agenda fremont city council special meeting-work session
TRANSCRIPT
Agenda
Fremont City Council Special Meeting-Work Session May 09, 2017
City Council Chambers 3300 Capitol Avenue, Building A
5:45 PM
1. Preliminary
A. Call to Order
B. Salute the Flag
C. Roll Call
D. Announcements by Mayor/City Manager
2. Public Communications
Any person desiring to speak on a matter which is not scheduled on this agenda may do so. The
California Government Code prohibits the City Council from taking any immediate action on an item
which does not appear on the agenda, unless the item meets stringent statutory requirements. The
Mayor will limit the length of presentations (see instructions on speaker card) and each speaker may
only speak once on each agenda item.
A. Oral and Written Communications
3. Staff Reports
A. FREMONT BICYCLE MASTER PLAN UPDATE - Receive presentation on update to
Fremont Bicycle Master Plan and provide input to staff on current direction.
Contact Persons:
Name: Rene Dalton Hans Larsen
Title: Associate Transportation
Engineer
Public Works Director
Dept: Transportation Engineering Transportation Engineering
Phone: 510-494-4535 510-494-4722
E-Mail: [email protected] [email protected]
RECOMMENDATION: Receive presentation on update to Fremont Bicycle Master Plan and
provide input to staff on current direction.
4. Adjournment
Fremont City Council Meeting: 05/09/17 05:45 PM 3300 Capitol Avenue Div/Dept: Transportation Engineering Fremont, CA 94538 Category: Plans, Policies and Studies
SCHEDULED
Sponsors:
STAFF REPORT (ID # 3062) DOC ID: 3062
Updated: 5/4/2017 10:52 AM by Susan Gauthier Page 1
FREMONT BICYCLE MASTER PLAN UPDATE - Receive presentation on update to Fremont Bicycle Master Plan and provide input to staff on current direction.
Contact Persons:
Name: Rene Dalton Hans Larsen Title: Associate Transportation Engineer Public Works Director Div/Dept: Transportation Engineering Public Works
Phone: 510-494-4535 510-494-4722 E-Mail: [email protected] [email protected]
Executive Summary: N/A
BACKGROUND: Various grant programs require cities to have a current Bicycle Master
Plan in order to be eligible for grant funding for bicycle related programs and projects. The
Alameda County Transportation Commission requires jurisdictions to update their bicycle
master plans every five years in order to receive Measure BB funding for bicycle projects.
The current Fremont Bike Master Plan was prepared in 2012.
A process to update Fremont’s Bicycle Master Plan was started in Spring 2016, and included
various opportunities for community participation. A draft plan is now available for review
by the public and coordination of the plan is being scheduled for meetings with the City’s
Pedestrian and Bicycle Technical Advisory Committee, Recreation Commission,
Environmental Sustainability Commission, and Planning Commission. Approval of the plan
by the City Council is proposed for consideration in September 2017.
At the Work Session with the City Council, staff and consultants will provide an
informational presentation and address questions on the proposed Fremont Bicycle Master
Plan relative to the process, scope and schedule, with the intent to receive feedback from
the Council on the overall policy direction and priorities.
DISCUSSION/ANALYSIS: N/A
FISCAL IMPACT: N/A
ENVIRONMENTAL REVIEW: Environmental review is not required at this time as the
Council is not taking an action to approve the Bicycle Master Plan. Appropriate
environmental review will be completed before the plan is brought forward for Council
approval.
LINKS: A copy of the draft plan is available at the following weblink:
https://fremont.gov/534/Bicycle-and-Pedestrian-Program
ATTACHMENTS:
Bike Plan Presentation
3.A
Packet Pg. 3
Staff Report (ID # 3062) Meeting of May 9, 2017
Updated: 5/4/2017 10:52 AM by Susan Gauthier Page 2
RECOMMENDATION: Receive presentation on update to Fremont Bicycle Master Plan and
provide input to staff on current direction.
3.A
Packet Pg. 4
Bicycle Master Plan Update
City Council Work SessionMay 9, 2017
3.A.a
Packet P
g. 5
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Bike to Work Week Activities
• Energizer Stations
• Bike East Bay Ribbon Cutting
• SchoolParticipation
3.A.a
Packet P
g. 6
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Recent Accomplishments
• Buffered Bike Lanes
• Bike Detection @ Signals
• Green Lanes
• Physical Separation
• Educational Videos
3.A.a
Packet P
g. 7
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
New Projects, Plans and Funding• Protected Intersections
- Grimmer (3 locations)- Fremont (2 locations)
• Walnut Bikeway
• Warm Springs- West BART Access Bridge and I-880 Bridge
• Joint Venture Silicon Valley Bike Plan
• SB1 – New Active Transportation Funding
3.A.a
Packet P
g. 8
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Bike Master Plan Update• Started: Spring 2016
• Public Outreach- BPTAC- Community Workshop- Website Feedback- Community Events
• Approval Process- Commission Review- Council Action: Fall 2017
3.A.a
Packet P
g. 9
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
May 9, 2017
BICYCLE MASTER PLAN UPDATE
CITY COUNCIL WORK SESSION
3.A.a
Packet P
g. 10
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
agenda- Plan Purpose
- Plan Process
- Biking Toolbox
- Walk through Draft Plan
- Questions & Comments
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017 3.A.a
Packet P
g. 11
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
1 Plan purpose
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
Clarify the General
Plan’s bold vision for
biking Fremont
Update Project List per National
Best Practices to Achieve GP
Vision
3.A.a
Packet P
g. 12
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
plan purpose
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
“Fremont will serve as national model of how an auto-oriented suburb can evolve into a sustainable, strategically urban, modern city.”
CLARIFYING THE VISION ESTABLISHED IN THE CITY’S GENERAL PLAN
3.A.a
Packet P
g. 13
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
plan purpose
FREMONT BMP UPDATE | BPTAC Meeting May 3, 2017
CLARIFYING THE VISION ESTABLISHED IN THE CITY’S GENERAL PLAN
3.A.a
Packet P
g. 14
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Establish the VisionSpring 2016
Identify Network Gaps and Existing
ConditionsSummer 2016
Develop Solutions and Refresh the
NetworkFall 2016
Further Develop High-Priority
ProjectsFall 2016
Create a Funding & Implementation
PlanWinter 2016
Draft the BMP Update February
2017
Revise the BMP Update Spring
2017
Commission Coordination
Summer 2017
Adopt the Updated Bicycle Master Plan
Fall 2017
plan process
We are here
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017 3.A.a
Packet P
g. 15
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
2 Goals & Policies
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
1. Implement a safe, convenient, connected, and comfortable citywide bicycling network for people of all ages and abilities who live, work, and visit Fremont.
2. Prioritize bicycle safety to achieve the City’s Vision Zero Policy.
3. Use best practices and innovative but tested bicycle designs to implement a continuous, comprehensive low-stress bicycle network to serve all ages and abilities.
4. Improve safety and attract new bicycling trips through education, encouragement, and enforcement activities.
5. Provide for regular maintenance of the bicycle network.
6. Facilitate coordination and cooperation in the development of the bicycle network.
3.A.a
Packet P
g. 16
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
PATH/TRAIL
biking tools3.A
.a
Packet P
g. 17
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
SEPARATED BIKEWAYS (PROTECTED BIKE LANES, CYCLE TRACKS)
biking tools3.A
.a
Packet P
g. 18
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
BUFFERED BIKE LANES
biking tools3.A
.a
Packet P
g. 19
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
BIKE LANES
biking tools3.A
.a
Packet P
g. 20
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
NEIGHBORHOOD BIKEWAYS
improvements3.A
.a
Packet P
g. 21
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
GREEN BIKE LANES IN CONFLICT ZONES/KEY AREAS
biking tools3.A
.a
Packet P
g. 22
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
biking toolsPROTECTED INTERSECTIONS
3.A.a
Packet P
g. 23
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
3 Existing Conditions
Bicycle Lanes
Buffered Bicycle Lanes
Paths
Bicycle Routes
3.A.a
Packet P
g. 24
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
ALL AGES & ABILITIES VISION NETWORK
FREMONT BMP UPDATE | BPTAC Meeting May 3, 2017
4 Vision Network3.A
.a
Packet P
g. 25
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
All Ages & Abilities Bicycle Network
Access to Dense Residential/ Employment
Areas & BART
Competitiveness for Grant Funding
Safety
Connectivity
Low Stress Bikeways
BPTAC, City, Public Input
HOW WAS THE AA&ADEFINED?
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
4 Vision Network3.A
.a
Packet P
g. 26
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
4 Vision Network
Paths
Separated Bikeways
Neighborhood Bikeways
Protected Intersections
3.A.a
Packet P
g. 27
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
5 Five Year PlanADDITIONAL PROJECTS• Warm Springs
Development Projects• Grimmer Boulevard
Two‐Way Separated Bikeway
• Fremont Boulevard Caltrans HSIP Grant for Separate Bikeway
• Other repaving projects• Freeway Interchanges
High‐Priority Vision Network Corridor ProjectsComprehensive Trails Study (East Bay Greenway, Bay Trail, Alameda Creek Trail)
Dumbarton-Union City
Central-Peralta
Walnut-Sundale
Grimmer
Fremont-Washington
Niles-City Center-Mission
Warm Springs
Stevenson
Paseo Padre
Opportunistic Low-Stress Bicycle Lanes and Neighborhood bikeways & Freeway Interchanges 3.A
.a
Packet P
g. 28
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Comprehensive Trail Feasibility Studies
3.A.a
Packet P
g. 29
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Dumbarton-Union City3.A
.a
Packet P
g. 30
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Central-Peralta
Proposed Separated Bikeway Cross-Section (Long-Term)
3.A.a
Packet P
g. 31
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Walnut-Sundale
Proposed Separated Bikeway Cross-Section (Long-Term)
3.A.a
Packet P
g. 32
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Grimmer
Proposed Separated Bikeway Cross-Section (Long-Term)
3.A.a
Packet P
g. 33
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Fremont-Washington
Proposed Protected Intersection and Separated Bikeway Design per the City’s Successful HSIP Grant 3.A
.a
Packet P
g. 34
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Niles-City Center-Mission
Proposed Separated Bikeway Cross-Section (Long-Term)
3.A.a
Packet P
g. 35
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Warm Springs
Proposed Separated Bikeway Cross-Section (Long Term)
3.A.a
Packet P
g. 36
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Stevenson
Proposed Separated Bikeway Cross-Section (Long-Term)
3.A.a
Packet P
g. 37
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
Paseo Padre
Proposed Separated Bikeway (with Near-Term Painted Buffer and Plastic Posts/Curbs)
3.A.a
Packet P
g. 38
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
Trails Separated Bikeway Bike Lane Neighborhood Bikeway
• Paseo Padre
Connector to East
Bay Greenway at
Grade Separation
• Mission Creek
from Mission to
Palm
• Mowry Avenue
• Liberty Street
• Guardino Drive
• Civic Center
• Country Drive
• Liberty Street
• Sundale Drive
• Hastings Street
• State Street
• Beacon Street
• BART Way
• Argonaut
• Eggers Drive
• Hastings Street
• Sundale Drive
• Logan Drive
• Mission View Drive
• Main Street
• Country Drive
Opportunistic Low-Stress Bikeways3.A
.a
Packet P
g. 39
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
- Practical approach maximizing limited resources
- Targeted recommendations on:
- Safe Routes to School
- Adult Education & Encouragement
- Enforcement
- Evaluation
6 Support Programs3.A
.a
Packet P
g. 40
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
FREMONT BMP UPDATE | BPTAC Meeting May 3, 2017
WHAT ARE THE NEAR-TERM KEY ELEMENTS?
Build a High Quality, Connected Bike Network in PDAs by 2020• Most conducive areas for biking• Introduce bike share
Expand the trail network where funding opportunities are best• Develop long‐term trails strategy
Continue to use pavement maintenance program to help develop and improve Citywide bikeways• Increase priority for pavement maintenance for locations identified from community feedback
Continue and Enhance Education & Encouragement Programs• Safe Routes to School• Informational videos• Promotional rides & event with Fremont Freewheelers
• Consider having Cyclovia events
Set and Achieve a Goal for Increased Bicycling• 3% by 2022• 10% by 2040• Monitor progress with robust data collection
7 Implementation Plan3.A
.a
Packet P
g. 41
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
NEAR-TERM7 Implementation Plan
Apply for & Secure Funding
Design & Build Near-Term Priority Projects, Complete
Trail Study
Bicycle Parking Program
Bike Share Program
3.A.a
Packet P
g. 42
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
ONGOING RECOMMENDATIONS7 Implementation Plan
Planning & prioritization
Signal upgrades &
maintenance
Maintenance & ongoing operations
Additional Trail Studies
Count Program
Collision Reporting/ Vision Zero
Safe Routes to School
Support Programs
Stakeholder Involvement
3.A.a
Packet P
g. 43
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
TDA Article 3
Measure B, Measure BB, Local
& Discretionary Funds
Alameda CTC Capital Investment
Plan (CIP)
Pavement Management
Statewide Competitive Grants
(HSIP)
Private Development
7 Implementation PlanFUNDING SOURCES
3.A.a
Packet P
g. 44
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017
A Design Guidelines- Travel Lane Widths
- Preferred Separated Bikeway Design
- Protected Intersection Design
- Interchange Guidance
- Neighborhood Bikeway Preferred Design Elements
Preferred Separated Bikeways Dimensions
3.A.a
Packet P
g. 45
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)
next steps- Spring 2017 – Revise Draft Plan- Summer 2017 – Commission Review- Fall 2017 – Adopt Final Plan- Ongoing – City pursuing grant funding
for Near-Term All Ages & Abilities Network
FREMONT BMP UPDATE | City Council Work Session, May 9, 2017 3.A.a
Packet P
g. 46
Attachment: Bike Plan Presentation (3062 : FREMONT BICYCLE MASTER PLAN UPDATE)