,,,!tl.:/2 - ~I . I Q.'/
I j vvlu:/,. C <J ~t . /,,co-ti 'l,J. "' Cid! J.#,t 111 - 4,, M!) 3,()?,., /\h"' r
C:\Users\JDoucett\AppDala\Local\Microsoft\Windows\Temporary Internet Files\Content. Oullook\62VQM0L8\SC Score Sheet 14-041-SC _ Veolia (A).doc
Name of Firm: Veolia Trar._ ,.,brtation, Inc. Individual Scores/Written Responses RFP No, 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stabilit\(.. (Section 3.5)
Points Assigned: _____ _ 1.0 =
RATIONALE: Jd,d p)<"" y.,_t1,,r.... M.J,d/....
~ ~ s:: ~~ ~ '}JS\?,s.
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
\
J Run Package A
Weight 10% (10 pts)
Points: ___ __,?'--
Weight 40% (40 pts)
Points: 26.483
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
~ l!-0~ h lf'PP., W /YI,./~
Evaluator (Print) Date
C:\Users\JDoucett\App•ata\Local\Microsoft\Windows\ Temporary Internet Files\Content.Ou!look\62VQM0L81SC Score Sheet 14-041-SC _ Veolia (A). doc
Run Package A
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ 1...___ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_]...._ __ _
RA TIONALE:..,.t;="=o"'-"'-J_....,CX=-1r2"-=c.r..,_,.,,""-"'~"-~ .LI ..... -#e'-''"'-""'-'IJ'-'c"--r'-"/;'-", >:.........ttu.D::.J.. __ .. c.=.;c........,/-=c:.,.r_;;;~µ"-,,___,e::::.,J~--
' ' .4- /~
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: ___ ~-"--- X 1.5 =
(0) Unacceptable
Points:_\,_;)._____:__
RA Tl O NAL E:_,,C,""· c...,o0,:_,0,c_Jec.::.__;:_~-"-:+"-"'.:....,r+'---'"'=-,"°""~t?l<...!..!f ~"'"l\'--'--',-'--,11"'0"--r-"'o+}--'-~ "'b_/...---"A,::,,___:..""-4'20<,1/Jft.!('---'()<.::,<.::...:':........:l. - I I f ( 1 V
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package A
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) . Excegs Standards X
(5-4-3-2-1) Meets Standards
1.0 =
' RATIONALE: lr~1/\1t1p ,y<?4cj2 11/a'f,v,N!1''1<t1J~
L....~ ... l /Jb f
(0) Unacceptable
Points: £ ----"'-----
4. Maintenance Plan and Facility Weight 15% (15 pts) (Section 3.4)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
\f X 1.5 =
(0) Unacceptable
Points: 'h4 RATIONALE: -- P ... r~ /0c-J,,;,,J J.,,,r b....s.a..!J A. /,t,!&.
JI,,> t1 vf '-"i, M, t'I J (2 / ,,...:> r-, c, 4- S ) _c .tr,ds
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Veolla (A).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned:_...,.0,..t?'---- X 1.0 =
RATIONALE: No C,IP/lt,~,/'/.? tA,),h /'t..l/1a<.J ,Of
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Run Package A
Weight 10% (10 pts)
Points:__,0"-'----
st-~,lJ- t: '
Weight 40% (40 pts)
Points: :Z~.4~-->
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:. __________________ ,__
/J @za Q .f- a9fcrP-lr.l.,JJ) ba,J- ,.> ,.,,,.,..Y
Evaluator (Print) Leli:~
Signature 7 ~. Date
H:\CONTRACTS\Sharon\2014\1¼41 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_Veolia (A).doc
Attachment 6
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ __.(p..._ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) . Unacceptable
Points: {p
RATIONALE: ____ ~-------------------
& def:,cdJfior) in k,un Pktj, A-
2. Project Approach and Start Up Plan Information Weight 15% (15 pts) (Section 3.2)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
5 X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable ~
Points: / 7- f" ,
RATIONALE: _______ _,,----------------
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page2 of3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ $ __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:, __ 0,,,1-::...... __
RATIONALE: ________ ___,.54
·· ---'/} ___________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ \J __ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ 7_._S" __
C:\Usersltgrimsle\AppData\Local\Mlcrosoft\Windows\T emporary Internet Files\Content.Outlook\886138KN\SC Score Sheet 14-041-SC _First Transit (B).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses
Run Package B
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards -Points Assigned: __ b __ _ X
Weight 10% (10 pts)
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_---"6 __ _
RATIONALE: _____ -=5,:+/t<r-_._ ____________ _ I
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 38.370
GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
Evaluator (Print) Date 1
C:\Users\tgrimsle\AppData\Local\Microsoft\Windows\T emporary Internet Files\Content.Outlook\BB6I38KN\SC Score Sheet 14-041-SC _First T ranslt (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
/
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ "]__.__--'-- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ ' -')'----
RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(8-7-6) Exceeds Standards
(10-9) Exceptional
Points Assigned:, ___ b __ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 9 ----
RATIONALE:·-----------------'----------
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
7 X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ 1_,_ __ RATIONALE:, ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned :...,b..,__ ___ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_'1.;.__ __ _
RATIONALE:, ______________________ _
H:\CONTRACTS\Sharon\2014\14-041 • Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Firsl Transit (B).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package B
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:--=b:..__ __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_6~---
RATIONALE: ______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
"I. 0 .'.f) 0 Points: . .J O •
11'
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: J (,_ 3')~
OVERALL RATIONALE: __________________ _
Evaluator (Print) Signature Datd
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_Firsl Transit (B).doc
?
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14~041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
• The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) Exceptional Exceeds Standards Meets Standards
Points Assigned: f X 1.0 . =
(0) Unacceptable
Points: 9
✓
RATIONALE: /VI ry &nfruklr) ~ . Chtff.4R., 0~
vel// f'1t.s{- pr4-J1e10"" ?vr11P~ .@fu- H'&f ...,/r& Jci11.s R ~ v-~ lv5 W4Jc ~ -~. .1-!P~ ~ ~- 1Vl~ r'tA>M~J o¼{ vltff. i~
v
2. Project Approach and Start Up Plan Information (Section 3.2)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ · _74--_
Weight 15% (15 pts)
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No, 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) (5-4-3-2-1) (0) Exceeds Standards Meets Standards Unacceptable
Points Assigned: I X 1.0 = Points-p.,;f,,__ __ _
RATIONALE:~ &€\4-~ cf't:J ~g{J ~' ~ .t1p~~ ~' v,,,f aJ sfr,,~M~ 4J , .. ""o/ ~ v-.Wl~S1c. t!~~ 1. ci.0-c~. EM« ~ c{?ff>Nf~ ,/- 5 c y-e-to/' oF p~ci- ta;Vt½~ ff vp~~J /J/&t ts·
cP01 M11~ ~ fu~ @u~~ 4. Maintenance Plan and Facility Weight 15% (15 pts)
(Section 3.4)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 7 X . 1.5 = Points: ) ,;J ',f RATIONALE: {A01G l'-10fj~t.,- av= /!JWM.l,<{fk.£cR iJnPG.c~
/MA( C/), ti h 1;1, '14:> r I.V{fw,-. J , <--t,u µ1aivr~ p!ttt-r
ti~ ~(d~ uvirfa,fuvf d(
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_First Transit (B).doc
Name of Firm: First Transit, Inc. inclividual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) (5-4-3-2-1) (0) Exceeds Standards Meets Standards Unacceptable
Points Assigned: F X 1.0 = . Points: ~ ,lk~~ A~ .i~~,,~~
/Dt~,,- p~ a19a~ cCt&evS RATIONALE:
~~ . £ vf&c.uaac_~A
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 38.370
M, E f't uz {;,7" &- 0~/ a ir- ;:L /vi r \ I 1 ,. , 1 ;t;-;, {&-l;r
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:_...c.c{:)"""'-/$.,,c....:cf=-,,.,:=._=-----=d#:::......:._,' i±::'-"-_,,%<--,-""D ____ _ I
Evaluator (Print) 7/at:j/lf
Date
C:\Users\ljacobow\App•ala\Local\Microsofl\Windows\ Temporary Internet Files\Content. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC_First Transit (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ .... $?<--_ RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
/3. \/ Points: ____ ;_
RATIONALE: ______________________ _
\ Name of Firm: First Trans,., Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ .....,_f __
RATIONALE: ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
{ 3. )---Points: ____ ·_
RATIONALE:, _______________________ _
C:\Users\JDoucett\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content. Oullook\62VQM0L8\SC Score Sheet 14-041-SC _First Trans ii (B).doc
'\ Name of Firm: First Trani,., ,'1c. Individual Scores/Written Responses
Run Package B
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
~- Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
.Points Assigned:. _____ _ X
Weight 10% (10 pts)
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ ---'q'-----RATIONALE:. ______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL.POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 38.370
GRAND TOTAL POINTS: 9 'l.3'10
OVERALL RATIONALE: __________________ _
Evaluator (Print) Date·
C:\Users\JDoucett\AppData\Local\Microsoft\Windows\T emporary Internet Files\Content Outlook\62VQMOL8\SC Score Sheet 14•041-SC :_First Transit (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
/
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) (5-4-3-2-1) (0) Exceeds Standards Meets Standards Unacceptable
PointsAssigned: ___ ~C,__ X 1.0 = Points:_q--'----
RATIONALE:. VBr y operat1ons1
e-:x,@er t e nc ... :ed, ba ~ s fate w, cLv G-aod re.f'ere.n_c...es,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) (5-4-3-2-1) (0) Exceeds Standards Meets Standards Unacceptable
Points Assigned: __ 9.L.-__ X 1.5 = Points: / 3 ' S
RATIONALE: Good out-1,'ne,; and. sched1.Lle- P-or ?J1arf--u_ , Ver c.Jod +ech ica I boc_k ro u d; £uccess.Pu/ tn O er loca:hCJn wim Sfur-t-u__p.._
}.._ots o-F back -up res.ource.s. . Pt ar-i i & c_JetZ{ G d t v--ec t- o.(16 ros. dewi led tryfbf'rna t-{ on. b "1~ver wa38 ()ver c1l I;}, I hour
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 9 X 1.0 = Points:~CJ __ _
RATIONALE:~ ~a I s-fa_ .PP known -to fb.__t m Beocb CDun'ly. OJI have, good ,rov0d, Gen,,ro.J rn0-noger lO(_rtOuJf\ --to ~Im Tran. _Gc>e)d +ro.1nt0j r-2103 rQm I ~Vff if"t- cPro yY\ rz9 tOf\CLl $'TI").__*
Cl\fcu· lab le O L) R>c ~ ex/%
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 9 X 1.5 = Points: / 3 • S:
RATIONALE: Gc'.;>od loco..t-•'on near :r:.-q S / ath /rue. Nvr~ )
kke Worth (.,(); m bacJ"< -u.,p /n ODY nTOn Beach and betray r5eo.ch , G-r:icJ/ M&rp/J-fke:.O iii ?rJ4-1N-J.-EN,<J,.-IV"U..... 4/11~ ~?.J.tiA-.:l,1 t)')\ s,.,
C:\Users\TERRY\Oownloads\SC _Score_ Sheet_ 14-041-SC_First_ Transit_(B).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.0 = Points: ~ ~TIONALE: Ver¥ laC[fe ~ompany\ Qo,me__ I iens.)
cJuci~ wu9nts, No fo_t!ecl o~ -fermtt'\C(ted c,on~ )i°<bt-e-d_; \,owever dt1d t-JOT ('e,eorl bread,
of &>f\+roc+- w1tt, ~rar11-pa'id $7.3 m·,11io0 ~ e,,:tf( e. fY\ ,e,,,(\ T'l 2.-J!J 12.,..
6. Price Proposat'" Weight 40% (40 pts) (Section 3.6)
Points to be determined by Purchasing Points: 38.370
ihi'rd h~Aes-r Qo,ht5 +'ac price.;' ~ ~ & ~> q o 7 v more_ c) ver Se~ n C 7) X e£1.- rs
from -f21r-s-t- ro.n k (<$3.g-~ t<,/year).
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 9/, 37 ovERALL RAT10NALE:---'l/4'-e.::....:..r....;y,,___e=x:....i,p~e;.:..r_.,a...::e=-n...:=c_e_=-cl _ ___,_l.::.,;a'-!..,~81-=e=-
t-ompoav. I
c-4~~&.ow~ Evaluatorrint)
~;&-·· --Signatu4
~A(J1~ Dat
C:\Users\TERRY\Down!oads\SC_ Score_ Sheet_ 14-041-SC _First_ Transit_(B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ '](_.,_ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: _ _.r"-----RATIONALE~..,."--"{s,,""-"-''-"'V"'''---'""'x'-l-,(2:..u.,.lf,::;:J.!1£tVfu.C..s.t,_, _,M-"-"-"--'~="'-"'?'-""-'-'-ll,,:;J.__.(J<..!.,::...A.L...:..,l-"•-'-l-'-'-,1.._,,,,'-"?"-''c..,,?,:.•::..._ __ -;
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ i( __ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: /2:,. RATIONALE: ______________________ _
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:, ____ {!C,....._ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:,_~Y,___ __
RATIONALE: ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ 1..,,_ __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: J l RATIONALE: ____________________ ...;__ __
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selectlon Committee\SC Score Sheet 14-041-SC_First Trans!t (B).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package B
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
PointsAssigned:_.......,C_o'---- X 1.0 =
(0) Unacceptable
Points: __ (p __ _
RATIONALE:_,_M_u_c.,c.._"~/l~?:=~~(~fl~· ....... {d'-",C..:/4-'--__.,fi,_,1:~e:.=-l='~/,..,,,t...,,v~-"'~l'"-~il'~t~U_t~a_t..) ____ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: ,.3 ~- 3 70
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
!?valuator (Print)
__2}_2 rf4_ Date
H:\CONTRACTS\Sharon\2014114-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_Flrst Transit (BJ.doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC / Palm Tran Connection Paratransit Service
NAME OF FIRM: Keolis Transit America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _ __,,5'----- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ 5 __ _
RATIONALE: ln:>u.+-hcie-nt Y""'ef-«ence.s 1
unctble -+o e,6-\n.,i<l lrL:f-o(1(Yl.(L-h'o()
en 4?a.5i- ¥cfo,/Ylancc'Prnpase_,r h:t5 ~p<Xie-n::e in~~+ ~cs,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
6 X 1.5 =
(0) Unacceptable
Points: 7S
RATIONALE: ___ (""'m--"--"-'d.._'-=--"-CLff=:...:..rD=CL::....::..,::_vV\_,,:-=_· _______ _
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: lP X
RATIONALE: 3o I ( cl +.e:a.m.
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: LP X
RATIONALE: r:})Ctfo5e.r ·1o\«rMt<:cl
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_..::Le,:__ __
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_--1q __ _
C:\Users\tgrimsle\AppOata\Local\Microsoft\Wind~s\T emporary Internet Files\Content.Outlook\8B6I3BKN\SC Score Sheet 14-041-SC _Keo11s (B).doc
•
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package B
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 6 X 1.0 = Points: -----RATIONALE:. ___ ~()},~~+--ri~Q~q,.....w~n~e,m~ll)~fTS~·---------
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 40.00
GRAND TOTAL POINTS:
OVERALL RATIONALE: _ _;Gv=-.c.co=cl=-----+P-'-'IV"4po_$c:.::==o.,1...,,=-'-, _;~::..::....:;:c...c/=c;('---'-/rVL..::.::...:0C-"e,"---
Y"f ce.iV <: ol hi5bec (a,h0j5 r'f ve~&cence info
vauator (Print) Date
C:\Users\tgrimsle\App•ata\local\Microsoft\Windows\T emporary Internet Files\Content.OuUook\8B6I3BKNISC Score Sheet 14-041-SC_Keolis (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Keolis Transit America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
(10-9) (8-7-6) (5-4-3-2-1)
Weight 10% (10 pts)
(0)
Exceptional Exceeds Standards Meets Standards Unacceptable
/
Points Assigned: s- X 1.0 = Points: ::r: RATIONALE: L-CJ..f" u-:lLl)L.:::
I ;JO'< ,A,{.JC-1rl._ ~vV~A
2. Project Approach and Start Up Plan Information Weight 15% (15 pts) (Section 3.2) ·
(8-7-6) (0) (10-9) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards Unacceptable
Points Assigned:. ___ ,_· __ _ X 1.5 = Points:._~-'---
RATIONALE:._-----'"\._'{__,_/-=-t .::,~c..:........:'-=----------------
.J(w" .fll-/•vJ- C-1[.::i
f 'i ooo ~ 1'\/1'14-/vr.f
C 1-f.A IJ Clo c.v{M,11 -c;.tv\ C. ,t ~\,\\O Vll'i""'-•) t J .f fJr/\.'f<Jf'f
W te'vK-"-"'I , " a E0I c.,vt .J I /1,,A \!"IV,l-.~ l<Y,J C.,.,. L., L-{ cf A.. C, f"/ crA~• "' wJ ~ r1.f c r1 •{'I . .»I o=- ()l!:,J;.f
~Cl,(JQ
)A '-1 Ct.,.-'( -9 : A.f"'-4 ft.w✓Ht/J ,- t--Jv f.c.., c:::,,-.__ J/\a I ,.J'f '<,J C ,o,vr' .(' • • W IA' f"\"-"~ { 3 0 ~7/vl ~•IJ~ A,"\.j /VL..-r.-"''f €'x./J ·
fv•JArJ c£.,.,. W'\.. ~M f/JV'Vlll'/(,7'ol\)
Mfs o/( J f'llr'r E:,9't'Wl1 lr,Jc,r'
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 0c= _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ , ... C~-RATIONALE: ___________ ~-----------
(('5 J CLl°lll'-- - r,s, L,'l'T Lt" (-=1...orf\.-ttJH i,,b.-\...\("'/\,,....,N(.l-
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:. ___ 6.=;,_ __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ C/__,__ __
.RATIONALE: __ :('+--\ ..... f_\;_c.A~L-=-----------------
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Setection Committee\SC Score Sheet 14-041-SC_Keolis (B).doc
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package 8
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ~--- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:, __ b:...._ __
RATIONALE:. __ r,,.,_[ -''\"--/D--'-(_U-----'l=---------------
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
~ Points: 4o. 0
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: N Q '11 ~A) IOL (;::...( Nv\ e c...,O .[ l
(7.J\ . .t.G V ,<J CL(" '(W IJ,J ~J ( v'\..l("i4, ,t~yf,J,;;- L
Evaluator (Print)
, /L-,/rt Signature Dat.1e •
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Keolis (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service /
NAME OF FIRM: Keolis Transit America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4°3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: I{ X 1.0 = Points: l( RATIONALE: w~ 11,f:_ eJ /,,-? /41?{/taa. Vt' lv,~ ; r) ('iJ
0(2.[ftlVl I t:-..r
~ fri-r ~~ / C ~ i,,a G~ ~r~· cJM-1 C(;vc1.(r 1--tc cWaG: c
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: {ij X 1.5 = Points:--2__
RATIONALE: 5f&.~i up , Cc~ o--dJ p/a-s-,,"' ±r::ct11 .>l 41 "s g pp n? be,~ r' !) tf di.A r1KqJ b c,,:r½)f-..._
I I
~. f vt1,(f Hf/ddl tpkkc /r Ctl r-;i cl~ f"v/JPtt1 ,~
:::ft tkhC d:z "' ~ 9w -~-,f'1$,_ ?LJ lklt-c--rikR_ f':-{(w, / rJh , t-
. . .P..xp "v/'vf ~ ~[ t
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service
Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
(10-9) (8-7-6) (5-4-3-2-1)
Run Package B
Weight 10% (10 pts)
Exceptional Exceeds Standards Meets Standards (0) Unacceptable
Points: 0 Points Assigned: (}; X 1.0 =
RATIONALE:·~.• /-t1¥~ &m f\.W~e tf~ke-tz,jr- -
V)/ f/"IJ,f.~IJl-i~,c 0 6tl"I~ ff5c1-----~ NAKau.J.c
µ160 l'-11k h~ {IC.,,- /"¼ •• [~ ,,,,..*':tr·
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ -=-7,.,.,_._ X
Weight 15% (15 pts)
( 5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable.
Points: 7 r 2 /1 ......,,_ L ·f /Vf 1,.. . 1 ·-
RA TIONALE:___,b-~~":!::• !~Q?~:__..1.@~lot~p~!;t;2i>i~d~}@!!!-~..ij~--,,__LL~·"...!!...t~7~,~ .J/f.!:.P11.£.~~,:;,-
/~;1 ul tnW4 u ?
DIU/4z
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Comm!ttee\SC Score Sheet 14-041-SC_Keolls (B).doc
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: . ~ . X 1.0 = . P~:-i,__ __
RATIONALE: [till, be-,d~ c;J:~/;t ~~/ ,;;) r((c:4:.,
oJt'0,vtaf- ;ao(J (§IL,;:)!(, ·3 C/4,ff' f Vt1<r) /- ~n ~w
ht1~ . f<WttJl/.f ~/y ~-(/"d~e &Cc._
tf}ktf ~~ 0--4f~ 6. Price Proposal
(Section 3.6) Weight 40% (40 pts)
Points to be determined by Purchasing Points: 40.00
O ~ 6tJ~ 5r ~>- .J ~u)~ PJ/l[)f?~aw_
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:_------'{>:;__~-'---~-·~-----~-=-;:__•__._~.__&---<. t?a_·_,,___, __ _
7J;;Jo/JY Date 1
C:\Users\ljacobow\AppO8ta\Local\Microsoft\Windows\T emporary Internet Files\Content. Outtook\4CIWIBU7\SC Score Sheet 14"041-SC_Keolis (B). doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service .
NAME OF FIRM: Keolis Transit America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) __ Exceptional .
V (8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: ___ 7___ r;;~ 1.0 =
(0) Unacceptable
Points: ___ ..._7_ ,r;:• l ft..- ~ ·. !fr~ D
RA TIO NALE: r,J, ~,.&<1e,,1..-< "'IV> )/l'I., · -"--'"-"-'CC......C;__-----'="-"-----"'c.:..;:_-~~-------------
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
J (8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
/
,,v.-t!~ointsAssigned: __ -----'-7___ X 1.5 = Points: ____ .-~ ...... ,,,,,{
l'o~"J1-r RATIONALE: k~Ar'.£,1,y,. 11-/r'" ,r2:i,.,,,_,,.,(c((1) d,Jr,rif ,1/.L-,t,_ ~;14f-c.,~':prcN:r Mfl.L ~- b4(J-s
lh r(d e. <"c h, H~l,,11, W ""' .fty .s·r. · '
/!A ~ ~ ~ AAJw +"'_J,).,;. wYJ /;,. C..;t.,v,/
Name of Firm: Keolis Trat,_)America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel. and Operations Information Weight 10% (10 pts) (Section 3.3)
(10-9) Exceptional
/ (8-7-6) Exceeds Standards
Points Assigned: __ ...cr __ _ X
RATIONALE:&1111/1-~ 2/;, . CM 0/2. . ',/mm•/,,..€·& J :;.
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ____ 1'_
ev-"Jil s~ hr t!t, f1151:(II: , &vv-t,JJ f:rj wlt;,t~l Pl/2M 2'Jf?'P~~ *1 !&U . I /,,.,Y ,
vou f½t) '?>-:> , ~;,,;;.,,.,, ~-; i "'f"i .. ~"" . 4 v/..J hih . s0t.rszj ~ ~ s;~ ~ fjt'i l~ :._, ~ ~W+-, om -14f!i 7 h,;,,. .;_ ,t,.,/. r1, ?
t 1' ~ ¾ M ,J $/ 1' 5~ ~ Ml! 1' Z.3 ;1/ • 4 A, r,,,t/ t11,11i,~ fhff' ,p,,.,,.-f-4,-c.k lie,.~ /4 3, ,;, I.,· . "' fr,, sli,1iv.e'
4. Maintenance Plan and Facility Weight 15% (15 pts) (Section 3.4)
(10-9) Exceptional
/ (8-7-6) Exceeds Standards
Points Assigned : __ --1.7 __
RATIONALE: 5<ar) MA-L ~ ?P"'e/..t,,./4- -
.--- e.1h@crJ /i, f!-1,J :: Yl'1 r;,,.v
j
X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:
stfk,J,.,.,l. ~, cedll~-t;p /rrct1.L
1,\ ~~- 1 ~ ~ u.,1 }..,_ t½<A
C:\Users\JDoucett\AppData\local\Microsofl\Windows\T amporary Internet Files\Content. Outlook\62VQMOL8\SC Score Sheet 14-041-SC _ Keolis (B).doc
\ Name of Firm: Keolis Trar.~.i America Individual Scores/Written Responses
\ ) Run Package B
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ ,---,,--.:_
X
Weight 10%(10 pts)
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ____ :b......,.
@'-----------------------6. Price Proposal Weight 40% (40 pts)
(Section 3.6)
Points to be determined by Purchasing Points: 40.00
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
Evaluator {Print) Date
C:\Users\JDoucett\AppData\Loca\\Microsoft\Windows\T emporary Internet Filas\Contant. Outlook\62VQM0L8\SC Score Sheet 14-041-SC _Keolis (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC / Palm Tran Connection Paratransit Service
NAME OF FIRM: Keolis Transit America
SY~TEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 8: X 1.0 = Points: g' RATIONALE: U.n.abl,e___ to c..on t-a.c..,t- bust n e~s re.Perence.S'"
Ver3 '"-;f' CDmf?a'J,, rrs. to have 900 cl b0-C::J-3round , l-2ftJ-~;;,: mosTl'j
+-Jl,ize-overs> n..s DJ?po-s.ecl tc s +ar-t--u pS \ G reot_t"- '$a f'e+-y Y-eUJrd,
2. Project Approach and slart Up Plan Information . Weight 15% (15 pts) (Section 3.2)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 8 __ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: /;;2__
RATIONALE: Good. pla_n fuy-- ~v1:b apera.:t-,'00s 0-ncl "D t0-ttL ~ , 8.,.,n p lo j ee.i L,V1 c en 1'- t v e S , pes- f)o.?: 0,
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2of3
3. Key Personnel and Operations Information (Section 3.3)
Run Package B
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.0 = Points:_8 __ _
RATIONALE: Ga:Jd <51ct ffi Y}f1 p l Ol,Q 01-Vld dood -fra1nH·l.J outl11neJ" i~rlver w(J._3e o\f'e)("' $ I~ -J ~au ,r C <'1l I t:2, cJ-1 ) , fVo t" mari Y, refe.rerceS
for propo~B,d sm__-Pf--, f)?1ve Cfhv\ -
' i ,.
4 . . Maintenance Plan and Facility (Section 3.4) ·
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: Z X 1.5 = Points: I ;;l__
RATIONALE: Good Loc.c,_-/-t'on . -h)y Run ''6 '' .. (\[ eo.x·· h'n ~n 6 l v d, fb .:;::~ 9 5 , De.J ro.-y 6ch,
Go~ d p1e,:v'e,,n:t-Lcv'ie) mA \ n -i-en O\JV"\ c..e.. c;e.r \f le'.€> '(Yvl.'.)n l fm"' l 0 ()__,'f f m 0--cJ. a:n d O \/'0<U..,\ \ YY)_Q\ I\ "1€.J{'\Gl n ce fLCJ-.'f\ w 1=f-h h23h 1-eve,I +ec..hs. uLleei--lv~ . ~t---0-- £ ~ %~-
C:\Users\TERRY\Downloads\SC _ Score_ Sheet_ 14-041-SC _Keolis _{BJ.doc
' ',
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 3 X 1.0 = Points: g s,tu~rd S , RATIONALE: ltppe.ar~ +-o exceed
Ver:~ /ar-g e.., 1r1-re,rta_t-[ ona_J op-era_n'6 n ~ -7fia(\ce_J Ca l'\Cl~ J Un, +-e_d I-< t 11§ do m, U, S.
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: 40.00
H1'3hest 001·n1:s -Fvr Run ''B'1
, ~e)<.-r
pcop t:?9::.-e!r 1s on~ <//~ 3 '+II a-ver c:Pur en +in~J Sev'Q.n (7 J years. (39,99'7 pt-s)_
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: ~<t ovERALL RATIONALE:. _ _;G=-o_o_,J=<--------¥p'-'-n->=o'-lfp::...o=S=°'--=-}-----"'a=n....c.=d=------
CLf~CLr$ -to . be ob l €.. iD j10e .-£,rn ,, q l I eon d,+-t oriS <elccTe.cl _ (!-o Run 11 6 ..
. I ~1<t/8M0/I/ Evaluator (Print)
C:\Usars\TERRY\Downloads\SC_Score_Sheet_14-041-SC_Keo1is_(B).doc
Run Package B 11/11 y
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Keolis Transit America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
· (8-7-6) Exceeds Standards
Points Assigned: _ __,,.__1_.__ __ X
(5-4-3-2-1) Meets Standards
1.0 =
RATIONALE: {x-1J,~10,,c1 (I'/. ~2 (')r/v,~rtl•
' No c: ... ft1: /..MA l,c r,Jw.41;
(0) Unacceptable
Points:_7-F----
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ :'l-'<...f.--'?'---- X
(5-4-3-2-1) Meets Standards
1.5 =
RATIONALE:~tboci>v&b s./-..,.J -11 IJ I! IM I '
(0) Unacceptable
Points: tf#i: /.), 7 5
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:. ___ ]'---- X 1.0 =
RATIONALE: ~l",,a 0 ,.,1.ef~ aP./.. .,. lo,, ... :;-v I
Points: __ 7_,_ __
J,cr, 0 ,J/' >J 6c:,~
f !n• ~ t I /YI .,,,..;;.s, t C '/- s J....,..J. - VI' ~ 4 • r'I I/•' ,V ~ 012L
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _;<(::....._ __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: { d:,,
RA Tl O NALE :_Tc.;""=-.,,./ .,,_r.,_, "'"~J...&2::.L.as,U< (1:,_l-'--,-1-IJu.r.,,_'{);.,,~C:.,eA,t:,cdc.L., ..,u"-'~=-={;,'-'---~-2~p.:.,_:I 'cc;....,;.,___ ___ _
),,r P .. e., t,J ,/ 7
H:\CONTRACTS\Sharon\2014\14-041 • Palm Tran\Se\ection Committee\SC Score Sheet 14-041-SC_Keolls (B).doc
Name of Firm: Keolis Transit America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package B
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ .:e:(o::... __ X
(5-4-3-2-1) Meets Standards
1.0 =
RATIONALE: /1/rP &/fl·(;,rti-.J 1cvJ\ 1e/J11:i,J
6. Price Proposal (Section 3.6)
(0) Unacceptable
Points: fo -~---
Weight 40% (40 pts)
Points to be determined by Purchasing Points:,_t/..,_,O"'---
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONAL~7'
60& ~ fJr0rflf)-5~} buf rJ()J- ~-5
f?valuator (Print) .,;d:;l Date '
H:\CONTRACTS\Sharon\2014\14"041 - Palm Tran\Setect!on Committee\SC Score Sheet 14-041-SC_Keolls (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
/ RFP No. 14-041/SC
Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ..=5" __ _
(5-4-3-2-1) Meets Standards
X 1.0 =
(0) Unacceptable
Points:_O_-__ _
RATIONALE:, ___ &:..=.=.-ee,.,~cli=r:'-"s"""cn"--'-l'-'Du...hu..<o"-'n-S'-=--'-'-'io'---'!2u~n'-A--'--¼:,q-'+--,_,4-_· '---/ '-c:3
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 5 __ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 7. 0
RATIONALE: _______ __,,,----------------
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ....;/pc...... __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_.....,.{P:c..... __
RATIONALE: ________ ,--_____________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:, __ ...,/e,:;...... __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
·1.5 =
(0) Unacceptable
Points:, __ 9-'----RATIONALE: _________ ,----____________ _
C:\Users\tgrlmsle\App•ata\Local\Microsoft\Windows\Temporary Internet Files\Conlenl.Outlook\886I38KN\SC Score Sheet 14-041-SC_National Express (B).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: ___ &"--- X 1.0 =
Run Package B
Weight 10% (10 pts)
Points:. __ UJ=---RATIONALE: _________ +--------------
g/i
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 35.491
GRAND TOTAL POINTS:
OVERALL RATIONALE: ____ -1--------------'----
?)/i r
lator (Print)
C:\Users\tgrimsle\AppData\Loca\\Microsoft\Windows\T emporary Internet Files\Content.Outlook\886I38KN\SC Score Sheet 14-041-SC_Natlonal Express (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service /
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _ __:,6~-- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_-'-b __ _
RATIONALE: ____ ~--------'---~---------
2. Project Approach and Start Up Plan Information Weight 15% (15 pts) · (Section 3.2) ·
(10-9) Exceptional
(8°7-6) Exceeds Standards
Points Assigned:. __ fo __ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 9 ----RATIONALE: ______________________ _
.. ,,-..,
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ £-=----- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ (, __ _
RATIONALE:·----------~------------
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_-=b:;.._ __ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ q__,_ __
RATIONALE: ____________________ -'----
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleotion Committee\SC Score Sheet 14-041-SC_National Express (B).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection .Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: __ 6:.__ __ _ X 1.0 =
Run Package B
Weight 10% (10 pts)
Points:_b:,.L. __ _
RATIONALE: ______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts) ~
Points: 3 Jo LJ q J ,,
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
71 ~,Y'll
OVERALL RATIONALE: __________________ _
Evaluator (Print) Signature Date' 1
H:\CONTRACTS\Sharon\2014\11-041 - Palm Tran\Selectlon Committee\SC Score Sheet 14-041-SC_National Express (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSA!-S/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service /
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ;J X 1.0 = Points:~_c;'.., __ _
RATIONALE: (\!)I {- (V/,ttfJ/y tJ;,.-,;f,fc,u;jf ,' /)cl'if A /\ii{ o.~
P'1&1~J l#E:;" ~ W~tttl-&-£
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
(10-9) Exceptional
PointsAssigned: ___ fo-""·-· _ X 1.5 = Points: 7" ,5 RATIONALE:_-+-e_,_1a_0 __ ~_r:_~_-_;__,_~-/-~---'-/l_d_{-_µ.-::1 __ d_~_--~----'---
Name of Firm: National Express Transit Corp. 0
lndividual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:~ __ ....,r;_· _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:~(o~---
1c/h-z ~,✓ -In rh-<t
RA TIO NALE: Cf"r ~ /4t( flA ,rl.-.q?dcu({
~ ~ r /Y"TuGt11.JJk (u,gr;;, , L J
i?d--'().f/'1~ ~- IJPktHt,J)~ 0/4r ~~S,'f-1 r J I uD£.i S:~fLtr!t,
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_· __ _,u}y...<- X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ Cj+---RATIONALE:._--'-(J dw_~_1 vu,,(,_f~~,l--,'--);;_fl1?-:..i:;.-----=:d_f-__,_/ .,,.:;../..~-'-----=-=--+;_"---'_tfrl __ A_1'7~~'-----=-~
f /t</0 P'1~ J tt·I- & i?Jcalt,~
C:\Users\ljacobow\AppData\Local\Microsofl\Windows\T emporary Internet Files\Conlent. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ National Express (BJ.doc
jllame of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: ___ _,,4,___ X 1.0 =
Run Package B
Weight 10% (10 pts)
Points:_'f---1----
RATIONALE: {)tJl; Ga~ J:> Z,, :Z.#5ttd'd I <r cM L?I · tit9-q ~13 }(" e~ u~f?;e&y /4 br,?c-c-~C C
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to bl determined by Purchasing Points: 35.491
--f' ~ d-j 4°1~191/ ~ Cj I ff~, s.;)u -;P 11> 5 ,4 II p:
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:-,,,-.~:::_~9~B::_7 ~t:...,::::::-~-;}-t::,0-:'.'.'.:....:_' L.7:Y~:..i·0,_ ____ _
w & f- p iiv~
Evaluator (Print)
C:\Users\ljacobow\AppData\local\Microsofl\Windows\Temporary Internet Files\Content.Outlook\4CIWIBU7\SC Score Sheet 14-041-SC_National Express (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service I
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score
the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References
(Section 3.1) Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ' ----RATIONALE: _______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_---"/'--'2,, __
RATIONALE: _______________________ _
Name of Firm: National Ex., . .,~s Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
(8-7-6) (5-4-3-2-1)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional Exceeds Standards Meets Standards
(0) Unacceptable
Points Assigned:. _____ _ X 1.0 = Points: ___ -"g'--_ RATIONALE: _______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ___ "'"'1..___
RATIONALE: ______________________ _
C:\Users\JDoucatt\App• ata\Local\Microsoft\Windows\Temporary Internet Files\Content.Oullook\62VQM0LB\SC Score Sheet 14-041-SC_Nationat Express (B).doc
\ Name of Firm: National Eiq ... .. ~s Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: _____ _ X 1.0 =
Run Package B
Weight 10% (10 pts)
Points: __ ....::<} __
RATIONALE: ______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 35.491
GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
Evaluator (Print) Date
C:\Usars\JDoucett\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62VQM0L8\SC Score Sheet 14-041-SC_National Express (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
j RFP No. 14-041/SC
Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: q X 1.0 = Points:_...,.8_,__ __
RATIONALE: 4r:ge CiDmpanv w, ff) howte off,(!,e ,·n c h(jlcD'\d , Good bu sn 11e~s ~+e. re,nc.e tro rn rn 6149-1 Yee"/ cl 1v'e,S,e., loea.:t·to nS, 1J riect + rxf n::L+rans.,+~ p-e.r ,-e nc:-e) Q(\ d boc.Jyj mo ,raJ ., G DC) d ~afe:t-y ,reC-Q)-r d .
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.5 = Points:_J_.;l.... __ _
RATIONALE: Dr 1' ver wo.-3~ oy<f!_:r fll t ~,/ hR., {dJ;!).., r::":Jo) O.V\cl ood ~:J-enef,'+ e,Lenta.. (4- o/o '
Ver'y 0God sta,t--up pion an Staffi73 out-lire, \lery 300d ovt-llh:fi at.nq\ 4/ow-eha.-r+
~of ope,c.LT10V1S 'l \)\?,f : a~.(oQ trio
·,
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: g X 1.0 = Points: g_ RATIONALE: GOdc:L r~Ference.S ¼ r C>pe,61..ti' o ns mgr: QI) d V eJ1 't c:/ e,__; ma l n 1eV\ an ce vYI fj r.
4. Maintenance Plan and Facility (Section 3.4) ·
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: g X 1.5 = Points: / ;;).__
RATIONALE: Good locat,on - a~~~s ~) 0cJ~t'1toYJ 8cJ)bef-u.Jee.n PrtiaAt,c. Ave and Woolbn3A+- Rd.
C0aecl s-ta.-ff1n3 le ve/ - ✓ce.ry derailed pr:e-v-RnJ,'ve,, ma,o1e n~nce.. plan ,
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_National_Express_(B).doc
,!' , • -•
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
Points Assigned: ~ X 1.0 = Points:_~=---
RATIONALE: tva uedi+, referel"\ce51 0vvciilo...b/E:A, rvo f21nor1cic,_/ risk ratlr;j ava, /oble-.
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 35.491
~anJ<:;=tl-/ our·cJ-f-! G. on over-ctll PrtCe) ' S UJ rt V\ ... <:ii 7 39 : 68' ~ m or-e_ t-hci ali k ff:/
Cr.fl 1;05 ; 3 &3 per '-Jear-- c1 veroge..., vnar-e over ?> -e_,vex'> C? > '1 e_a.:rs 0
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: g' 3 • 'f'f)
ovERALL RATIONALE, Ver 1 .Qi; od ui m FJ% ov-era//, CoJ~d F ~-td.0 eel) ' d2 ~e.1rvtc._es'
' 7 s><1~ V !3RtJw/f( F_.:7:--"-'~-e.....-;p.---=. =-------·· _
Evaluator (Print) Sig~
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_National_Express_(B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 1-+-- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ]
RATIONALE: _______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:. ___ 1:..__ __ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: / 1 RATIONALE: _______________________ _
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page2of3 ·
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:. __ ".'\..,_ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:. __ °)-1----
RATIONALE: __________ ~---,----------
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ c('....;:. __ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meet$ Standards
1.5 =
(0) Unacceptable
Points:_.L/,,,.J,.,._1 __
RATIONALE: _____________________ -'-----
H:ICONTRACTS\Sharon\2014\14-041 - Palm Tran\Selec!ion Committee\SC Score Sheet 14-041-SC_National E:<press (B).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: __ ~(_()~-- X 1.0 =
Run Package B
Weight 10% (10 pts)
Points: 0 -----RATIONALE: /\}p ?tP11 CLr/7 l,,/1/J.l, 5J,r:.b, /.1.L.y I/' rctl, (L_.,;
~~~-~~~~-~~~~~-~~,,..-~~-~~-~--
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: J 5'. 41 /
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: <g/,t/q/ •
OVERALL RATIONALE: __________________ _
Evaluator (Print)
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Nationat Express (BJ.doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
/ NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 7.L,_ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_--'7.._ __
RATIONALE: ___ ~~-------------------
S:ee d~scripl-ton:s i {) Run 't:j A-,
2. Project Approach and Start Up Plan Information Weight 15% (15 pts) (Section 3.2)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _,7'---- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: /0. 5
RATIONALE: _______ ~----------------
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ---'1'---- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:, __ '1 __ _
RATIONALE: ______ -S=-1-'-A-_. _____________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ~lp,__ __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ CJ....:.... __
RATIONALE: _____ S...j!4--_,__ _____________ _
C:\Users\tgrimsle\AppData\Local\Microsoft\Wlndows\T emporary Internet Files\Conlenl.OuUook\8B6138KN\SC Score Sheet 14-041-SC _ MV Transportation (B).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
Run Package B
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ {p.:i.... __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ Lf;___ __
RATIONALE: ______________________ _
~ltc
6. Price Proposal (Section 3.6)
l
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 39.997
GRAND TOTAL POINTS:
OVERALL RATIONALE: ___ ~---------------
7 Tu.ts JJ,,'"O ~bnJo• Eva ~tor (Print) Signate Date 1
C:\Users\tgrimsle\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\886I3BKN\SC Score Sheet 14-041-SC _MV Transportation (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ !-'--- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_}~~--
RATIONALE: ___ ~-------------------
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_--"=6"---- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: er ----RATIONALE: _________ ~-~-----------
/
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ l __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: I RATIONALE:, ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ .,,.,.__ __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_9......:... __ _
RATIONALE: ______________________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_MV Transportation (B).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service
Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(8-7-6) (5-4-3-2-1)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional Exceeds Standards Meets Standards
(0) Unacceptable
Points Assigned: __ ..,;.~--- X 1.0 = Points: __ , __ _
RATIONALE: ____ ~------------------
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts) 7;,f
Points: 51, 997
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: _________________ _
Evaluator (Print) Signature Date
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Commiltee\SC Score Sheet 14-041-SC_MV Transportation {BJ.doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service ✓
NAME OF FIRM: MV Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.0 = Points: e RATIONALE: 1/a,! 4 L,J rJ-? /4t:rH't05:fM rl4f&1tdt-<..-(.O,
(l{,f~ h,µµ-- h «ctcf f{-, 1t11fidr tJ/w £)-t,,,--/4~
f?yp~ ~ ( ~ Af,/'z~ f
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards ·
(5-4-3-2-1) Meets Standards
(0) Unacceptable
f: X 1.5 = Points: ) /=:: RATIONALE:------111-~-'--~~-~c""'---=-_'--J~-=-+'--1/)~/'F-~-';-':'-'-::-9~,:;__· ~~,µ....,t20"'-><;;G.;<,-?-----"-/4-'--=--/apfaC/e---
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses
· RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package B
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: Jf? X 1.0 = Points: f? RATIONALE: M ttv/11~r: ff ,t,t..,_ut~y,:, ~ 419:ru;
. . I U ' {,,,_Q~/( ,, ~d 11---zfu,;/?--§;..-,pe A..-:t:&....
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
Points Assigned: ~ X 1.5 =
(0) Unacceptable
Points: }~
RATIONALE:-+....:.....;.--'-_0_;_h_-+_,__-""-'-__ J_....:...f...:.ti-'-~--.=...:__;__" ____ _
C:\Users\ljacobow\App• ala\Local\Microsoft\Wlndows\Temporary Internet Files\C0ntent.Outlook\4CIWIBU7\SC Score Sheet 14-041-SC_MV Transportation (B).doc
Name of Firm: MV Transportation, Inc. ' Individual Scores/Written Responses "RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) (5-4-3-2-1) (0) Exceeds Standards Meets Standards Unacceptable
Points Assigned: "7 X 1.0 = Points: ? RA TIONALE:_____sd{)~J 2==-._,_,,,/;J~rlz.:::.,___,,,_b=w;=M-:t--e'-", ~< _.,,!/c.,:/:_~=-+?l-·.i.e:;l.:::...L./2...LL.Ld.;.,/;c..=,-,,.="=>"-=-= _
~f5 z/c::r~ ~c{hc.~_oF-fW~ cJ<Qc:J.
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 39,997
Tilt:!-? /41!~ - o >, at1>. f~r
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: ££ 29 ~ OVERALL RATIONALE: ~t ::- X 'L () % , I
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\T emporary Internet Files\Content. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ MV Transportation {B).doc
Run Package B \ '
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
/ RFP No. 14-041/SC
Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ t[_ RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:. ___ /_~_
RATIONALE: ______________________ _
i Name of Firm: MV Transp6, • .ition, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ __.,g'--
RATIONALE:. ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ ---'-/1--_
RATIONALE: ______________________ _
C:\Users\JDoucett\AppData\Local\Microsoft\Windows\T emporary Internet Files\Content Outlook\62VQM0L8\SC Score Sheet 14-041-SC _ MV Transportation {BJ.doc
'\ Name of Firm: MV Transpi>, ,dtion, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:. _____ _ X 1.0 = Points:. ___ _,_9_ RATIONALE: _______________________ _
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 39.997
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 'lJli',1°11
OVERALL RATIONALE: __________________ _
Evaluator (Print) .~ Date
C:\Users\JDouce!l\AppData\Local\Microsofl\Windows\T emporary Internet Flles\Content. Outlook\62VQMOL8\SC Score Sheet 14-041-SC _MV Transportation (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review .all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.0 = Points:_9.,__ __
RATIONALE: Gciod bo.ck.. ,oond w, +h l-<.nou..l )eof e, o...P. para__+ro.V'\~\+ a.o1d.. CO.f r c.usn::,m-e.,£, Gxxi +ec.hni"c.a..1
bacJ<9 ,ou nd' ''G--oo D lj -rewet\Ce.5: (\j er j 5crr15~,e.A"' l vnD"S-t--1 y). 0 pe<a..'fes mcu'\'I b,ge _ cof'l-trac,"t<s.
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ q.__ __ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: / 3. $
RATIONALE: G:'ood plan w '1th cusfo mer -00-t-reo.ch,
be-railed sta,t-up s.,chedu\e,.
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: ___ q_,__ X 1.0 = -
(0) Unacceptable
Points: __ g...,_ __
RATIONALE: O~-r~t-a.,d t ?j <z. ~a. f-f' bacM3 mu nd, expe.rier,.ce..d, G'ood + (Cll n t na a (l a d I sra-Tc__h p l Q Q '
t>BE., - f)..00"/-o - brt've, wa3e_ r::;ve-r fl);c:J.)hvo, G co cl 6 e.J"\ e-f', +s
',.I, I
4. Maintenance Plan and Facility ··· ( Section 3 .4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: __ ~q_. _ X 1.5 = Points: / 3.- ~
RATIONALE:
la.I<-e.,,
Ve'(' Ver
\ V e_o_ -\·< O Y\ , ~ ~ ('
(
oocL ou+f, V'\ 0
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_MV_Transportation_(B).doc
r-,q5 & -th A-ve £ou't'h J '
•v ·,
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: l () X 1.0 = Points:__._A-=~'----
RATIONALE: Good creo\; + ,e-fere"c_e.s,'" l-o uJ ,\sl-< ra.. ttn3,
LCL-ri)e._ o pe~ra.J·i o "S on net~CnCL\ \eveJ ,
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 39.997
Ve-r1 <§ood o-fe.<Cll\ f~u:~.e.J, u.)\th~() c:://tf-J31-J,
\[er~ ciose TO hi'3he£.t-') wh\C.V\ has Jfo r-rs.
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: q4-, ~ ~'j
OVERALL RATIONALE: \j 8ri expel'"·, e'f\ce.d C li)YY1 par, Y,
fta,_s good repu,o.11 on, !-<:now n iD I
· 7 ~v 13.Raww -";;:te.:~ Evaluator,(Print) -"s""'ig""n'-"at""u::..?e.,e,,:;."""""''------
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_MV_Transportalion_(B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_--1-/li..O,,__· __ X
(5-4-3°2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ /0 __
RATIONALE: __ ~-------~------'-------
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ §...,_ __ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: _ _,_lx.~-'--RATIONALE: ______________________ _
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ \_,__ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ 4_._ __ RATIONALE:. ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ,_"-'iLL-_ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: I ~ RATIONALE: ______________________ _
H:\CONTRACTS\Sharon\2014\14-041 • Palm Tran\Selection Commlttee\SC Score Sheet 14-041-SC_MVTransportation (B).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(8-7-6) (5-4-3-2-1)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional Exceeds Standards Meets Standards
(0) Unacceptable
Points Assigned:, ____ ~=--
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
X 1.0 = Points:, __ b ___ _ r;./.,. I,, /,,,,L/
'
Weight 40% (40 pts)
Points: ) '7 4 °I °I 7
GRAND TOTAL POINTS:
OVERALL RATIONALE: ________________ ~--
Evaluator (Print) Signature
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Commlttee\SC Score Sheet 14-041-SC_MV Transportation (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC / Palm Tran Connection Paratransit Service
NAME OF FIRM: Transportation America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: &, X 1.0 = Points:_(p;:..._ __
RATIONALE: EiGperi-enced. .para__Jra.irts1.J-1pl?Jll'ider. ~eference.5
c\zkre, not-- submi~d by ma.in eon-l-mc:t IT'.fen.n.:eol in '(Ef!etl-flldton.
Olen11 9(,Ut,l/·h'eoL +o 'fY1J1/Jcie 6UVlces required..- h;t "Pre,,
h:MeNer n::pen;rEe:S ,on ~ cpe,rf~ 1ncli2rc.,/us,/Ve,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: # le
RATIONALE:c:pr!ip'Z'C':Rf
l CU\_,.
X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: _ _.q __ _
Name of Firm: Transportation America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 5=--- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: 5
RATIONALE, , ~ ~cu.:, iO be l•mi:lrdc 'Chuckd ~rJ-. H=cuul. pr!!prsaJ d1oL VlP+
te:f'e czt Ctr) u+..en61Ve bu-x:n In k e((R-n+ Qd.d,,i--h07UU
wwk ,s. ob:61oed -
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: -j- X 1.5 = Points:_~(() __ _
RATIONALE: ~o&ie,r dlol- no+- 'Suhrni+ f-ci1,,i±!J info
co (pvvoo$aL bv+ fYl!Y[olecL 1rtfe ✓ .eKfla_n_@vr1 as -lo ! I ,
c1-evi-$1ro ro·f- ---fo tx1.J:xn1f,
C:\Users\tgrimsle\AppOata\Local\Mlcrosoft\Wlndows\Temporary Internet Files\Content.OuUook\8B6138KN\SC Score Sheet 14-041-SC_ Transportation America (B).doc
Name of Firm: Transportation America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
Points Assigned:,_---'5,.__ __ X 1.0 =
Run Package B
Weight 10% (10 pts)
Points: 6 RATIONALE: ______________________ _
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 32.467
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: r:()Mpo~c:J C,.{zVv@JYlc'.ci, refocences 1"D
~Lva-rcl, 0uucl:tj ~h upf~on qro111deet. C@opa~ fi, Leet -1-o fYllvl'de per..f.'ren+- info +he a_ffiot-ecf
BVe.irlU1 'E:Lo(Y. <J-hri :fu CUJt;,()rb s,-b._£+: (L(IC{ acqu.irfc
~ ~ i..tftS- h () ..J-- C/g(lf I
~ 1:avis 0ohn~n Evaator (Print) Date 1
C:\Users\tgrimsle\AppData\Local\Micmsoft\Windows\T emporary Internet Files\Content.Outlook\BB6138KN\SC Score Sheet 14-041-SC _Transportation America (B).doc
' Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC /
Palm Tran Connection Paratransit Service
NAME OF FIRM: Transportation America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned : ___ b:;_ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ £ __ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0)
Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: -J X 1.5 = Points: '7,S-
RATIONALE: Ll/\A. 1T~1<1 Vl Jl o;J 0 r ✓ uJ r..r...r/J
jv\. ( of wt\ Olt<.rT~ c.f" u.A.... ,_. ,It C,-J 00 ,J._.-i,.<,c...1..-lf"J ·
fA>p~rJt: 6:./J r,,.J f}/11)~
.f OJ ~ /!, ' ~ 01LX:·I
/rJ <.r'A-. ~J<. 'ILIL-.a-1-1 vi VIM .
Name of Firm: Transportation America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0)
Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: s- X 1.0 = Points: s-RATIONALE: :f t-J .... -, C LC,}.\ =
M_, \/:J •
,v\ 4 ( l\f'I- MCrr/L P~J '< ,.;-, (S1!),,
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
,C X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: I, S-: RATIONALE: ___ ~-+--<-(~,/J'--'--1 _c.-,f--'-'-_L-______________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Transportation America {B).doc
Name of Firm: Transportation America Individual Scores/Written Responses
Run Package B
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts) (j
Points Assigned: __ .=c_· __ X 1.0 = Points: __ ...:6,c___ ( I RATIONALE:. __ -=--____________________ ,_,.. ----~--=--(_"t.:.....(?_c c...,f----'-'-(..,._ ___________ '"" 3 L-
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: 'J2, '-4' I <:3 "--
TOTAL POSSIBLE POINTS= 100 GRAND TOT AL POINTS:
OVERALL RATIONALE:_~ ____ o_c--__ eo___,_0-,--'fi,{----'-( -'-(;'-/1,{_CrN_t--' ___ _
c~c--Evaluator (Print) Signature Date
H:ICONTRACTS\Sharon\2014114-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_ Transportation America (B).doc
,, Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service /
NAME OF FIRM: Transportation America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 7 X 1.0 = Points:~/~--
RATIONALE: 1\/tJ'J- f¼,ry f'\,r.-1-j.-'I' l,dk~ ( 81q,,fn.t;1J, rf ..
rM-j}J:rfa/ ~ { ~ "'f ~ /"<lr-f~ - _i ~ -~~ h'<e,f
t,J;rf(- J.ev--r,1~; ½zlv"'vt,c_, ~* rt<-,,{ J rule/ e j)tM:L-~/if--_
S. ~ u_r @<'- ? r 3'. /
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ___ f;......,__ X 1.5 = Points: 7 1 5 :'-r,; /~ ~~ ~ rr ~.r · RA TIONALE:-----"'"Xf:'.:1""-"--'---'-,.>-_' _________ '4:::,___;:VW:..-=--__ ~ </ (
fsrt?wt¼,{, CJ(/4y ~ rr r >' r:z,d/v; ft 'Ct-tkc?c /~rV~
{k{JM oipph/ M nuf <if d''4kid <U
~ame of Firm: Transportation America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package B
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: UJ X 1.0 = Points:--1(oc++•--
RATIONALE: ~ A I< ~ ~ vewr h 4/f'.o/:'.,,r c.
/l~u,v1n~ &Jr,-~~~ 7cWcJ~J-
t1[_:_ by .pttrrll~ vJ ,/'f « cC'f'Wt_:5 Cf[ dfb fH /?«c4flc ~ A'ffjl1.fhi t«d.ictdc.k!Lf7 / @~
'R4-pcg,A,uu.o (C aq ~ 4. Maintenance Plan and Facility
(Section 3.4) Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ 1-tif',,'---- X
(5-4-3-2-1) Meets Standards
1.5 =
RATIONALE: fR_«,y, Q'-<-tl~ up.Jc.. ,.M/4/?t-G.(
- /orw{.zo '1 ct{. ~C¥sk v"'ke-r&U-4.
(0) Unacceptable
Points: 9_ 1,,C 4'~
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\T emporary Internet Files\Conlenl. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ Transportation AmE!rica (B).doc
Name of Firm: Transportation America individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
6. Price Proposal (Section 3.6)
Run Package B
Weight 10% (10 pts)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 32.467
'7~( v;-r;5,> fli'(1
; 1t,1 qr.2/ 15t17 ; ~ o;r;:;__1
t'>rr-::=,
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: /) /s f::; :::::, diJ .- cl ,cJ _';1/o
~--s;;,,.,f,,...f; ~ Evaluator (Print) ~ re C:\Users\ljacobow\AppData\Local\Microsofl\Windows\ Temporary Internet Files\Content. Oullook\4C IWIBU7\SC Score Sheet 14-041-SC _ Transportation America (B).doc
\ 1 Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS L!,,,c;1e,'1
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Transportation America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualiffoations/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
v (8-7-6) Exceeds Standards
Points Assigned:______ X
RATIONALE: ('?,,If, M1(\).<l,/ r11r6ki.t Y~fef-o/c , I
J;_zlc er, /itllft,!J fJ ~, lp)(w(b..lp_ b,r,mv,.,,,,,,.,
(5-4-3-2-1) Meets Standards
1.0 =
11,(k))qSM
(0) Unacceptable
Points: ----
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ _;h __ RATIONALE: 1-efr1°"co \o £1-ow,.J Q,,
X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ___ J,_
Name of Firm: Transport~ .. )n America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information Weight 10% (10 pts) (Section 3.3)
(10-9) Exceptional
(8-7-6) . Exceeds Standards
Points Assigned: _____ _
✓ (5-4-3-2-1) Meets Standards
=
(0) Unacceptable
Points: ____ &_ r,; f\ "'-I~
RA Tl ONALE:_JJ/ l<~:E...1..J.+:l!(f_!.:ctD:;::..•~L:..l~.L'!!!:;;,__.:!...' ~IJ,c~..p::;.~~J.--c-.,..,..!=~.l::..5:.'-f..!2.+Jl!.!:....!:.j.!2.....j:!!~p:...!{!2.
-- 4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
Weight 15% (15 pts)
j (5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
1' { Points: ____ _
RATIONALE: N.}/ prA. ~ &1,.;;/--1&u.,._ - ,,,.,,,,f Mf1?4-zi-.<,
-aw~ n(M 5Afot \i\1,f t-r L ~ uttvv Mi~ Mr Mt f11'40'f ,tL~ b lfti> 1 h )·Q0fl·'"
C;\Users\JDoucelt\AppData\Local\Microsoft\Windows\ Temporary Internet Files\Conlent. Oullook\62VQM0L8\SC Score Sheet 14-041-SC _ Transportation America (B).doc
Name of Firm: Transport .. __ .,h America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability? ./ (Section 3.5) .
/
Points Assigned: _____ _
!I. RATIONALE:k- 2'/~IC /l,J@ 2.<l13.
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
X 1.0 =
Run Package B
Weight 10% (10 pts)
Points:, ____ 1_
Weight 40% (40 pts)
Points: 32.467 ?,'1. ,-
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
Evaluator (Print) Date
C:\Users\JDoucetl\AppData\Local\Mlcrosoft\Windows\ Temporary Internet Files\Contenl. Oullook\62VQM0L8\SC Score Sheet 14-041-SC _ Transportation America (B). doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Transportation America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score . the proposal based upon the criteria listed below:
/
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ,-Z X 1.0 = Points:_7,,__~_
RATIONALE: Ve~y, re feya.n--t- exf~ri'enc.e C1.nd b0-c.kjround, f/-O-S manv off, /,a_f-e_d Qompa.n,es, G'ood bu'b1ne.s.s
J ..
re.Perence... f.?roYrJ Ci' +-y al' m /am , ,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: ¼2 X 1.5 =
(0) Unacceptable
Points: 9 RATIONALE: Good f2Y'DJecr c;.-/r:J_,f-U,;p <;ci-,edu__ le, fp, 1'm.plewien1a110 n,
0<1TI, r1e a.n.d
b rBc: o'-o o/o.
Name of Firm: Transportation America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package B ·
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
PointsAssigned: &, X 1.0 = Points: (j:;, RATIONALE: G()od reler&r-.c eS ~T e;p-ero.t-,'ons l'Y\aY"\a__ger-, a_~ w e.J\ as -the. Ve.h 1c!e....
UrJdet"" <JI /.;?./hot.Jr {th//. 61/..)o Lou..J 'csnef!?ts
. perc_eA f"c.t'J e. ,. ,' ' .. i '' ' ' . ,,,. .
• 4, •Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: 3 X 1.5 =
RATIONALE: [9aud ma 1()1'~ n evnce,...., No q,ffe_ i deri+i~,·eci~ 0 n 0J
C:\Users\TERRY\Downloads\SC _Score_ Sheet_ 14-041-SC_ Transportation_America_(B).doc
(0) Unacceptable
Points: J/. 5:'
Name of Firm: Transportation America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
Points Assigned: 7 X 1.0 = Points:--'7..._ __
RATIONALE: yery s.t'ro0j· +Lna.'nc..ia../ . 8 O'S i' +-i Or1o _ _ kow rt 'SI< ra_,t i ~ ..,,
6. Price Proposal (Section 3.6)
- . I I
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 32.467
F11'-rh { '::i M) h LjheCS.t"' dollar- o.,m ou'l'I+ fpr R\J("\ '\B '~ __ di I~ 35~ 9 'f 7 rnore Man !<..an J<. tt=-/ on f?17ce_or1 !J·
(111;76½ ~So per y1ea.c mo,e over Sever) (7 )years-)
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: (pf;, Cf fi 7 OVERALL RATIONALE: H13 h hot), I y rai-e ,
Driver VJa_5e a.nd. bene-P,·+~
• J ~~&a4i/J Evaluator (Pilnt)
C:\Users\TERRY\Downloads\SC_Score_ Sheet_ 14-041-SC _Transportation_ America _(B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Transportation America
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 1 RATIONALE: hpv,111c•
1.,£Ji,,.e,r> o~
X 1.0 =
/,A,/. el c.,,,,,/)1-l'eA ,}, I
2. Project Approach and Start Up Plan Information (Section 3.2)
Points:_~].___
o/4,,,.~
Weight 15% (15 pts)
(8-7-6) (5-4-3-2-1) Meets Standards
1.5 = Points:
! ,,,
Name of Firm: Transportation America Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ lp=---- X
(5-4-3-2-1) Meets Standards
1.0 =
RATIONALE: A I rc~,t?v I) '2? CAr1or,,:.. 5 _yt,tc;-1
- /1.. la e-- I /2• 12,12 I• ., ~ L~ . .J ,
4, . Maintenance Plan and Facility (Section 3.4)
(0) Unacceptable
Points:. _ __,'2""'---
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) (5-4-3-2-1) (0) Exceeds Standards Meets Standards Unacceptable
PointsAssigned:_j. __ ~_ X 1.5 = Points: ,:1,5 RA TIONALE:_/)'--"'-) .... f)'----<<U(.,,f..._,i,__,c,~· _ ....... c .... ) .... l,..c'-'-c ... 4-.__......,_~="-=-?=d _ __,lc....,,?"--------
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Transportation America (B).doc
Name of Firm: Transportation America Individual Scores/Written Responses
Run Package B
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: __ -1,0:J;:...,,,__ X
RATIONALE: (V'i <'Met ro-2 t-/ ,f~
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 10% (10 pts)
~ 1.0 = Points:~
re. <1,RC.,1 If), ff...1,lt1-v
Weight 40% (40 pts)
Points: :'.1 ;i. • tf '7 7
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
(l)&,1- h> &ic--pf/ well, fltt?,fr;Jc-- b -/1(1)
Evaluator (Print) Date 1
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Commlttee\SC Score Sheet 14-041-SC_Transportatlon America (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC / Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_----"f:2"'----- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_....._R_,_ __
RATIONALE:, ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 8 ___ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: (~
RATIONALE: ________ ---,-_____________ _
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 8'"'---- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: _ _JB~--RATIONALE:. _______ ~,----------------
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 7 __ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: /o.5
RATIONALE:. _______ --, ______________ _
C:\Users\tgrimsle\AppData\Local\Microsoft\Wlndows\T emporary Internet Fi1es\Content.Outlook\BB6I38KN\SC Score Sheet 14-041-SC _ Veolia (B).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned:_~B.._._ __ _ X 1.0 =
Run Package B
Weight 10% (10 pts)
Points: __ B'-'<---RATIONALE: _________ _,._ ____________ _
s[A
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
J
Weight 40% (40 pts)
Points: 32.438
GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
C:\Users\tgrimsle\AppData\Local\Microsoft\Windows\T emporary Internet Fi1es\Content.Outlook\88613BKN\SC Score Sheet 14-041-SC _ Veolia (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
/ RFP No. 14-041 /SC Palin Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score
the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ b __ _ X
(5-4-3-2-1) Meets Standards
-1.0 =
(0) Unacceptable
Points: rb RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned:_~,~·--- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: 9' RATIONALE: ______________________ _
Name of Firm: Veolia Transportation, Inc.
Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service
Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ , __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_"""t"---
RATIONALE: ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards ,,
Points Assigned:, _____ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ 9 __ _ RATIONALE: ______________________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Commiltee\SC Score Sheet 14-041-SC_Veolia (B).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: ___ b __ _ RATIONALE:
X 1.0 =
Run Package B
Weight 10% (10 pts)
Points: -----
--------------------------
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
5£ Points:3'2., Y 3f
6 f. '-13?
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: ......
OVERALL RATIONALE: JA tA C- (SJ A <- •
Evaluator (Print) Signature Date
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Veolia (B).doc
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 0 X 1.0 = Points:_{o=----
RATIONALE: EJ:fZ~ we& f'1 v<4-rlr fey /41,£~~ &~hvwvr/:- ~._,~<~(Vil f- v,7 Lrf09:15 ~ 7
tAU f}J 0fe,/," ,-
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: · 7 X
RATIONALE: JjN .(C.:~
Pit\~ C4Ppr~
(5-4-3-2-1) Meets Standards
1.5 =
I (
(0) Unacceptable
Points: UJ ' ;; I
I',
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
(8-7-6) (5-4-3-2-1)
Run Package B
Weight 10% (10 pts)
(10-9) Exceptional Exceeds Standards Meets Standards
(0) Unacceptable
Points Assigned: (/ X 1.0 = Points:_0 __ _
RATIONALE: ('1~'/-,(rf~ Ja:rf--. V&y>W~- ~ H 'b w, ~ ,f LhJ-J~ vtrf::;- {?l:{v~f # d/'Wl- CYM(j~ Jv()fdN~? ~ ~4,;~ /JI ac-,
l ~
4. Maintenance· Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ;;2 X 1.5 = Points: / / P RATIONALE: /p117 ,Pwrosl-lt'Q@ vf-- l<--z~
/½a~~ (J/tts wi1nc1Cvf, C,,uf- /?rdr--: cZ{ . r t / v1 vC.v1 red V--_£ #+z F412r4 ,Af::1 £
C:\Users\ljacobow\AppData\Local\Microsofl\Windows\T emporary Internet Files\Contenl. Outlook\4C IWIBU7\SC Score Sheet 14-041-SC _ Veolia {B ).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package B
5. Financial and Business Stability Weight 10% (10 pts) (Section 3.5)
Points Assigned: ~ X 1.0 = Points:.,,...?=-----
RATIONALE: ()t/0 ~{tu-u.., dJ:[:.L-:i 11, ~J~r (1 /IJ •.9-o}? r40¾ Cpvy>&ttJt J vb.r, 0cc.-cp,r /!~c~~
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points: 32.438
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: ()(°$, ~-.::'.- ;)--5" 7 7";/t I
Evaluator (Print) (;?~!//°
Oat
C:\Users\ljacobow\AppDala\Local\Microsofl\Windows\T emporary Internet Files\Content. Outlook\4CIWIBU7\SC Score Sheet 14-041-SC _ Veolia (B).doc
\
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
) \ I
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1 .. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ </_
RATIONALE:_-,--____________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ___ /_?.,,_
RATIONALE: _______________________ _
/
Name of Firm: Veolia Trat,_.,brtation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
i Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
RATIONALE: 1,,-,v, •b o"' •1~ v1111 ,. y, e/vs
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
/ (8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ ~--
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: .·9 ----+7-
RATIONALE: _______________________ _
C:\Users\JDoucett\AppDala\Local\Microsoft\Windows\T emporary Internet Files\Conlent. Outlook\62VQMOL8\SC Score Sheet 1,4-041-SC _ Veolia (B).doc
. '
Name of Firm: Veolia Trai,~,-,hrtation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability ' .. ,,,!,, ,µ,...h (Section 3.5) , ,..
Points Assigned: _____ _ X 1.0 =
\ ) Run Package B
Weight 10% (10 pts)
Points: ___ 1_
RATIONALE: wk,l
I~• 4 ¾ ""' r.,~\ JI ((Tl
. ])(~~ ~{'/.,),,.,-,/,. en ~(?,,A@ io,.) -;;:)J./.-.,___,.JJ4lt
0,,-t .GI L, ,;;,I Jf r.;flJ IY'
~ )?('2,. = 3'! fl"'
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
GRAND TOTAL POINTS:
Points: 32.438 y(
OVERALL RATIONALE: __________________ _
Evaluator (Print) Date
C:\Users\JDoucetl\App•ata\Local\Microsoft\\1\/'indows\Temporary Internet Fltes\Content.Oullook\62VQM0L8\SC Score Sheet 14-041-SC_Veolia {B}.doc
r
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: z3' X 1.0 = Points:_....,,8',,__ __
/
RATIONALE: 0® t b:Jckgro u rel ond exper ,"en <:ie ; >
l!GoGb 'I /oLL<;;.tnes.s ref'e,re,nce~, 1/8?1 faf{Je__ Cl)vnGgnv - f)anJ!es. manv {urge, coofrctcl:S,
~I I u
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 2 X 1.5 = Points: l 3, £0
RATIONALE: J'.)r 111e r wa.3 e ov,e r fJI. I ~-,I ne. (<2Y A:Q, a~ c;'oo cl bP v1e f,·+ s p re en -tage, ( 39 ¥iJJ, Ver~ e OQ cJ +ra I j,,, I '25 p }c, o,
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2of3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
\l1s.1an •
4. Maintenance Plan and Facility (Section 3.4)
(5-4-3-2-1) Meets Standards
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: <B: X 1.5 = Points: ) ~
RATIONALE Veelc u°ocl locat,·oa - C'n,½-res.s Ave-, /3o¥n foo cJj - be 1ween /ttla ,c.., A-ve...,,,
o.n!:1 Wool h'f'1/ hr f<d.. Ver:.y 90~ Vch,Cle:, vna,,.,1enanu? ,plan.
C:\Usars\TERRY\Downloads\SC _Score_ SheeL 14-041-SC_ Veolia_(B).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
Points Assigned: 7 X 1.0 = Points:.__,_7 __ _
RATIONALE: t,sted as. CL '1rncJderaTe -risk.)~,
Good credl-J- rrurenc:_e sJ tncluol, 0 fhr'\lc a£ I) rnerica,
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 32.438
Ra:12:2~,-/~:;;;;;~ f;:r::";; ~~er 2/2 v~ n ( 7) ye a, s (<T 0 '77 ~ 0 cs 7 /year a_ veroge,)
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: ii"• 'f 3(} OVERALL RATIONALE: . Good CJtrmpC{ ny\
A--ice.,, is iuo h,~, Yer[ 1m,o(f'.csed w,ct--Amb.tssaclor
(f-m§ rt&.;,.. fbr ride rs .
' ;; &lilt/ 8/.?dWIV Evaluator (p'rint)
-C:\Users\TERRY\Oownloads\SC_Score_Sheet_14-041-SC_Veolia_(B).doc
/
,,
Run Package B
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Veolia Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ _,J/'--- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_74---__
RATIONALE: _______ ~---------------
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ~--"---- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_.,_} LA,._, __
RATIONALE:. ______________________ _
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package B
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ----'C/"--- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: 1f
RATIONALE: ________________ --,-_____ _
4 . . Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _.( .. o~-- X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: :/
RATIONALE: _______________________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\SelecUon Committee\SC Score Sheet 14-041-SC_Veolia (B).doc
Name of Firm: Veolia Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package B
Weight 10% (10 pts)
Points Assigned: C, X 1.0 = Points:. _ _,C,c:..,.... __ _
RA TIO NALE: /VIP CCD/'\ Ct ((1 S LJ rt~ re. (/ 1 • w -' /' ~ f,,:. b, l J. 'I'.
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 3:?. t../J </'
GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
valuator (Print)
_2_llr,,..___..,/•/_ Date ·
H:\CONTRACTS\Sharon\2014\14-041 • Palm Tran\Selectlon Committee\SC Score $heel 14-041-SC_Veolia {B).doc
Attachment 7
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: __ ..=.::.....::5__ X 1.0 = Points:_--'•=--_;;_5_
RA TIONALE:,_~_&l....:;e--"e---"-'c/C...::.e=s=cn.c.+p'-'f-'-1"'-'vn__;___,'n'--Rvn __ Pi_r-:g--1-___;_;,4 ___ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
·Points Assigned: __ _;(p=--- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ Cf_,__ __
RATIONALE: ______ ,---_______________ _
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_-'lp"'---- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_---'(p"----
RATIONALE:_· ------=s=<.jl'-1-A-_____________ _ f+
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ...:{p,:__ __ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ q--'----RATIONALE:.:.._ ______ __:::S'-44-------------
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_First Transit (C).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
(o X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_lt.,__ __ _
RATIONALE: ______ S=+-fr:.___ ___________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: 28.488
TOTAL POSSIBLE POINTS= 100 GRAND TOT AL POINTS: &3.4<oB OVERALL RATIONALE: ____ S+k_;__ ____ ~--------
Evaluator (Print) Signature Date
H:ICONTRACTS\Sharon\2014\14-041 - Palm Tran\Se!ection Committee\SC Score Sheet 14-041-SC_F{rst Transit (C).doc
<
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC / Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
7 Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_'°)__,_ __ _
RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ (:, __ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_'1_.._ __
RATIONALE: ______________________ _
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
7 X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: l __ ,__ __
RATIONALE: ___ ~-------------------
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_6-=--___ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_9_:_ __ _
RATIONALE: _____________________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_First Transit (C),doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses
Run Package C
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_b ___ _ X
Weight 10% (10 pts)
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_6~---
RATIONALE: ______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
'J f
Points: 'l... f.,y PP
Lfi'I
GRAND TOTAL POINTS:
OVERALL RATIONALE: __ ..f_ftl_M...::....:cC____:~...:...:,.[,_____LA...__ ______ _
tAkt IA-(foJV --Evaluator (Print)
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Commlttee\SC Score Sheet 14-041-SC_FirstTransit {CJ.doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
t:.._ e.
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: K X 1.5 = Points: J ?, RATIONALE: Tt0f:0J1V7@ee a.ep £~ v,e p/a111 c
/ 11c Iv /ILL P1 :::±Y'-AV1.f cWoc,., ~ .11'lt:f) -~tlc_
tM ~; -kni,vzf/'12 ½? a ltJ?ez 't-e? __s e Qu~ c:/4U/vd~ of,~ /44½£ ~~)
-
• Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: ~ X 1.5 = Points: )4J '> RATIONALE: /))1~vJ u{c_ ) ✓?w dvi/<4 ~ 61½-f! kZ aJqh/~ <
\ ~ l ~ /Jo<M~ p!Mr [)rl"4{ / ~ ~/,tc (
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_First Transit (C).doc
- Name of Firm: First Transit, Inc. · Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:_____ X 1.0 = Points: __ 7_,_ __ RATIONALE:_~~E':'!~~(f_{_I_1'__5l.~~~:::'.::c~~:=::-~~!:._'.-:.:..::=._f:_:C~~~:ft:::ttk(
Pr i-i~?ff ~~-1&-~ ~
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
3 g"_ 7 r4( f fta:tc /c
Weight 40% (40 pts)
Points: 28.488 . I
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: QJ,qdv"' OVERALL RATIONALE: __ ...::f):......c.~.,L...:,/;=c'-~~.'--_---->=:;;.,,o~'--'--__;;<::J;;...tG_,__r?f>'-'-'-----
~I ;v ::s;;p _frtf'wt:R;. ----'--"'-+ Evaluator (Print) 7WJJi/
Date C:\Users\ljacobow\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Oullook\4CIWIBU7\SC Score Sheet 14-041-SC_First Transit (CJ (2).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
(8-7-6) (5-4-3-2-1)
Weight 10% (10 pts)
(10-9) Exceptional Exceeds Standards Meets Standards
(0) Unacceptable
Points Assigned: ____ _ X 1.0 = Points: ___ <:(_
RATIONALE: ________ ---....,,..._-..------------
C:- 4
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
I Points: ___ /_~ ,_'I_
RATIONALE: ___________ ~-----------
~~-- A-
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ q_ RATIONALE: ______________________ _
4. Maintenance Plan and Facility Weight 15% (15 pts) (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
/?,( Points: __ _..:__,_
RATIONALE: ______________________ _
C:\Users\JDoucett\AppData\Locat\Microsoft\Windows\T emporary Internet Files\Content. Outlook\62VQM0L8\SC Score Sheet 14-041-SC _First Tran sit (C ).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses
Run Package C
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
Weight 10% (10 pts)
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ q __ RATIONALE: ______________ .....,._ ________ _
~~ JJ=
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
GRAND TOTAL POINTS:
Points: 28.488 ;
OVERALL RATIONALE: __________________ _
Jc,( bclv'c~Jfl __ Evaluator (Print)
C:\Users\JDoucett\App•ata\Local\Microsoft\Windows\ Temporary Internet Files\Content. Outlook\62VQMOL8\SC Score Sheet 14-041-SC _First Transit (C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ___ Cf~_ X 1.0 = Points: __ '7~· __
RATIONALE: er, enc. ed h0-s. s1a.t-e wide., re..Pere,nc.€. $ .
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 9 X 1.5 = Points: / 3, S:-
RATIONALE: Goo cL ()t.JTl1ne) o,n O <;che..di.J le Wr" sfar+-u.,p, V ~ry ~ood tee\\ n i,,c0--) ~cl-<3rourid) s0--c.(~_es,.s -f'u I In c-th er / o ca..t I D rJ w L rh s 1ci. H- u.._p .._ ~ots Df bo.c.k-u..p (€-S.OO<"ceS , Pt avi 1S c...lea1 d,rec-rand haS de-ra.,led /nf'orMaf-lc:>n, Ort'v-er UX18e. oveir di Id•/ hour.
''"
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
3. Key Personnel and Operations Information (Section 3.3)
Run Package C
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: q X 1.0 = Points: '? RATIONALE: ka./ sfrJPr known ft> ~Im f3ch. l1>un 1:/· Oil have good Jaa~rounol, Genen:lll
(Y)aro<3er known 1v Pa m lrao, G-ood -frcu n ,rg ~'i,mrn, SU-pf or+- fu-rn 03,ono-J S~Cl-fF ava ,' la le, ~BE: ol l ¾
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 9 X 1.5 = Points: ( 3, 5 RATIONALE: 6:aod loco.t\'~ns, Sa.m.e__ °'-~
Run \'r2> " - la.Ke vJo,-t--h ) Bcyj n-too
C:\Users\TERRY\Down!oads\SC_ Score_ Sheet_ 14-041..SC _First_ Transit_(C).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ~ X 1.0 = Points:. __ gi __
• RATIONALE:\kr1, Lawe. {}_()VVJ,f?a ny -c;;;ome_ I l en'£:) Jvd~ents \ ~o fui led or fefm',rat-ed c.fani-roet-S Its ied3 howeves cL1'd AJtJ, v-epor+ breach of2 ton +rac.+ w l rh M t3 Tit - ea I cL <II 7, 3 rn t I It O 0 z=ettl em ~rrl- ZCH z .. '
6. Price ProposJ Weight 40% (40 pts) (Section 3.6)
Points.to be determined by Purchasing Points: 28.488
Ve,ry dood price__, for f<u" "C.;', tt4 hes.fnu_m b r of poiri+s. -& 5J3e:i9j 3'+ .. L.(Q,c;s than ne--xt- proposa) C.#76~ r.c2.lyear)
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: g/ t f/113/ OVERALL RATIONALE: Vey y exr,erl ertcec:P lame.__, tnm P QY,y ,
Jel<~Ytikown/ -Ev-al-uator (i='rint) C:\Users\TERRY\Down!oads\SC_ Score_ Sheet_ 14-041-SC_First_ Transit_(C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS /
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: First Transit Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ c( __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ~
RATIONALE: _________________ ..;._ ____ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ 7[~-- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ /~J,.~_ RATIONALE: ______________________ _
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ o/ __ _ X
(5-4-3-2-1) · Meets Standards
1.0 =
(0) Unacceptable
Points:_-'Y'-· __
RATIONALE: _______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) . Exceeds Standards
Points Assigned: __ i(_c_ __ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_~/-ef\_,___
RATIONALE:. ______________________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Committee\SC Score Sheet 14-041-SC_First Transit (C).doc
Name of Firm: First Transit, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _,(o~· __ X
(5-4-3-2-1) Meets Standards
1.0 =
. (0) Unacceptable
Points: __ c;: ___ _
--------------------------~-6. Price Proposal
(Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points:d "7/, t-/ ~ ~
GRAND TOTAL POINTS:
OVERALL RATIONALE: __________________ _
~ 3&='d::....:~...::.2 __ Evaluator (Print)
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Commlttee\SC Score Sheet 14-041-SC_First Transit (C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS /
.~ ;t-1: RFP No. 14-041 /SC
Palm Tran Connection Paratransit Service
NAME OF FIRM: Maruti Fleet and Management
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:_~•~-7~_ X
RATIONALE: ~noive upene.nce..
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: 1 -~---
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: 5 X 1.5
RATIONALE: Good gfzv-+ up plan
=
(0) Unacceptable
Points: '7-S" -----pre~cl.
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: {o X 1.0 = Points: _ _.,(p"'---
RATIONALE:, __ ..:::°-5o=-::.o..:..;c{'--~=...!....!....-4F=· =esen-h='-~~c{c...:::.__. _____ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ___ b __ _ Points: __ q....:.... __
RATIONALE: ~ f-1a.nf-ef\ance p /an a.nol ft_u''±f
X 1.5 =
\'"he e+ --Ire. ove..n:u I nee do 'f C/Tc . V M tvj rece,,i v ed e,.,LUJ {ert'
ra.A-r~ f>r 5ervlce fCDvlded in pcus+-- specjo mw..nce~
C:\Users\tgrimsle\AppDala\Local\Micmsoft\Windows\Temporary Internet Fi!es\Content.Outlook\8B6138KN\SC Score Sheet 14-041-SC _Maruti (C).doc
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package C
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 0 X 1.0 = Points: __ 5 __ _
RATIONALE: Chs,,, b:Jarce <J re&rve6 nporhd are low, Cor:r:em I
tL!oou.,,t ftanua.,/ .sfrR-73-lh of /irn,
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
Points: 40.00
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 'ii/. S°
OVERALL RATIONALE: 6 Overa.J I 1 ¥°Fr. ft?Sef)-kol Ol)c:t fa.fl howe,vev- n~ rniveol wi~-h
of t/\Iprfc fillVi'olevl,. ~ol lowef '+ha..n o-lher pPpose.r:5 arwL biq§6 conre,rn --lo fCP~r fx-t·09 llbl-e it?
Date 1
C:\Users\tgrims!e\AppData\Local\Micmsoft\WJndows\Temporary Internet Flles\Content.OuUook\886138KN\SC Score Sheet 14-041-SC _Maruti (C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC / Palm Tran Connection Paratransit Service
NAME OF FIRM: Maruti Fleet and Management
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ,-3 RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned: ___ -r--'· ,__ __ X
(5-4-3-2-1) Meets Standards
1.5
(0) Unacceptable
Points: 7 ,r RATIONALE:. ______________________ _
Lt:r.orl/ .rr,.. ...r1c;:,v..f\-
G:.M"" ,,r";.J E-rnv ,-r, .IN c..e!'\l<.1,M(c.;r~ ,..,) r
/.AOr.JA C.,.,l,\IC.l ~ 6=-M
tf "'/4- 1"' '"' c...- ~ JJ ef( <:::i.M"" l r(jiO -ro 11 /VY ~ ~1:r ~ I)\ s,.J~'-1 if y./J , . J,J "'r ~.) ...J vi Cot',..("
. (J ~ ij('IF~C.(" f'o.._,, C.--{
(},JI l).,V ,-J-it,o') •
~ o;;-, .fZ~
'
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 0=--. __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ J,,.· '----
RATIONALE: _______ ~---------------
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ S--....:;_ __ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: I. r RATIONALE: ______________________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Maruti (C).doc
/ \_,,,J ,o
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ 2 __ _ X
(5-4-3-2~1) Meets Standards
1.0 =
Run Package C
Weight 10% (10 pts)
(0) Unacceptable
Points:. __ '?_ __
RATIONALE:, ______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
~ Points: :f O. 0 ~
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: _ __,J,..__,_M--'--"A'-"1.,..:;l, ..... - -'(.,"-"--f M:...,.L.r _._(l-=--it-tl~>,5--L/t-E-,_=;y_Q_.J_/l_· _c_l!"'....cJ.,,,_, __
fcA..s't Jc lr u-C ft~ G-- ~~ 6<.fJ. 1A) F<-h I
/f"J ..!'"'08, \....ow PA/ell( {'f""o9 t..evJ) 7
Evaluator (Print) Signature Date
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14"041-SC_~arull (C).doc
,." ·-) '
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Maruti Fleet and Management
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds. Standards
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_~~--.., Points Assigned: ___ f3-,,t:....-
RATIONALE: Ntl W"?'rfrid<f) ~ tz//)1.14 ;- /)'3p ~ 01,,? plbdletf -lj'~ /jt!d~~ @,/1 I¼ tt/rU
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ f_· -'-/-
(5-4-3-2-1) Meets Standards
=
w~c(
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) Exceptional Exceeds Standards Meets Standards
PointsAssigned: 7 X 1.0 =
(0) Unacceptable
Points: e; 7
RATIONALE: On ft f/'#Stpc/??5;.e ~ q ~5,ur1nd r~ vJa_[ t,- \ Jt01dt ,1y~,~~ /qfr--c t¼...f
. cA/P.-1 . h[t/(f~~r"ce_/" fJfMt--c.e ~j ,Sv-- th.id~ .
<tt,(~kw/ Jay f"'!}:dv, ;u.f , .£ ,W, fiv-Z ,k A( ~ w~ dcffec( ., Ck£~r:
· De~r ~eJp~.1c,,,c· pla~ ~ ~pM~tt/Af h~/?U-<t!_ ~ 4. Maintenance Plan and Facility Weight 15% (15 pts)
(Section 3.4)
(10-9) Exceptional
X
(5-4-3-2-1) Meets Standards
1.5 =
H:\CONTRACTS\Sharon\2014\14-041- Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Maruti (C).doc
(0) Unacceptable
Points:· ) rJ' .>
"' ., • t,
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses
Run Package C
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ 1--+-
Weight 10% (10 pts)
(5-4-3-2-1) (0) Meets Standards Unacceptable
X 1.0 = Points:_7 __ _
RA TIO NALE: 2J ( 2: eu,JC, bed~ .- :J (1
-~?:,S'. 7
~ ~ f ~ ._
2--::J--C/1
kflo.3 /, ha~ ok~o~~
6 P- PD I . rice roposa Weight 40% (40 pts) (Section 3.6)
Points to be determined by Purchasing Points: 40.00
TOTAL POSSIBLE POINTS= 100 ~~. j GRAND TOTAL POINTS: -f {)
OVERALL RATIONALE: __ 7 /~t/"-'-eJ~eJr/J.....,(J,.L--~b,~/,:~k=_~-----/ 7
C:\Users\ljacobow\AppData\LClcal\Microsofl\Windows\Temporary Internet Files\Content. Oullook\4CIWIBU7\SC Score Sheet 14-041-SC _Maruli (CJ.doc
-- ---- ------------- ---------
I
i Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC 73,.
Palm Tran Connection Paratransit Service
NAME OF FIRM: Maruti Fleet and Management
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References Weight 10% (10 pts) (Section 3.1)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
( (5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: '5 -----K.1~/'f\ >- )/h
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _
(5-4-3-2-1) Meets Standards
X 1.5 =
(0) Unacceptable
Points: ___ -1-o/-RA TIONALE:__jt'.!!!!2±::11...,~~..&!:illJ::/--L.!' ./~"ll'~U~·~ :::.~ ...f.::t.~_,~J,~?L' _.'...!¼1:~::rh2.;hz:.uk~---4D!:!!:✓,1;;~a~_,SS!...l.JI ~ea;.:-'!:!pk;~_
I • f
!Nt}/tn,~Jl.vi ,, /c,,//(5 '.J?~N<o /1/0/ ,,k,ef-,. e
.\
Name of Firm: Maruti Fleet ... ,d Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information Weight 10% (10 pts) (Section 3.3)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
I (8°7-6) Exceeds Standards
Points Assigned: _____ _
X
X
I (5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ 6 __
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ____ 1'_ RATIONALE: )1 /£4 w f/C1,,.. ,._;,,,v,, ew ~1/r✓eca,,k/ ,,;_ dci..11/,..,flie;d,
~ e,.;w't1 1,1J/rrw1 pmp - !?d k.LJ,·K.t
C:\Users\JOoucetl\AppDala\local\Microsofl\Windows\T emporary Internet Files\Content. Outlook\62VQMOL8\SC Score Sheet 14-041-SC _Maruti (C).doc
'
Name of Firm: Maruti Fleel __ .,d Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5) I
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5a4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
/ ~-Points: ____ _
6. Price Proposal Weight 40% (40 pts) (Section 3.6)
Points to be determined by Purchasing Points: 40.00
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:. ___________________ _
fkrrhl k✓,r v~ w~ ~--,M14h~~
Evaluator (Print) Date
C:\Users\JDoucelt\AppData\Local\Microsofl\Windows\Temporary Internet Files\Content.Outlook\62VQMOL8\SC Score Sheet 14-041-SC_Maruti (CJ.doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: Maruti Fleet and Management
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
• 1. Experience/Qualifications/Past Performance/References Weight 10% (10 pts)
(Section 3.1)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: '7 X 1.0 = Points:_7_,_· __ _
RATIONALE: Ff CL$ on.lj '5 rvtal I c,.or1-t-~o.c... iS '-- I={ D-r ida_,,
Q_ 0 yyt ea (\ y \ Goo d.. 1:5 u s l 11 '€..SS, ( e+ e (@.nee s +?m rYJ
:fttx.TA. r/00 "'to b B& ,1Z>roposa/- C.Z.ti+,e_d: Woman
plUcS D~E... <"i;u.be,.on+,o..c.:rors,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
7 X 1.5 = Points: /0, S
RA TIONALE:_...,,_(}..__o:....:o=:;__.;::.d _ _;_tr.:....._a--"-l _.:n....:..1. _n.._Sf+--=0---'u_t-'---'-'..I l ..:.._n;_;:e,;=-.,._\ ----
G-o o d s.to.r+-ur ou-fl/ne.; 0-<\ d,, c;ched0le,.
(
:
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 6 X 1.0 = Points:,____,,~=<---
RATIONALE: t\(eµ,) & ('() - VlCLS V e;r 'f ~ ood reference.. broVY\ prev,ouS emplo'ier-s, D("L\/e_,r ,D~ ?e,~o w_ SI I ;J. /ho u< ( $/ I/. 6¥) O.x\d
1 o LO 'oet\ef\ +-s. yef" c:e,'A --tc.t-3 e,;,
4: Maintenance, Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: !J X 1.5 = Points: / 2.. RATIONALE: Vuy 300d refe,ex,c.,e., 'fvr \/<Qh1c;:_,\v mcu n rev1.anc..e, ,mor'\0--g e,<", &ood -Paci I I +y l O C,Q +-,' 0 (") - R l \/ c~("'Cl......) Be.a_c..h nea. ("' U:) t'\_CJ (~ Ave.,, +u 45th. hl(ee,1 CV'td :L-95,
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_Maruli_(C).doc
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: '" X 1.0 = Points:~G,.,..' ·.,.__ __
RATIONALE: A,apeaco -+o ha_ ve,, <;;uftiete.a +-fu y') ds to C) pe.Cct t' e, Q + -th ls I eve) \
Points to be determined by Purchasing
H1J hes.r 1o r ic._e_; pot n 1s fbr
((71 E; 359) 34-~ . .--- less oV-e.<
Points: 40.00
Run '' (/1 ,-
7 '/ e_olr-$
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE, Pro po~ er- 0-F;J"e;a,,--s, eo.pccb le...., of- har1c1110:J rh,s lz,.e, ~efv\ce,...., o.,(ea_. +o< Rvn \\ C..,'1
✓ ~v e~()evtV Evaluator (jii'rint)
C:\Users\TERRY\Downloads\SC_Score_Sheet_14-041-SC_Maruti_{C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service /
NAME OF FIRM: Maruti Fleet and Management
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ,.i:{a.J--__ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_-\!'19---
RATIONALE: (VoJ ,q wJ.,.$,V• .. , aA-r -'.J fovJ hoDei ,;J, /IC 11
(), Gfl ·r lao, I C C/.S/tP,v1, C £.. ac IJ, e. ( " "
/ :
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:. __ _,i(-'---- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: / d-,
0111y
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ?/_~&~- X
(5-4-3-2-1) Meets Standards
1.0 =
RATIONALE: 6 ,('1, f"'ltJ/d. ,fl.,,.,,., t/(l:,h,..,!J, ~1.~L.,./4
(0) Unacceptable
Points:_.,,0=-. __ _
7.. ,,.; .Jo I.,,. .,.. e <
4; Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
Points Assigned:'i5 0 RATIONALE: 0 J,f.~+
X
(5-4-3-2-1) Meets Standards
1.5 =
~. CoaJ /e,c,:;..J,ual Li,, b&,5'-
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Maruti (C).doc
(0) Unacceptable
Points: # l.:Z
,/ ''
Name of Firm: Maruti Fleet and Management Individual Scores/Written Responses RFP No, 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
r.o X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:. __ C,...,. __
RA TIONALE:._..:.ll...,/i""(l'---'-'-e.:P:..r..nLt:.'=-"-c '--'r /lc...:....~N!!...!...1i::.t.,__.,:::~1-•f&-::::.L'''--'/,u, t=-ir'<-...:,v-_.Lr_,_ • ...Lua,.:c.4-,!ewc..._ __ _
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: l/ 0
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 7f J OVERALL RATIONALE: 111~c v./,· ~u,.,,...s. 1.. b, .., ,bo,L ll'Clv,f..r
w~o fa,.z /",,_/,/y f2r()>r,,r1,s. fiqc &uNtl ft cfl,//,,.S. t,o./le~l'l'c.i
&Jvr-r. r:-lc,
E\,aiuator (Print) -112rh-oate
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selectlon Committee\SC Score Sheet 14-041-SC_~arutl (C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _ __..E...-7-'--_ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ '1~--RATIONALE: _____ .,..--------'-------------
&e olescnfhPn in Rt<n fkj A-
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ '7-'--- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: [0,5
RATIONALE: _______ ~---------------
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ {.pa,._ __ X
RATIONALE: S ,1-
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_&::,:__ __
4. Maintenance Plan and Facility Weight 15% (15 pts) (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ -'(p"--- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_q-'----
RATIONALE: _______ S;-i·.;.;e4-_____________ _
C:\Users\lgrimsle\App• ala\local\Microsofl\Windows\T emporary Internet Files\Content.0utlook\BB6138KN\SC Score Sheet 14-041..SC _MV Transportation (C).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses
Run Package C
RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ~lf,__ __
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
X
Weight 10% (10 pts)
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: lp --~--
Weight 40% (40 pts)
Points: 32.844
GRAND TOTAL POINTS: 7/.3#
OVERALL RATIONALE: ____ t:+----------------sa l
010. ;DwJs l"h(r.,On Evaluor (Print) Date C:\Users\lgrimsle\AppDala\Local\Microsoft\Windows\T emporary Internet Files\Content.Outlook\BB613BKN\SC Score Sheet 14-041-SC _MV Transportation (C).doc
. '
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC I Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below: ·
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ /~-- X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: )
RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: Cf· ----Points Assigned: __ ...:,::.._ __
RATIONALE: -------------------------
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
Points Assigned:
(8-7-6) Exceeds Standards
J X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: J RATIONALE: ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ , __ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ 9 __ _ RATIONALE: _________ _;_ _____________ _
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_MV Transportation (C).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ b __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ 6"'---RATIONALE: ______________________ ~
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts) Jr
Points: 31-. P~\f
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:_~_u"'--"'jl.c.:...,_/Vl_...::..~:::..____:...~=-f::___~_,_'A_,___• _____ _
~j -Evaluator (Print) Signature H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Se!ection Commlttee\SC Score Sheet 14-041-SC_MVTransportation (C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Perform.ance/References (Section 3.1)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned : __ ----"f,...___
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 10% (10 pts)
Weight 15% (15 pts)
(10-9) (8-7-6) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned:-,--........--+--- X 1.5 = Points: )(j I i RA TIONALE:---lf--L-"-Y:..&::....:--:.---=:.....:+-Ff-~--.:...__--=b,=----:~=---/--
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses
'RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ __.f.,,_ __
4. Maintenance Plan and Facility (Section 3.4)
(8-7-6) Exceeds Standards
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: J:
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
(10-9) Exceptional
Points Assigned: __ 7--1'--- X 1.5 = Points: ) r! ';:
RATIONALE:__,_/0--'--'iflc,,-'--_._0.L../V!..::..:.h_fj-+--i-::r~-"'' --'--d_l .:.....r u..:..L.~"-=-"---'-" -----
tN l1 ~, 01~ If d~,'kJJi/.._ r V >
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\Temporary Internet Files\Conlent.Outlook\4CIWIBU7\SC Score Sheet 14•041-SC_MV Transportation (C).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses
Run Package C
' RFP No .. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _,e._..J,__ __
Weight 10% (10 pts)
(5-4-3-2-1) (0) Meets Standards Unacceptable
X 1.0 = Points: _____ &]"""· __ _
RATIONALE: ;J-t}{d- LJtJ½ .;pr; ---- v/4
0a/M-<-dl I' t / lf~ d--- 11-7 If k de... "
~t¼u.e &J'-/1/tl~ awCJ._ 7
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 32.844
'-Jrt{+e t1cl ~ f c;~ ~lw 1 ~
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE: pf;,t Z::: dY, j rO
C:\Users\ljacobow\App•ala\Local\Microsofl\Windows\Temporary Internet Files\Content.Outlo CIWIBU7\SC Score Sheet 14-041-SC_MV Transportation {C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ 1L-_
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ___ l_"v_
RATIONALE: _______ __,-,-----,-------------s~ t
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ___ <{-'---RATIONALE:, _________ .,-=~------------s~ ft
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ _,._/;_z,,_
RATIONALE: ___________ ---,1------------
A;
C:\Users\JDoucelt\AppData\Local\Microsoft\Windows\T emporary Internet Files\Conlent.Outlook\62VQM0L8\SC Score Sheet 14-041-SC _MV T ransportalion (C).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ ____cr __
RATIONALE: _______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
1± Weight 40% (40 pts)
Points: 32.844
GRAND TOTAL POINTS:
OVERALL RATIONALE:, ___________________ _
l'r
Date C:\Users\JDoucelt\AppData\Local\Microsoft\Windows\ Temporary Internet Files\Content. Outlook\62VQM0L8\SC Score Sheet 14-041-SC _MV Transportation (C).doc
. ' ' Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: MV Transportation. Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 9 X 1.0 = Points:. __ q,__ __ RATIONALe:Gooci background W1-t-h l-<.nouJle&9e.. 6-t
pQ-ra+ro.Y,'b11+- al"l d- ca(e -fu'< pa.s:.c;e"ge rS" 8ooc:L fee,h'(\{c~l
b acl-1. 9 r o uf\d \ '' Go ot:> 11 "(""ef'e re.v-,c& s;, '-\ Ve ,r'-1 s.a-t\ s. ..f',ed
C m,Obt-1 '4 ), O~GfQ-tes, ma.Y\'>j \a.:rge 0...DY\-\-roc"i-s.
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 9 X 1.5 = Points: / 3, '5 RATIONALE: G;ood- plo.o w, t-lr) c/ust-ome, ou-t-reo.ch, ~ e ta. a e_.d -:,_.fur +- u ~ s c.°"e- cl v 1e ,
·'
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: 9 X 1.0 = Points:_!-1-----
RATIONALE: Ou t-5. roY'id,\ tJ ">t-C-LW l,;;Jock3 ,ound., e'I(( p e.,r i:e.x\ Ced ' G-oo cL tra I n't 2J and__ O:l ~ p::-£i·oh p\0-0 ',
l)(c,E.,- d,.(:;; °10 ~ brlue.-r 1.ua._ge., 0 ver '11 J.;;)./1,~u, Goocl 'oe~f..,--r-S
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(8-7-6) (10-9) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ___ 4S/-=----- X 1.5 = Points: / 3 , S:
RATIONALE: Gc:::,C) d kke_ l<.Jort-1') '
VQry jood Ver'f ~ood
loco..T10v') '- 1/eo.-r :r-9 S) t Dt-1--\ Ave No-rit\J
ovt/1,e Jb-r ma,~ tenance,, <;.afe,13/ re c0 rd _
C:\Users\TERRY\Down!oads\SC _Score_ Sheet_14-041-SC _MV _ Transportatlon_(C).doc
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: /0 X 1.0 = Points:_/'-()'-----
RATIONALE: Goo cL credid- re.fe 1eV"\ces, L-ow rt~k rat-11j h°"y-ge. ope. rQ r; on s DVt Aa i, ~ovto.,f I e vel , (6., cl.. ~wl() l 1V\e s. cf' c,re clrr,
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 32.844
Ov era. I ) - 'f/1 5> :3 CS 9 ?:, tf 8 , (r)o,0 For s e v'Q" ( ') ') y eo. rs, ~c:/1 fJbtR J"(. Joe r ;eo,r4 TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
ovERALL RATIONALE: Very e,x pe.r·1 ev'\ c_e.d C,_!b(Y) pa.,v1 y, i+o.s. %d --repuhd7bn. K'n DWYc tu
2 M/4t/ B,i()(') wrv' .. Z.::, ~~·-Evaluator (Pfint} Signatu,?
~1~/.;u;1~ Dat6' '
C:\Users\TERRY\Downloads\SC _Score_Sheet_ 14-041-SC_MV _ T ransportalion_(C).doc
Run Package C INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
/ NAME OF FIRM: MV Transportation, Inc.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below: · 1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ /~O~-- X
(5-4-3-2-1) Meets Standards
1.0
RATIONALE: ,(J,J I u1"(} ,/ur~<J /k~f.J,,,,,,J/p.,,/3
(;,oorl (tfJ/-e/lt:t}
(0) Unacceptable
Points: /0
2. Project Approach and Start Up Plan Information (Section 3.2) Weight 15% (15 pts)
(8-7-6) (10-9) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ¥ RATIONALE: 5/.,.._r J -,.,;IJ
I lJ ,[( ~ L11, c. lo f I ~
X 1.5 = Points: / ·:l t2 l.r:/1 -I ~ ,, ,., .. .,, 6 b C•fc().reJt .&vp17,rl Pae .J,,f..,v1-vp
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned : ___ v'l_,_ __ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ 1+---""is,h
RATIONALE: [(,•o,JJ -/re,/ ftp,-, v✓/4 ./,c,../ a)l/J,/'u,,.e,
to"/o 2(2,..rt 1&-/,0 ~,,r rfcc111:r !>,J b'-.$.c J,v, {)(/0 /2
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
A! Points Assigned: _ __,'!ftlll!!! ___ j)_....__ X
(5-4-3-2-1) Meets Standards
1.5 =
RATIONALE: v.rV ,._,./ r,,,,_+ (':7e;,,~cr
11:'.1•"'" fl"{) ivr (.t6ef.J
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Seleclion Commiltee\SC Score Sheet 14-041-SC_MV Transportation (CJ.doc
(0) Unacceptable
)?' Points:_,:..c..~-+---
Name of Firm: MV Transportation, Inc. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
Run Package C
5. Financial and Business Stability (Section 3.5)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ {~p"---RATIONALE: /J/o C/1/1 ~•</I
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
(5-4-3-2-1) Meets Standards
1.0 =
re Uti>-.J
(0) Unacceptable
Points: _ _..G ... · '---
Weight 40% (40 pts)
Points: 3,2. 711-/1
GRAND TOTAL POINTS:
OVERALL RATIONALE: _______________ _;__ __ _
a e (l {I c._r, J. ,
Evaluator (Print) H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Commntee\SC Score Sheet 14-041-SC_MVTransportation (CJ.doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: __ _,L'""o'----- X 1.0 = Points: __ (p __ _
RATIONALE: ______ S._e_e_d;_-e__sc,n=· -",Pc::..h'-"o"-'-n-'--_//)_R_t_ln_;__'i±g:.....:....;~A-__
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ ....a/.e.__ __ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ 9..__ __
RATIONALE: _______ ___;S':::../-'-'L-------------
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _..l,z'--_ X
RATIONALE: SY}-
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_-"(p __ _
4. Maintenance Plan and Facility Weight 15% (15 pts) (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ __,/.e"'---- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:, __ C/_.__ __ _
RATIONALE: ______ ___l,..!...j..l::ekc,._ ____________ _
C:\Users\tgrimsle\AppData\Local\Microsoft\Windows\T empomry Internet Files\Content.Outlook\886I38KN\SC Score Sheet 14-041-SC _National Express (C).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: __ l,..p __ _ X 1.0 =
Run Package C
Weight 10% (10 pts)
Points:_-'(p"-----
RATIONALE:, _______ _;,• ~'-1-------------
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 23.020
GRAND TOTAL POINTS:
OVERALL RATIONALE: ___ ~---------------
Evalt'iator (Print) Date!
C:\Users\tgrimsle\AppData\local\Microsoft\Wlndows\Temporary Internet Files\Content.Outlook\8B6138KN\SC Score Sheet 14-041-SC _National Express {C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ (; __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_____,,£'----
RATIONALE: ______________________ _
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:,_·_~_6.:__~- X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points:_'1;:.__ __
RATIONALE: ______________________ _
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: ___ (, __ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ b...:.__ __
RATIONALE: ______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _ __,b"'·--- X
Weight 15% (15 pts)
(5-4-3-2-1) (0) Meets Standards Unacceptable
1.5 = Points: __ °/_,__ __
RATIONALE: ______________________ _
H:\CONTRACTS\Sharon\2014\14-041 ~ Palm Tran\Selec!ion Committee\SC Score Sheet 14-041•SC_Nalional Express (C).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned:_(, ____ _ X .1.0 =
Run Package C
Weight 10% (10 pts)
Points:_{, ___ _
RATIONALE: ______________________ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
Weight 40% (40 pts)
3 -' Points: 'l '3, O'LO
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
..-.,..,Ar ,,.I •'/\ L • OVERALL RATIONALE: __ .4._ 1J_O\_J_v1:.~ __ v~'~--(<::I-~-------
Evaluator (Print) Signature Date
H:\CONTRACTS\Sharon\2014\14-041 • Palm Tran\Selecllon Committee\SC Score Sheet 14-041-SC_National Express (C)'.doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned : ____ j.,,,__ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: ,5::
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(8-7-6) (10-9) Exceptional Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: __ --=5 __ _ RATIONALE:
Al p _I cu-, J l IJ~
X 1.5 =
AC/--ttJc.. [ rJ u1-+-l
(0) Unacceptable
Points: 7✓ 5 t-y, d ~-tfq
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:---166.-'---
-ftkedvf ,,.._.__z
gfae; f
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ((; X 1.5 = Points:_CJ--1----
RATIONALE: /)u'-i ?tYltir, (t~ ,;.f- /,--i~/ r &a.r0r;b,,_,~ f /tU-z ~ Vi tAM . Ir r'c4 cl i!f~ue r ,
C:\Users\ljacobow\AppData\Local\Microsofl\Windows\Temporary Internet Files\Content.Outlook\4CIWIBU7\SC Score Sheet 14-041-SC_National Express (C).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Run Package C
Weight 10% (10 pts)
Points Assigned: u) X 1.0 = Points:~1---
RATIONALE: Olh 0a~ -f:::i.Y:, ;,v~ p,p~~c-~f3°<3,&1eP,e,
J L-i cn.t'! .5 / 00t r w.-4 4/M4P~ 44 ~&½{
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
I q:;_ r I 7 ~( (fJ '? 1 C
Vt:i r1,l;lt
Weight 40% (40 pts)
Points: 23.020
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 9/· 4.;i._V OVERALL RATIONALE: Dist::. t::: .:::t'.7,, -fl 'Va ~~ p OI~ f5~ /4tJ:f 0-r p~h )c fr! J.,,_,
Uvw{y { <
C:\Users\ljacobow\AppData\Local\Microsoft\Windows\Temporary Internet Files\Conlent.Oullook\4CIWIBU7\SC Score Sheet 14-041-SC_National Express (CJ.doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041 /SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:, __ ___;_1_
RATIONALE: ____________ __,,-----------
/f·
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: ___ !_?,,-_
RATIONALE: __________ ~---,-----------
5: .e,__ ~-"
Name of Firm: National Express Transit Corp.
Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service
Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:_---'_(_. __
RATIONALE: _______________________ _
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: _____ _ X
/\--
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: __ __.1----'_
RATIONALE: ___________ __,,,=----,,---------
~ IF
C:\Users\JDoucett\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62VQM0L8\SC Score Sheet 14-041-SC_National Express {C).doc
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned: _____ _ X 1.0 =
Run Package C
Weight 10% (10 pts)
Points: -----RATIONALE: ______________ ,--_______ _
6. Price Proposal (Section 3.6)
Points to be determined by Purchasing
TOTAL POSSIBLE POINTS= 100
Weight 40% (40 pts)
Points: 23.020
GRAND TOTAL POINTS:
OVERALL RATIONALE: ________ ~----------
~ 11--
Evaluator (Print) Signature Date
C:\Users\JDoucett\AppData\Local\Microsoft\Windows\T emporary Internet Files\Content. Outlook\62VQMOL8\SC Score Sheet 14-041-SC _National Express {C).doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: ~ X 1.0 = Points:_-=g=----
RATIONALE: Large c.nrnf?lr W l t-h home,, aif(e,e, 1'Y)
E113 lQY"\ d '- Goo cl bu:si ne~ ref'e<ence, Wom ((}/3T-fl,
Y err~ d Iv~ rGe, loca:t-; onS, Q <eot..:t pira_ lY'CLn<i.i+ ~1--pen~f\Ce avd bllc.J:::.3rou<d" ~oocl s:'CL~, rec.urd,
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: 8: X 1.5 = Points: / ~ RATIONALE:Uf1.v'er Weege., ()~'c <!/l';Q,,/hR, cd/1~.so)
on d. q:pod \oe l'\ef 1'+ pe re. e (\--r~ 3 e, C 4- 2., c:1-1°) , \{ e-r ood s::wr-t- , la n ctn s tt {{; n CJu-rl1'11e,
e . ocd ovtJ, ne a ,.P,/ot..JJ ~ eJ., . r (5) percx / 0 0 S. !) toe: c}d., f.t>O a-to
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) (8-7-6) (5-4-3-2-1) (0) Exceptional Exceeds Standards Meets Standards Unacceptable
Points Assigned: <g X 1.0 = Points:_<( __ _
RATIONALE: Good references fk, ope,cen' DVlS maea.nd vehtclv ma; n-tena_nc e, ~ge.
cJuod proprosed 9alary f /o..o,
4. Maintenance Plan and Facility (Section 3.4)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Weight 15% (15 pts)
(5-4-3-2-1) Meets Standards
(0) Unacceptable
Points Assigned: i X 1.5 = Points: /-;;J._
RATIONALE: Rt v ( ecv f3 c.h , / 0 CJJ. n' on Gc:)od ~ftir1.3 /--eve_/- Ver(
p-revef'lt-,'v-e; ma,n+-e.na..n.ee _ plo.n,
C:\Users\TERRY\Downloads\SC_Score_ Sheet_ 14-041-SC_National_Express _(CJ (1 ).doc
cte'tt:l- i led
' )
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of3
5. Financial and Business Stability (Section 3.5)
Run Package C
Weight 10% (10 pts)
Points Assigned: 8' X 1.0 = Points:_g __ _
RATIONALE: /Jo credit-- references. o..vai /able,. /Vo ,f{ntu'\CIO..I r1sl-<: 'ra.""h cy a..vailable '-
6. Price Proposal (Section 3.6)
Weight 40% (40 pts)
Points to be determined by Purchasing Points: 23.020
1-f(jA es-r do II ar o.m oor'"l+ 1/o-r Run '' C.,, '',
Kan~ #=± out- o-P If .. <1J, 16S '7/&,} sL/3 more.... , . over Ro.n \< =1=t= <I)) ~lf.o (olf-9 mo,e_ ave~
per year over <;;-eveh c j yectr.s,) / TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS: 71, <1 2./)
ovERALL RATIONALE: Vevy 0aod Com oan v cDVerq I I, Could p,ovide ce O 0( r-~a
. I EP~y:8~ot.()4/' Evaluator (pfint) Signature/
C:\Users\TERRY\Down!oads\SC _ Score_ Sheet_ 14-041-SC_NationaLExpress_(C) (1 ),doc
Run Package C
INDIVIDUAL SCORES OF PROPOSALS/ORAL PRESENTATIONS
RFP No. 14-041/SC Palm Tran Connection Paratransit Service
NAME OF FIRM: National Express Transit Corp.
SYSTEM FOR EVALUATION WITH ASSOCIATED CRITERIA AND POINTS
The Selection Committee Members are to review all responsive proposals and score the proposal based upon the criteria listed below:
/
1. Experience/Qualifications/Past Performance/References (Section 3.1)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
· Points Assigned: ___ J1----RATIONALE: [._J,r.,._c,,.s 5()0£
;YoJ. ,__s b,5 eq/\fu-ef 5
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points: __ ?_._ __
2. Project Approach and Start Up Plan Information (Section 3.2)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned: __ _,:-(,.__ __ X
RATIONALE: ,£5,tL {r 6 iy,_J":j
boo.i s/-,-cJ -vp ff,,.,._
(5-4-3-2-1) Meets Standards
1.5 =
(0) Unacceptable
Points: I~
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 2 of 3
Run Package C
3. Key Personnel and Operations Information (Section 3.3)
Weight 10% (10 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
Points Assigned:, ___ "'\_,__
RATIONALE: Ll"'l .,.6,M4-Y pl 1/1""§
rq .,, ,,L C l'1
X
(5-4-3-2-1) Meets Standards
1.0 =
(0) Unacceptable
Points:.· __ 'j__,_ __ _
4. Maintenance Plan and Facility (Section 3.4)
Weight 15% (15 pts)
(10-9) Exceptional
(8-7-6) Exceeds Standards
(5-4-3-2-1) Meets Standards
Points Assigned: I '[ X 1.5 =
RATIONALE: &waJ /()c..e-.l,u,,J a~ he:..:,(.
{;e,,p j n,,,d. a_fe-,J. ,
H:\CONTRACTS\Sharon\2014\14-041 - Palm Tran\Selection Committee\SC Score Sheet 14-041-SC_Natlonal Express (C).doc
(0) Unacceptable
Points:~1--) .,_),,.___ F \
Name of Firm: National Express Transit Corp. Individual Scores/Written Responses RFP No. 14-041/SC, Palm Tran Connection Paratransit Service Page 3 of 3
5. Financial and Business Stability (Section 3.5)
Points Assigned:, ___ (o=---- X 1.0 =
RATIONALE: /111 ~qa t:-tc,.Ji: µrfL 9/,::..'),(, ty
6. Price Proposal ( Section 3. 6)
Points to be determined by Purchasing
Run Package C
Weight 10% (10 pts)
Points: _ __,~'----
Weight 40% (40 pts)
?.J, 0;20
Points: 1$?:?E'v/,
TOTAL POSSIBLE POINTS= 100 GRAND TOTAL POINTS:
OVERALL RATIONALE:. __________________ _
Evaluator (Print) s;~
H:\CONTRACTS\Sharon\2014\14-041- Palm Tran\Se!ection Commlttee\SC Score Sheet 14-041-SC_Na\ional Express (C).doc
Request for Proposal – RFP No. 14-041/SC Palm Tran Connection Paratransit Services
September 9, 2014
Attachment 8
Pal111 Beacl1 Cot111ty Boar·d of Cot111ty Co111111issio11er·s
=~- -------,~aim 7ian~;;;;;;;;;;;;;;;;;;;;;;;;;===============
CONNECION Lndepende..nce Lb.rough ..r.nob../h?,P;
Prior BCC Direction February 25, 2014 • Approval of key RFP provisions:
7 year contract
3 vendors
3 run packages (A, B and C)
100% dedicated service
Incorporate Living Wage Ordinance
20% DBE Participation
April 22, 2014 • Approval of Request for Proposals (RFP)
2
_-=-_-==_-==_====-=-=~ a :f$~alrn7ran
CONNEC ION
RFP Schedule
• May 1, 2014 – RFP Advertised
• June 20, 2014 – Initial RFP Submittal Deadline
• June 27, 2014 – Revised RFP Submittal Deadline
• July 28, 2014 – Selection Committee Convened
Oral Presentations
Consideration of Written Proposals
3
C
-==--=-=-=-====..=:: a :f$~alrn7ran
CONNEC ION
RFP Responses
• 12 Paratransit Companies Submitted
• 23 Total Proposals Received
Run Package “A” - 7 proposals
Run Package “B” - 8 proposals
Run Package “C” - 8 proposals
4
===========~ a ,;/$~alrnTran
CONNEC ION
RFP Responses (Cont’d)
• 7 Responsive Proposers 1. First Transit, Inc.
2. Keolis Transit America, Inc.
3. Maruti Fleet & Management, LLC
4. MV Transportation, Inc.
5. National Express Transit Corporation
6. Transportation America, Inc.
7. Veolia Transportation Services, Inc.
• Number of Total Responsive Proposals Run Package “A” - 4 proposals
Run Package “B” - 6 proposals
Run Package “C” - 4 proposals
5
(Cont'd)
==========~ a ,;/$~alrnTran
CONNEC ION
Selection Committee Members
• Robert Weisman, County Administrator – Chairman
• Irwin Jacobowitz, Director of Contracts
• Tonya Johnson, Director, Office of Small Business
• Joe Doucette, Director Administrative Services, Palm Tran
• Ron Jones, Director, Palm Tran Connection
• Terry Brown, Palm Tran Service Board Member
6
_ __:__==-.:-.:--=-=====.::: a :f$~alrn7ran
CONNEC ION
Selection Committee Recommendations
7
Proposer Points Total
Ranking 1 MV Transportation, Inc. 520 7 2 First Transit, Inc. 488 12 3 National Express Transit Corporation 443 20 4 Veolia Transportation Services, Inc. 410 21
Run Package “A”
l
==========~ a ,;/$~alrnTran
CONNEC ION
Selection Committee Recommendations
8
Proposer Points Total
Ranking 1 MV Transportation, Inc. 518 7 2 First Transit, Inc. 496 14 3 Keolis Transit America, Inc. 473 17 4 National Express Transit Corporation 451 27 5 Veolia Transportation Services, Inc. 451 28 6 Transportation America, Inc. 451 33
Run Package “B”
l
==========~ a ,;/$~alrnTran
CONNEC ION
Selection Committee Recommendations
9
Proposer Points Total
Ranking 1 MV Transportation, Inc. 470 9 2 Maruti Fleet & Management, Inc. 453 12 3 First Transit, Inc. 440 15 4 National Express Transit Corporation 379 24
Run Package “C”
l
==========~ a ,;/$~alrnTran
CONNEC ION
Recommended Vendors
MV Transportation, Inc.
• California based company
• Seven (7) Year Price - $ 72,670,431
• 26.1% DBE participation
Banneker Energy, LLC - fuel (6%)
Safety Transportation, Inc. - transportation (20%)
JCM & Associates, Inc. - uniforms (0.1%)
• $1 Million Bond
10
Run Package "A”
d
72 670 431
(696)
(20%)
(0.196)
===========~ a ,;/$~alrnTran
CONNEC ION
Recommended Vendors (Cont’d)
First Transit, Inc.
• Parent company out of England
• Seven (7) Year Price - $ 76,201,015
• 20.2% DBE participation
MDB Services - fuel (7.99 %)
Moore Cars, LLC - janitorial/vehicle cleaning (3.86 %)
Medi -Wheels of the Palm Beaches, Inc. - transportation (4.01 %)
People’s Transit - transportation (4.01 %)
JCM & Associates, Inc. - uniforms (0.33 %)
• $10 Million Bond ($1 Million required)
11
Run Package “B”
C
76 201 015
(7.99 96)
(4.01 96)
(0.33 96)
(Cont'd)
(3.86 96)
(4.01 96)
===========~ a ,;/$~alrnTran
CONNEC ION
Recommended Vendors (Cont’d)
Maruti Fleet & Management, LLC
• Orlando based company
• Seven (7) Year Price - $ 35,017,147
• 100% DBE company
• $750,000 Bond
12
Run Package “C”
Ir (Cont'd)
35 017147
==========~ a ,;/$~alrnTran
CONNEC ION
Protest Process
• 4 Letters of Protest Received
1. Ride Right, LLC
2. Medi-Wheels of the Palm Beaches, Inc.
3. Two Wheels, Inc.
4. National Express Transit Corporation
• Director of Purchasing did not uphold protest
• NO requests for hearing received
• Selection committee recommendations stand
13
===========~ a ,;/$~alrnTran
CONNEC ION
Next Steps
• October 7, 2014 – BCC considers contracts
• November 1, 2014 – Notice to Proceed transition period
• February 1, 2015 – New service commences
14
_ _:__=_=_=_=_=_=-=--=--=-=...:: a :f$~alrn7ran
CONNEC ION