Page 1: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

1 N. E. Railway , Varanasi

Operating Department

Page 2: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Geo-Physics

2

No. of states

coverage 2

UP &

Bihar

No. of Districts

coverage

11 UP

3 Bihar

Contd…

Page 3: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Jurisdiction Six Control Boards

1 2 3 4 5 6

Main Board(CTC) BTT Board CPR Board ALY Board CPJ Board MHC Board

CI-GKP BTT-ARJ-JNU CPR-ARJ

ARJ-ALD

GKP-PNYA Closed since

01-04-15 for

gauge

conversion of

CPR-THE

DDA-MHZ

MAU-SHG

PEP-IAA

CPJ-THE

SRU-BHJ SV-THE

IAA-DIT(MG) HTW-BHBR

Jurisdiction of Eleven Sectional TIs HQs

1 2 3 4 5 6 7 8 9 10 11

CPR SV BTT CPJ POU MAU BCY MUV GCT BUI AMH

CP

R-G

OP

G

TKV-SV

ZR

DE

-KH

M U

NL

A-P

NY

A

CP

J(Ex

cl)-

TH

E(E

xcl)

BT

T(E

xcl)-

AR

J(Ex

cl) JNU-

ARJ(Excl) M

BS

-AL

Y

AR

J-K

MD

R

GTST-PEP

MAU(Excl)-

SHG(Excl) ARJ(Excl)-

KFK PEP-RTP

SV-THE

HTW-BHBR

Page 4: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Assets BG MG Total

Single Line 919.82 KM 143.77 KM 1063.59 KM

Double Line 180 KM -- 180 KM

Twin Single Line 8.3 KM -- 8.3 KM

Total 1108.12 KM 143.77 KM 1251.89 KM

No. of Block Stations 109 11 120

No. of Halt/Flag Stations 56 19 75

Type of Signalling

(No. of stations )

Colour Light Semaphore Total

BG MG BG MG

Modified Non

Interlocked (MNI) 1 -- -- -- 1

Standard-I 3 -- 12 Nil* 26

Standard-III 93 -- -- -- 93

Total 97 -- 12 11 120

* MG section (CPR-THE:11 stations) is closed for GC work since 01-04-15)

Contd…

Page 5: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

System of working BG MG Total

Absolute Block System 109 Block Stations 11 Block Stations (Closed for GC work)

120

Automatic Block System Nil Nil Nil

One Train Only 3 sections (9 Halts) 1 Section (5 Halts) 4 sections

Railway Electrification

Section Status

BJU-CI-CPR-BTT Completed

BTT-GKP Completed

Yet to be commissioned

SV-THE Completed

CPR-BSB-ALD Work Sanctioned ( In initial

progress : to be done by RVNL)

5

Contd…

Contd…

Page 6: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

SN Sections Jurisdiction D. Line/

S .Line Gauge KM

No . of

Stations +Halts

Inter

locking

System of

Working

1 CI-GKP CI-GKC(Excl) DL BG 180 22+4=26 Std-III Absolute Block

System

2

GKC(Excl)-

PNYA

UNLA-PNYA SL BG 86.06 8+3=11 Std-III Absolute Block

System

3 CPJ-THE

CPJ-THE SL BG 98.8 10+6=16 Std-III

Absolute Block

System

4

BT

T-B

SB

BTT-IAA SL BG 59.91 5+4=9 Std-III Absolute Block

System

IAA-MAU TSL BG 8.3 1+0=1 Std-III Absolute Block

System

MAU-BSB SL BG 92.39 10+3=13 Std-III Absolute Block

System

5 BSB-ALD

MUV-

KWH (Excl) SL BG 27.48 3+3=6 Std-I

Absolute Block

System

KWH-ALY SL BG 90.5 13+3=16 Std-III

(Excl DRGJ)

Absolute Block

System

6 CPR-ARJ CPR-ARJ SL BG 172.45 20+7=27 Std-III Absolute Block

System

Contd..

Contd…

Page 7: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Contd…..

SN Sections Jurisdiction D.Line/

S .Line Guage KM

No . of

Stations +Halts

Inter

locking

System of

Working

7 MAU-SHG MAU-SHG SL BG 99.46 9+4=13 Std-I Absolute

Block System

8 PEP-IAA PEP-IAA SL BG 49.68 3+4=7 Std-I Absolute

Block System

9 SRU-BHJ SRU-BHJ SL BG 20.25 0+4=4 -- One Train

Only

10 DDA-MHZ DDD-MHZ SL BG 5.7 0+1=1 Std-III One Train

Only

11 SV-THE SV-THE SL BG 28.17 3+1=4 Std-III Absolute

Block System

12 HTW-BHBR HTW-BHBR SL BG 22 0+4=4 -- One Train

Only

13 ARJ-JNU ARJ-MFJ SL BG 63.2 2+5=7 Std-III Absolute

Block System

Total BG Route KM 1108.12 109+56=165 --

14 CPR-THE CPR-THE

(GC is in progress) SL

GC in

progress 108.95 11+14=25 --

Absolute

Block System

15 IAA-DIT IAA-DIT SL MG 35 0+5=5 -- One Train

Only

Total MG Route KM 143.77 11+19=30 --

Total Route KM 1251.89 Total No. of Stations =109+11= 120

Total No. of Halts =56+19=75

Contd…

Page 8: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Rake Handling Terminals Contd…

Contd…

SN SectionName of

Station/Siding

Running Line/ Siding

Line

No.of

SpurCSL (Mts)

Avr. Rake

per Month

Whether

I/W or O/W

Commodity

Dealt With

Type of

SidingRemarks

Work

sanctioned

1 Siwan Siding L/no.-8 & 9 2 686 Each 44 I/WFert.,FG,CT,

StoneRly

Round the

clockImpr Work

2 Mairwa Siding L/No.-5 1 686 8 0 0 Rly Nil

3 Deoria SadarSiding L/No.-(6+7) & L/No.-7

(Extended)2 653 , 706 25 I/W Fert.,FG,CT Rly

Round the

clockNil

4 Baitalpur (BPOB) Siding L/no-5 1 686 32 I/W Petroliuum Pvt. SidingRound the

clockNil

5 Sardarnagar Running Line no.-5 1 716 6 I/W 0 Rly Nil

6 Kushumhi Running L/n-4 & 5 2 710 Each 7 I/WCoal ,Rock

PhosphateRly Nil

7 Mau Running L/no.-8 1 695 14 I/W Fert.,FG,CT Rly Nil

8 Azamgarh Running line no.-4 1 716 15 I/W Fert.,FG,CT Rly Nil

9 Gautam Asthan Siding L/no.-4 1 710 12 I/W Stone/Cement Rly

Line No.4

with rake

handling PF

10 Ballia Siding L/No.-(5+6) 1 645 15 I/W Fert.,FG,CT Rly Line No.5

11 Phephna Running L/no.-3 1 686 5 I/W Coal,BT Rly Nil

12 Gajipur City Running L/No.-4 1 686 8 I/W Fert.,FG,CT Rly Nil

13 Manduadih Siding L/no.-8 1 600 5 I/W Palm oil RlyRound the

clockNil

14 Katka Running L/no.-3 1 705 3 O/W BT Rly Nil

15 Siding L/no.-5 1 875 3 O/W BT RlyRound the

clockNil

16 Container Siding 1 730 3 O/WCarpet ,

Allumunium

products

Pvt.Siding Nil

17 Siwan-Thawe Hathua Running L/no.-3 1 686 20 I/WStone,

BoulderRly

Half rake

handling PF

18 Bhatni-Aurihar Indara Siding L/no-5 1 686 5 I/W Coal Rly

19 Tamkuhi Road Running L/no.-3 1 715 1 I/W Rly

20 Padrauna Running L/no.-3 1 733 7 I/WCement ,Food

GrainsRly

21 Varanasi-Aurihar Varanasi City Siding L/n-6 & 10 1+1/2 663 , 465 12 per year I/WOnion , BT ,

RMCRly

1 Chhapra-Gorakhpur Chauri Chaura Siding L/No.-5 One 300 0 I/W,O/W Fert.,FG Rly Nil

2 Chhapra-Gorakhpur Chhapra Siding One 309 , 150 18 I/W Fert.,FG,CT RlyRound the

clockNil

Half Rake

Ch

ha

pra

-Go

rak

hp

ur

Mau-Shahganj

Au

rih

ar-

Ch

ha

pra

Madhosingh

Va

ran

asi

-All

ah

ab

ad

Cit

y

THE-CPJ

Full Rake

Page 9: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

:Others:

Assets Available at At

Running Rooms 8 stations CPR, BUI, MAU, BTT, SV, THE , ALY, CPJ

Washing Pits 4 Station MUV (02 :full length) , CPR(01+01 under

construction : full length) , BUI(01 : 12 coach)

and AMH (01 : 20 coach)

Crew Changing Point 8 Stations CPR, BUI, MAU, BTT, SV, THE , ALY, CPJ Manduadih

Contd…

Contd…

SN Name of Station With Div/Rly. Avr. no. of Goods

trains daily

Total no. of

Mail/Exp

Total no.

of pass.

1 Chhapra Kacheri Sonpur/ECR 16 pairs 53 pairs 5 pairs

2 Paniyahwa Samastipur/ECR 6 pairs 10 pairs 6 pairs

3 Gorakhpur Cantt Lucknow/NER 13 pairs 49 pairs 12 pairs

4 Shahganj Lucknow/NR 2 pairs 13 pairs 4 pairs

5 Jaunpur Lucknow/NR 3 pairs 2 pairs 2 pairs

6 Varanasi Lucknow/NR 1 pair 16 pairs Nil

7 Allahabad City Allahabad/NCR 7 pairs 18 pairs Nil

Interchange Points

Page 10: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Notice Stations for Caution Orders

Varanasi Division (N.E.Railway) ( 16 stations )

Chhapra Jn. Indara Jn. Kaptanganj Jn.

Siwan Jn. Ballia Manduadih

Bhatni Jn. Aundihar Jn. Duraundha Jn.

Thawe Jn. Varanasi Jn. Azamgarh

Mau Jn. Allahabad City Varanasi City

Salempur Jn.

Other Division & Railways (05 station)

Gorakhpur Jn.

(LJN,NER)

Shahganj Jn.

(LKO,NR)

Narkatiaganj

(SPJ,ECR)

Allahabad Jn.

(ALD,NCR)

Jaunpur (NR ,LKO)

Contd…

Contd…

10

Page 11: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Items No. of location Stations

CMS Integrated 3 (A-Class ) BSB, CPR, MAU

CMS handled by

SM/ASM

2 BUI , BTT

7 (Sanctioned)

( Work in progress)

THE,CPJ,SV,ALY,MUV,ARJ,BCY

FOIS 2 CPR , BSB Control

TMS 12 DEOS , KHM , BALR , SV , CPR , MAU ,

BUI , AMH , MUV , GCT ,IAA , MBS

COIS 3 MUV , CPR , Control (BSB)

COA 1 Control room ( Connected to NTES)

Contd…

11

Page 12: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Coaching Operations

Contd…

12

Type Org.Trains Through Remarks

ME 26

73

Pa

irs

02

pai

rs t

o b

e

intr

oduce

d

Passengers BG 52 Nil --

DMU BG 03 Nil

Passengers MG Nil Nil --

DMU MG 05 Nil --

Total 86 73 Pairs --

Page 13: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Contd…

Contd…

M/EXP PASS Total

GKP-BTT 41 4 45

BTT-SV 32 4 36

SV-DDA 32 10 42

DDA-CPR 32 8 40

GKP-PNYA GKP-PNYA 11 8 19 13 Pairs 8 Pairs

BTT-SRU 13 6 19

SRU-IAA 13 4 19

IAA-MAU 22 7 29

MAU-ARJ 11 6 17

ARJ-BSB ARJ-BSB 27 9 36 22 Pairs 8 Pairs

BSB-MUV 20 3 23

MUV-ALY 20 3 23

ARJ -PEP 18 4 22

PEP-BUI 28 7 35

BUI-CPR 29 4 33

CPR-SEE CPR-CI 53 5 58 30 Pairs 15 Pairs

PEP-IAA PEP-IAA 10 3 13 8 Pairs 2 pairs

MAU-SHG MAU-SHG 13 4 17 10 Pairs 2 Pairs

CPJ-THE CPJ-THE - 4 4 4 Pairs 1 Pair

THE-SV THE-SV - 7 7 7 Pairs 2 Pairs

ARJ-JNU ARJ-JNU 2 2 4 4 Pairs 3 Pairs

SRU-BHJ - 4 4 4 Pairs Nil

HTW-PLWR - 1 1 1 Pairs Nil

DDA-MHZ - 5 5 5 Pairs Nil

IAA-DIT(MG) - 4 4 4 Pairs Nil

CPR-THE(MG) - 6 6 6 Pairs Nil

BG: 55 84

MG:05 (42 Pairs) per day

No. of trains in pairs Average

Coaching

Traffic Daily

(Pairs)

Average Goods

Traffic Daily

Total 99 15988(44 Pairs) per

day

Other Small

sections

25 Pairs 12 Pairs

14 Pairs

(MAU-IAA 20

Pairs)

13 Pairs

(BSB-MUV 15

Pairs)

18 Pais

4 Pairs

7 Pairs

7 Pairs

CPR-GKP

BTT-ARJ

BSB-ALD

CPR-ARJ

Section Sub Section

Page 14: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Stations No. of Mail/Exp No. Of Pass.

Allahabad City 1 3

Manduadih 7 4

Aurihar Jn. NIL 2

Ballia 1 3

Chhapra. 12 9

Varanasi 1 1

Mau 1 1

Azamgarh 2 1

Varanasi City 1 9

Salempur Nil 2

Bhatni Nil 6

Siwan Nil 11

Thawe Nil 6

Kaptanganj Nil 2

Ghazipur City Nil 1 (DMU)

Barhaj Bazar Nil 4

Indara Nil 4 RAIL BUS(MG)

Dohri Ghat Nil 4 RAIL BUS(MG)

Duraundha Nil 7

Bathua Bazar Nil 1

Maharaj Ganj Nil 5

Contd…

Contd…

Page 15: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Freight Movement

Features

Average No. of Goods Trains Interchange Per Day 100 per day

Average No. of Inward Rakes Per Month(2014-15) 260 per month

Average No. of Inward Rakes Per Day(2014-15) 9

Average No. of Jumbo Interchange (Thr. + Org.) 30 per day

No. of Rake Handling Terminals Major 13

Minor 8

Contd…

15

Page 16: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Geo Map of Varanasi Area

16

Varanasi Cantt Rly Station (NR)

To Lohta Station (NR)

To Manduadih NER

Existing Unused Alignment

Contd…

Contd…

To Shivpur (NR)

Page 17: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Plan in progress

1. Development of BSB area (BCY-BSB-MUV) in an integrated manner combining

traffic requirements and Land availability of NR & NER.

2. Decongestion of BSB & development of adequate through capacity so that BSB

Yard would not become a bottle neck after doubling and electrification.

3. Direct connectivity of MUV with LOT side so that terminating trains of RPC-IV and

PF return can be dealt directly at MUV without requiring them to be dealt at BSB .

17

Contd…

Page 18: Agenda for General Manager's Conference...Mau 1 1 Azamgarh 2 1 Varanasi City 1 9 Salempur Nil 2 Bhatni Nil 6 Siwan Nil 11 Thawe Nil 6 Kaptanganj Nil 2 Ghazipur City Nil 1 (DMU) Barhaj

Thanks