Connectivity & LTA agenda for meeting to be held with 32 nd NR SCM Page 1 of 15 Agenda for Connectivity/Long term Access to Generation projects in Northern Region POWERGRID has received Connectivity and Long term Access (LTA) applications for new generation projects in NR. In addition, there are certain modifications of already granted Long term Access. The list of the projects to be discussed is given below: 1.0 Connectivity and LTA to Faridabad Solar PV (5 MWp) Plant of M/s NTPC Limited in Haryana. 2.0 Connectivity and LTA to Unchahar Solar PV Plant (10 MWp) of M/s NTPC Limited in Uttar Pradesh. 3.0 Connectivity to Singrauli Small Hydro (2X4MW) Plant of M/s NTPC Limited in Uttar Pradesh (Long term Access discussed in last meeting). 4.0 Timely development of Evacuation system for Tapovan Vishnugadh / Lata Tapovan Hydro-electric project of NTPC 5.0 Connectivity and LTA for Sainj HEP 6.0 Long Term Access for 240 MW from Essar Power (1200 MW) in Jharkhand to Noida Power Company Limited (NPCL) and 300 MW from GMR Kamalanga (1050MW) in Odisha to Haryana

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 1 of 15

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

POWERGRID has received Connectivity and Long term Access (LTA) applications for

new generation projects in NR. In addition, there are certain modifications of already

granted Long term Access. The list of the projects to be discussed is given below:

1.0 Connectivity and LTA to Faridabad Solar PV (5 MWp) Plant of M/s NTPC Limited

in Haryana.

2.0 Connectivity and LTA to Unchahar Solar PV Plant (10 MWp) of M/s NTPC

Limited in Uttar Pradesh.

3.0 Connectivity to Singrauli Small Hydro (2X4MW) Plant of M/s NTPC Limited in

Uttar Pradesh (Long term Access discussed in last meeting).

4.0 Timely development of Evacuation system for Tapovan Vishnugadh / Lata

Tapovan Hydro-electric project of NTPC

5.0 Connectivity and LTA for Sainj HEP

6.0 Long Term Access for 240 MW from Essar Power (1200 MW) in Jharkhand to

Noida Power Company Limited (NPCL) and 300 MW from GMR Kamalanga

(1050MW) in Odisha to Haryana

Page 2: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 2 of 15

1.0 Connectivity and Long term Access to Faridabad Solar PV Plant (5 MWp) of

M/s NTPC Limited in Haryana.

i) Connectivity

M/s NTPC Ltd. has applied for Connectivity for 5 MWp to Faridabad Solar PV Plant (5

MWp) located at Faridabad in Haryana. As per the connectivity application,

commissioning schedule of the plant is Dec.’2013. Accordingly, connectivity has been

applied from Dec.’13 (Copy of the Connectivity application attached at Annexure 1).

As per the application, the Solar power is pooled at 33kV & further connected through

the existing electrical system of 220 kV Faridabad generating station. Accordingly, no

transmission system is being proposed for connectivity to 5MWp solar power of the

plant.

ii) Long Term Access

M/s NTPC Ltd. has also applied for Long term Access (on behalf of GRIDCO) for

transfer of 5MWp power from Faridabad Solar PV Plant (5 MWp) to GRIDCO Limited,

Odisha in Eastern Region. LTA has been sought w.e.f. 1/12/2013 upto 1/12/2038 (Copy

of the LTA application is attached at Annexure 2).

No transmission system requirement has been envisaged for Long term access as the

LTA has been sought for 5 MW in the direction from Northern Region to Eastern Region

which would be opposite to the normal power flow direction and would be transferred

via existing inter-state transmission system through displacement.

iv) Proposal:

Connectivity & Long term Access for 5 MWp solar power from Faridabad Solar PV Plant

of M/s NTPC Ltd. is proposed subject to:

Connectivity

� All applicable conditions as listed in Annexure-A.

� As per CERC order dated 2/5/2013, following has been mentioned:

‘Provided further that the application by the applicant defined under Regulation

2(1) (b)(i) (e) shall be considered by CTU only if the existing generating station

agrees to act as the ‘’Principal Generator” on behalf of the renewable energy

generating station(s) seeking connectivity through the electrical system of the

generating station and formalizes a written agreement/arrangement among them

Page 3: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 3 of 15

to undertake all operational and commercial responsibilities for the renewable

energy generating station(s) in following the provisions of the Indian Electricity

Grid Code and all other regulations of the commission, such as grid security,

scheduling and dispatch, collection and payment/adjustment of Transmission

charges, UI charges, congestion and other charges etc. and submit a copy of the

agreement to the CTU, alongwith the application for connectivity, with copy to the

respective RLDC in whose control area it is located’’

� In line with the above para NTPC vide letter dated 10/07/2013 was requested for

submission of suitable declaration that the Principal Generator shall undertake

the provisions of the above Regulations. In response we have received a letter

dated 01/08/2013 from NTPC Ltd. stating that

“since ‘Faridabad Solar Plant’ is under the ownership of NTPC, Shift Charge

Engineer of ‘Faridabad Gas Power Station’ will be responsible for all day to day

coordination with RLDC in regard to declaration of schedules, submission of

metered data etc in regard to ‘Faridabad Solar Plant’. Further ‘Faridabad Gas

Power Station’ agrees to act as principal Generator on behalf of Faridabad Solar

Plant and agrees to undertake all operational & commercial responsibilities for

‘Faridabad Solar Plant’ in following the provisions of IEGC & all other regulations

of CERC. However, ‘Faridabad Solar Plant’ will be considered as a separate

‘User’ for which energy accounts to be issued separately.”

A copy of the letter dated 01/08/2013 from NTPC is enclosed at Annexure-

Members may deliberate and connectivity may be granted to Faridabad Solar PV Plant

(5 MWp) of M/s NTPC Limited in Haryana.

Long Term Access

� LTA is proposed to be granted subject to

o Grant of Connectivity

o NTPC to submit the copy of the PPA

o Signing of requisite Long Term Access Agreement and TSA for payment

of the transmission system charges, as applicable, from Dec.’ 2013 for 25

Page 4: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 4 of 15

years by GRIDCO Limited in case of firm PPA with GRIDCO is available

or by NTPC Ltd in case PPA is not available.

o All applicable conditions as listed in Annexure-A.

2.0 Connectivity and LTA to Unchahar Solar PV Plant (10 MWp) of M/s. NTPC

Limited in Uttar Pradesh.

i) Connectivity

In line with the CERC regulations, M/s NTPC Ltd. has applied for Connectivity for 10

MWp to Unchahar Solar PV Plant (10 MWp) located at Raebareli in Uttar Pradesh. As

per the connectivity application, commissioning schedule of the plant is Sep.’ 2013.

Accordingly, connectivity has been applied from Sep.’13 (Copy of the Connectivity

application attached at Annexure-3). NTPC may confirm the date for connectivity.

As per the application, the Solar power is pooled at 33kV & further connected through

the existing electrical system of 220 kV Unchahar Switchyard. Accordingly, no

transmission system is being proposed for connectivity to 10MWp solar power plant.

ii) Long Term Access

M/s NTPC Ltd. has also applied for Long term Access (on behalf of Damodar Valley

Corporation) for transfer of 10MWp power from Unchahar Solar PV Plant (10 MWp) to

DVC, West Bengal in Eastern Region. LTA has been sought w.e.f. 01/08/.2013 upto

01/08/2038 (Copy of the LTA application is attached at Annexure 4). NTPC may

confirm the date for LTA.

No transmission system requirement has been envisaged for long term access as the

LTA has been sought for 10 MW in the direction from Northern Region to Eastern

Region which would be opposite to the normal power flow direction and would be

transferred via existing inter-state transmission system through displacement.

iv) Proposal:

Connectivity & Long term Access for 10 MWp solar power from Unchahar Solar PV

Plant of M/s NTPC Ltd. is proposed subject to:

Page 5: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 5 of 15

Connectivity

� All applicable conditions as listed in Annexure-A.

� As per CERC order dated 2/5/2013, following has been mentioned:

‘Provided further that the application by the applicant defined under Regulation

2(1) (b)(i) (e) shall be considered by CTU only if the existing generating station

agrees to act as the ‘’Principal Generator” on behalf of the renewable energy

generating station(s) seeking connectivity through the electrical system of the

generating station and formalizes a written agreement/arrangement among them

to undertake all operational and commercial responsibilities for the renewable

energy generating station(s) in following the provisions of the Indian Electricity

Grid Code and all other regulations of the commission, such as grid security,

scheduling and dispatch, collection and payment/adjustment of Transmission

charges, UI charges, congestion and other charges etc. and submit a copy of the

agreement to the CTU, alongwith the application for connectivity, with copy to the

respective RLDC in whose control area it is located’’

� In line with the above para, NTPC vide letter dated 10/07/2013 was requested for

submission of suitable declaration that the Principal Generator shall undertake

the provisions of the above Regulations. In response we have received a letter

dated 31/07/2013 from NTPC Ltd. stating that

“since ‘Unchahar Solar Plant’ is under the ownership of NTPC, Shift Charge

Engineer of ‘Feroze Gandhi Unchahar Thermal Power Plant’ will be responsible

for all day to day coordination with RLDC in regard to declaration of schedules,

submission of metered data etc in regard to ‘Unchahar Solar Plant’. Further

Feroze Gandhi Unchahar Thermal Power Plant’ agrees to act as principal

Generator on behalf of ‘Unchahar Solar Plant’ and agrees to undertake all

operational & commercial responsibilities for ‘Unchahar Solar Plant’ in following

the provisions of IEGC & all other regulations of CERC. However, ‘Unchahar

Solar Plant’ will be considered as a separate ‘User’ for which energy accounts to

be issued separately.”

A copy of the letter dated 31/07/2013 from NTPC is enclosed at Annexure-

Page 6: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 6 of 15

Members may deliberate and connectivity may be granted to Unchahar Plant (10

MWp) of M/s NTPC Limited in Uttar Pradesh.

Long Term Access

� LTA is proposed to be granted subject to

o Grant of connectivity

o NTPC to submit the copy of the PPA

o Signing of requisite Long Term Access Agreement and TSA for payment

of the transmission system charges, as applicable, from 01/09/2013 (to be

confirmed by NTPC) for 25 years by DVC in case of firm PPA with DVC is

available or by NTPC Ltd in case PPA is not available.

o All applicable conditions as listed in Annexure-A.

� The connectivity has been applied from Sept 2013, whereas LTA is from 01/08/2013.

NTPC Ltd may clarify the date.

3.0 Connectivity and LTA to Singrauli Small Hydro (2X4MW) Plant of M/s NTPC

Limited in Uttar Pradesh (Long term Access discussed in last meeting).

i) Connectivity

In line with the CERC regulations, M/s NTPC Ltd. has applied for Connectivity for 8

MWp of Singrauli Small Hydro Plant (SHP) located at Singrauli, in Uttar Pradesh. As per

the connectivity application, commissioning schedule of the plant is Feb’ 2014.

Accordingly, connectivity has been applied from Feb.’14 (Copy of the Connectivity

application attached at Annexure 5).

As per the application, the 8 MW small hydro units are stepped up to 33kV and

integrated through the electrical system of Singrauli generating station. Accordingly, no

transmission system is being proposed for connectivity to 8MWp power of the Singrauli

SHP.

ii) Long Term Access

NTPC Limited had also applied for LTA for 8 MW from their Singrauli small hydro

project, in Uttar Pradesh. LTA had not been granted due to the need to regularize its

connectivity. As per the LTA application, LTA is required from 01.07.2013 for 25

Years. NTPC may confirm the schedule. Also, the beneficiaries along with quantum

Page 7: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 7 of 15

mentioned were: UPPCL (4.1MW), Delhi Discoms (2.1MW), Rajasthan Discoms

(1.8MW). NTPC may indicate the Discom wise allocation for signing of the Long term

Access Agreement and the Transmission Service Agreement with the beneficiaries

(Copy of the LTA application is enclosed at Annexure-6).

iv) Proposal:

Connectivity & Long term Access for 8 MWp small Hydro Plant from Singrauli SHP of

M/s NTPC Ltd. is proposed subject to:

Connectivity

� All applicable conditions as listed in Annexure-A.

� As per CERC order dated 2/5/2013, following has been mentioned:

‘Provided further that the application by the applicant defined under Regulation

2(1) (b)(i) (e) shall be considered by CTU only if the existing generating station

agrees to act as the ‘’Principal Generator” on behalf of the renewable energy

generating station(s) seeking connectivity through the electrical system of the

generating station and formalizes a written agreement/arrangement among them

to undertake all operational and commercial responsibilities for the renewable

energy generating station(s) in following the provisions of the Indian Electricity

Grid Code and all other regulations of the commission, such as grid security,

scheduling and dispatch, collection and payment/adjustment of Transmission

charges, UI charges, congestion and other charges etc. and submit a copy of the

agreement to the CTU, alongwith the application for connectivity, with copy to the

respective RLDC in whose control area it is located’’

� In line with the above para, NTPC vide letter dated 10/07/2013 was requested for

submission of suitable declaration that the Principal Generator shall undertake

the provisions of the above Regulations. In response we have received a letter

dated 31/08/2013 (received on 02/08/2013, some typographical error in date)

from NTPC Ltd. stating that

“since ‘Singrauli Small Hydro Plant’ is also under the ownership of NTPC, Shift

Charge Engineer of Singrauli Super Thermal Power station will be responsible for

all day to day coordination with RLDC in regard to declaration of schedules,

Page 8: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 8 of 15

submission of metered data etc in regard to ‘Singrauli Small Hydro Plant’. Further

Singrauli Super Thermal Power Station agrees to act as principal Generator on

behalf of ‘Singrauli Small Hydro Plant’ and agrees to undertake all operational &

commercial responsibilities for ‘Singrauli Small Hydro Plant’ in following the

provisions of IEGC & all other regulations of CERC. However, ‘Singrauli Small

Hydro Plant’ will be considered as a separate ‘User’ for which energy accounts to

be issued separately.”

A copy of the letter dated 31/08/2013 from NTPC is enclosed at Annexure-7.

Members may deliberate and connectivity may be granted to Singrauli Small

Hydro Plant (8 MW) of M/s NTPC Limited in Uttar Pradesh.

Long Term Access

� LTA is proposed to be granted subject to

o Grant of connectivity

o Signing of requisite Long Term Access Agreement and TSA for payment

of the transmission system charges, as applicable, from July’ 2013 (to be

confirmed by NTPC) for 25 years by beneficiaries in case of PPA with

beneficiaries or allocation from Govt of India is available or by NTPC Ltd in

case PPA or allocation from Govt of India is not available.

o NTPC to submit the copy of the PPA

o All applicable conditions as listed in Annexure-A.

Members may discuss and concur.

4.0 Timely development of Evacuation system for Tapovan Vishnugadh / Lata

Tapovan Hydro-electric project of NTPC

The issue of implementation of integrated transmission system for evacuation of

power from various hydro projects (including Central Sector, State Sector & IPPs) in

Uttarakhand was discussed in various Standing Committee meetings as well as in

TCC & NRPC meetings. The issue was discussed in the 2nd TCC and 3rd NRPC

meeting held on 10/11/2006 wherein Chairman / Members observed that PTCUL

could take up the “intra-state transmission system” up to the pooling point on their

Page 9: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 9 of 15

own, for which there was no requirement of any commitment of payment of

transmission charges by other constituents and arrangement of recovery of

transmission charges will be only between PTCUL and the generators. While taking

up the implementation of transmission system, the agreement for payment of

transmission charges could not be signed with some of the Inter-state generators.

Subsequently, PTCUL took up the matter in NRPC meetings for declaring the system

for granting the system as deemed ISTS, however no consensus could be reached.

PTCUL took up the matter with CERC for declaring the integrated scheme as deemed

ISTS scheme. CERC has issued order dated 31/01/2013 regarding declaration of

UITP as deemed ISTS. As per the order, CERC had accorded the status of deemed

ISTS and directed PTCUL to segregate the transmission lines carrying inter-state

power and approach the CTU which is the nodal agency for vetting of the

comprehensive scheme in accordance with the connectivity regulations. Further, CTU

has been directed by CERC to study the transmission system and in case any

modifications are suggested by CTU, the same shall be incorporated and

implemented by the PTCUL. CTU has also been directed to monitor the ISTS portion

of the UITP scheme.

CERC has further stated that :

“only the long term access granted to NTPC by CTU is on record and the status of

long term access to other Central Sector generators and IPPs in the region is not

known. It is therefore possible that these generators might have planned to sell their

entire power or part of it on merchant basis through medium term open access and

short term open access. Since transmission lines are built only for long term access,

the transmission charges for the transmission lines built to cater to the requirement of

sale of power through medium term and short term access cannot be saddled on the

beneficiaries of the inter-State transmission system and must be borne by the

concerned generating companies. We direct the petitioner to ensure that these

generators enter into appropriate agreements with the petitioner and CTU for bearing

Page 10: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 10 of 15

the transmission charges till they identify and enter into PPAs with the beneficiaries

outside the State.

It is essential that the transmission lines which have been accorded deemed ISTS

status are segregated from the dedicated transmission lines and intra-State

transmission lines to obviate any confusion about the liability for payment of

transmission charges. The dedicated transmission lines from intra-state generators,

i.e. those generators selling power only within the State of Uttarakhand, from the

generation bus bar up to the main transmission line/pooling point of Uttarakhand

would be considered as dedicated transmission lines/intra-state transmission system

and the transmission system beyond the main transmission line/pooling point of

Uttarakhand would be considered as a combination of intra-State transmission system

and inter-State transmission system and paid for accordingly. That is, the Yearly

transmission charges of the various elements of such system would be divided into

intra-State portion and inter-State portion, based on installed capacity of the

generating stations using the common system. Charges for the ISTS would be shared

by beneficiaries of ISTS. For the intra-state transmission system, the charges would

be shared as directed by UERC.”

In regard to above, a preliminary meeting with PTCUL was held on 28/05/2013,

wherein PTCUL explained the status of the various transmission elements of the UITP

scheme. During the meeting it was explained by the CTU that the transmission system

needs to be prioritized & phased in such a manner that power does not get bottled up

from any generator. It was also informed by the PTCUL that at present their 1st priority

is for Alaknanda Basin as the generation projects in other basins may take some time.

The detail of the generation projects in Alaknanda basin along with Associated

Transmission Lines and LTA application status is enclosed at Annexure-8 and the

detail of the Common Transmission scheme in Alaknanda basin is enclosed at

Annexure-9.

Page 11: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 11 of 15

From the generation list it may be observed that Tapovan Vishnugadh (520 MW)

project of NTPC, a major project in the basin, may come up first. NTPC need to inform

the firm schedule of the generation project. The transmission scheme required for

evacuation of power from this project needs to be taken up on urgent basis so as

power from the generation project does not get bottled up. The issue of evacuation of

power from Tapovan Vishnugadh was discussed during the 28th NRPC meeting of

NRPC held on 26/04/2013, it was deliberated that the transmission scheme had

already been granted the deemed ISTS status and as per the BPTA already signed

beneficiaries had agreed to pay transmission charge for all central sector projects,

existing and future as per applicable CERC regulation. During the meeting

beneficiaries agreed for the payment of transmission charges corresponding to MW

allocation of Tapovan Vishnugad by Govt of India in line with CERC Regulations.

However, as per CERC order it has been directed to PTCUL to ensure that other

generators enter into appropriate agreements with PTCUL and CTU for bearing the

transmission charges till they identify and enter into PPAs with the beneficiaries

outside the state. It is therefore necessary PTCUL has to ensure that all the identified

generators apply for LTA and sign the required agreement for payment of

transmission charges. Accordingly PTCUL need to take necessary action in this

regard.

Keeping above in view the transmission system proposed by PTCUL needs to be

discussed and concurred by the Standing Committee on Power System Planning.

5.0 Connectivity and LTA for Sainj HEP

The issue of evacuation of power from Sainj HEP was discussed in 30th and 31st

Standing Committee Meeting of NR, wherein it was proposed that injection of Sainj

HEP of HPPCL could be through LILO of Parbati-II – Parbati-III 400 kV line. However

in case of outage of one circuit, 10% overload generation, 0.9 pu voltage and 0.9

power factor there may be certain constraints and generation would have to be

backed down. During the meeting, NHPC informed that enhancement of current

carrying capacity of 400 kV XLPE cable is not possible and hence evacuation of

Page 12: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 12 of 15

power of Sainj through XLPE cable provide at Parbati-III HEP is not feasible. It was

further deliberated that cable limitation may come in case of outage of one circuit, 10%

over generation, 0.9 pu voltage and 0.9 power factor and possibility of occurrence of

above contingency was very remote and HPPCL had agreed to back down the

generation at Sainj, if required with a view to prevent the overloading of the XLPE

cable of Parbati-III switchyard. Subsequently, NHPC informed that backing down of

generation at Sainj HEP does not safeguard the overheating of XLPE cable provided

at Parbati-III switchyard and as such the arrangement is not acceptable to NHPC.

After deliberations it was decided to form a committee consisting of representatives

from CTU, CEA, HPPTCL, HPPCL & NHPC to solve the issue and if required joint site

visit may be undertaken.

In line with above a joint visit was undertaken on 6th and 7th May 2013. During the

visit it was observed that it would be feasible to LILO 400 kV direct ckt from Parbatri-II

to Parbati Pooling station (Banala) for evacuation of power from Sainj HEP. HPPTCL

has agreed to construct additional towers for LILO arrangement. The above proposal

was discussed in detail during a meeting held in CEA on 14/05/2013. During the

meeting NHPC raised its concern that with the implementation of the LILO

arrangement, evacuation of power from Parbati-II (800 MW) would be dependent on

Parbati-III & Sainj and there would not be any direct link to Parbati Pooling station.

CEA & CTU stressed that keeping in view that long term planning, the most optimum

solution is through the proposed LILO of Parbati-II to Parbati Pooling station 400 kV

line at Sainj.

After detailed deliberations following decisions were taken:

• For evacuation of Sainj HEP power, LILO of 2nd 400 kV direct circuit from Parbati-II

HEP to Parbati Pooling station (Banala) shall be implemented by HPPTCL.

• HPPCL shall install suitable scheme at Sainj HEP generation station to ensure that

current flowing through the cable at Parbati-III does not exceed 2400 Amps. This

SPS scheme will back down the Sainj generation accordingly.

Page 13: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 13 of 15

• In case of permanent outage of Sainj switchyard 400 kV bus, bypass of LILO

arrangement will be carried out by HPPTCL for evacuation of power from Parbati-II

generation.

• The above proposed arrangement should be implemented expeditiously by

HPPTCL as the generation of Sainj is expected to be commissioned by December

2014.

6.0 Long Term Access for 240 MW from Essar Power (1200 MW) in Jharkhand to

Noida Power Company Limited (NPCL) and 300 MW from GMR Kamalanga

(1050MW) in Odisha to Haryana

• Essar Power (Jharkhand) Ltd. has informed that Noida Power Company Ltd.

(NPCL) has signed Power Purchase Agreement with them for supplying 240 MW

from their generation project in Latehar district of Jharkhand.

NPCL may kindly confirm for signing the requisite commercial agreements with

POWERGRID for payment of transmission charges for the above mentioned quantum

of power.

• Similarly, GMR Kamalanga Energy Ltd. has informed that Haryana has signed

Power Purchase Agreement with them for supplying 300 MW from their generation

project in Angul district of Odisha.

Haryana may kindly confirm for signing the requisite commercial agreements with

POWERGRID for payment of transmission charges for the above mentioned quantum

of power.

Members may note.

Page 14: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 14 of 15

Annexure- A

Connectivity:

� The applicant shall abide by all provisions of the Electricity Act, 2003, CERC

(Grant of Connectivity, Long-term Access and Medium-term Open Access in

inter-State transmission and related matters) Regulations, 2009, Central

Electricity Authority (Technical Standards for connectivity to the Grid) and Indian

Electricity Grid Code as amended from time to time.

� The connectivity shall be as per the Detailed Procedures of Central Transmission

Utility (POWERGRID) for Grant of Connectivity, Long-term Access and Medium-

term Open Access to Inter-State Transmission and all provisions regarding

connectivity would have to be met.

� The applicant shall furnish additional details for signing Connection Agreement

for the same and would sign the Connection Agreement as per the provisions of

Connectivity.

� As agreed in 30th Standing committee meeting 50 MVAR bus reactor would be

provided by all the generators having capacity of more than 100 MW and 80

MVAR bus reactor would be provided by all the generators having capacity of

more than 300 MW.

Long Term Access:

� Long Term Access is being processed subject to the condition that the

applicant/beneficiaries, bears all applicable transmission charges as per CERC

norms for transfer of power.

� In all cases wherein PPA agreement has not been signed, all beneficiaries

indicated shall be assumed as target beneficiaries.

� Signing the requisite LTAA / TSA for Transmission system charges.

� The applicant shall abide by all provisions of the Electricity Act, 2003, CERC

(Grant of Connectivity, Long-term Access and Medium-term Open Access in

inter-State transmission and related matters) Regulations, 2009, Approved

Detailed procedure of CTU, CEA (Technical Standards for connectivity to the

Grid) and Indian Electricity Grid Code as amended from time to time.

� The Long term Access shall be as per the Detailed Procedures of Central

Page 15: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Connectivity & LTA agenda for meeting to be held with 32nd

NR SCM

Page 15 of 15

Transmission Utility (POWERGRID) for Grant of Connectivity, Long-term Access

and Medium-term Open Access to Inter-State Transmission and all provisions

regarding LTA would have to be met

� As agreed in 30th Standing committee meeting 50 MVAR bus reactor would be

provided by all the generators having capacity of more than 100 MW and 80

MVAR bus reactor would be provided by all the generators having capacity of

more than 300 MW.

Page 16: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Ref. 0 : CC:PEE: TPC/FARIDABAO/L; N 1

Chief Operating Offic .(CTUPower Grid Corporation of India Limited,"Saudamini", Plot No.2, Sector-29,Near IFFCO Chowk ,Gurgaon-122001Fax: 0124-2571809

NTPC Li ited(AGoV!. of India Enterprise)(Formerly National Thermal Power Corporation lid.)

~ CWlf<'fll/ Corporate Centre

Date: 05-06-2013

Sub: Application for Grant of Connectivity to ISTS for Faridabad Solar PV Plant

Dear Sir,

With reference to the above subject, please find enclosed herewith our application for Grantof Connectivity for following NTPC Project :

I) Faridabad Solar PV Plant (5 Mwp)

In line with the CERC connectivity regulation published for renewable plant of capacity lessthan 50 MW, and detailed procedure of Central Transmission Utility Under Regulation 27(1)of the CERC (Grant of Connectivity, Long term Access and Medium - term Open Access inInter State Transmission System and related matters) Regulations, 2009,application for thegrant of Connectivity to ISTS consisting of following documents(as per regulation) for aboveproject dully filled in is submitted ;

1. Format - CON-1 (Affidavit)2. Format - CON-2 (Application)3. Details of EFT transaction I.e payment Unique Ref no. 201344032 ,paid on

31/05/2013 Rs. 2,00,000/-

The basic scheme indicating Faridabad Solar PV plant connecting to the existing connectionpoint with ISTS through electrical system of generatin g station is also enclosed(Flag A).

As you are kindly aware that above Solar PV project have short commissioningschedule(Dec 2013),the connect ivity of above project may please be granted at the earliest.The LTA app licat ion for Faridabad Solar PV plant is being submitted shortly.

Thanking You,

Yours faithfully,

. ,~ ~ / \ b(Dinkar Devate) )

GM (pE-Electrica l)

3rl1I i!liP-l<ti1 <tl1i!l f(i1i!l ~, tffiC «. n- su. ~-24 , lfficiffCfi!'l"rf. 13,~ (3Jr.) flr.r-201301

ENGINEERING OFFICE COMPLEX, Plot No. A-8A, Sector-24. Post Box No. 13, NOIDA (U.P.) Pin-201301~~.. : 0120-2410333 (10~) 0 120-2410116 (5~) tt<Rl : 0 120- 24 10 136 , 0 120- 2410137Telephone : 0120-2410333 (10 Lines) 0120·2410116 (5Lines) Fax : 0120-2410136, 0120-2410137q'~tf q;mf~ : 'l!'l. tt, tft,~. 11cf'l,~ <tl1 1tl~Cft1, 7, ~·&1~~I.,(i1 vnm.Mtdtm, rrt~ -110003

Regd. Office : NTPC Bhawan, SCOPE Complex , 7. Institut ional Area . Lodhi Road, New Delhi-110003

01178
Typewritten Text
ANNEXURE-1
Page 17: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

E

79AB 584441FrID VIT

In the matter of tilling application to Power Grid orporation f India Limited. torgrant of onnectivity under ERC Regulations. 2009 for Fa rida bud Sola r 5 MWp

I. .. i hra /0 Late hri hyarn under i hra, working a dditi nal eneralManager in Project .nginet:ring D epartment Electrical) of I 'PC Ltd., ha ing itregi tered office at TP Bhav an. ' cope ornplex, 7 In titutional area. Lodi Road.New Delhi-II 0 003 do so lemnly affirm and say as follows:

I. I am the dditional General anager of TP Ltd.. the repre: entative in theab e matter and am du ly authorized to tile the above appli ration and to make thiaffidavit.

I ubrnit that TP ' Ltd.. i a Go ernment ompany registered under CompaniesAct. 19 -6 a public limited mpany. nder the rticle of .iati n of theC mpany and in accordance with the provi ion of : Iectricit) Act. _003/ relevant

egulation s) of ERCC. the company run file the enclo .ed appl ication.

I ibmit that all the detail give n in the enclosed application for grant ofCon iect ivity al ng with ne cssary documents are true and correct and n thingmat rial ha been can ealed there [

( 1"0 be duly atte ted b) otar: )

t: 3JU N2013

Page 18: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Format.cON-2

S.:-io. Descsrlntlon DetailsI. Name the Annlicant :-iTPC Limited, Address for correspondence AGM(PE-EI«tJ,:lITPC LTD.. .

Engineering Office Complex.A-SA. Sector-24.NOIDA-20130Il U.I' )

3. Contact DetailsPrime: Contact Person Shri S.S.l\IishraDesiunation AG l\IfI'E-E I«t\

Phone No. (Lan dline) 0120-H I0729Phone No. (Mobile} 09650991145Fax 0120-H 10102EMail ssmis hra~n tllceoc.co. i n

Alternate Contact Person :\ts. S.~J ohant'"

Desienation DGMIPE·EI«tlPhone No. (Landli ne) 0120-3318421Phone No. (Mobile) 965099 1556Fax 0120-2410102EMail sagarika(QIntpceoc.co.in

4. Nature of AnulicationGenerator (other than captive] GeneratorCaptive GeneratorBulkConsumer

5. Details of Connectivity5 a. Capacity lMW) for which 5 MWp

connectivity is required5 b Date from which connectivity is 0<c '2013

required6. Location of the Generating (i.) Place : Faridabad

Station/Bulk consumerNearest Villaee/Town TownDistrictState Haryana

Latitude North :28 DeQ 17 MinLongitude East :77 Dec 19 Min13 Sec

7. Installed Capacity of theGenerating StationExisting - 430 MW(Combin<d cvclej

8. Commissioning Schedule- of the Ocr '~O 13

Generating Station

Page 19: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

9. Detai ls of the Generation StationName of the Power Plant Faridabad Solar PV plant

Promoter NTPC Ltd.Fuel Renewable

Source of Fuel SolarGeneration Voltage 300 V AC(eonverted through

inverter from DC)Step-up voltage Solar power is pooled at 33 kV

level and further connected throughti,e ex isting electrical sys tem ofgenerating station (220 kVswitchyard-Single Line Diagramanaehedl

Is it an identified project bv CEA NoBase Load/Peak load Intinn Power

10. Details of Neares t 400i220/132kV 220 kV Faridabad Switcltyard

Substations0 \ \ 11er NTPC

II. Details ofe-transaction(Application Fee)

Amount (in Rs.) 2.00.000/-(two lakh onlyfffbroughRTGS)

Transaction Ref. No ::!01 3044032(Paymcnt unique refno.)

Date 31/05/20 13Bank NameBranch Name

Page 20: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

FARIDABAD 220KV SWITCHYARDBAY O. 2

--~--- - TR. BUS-I-- -F-- BUS- II

-- ~-~~g~

J..EllWtl

@ CHECK lotmR

@ IolAIN mR

@ STANOOY ET'ER

PV CELLS PV CELLSlYPICAL

PV CELLS PV CELLS

lYPICAL

33/220 TRANSF.7.5MVA

::

TARIfF ERGY WmR

~ t ~ 33 KV POOLING SWGR

~ 6I!

i ~ CORE-l

j CORE- I Cl..: 5P20f! Cl:5P20.. JI

~ I ~2CORE-2ceuz

l• 2

~

i ~ g gI t ~GEN V/33 KV ~GEN V/33 KV

I I; I 9 9l it £

t ~

["" it .nm)NTPC

FARIDABAD-SOLAR PROJECT5

SINGLE LINE DIAGRAM

-.L IG. 1ltY. NO.

5704-999-POE-J-OOl a

Page 21: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

}

INFORMATION REQUIR ED TO BE SUBM ITrED WITH T HEAPPLICATION FOR CO ECTIYITY BY GE ERATI G STArIO

PROJ ECT NAME: Faridab ad Solar PY PlantlS MWD):>.No. Descrt ntion Informa tion Dera il1.0 Site identification and land Existing project, ava ila ble a nd belongs to

acquisition NTsc.

2.0 Environme ntal clearance for -NA-the power station

3.0 Forest C learance (if -NA-applicable) for the land forthe Dower station

4.0 Fuel Arrangements -NA-

5.0 Water linkage -NA-

Page 22: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

rr:!!!i5Trfl}~ff~

tl!:e~risl-;mited

~~/Corporale Centre

R '1': 0 I :CD: 706

,lncl: :.

10C< U (('"I llPower Grid orporution or India Ltd... ' audamini" Plot . o. _.\: ,tor-29, iurgaon-I ~2021I Ian anaFax l o . : 0 1 24-:~ 5 71 X09

Sub: Long Icrrn Access (L'I;\ I app lication for Faridabad Solar PV(:, i\1\\')

Pica. c lin I enclose d the LTA application ItH' Fa ridah ad Solar (- l\ IW) inc ludi nu Format I.TI\- Iand LT I\ -_ along with the proof o f applcatiun Il:cs ·o l" Rs. 2,OO.OO() ( Rupees '1'\\'0 lacs onl y )already pa id by RT( is vide Reference No 0000 12()25XXC 1'3 2]2 1'1- :) on 2 () , () 6 .~ O 13 as perCERC Rcuulations on "G ram of Connectivity. l.ong l'cnu Access and Medium-term Open\ c C' • in inte r-S ta te '1ransmission and re lat e I matter: Regu lations" 20n9 and s ubse q uent

pro .ed urcs dale 1 .... 1.1 2.2009 . Application for Gram of Connc , t i \ ' i t~ !l;: already he zn ma de \ ideurr I zucr date I 0 5,()6 ._0 L'" ( 'op~ of le tter '11 los 'd) . TPC IS mak lJlII this a l pii 'a iOI1 on h 'hal I'

o r the benefic iary i.c iRID '0 (GRI/) (,O kiter autho riving '"11'(' to app ly in its beha lf 1:­

enclosed ). ( iRID ) shall be signing any necessary uurccmcnt s includinu HP I'. etc. withPo wcrgrid / other transmission licensee and shall he respo nsib le till' payme nt or applicablecharges . It is requ est ed thai the enc losed appl icat ion may he processed at your end. We wou ldfurther like 10 indicate that since j rTP , is maki ng this application on hchalf nf (i RII)CO. 1 11'\may be uram 'd in the name of GRIDC'O .

Ihanking ~ ou'{nu l's 1:lith rulh

jW~(A . K. Bishrii )

:\(;1 1 (C u m mcr c inl)I. ' /' \ - 1- . \l"tid;:l\ it1.1'1\-2

..1 . Pruoror payment vide Reference No DOOO I _G25gX( ' r:' 23_1 ·1:5 on 20.06.20 I :;4. Letter dated 05.06.211 U lor Grunt of C OI \IlCLli \' i [ )

5. G RInco kiter dated 16.05.201_ uuthorisinu N'I PC In applyn il i ts h 'halL

l1;r iT lft ~ WA'm lflIPiACffi, 7, ~4'l~'£iH\1 'Qjtlrr rmftm,~ ~-1 1 0003, hr!Tel.: 24360100, c !Fax : 011.24361018

NTPC Shawan, SCOPE Comple, 7, Institutional Area, Lodhl Road. New Delhl-l 10003,~ebslle : www.nlpc.co.ln

01178
Typewritten Text
ANNEXURE-2
Page 23: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

JUDICIAL

e-Stamp

IN-DL19335490044379L

29-M ay-2013 11:45 AM

IMPACC (IV)! d17197031 DELHII DL-DLH

SUBIN·DLDL71970337923579949909L

NTPC LIMITED

Article 4 Affidavit

Not Applicable

o(Zero)

NTPC LIMITED

Not Applicable

NTPC LIMITED

10

(Ten only)

I DIA 0

Government of National Capital Territory of Delh i

I A. K. Hi. hoi Sin Shri S0I1111ath Bishoi workin u as . dditio uul G cncl'al Managcr(C nnuu er ciul) in I IT I'C Ltd. having its r 'l!.i uerc . ice ut I 'T Pe Hhawan. ,' ( '( )PF Complex , 7.Inst itut ional rea. L~ di Roa I. I I '\\ Delhi-I \ () (llt.:l3~vc~od~~·mnl~ aIfirm an d :a~ as fo llows:

Slatuatory Alan:1 The aUlhenl,cil y of lIle Stamp C ruficate con be venfied at Aulhoris d Col ection Cenl IS (ACCs), SHCll Offices and Sub-r g strar Offices (SROs).2. The Cont act Deleils 01ACCs , SHCll Offices and SROs are ll vallablo on the Web silo ·www.shcllostamp .com·

FO R tAT-I.T,-1

:\ FFID:\ V ITIII the matter or filinu application to Power Grid Corporation or India Limited. lor grant of LOIl l-!-­

ter m ACl:l:SS under eER Rcuulation s 2009.

First Party

Second Party

Stamp Duty Paid By

Stamp Duty Amount(Rs.)

Certificate No,

Certificate Issued Date

Account Rs'erence

Unique Doc. Reference

Purchased by

Description of Document

Property Description

Consideration Price (Rs.)

•••• •• •• •• •• • •••• • • •••••• • •• ••••••• • • •• •••••• •Please rite or type below this line•• ••• •• •• •••••• •••• •• ••••••• • •••••• ••• • •• .

Page 24: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

I. I am the Additiu nul Jt.'IH~nll 'l a nagt.' I' of N'! P . Ltd. the repro .cntative in the abo ve matterand am duly authorized to file the above applicat ion and to make thi. affidavit,

I submit that 1Is I 'T P Ltd. is it reuistc rc I company Public Ltd. Reui: rcrcd till Ier CompaniesAct. ndcr the Article of A.: elation of the Company and in a cor lane' wi th th ' pI' vi i n. fElc nri i t~ A t. _003/1' levant Rcgulationt r ER . th mpany 'an tile the en -I) " -dappli ration.

I submit that all the details given in the cnclo. cd app lication for grant of Long 'Icrm Accessalougw ith nccc: sary d OCUl1lclI !S an: true and correct and nothing materia l has been concealedthere f.

(A. K. Hi. hoi)

Page 25: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

FORl\IIAT -LT A-2

Application for Grant of Lon g - rer m Access (LTA)

I _la m e the A pplica n t

2 Ad d ress for' o r re spondence

3 on tact DetailsPrime ~OI1laC l Per. on

DesiunationPh nc lo.Il. andline

Phone No.(Mobi lelFax

I:-Mail

Alternate 'outa t Pcrs nDe iunation

Phone No.t l. andlinc )Phone o.t Mobile)

FaxE- -lail

-I lut u r e of the / pplicantm ial icncrutor other than capt ive)

aptive encratorBulk On 'lII11Cr

Electricity 'I'm IeI'Distribution Licensee

~ D ita ils for Lon g Term A ccess (LTA)

T P Limited (on he ha lf of G R ID 0 )

I TP " Bha vun , ~ o re-7 , . cope om plex7, In uitution a l Area, Lo d hi Road ,i lew Delh i-II 0003

A. K. Bi:ho iAdditio na l ener ul Ma nage r01 1-2-1.6 9 0l)650l)92568011-24360328a kh ishoi(U) ntpceoc.co.in

' . K. . 'ha n n aAddition a l Gene r a l lanager()11-2 • 6552.9650l)l)0535011-2-1 60328slishar·nwcmntllC.co.in

Sa uantum ( 1\\') fo r wh ich I.T irequired

5h Da te from which LTA required(/lO I earlier than 3 yearsfrom the lastday (~{t17(! month in which applicat ion

17m been received)

5c Date upto w hich LTA requi red(1_ years to _ - yearsfront the da le!

PO/11 which L7: I is requ ired)

5 1\\

01.12.20 13

01.12.2038

Page 26: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Sd Injection of Power (more thanone only in case of sing le Drawal )

Entity- IState/Region

Quanturu- Ionnect ivity with the Grid

Se Drnwal of Power (m ore thanone only in case of s ing le Injection )

Entity- I' tatc/RegionQuantum- I

Connectivitv with the Grid

I '1' PC, Fa rida had Sola rHa ryana / RSMW1 '1' 1'(' Fa ridahad Switchy a rd( Power shall be pooled at Faridabad ' o lar plant andgetting connected <II existing Faridabad stationSwi tchyard )

G RI DCOOr -issa /E RS '1\VVa r ious " l' U Substa t ions in Orissa

6 Detail of DD/Cheque e-trunsaction(Application Fee )

Amount (in Rs.)DD/ hcque transaction o.

DateBank 1ame

Branch arne

Two lacs onlyoonoJ 2625R8CT"232 145520 . 06 .~O \ .,Sta te Ba nk of HydcruhadScope Complex. I cw Delhi

7 Details of Bank Guarant eeAmount (in Rs)

Bank I arnePeriod of Validity

/

Pagc 2 0f 2

Page 27: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

L 3~:b

T he ED (Commercial),TPC Ltd., SCOPE Complex,

7, Inst itutional Area, ,Lodi Road, New Delhi- 11 1101,F ax: 0 i r- 2436 0358

~

..

,

GRIDCO

GR Dec> -rTli1:ed(A Govt. of O rissa Undertaking)(Form rfy Grid Corporatfon of Orissa LImited)Re d_~ce:Janpa~.Bhubaneswa~7S1022

Phone: 0674-25 41127 Fax: 0674-2543452C2) Date fb i q,d....

-.I

Sir,

Sub:' Arrangement.of'L'I'A on behalfof GRIDCO

With reference to the above cited subject, GRIDCO has executed Power

Purchase Agreements with PC to avail 5 fW power each from Dadri Solar P station

of Uttar Pradesh and Farida bad Solar PV Station of Haryana bundled with equal capacity

of therma~ po er from the nallocated quota of he u. coming coal based s atio .s of

"TPC to be located by toP, GoL For ansrn ission of those power from the above

Solar PV Stations to Odisha system through CTU network, Long Term. ccess from CTU

is required, ,-You are requested to make arran~ement on b~half of GRlDCO [9 apply

. " .LTA for availing Solar power from Dadri & Faridabad projects of NTPC.

I

Thanking' you ,

~ ,-./'~ c,.: ,'IP'

Sr. GM(PP)

Cc: Member Secre tary , ERPC, 14, Golf Club Road, Kolkata- 700033 for favour of

information

G 1, ERLDC, 14, Golf Club Road, Kolka ta- 700033 for favour of information

tr4~-{d2, ~~

d---- r-:::::=.<->:1- ( So-, , .

Page 28: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

(~TPC )I \ / U /", rUfIIll ( 0/111'1111)

ttTP

GPS P I O' 3 FII · 0 Date 01 0820 L

ToCOO ( TU)PO ER GRID CORPORAT IO OF INDIA LTD .'SAUDA INI' PLO T O. 2SECTOR- 29GURGAON (HARYANA)PIN 122 021FAX 0 .01 24·2571809

Su : Coordination for 'Faridabad Solar PV Plan t' by 'Faridabad Gas Po er Station '

De r II

T I i1a re erence o our Ie er dated 007 20 3 In regards to app ica Ion or Conn c i i Y or Fandabad

Solar i:)lant In trns regar ould h. e to Indicate at since Fanda ad Solar Plan IS nderhe

ov ersrup of TPC Shif Charge Engineer a Fandabad Gas Power Stat.on Will be responsible for all day

to oay coordmauon with RLDC Ir' regard to decl aration of schedules submisston of me ered data etc i

C :0 Fanda a Solar PI n F er Frida ad a Po er S a Ion ree a ac s nnci pa

er erator on hal" a 'Fandaoad Solar Plan a d agrees a nderta e all opera lanai commercial

res onsrmhnes tor Fancabad Solar Plant In ollowmq t e prov rsrons 0 IEGC & all other Regula tions of

CERe However Fandabad Solar Plant will be co s.dered as a separate 'User' for wh ich energy accounts

flee 0 b ISS d separately

Tag '(auYours Faithfully...

\ \ ' . /, •. e: ....,r,

Co NRLDC

-- - - -• "iF. ~.R =t-¢ . - 121 00 1.-:1f11

I. I t.lh.ll (,.1 Power t: In. Vill: ~' luihe i.!' II . . 'Ill a. l andaha I I~I fill t l l.rry ana}• n'~ Phonc : II I~ q•.2 (J1.'(1) J a: . () I ~\I-] .tllll ' 27. ;-""1 I .mail 11 111111 .hr: (J~ « ntpc .co.in

'iiliJi '~ ~~.17m~. i ~~.WT niT:.:Tf. ;.iJ~ n ~~. 1'!;';:;Jl- 110 003' ;:g(1. ()lI i ,1. \, r Pl B ha\\ ,II1. I:"-P"-' l "Illpi ." In..aiuui mal \1 ;:, . l.odhi Roa l. l'\\ (),,-·Ihi IIlll103

Page 29: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Ref. 0: CC .pcE:i ftJC/Ht= IGO /1

C~-. ~ : ~ C ;: ~ r:: ti ~. ~ C ~f1ce \\- I ~;

Power Grid Corporation of India Limited,"Saudamini" , Plot No. 2, Sector-29 ,Near IFFCO Chowk,Gurgaon-122001Fax: 0124-2571809

(A GoVl. ollnd'a Enterpnse)(Formet!y tional Thermal Power Corpota lid I

~/Corporate CentreDate: 23-04-2013

Sub: Application for Grant of Connectivity to ISTS for Renewable Projects

Dear Sir,

With reference to the above subject, please find enclosed herewith our application for Grantof Connectivity for following NTPC Projects :

I) Singrauli small Hydro Plant (2x 4 MW)II) Unchaha r Solar PV Plant (10 Mwp)

In line with the CERC connectivity regulation published for renewable plant of capacity lessthan 50 MW, and detailed procedure of Central Transmission Utility Under RegUlation 27(1)of the CERC (Grant of Connectivity, Long term Access and Medium - term Open Access inInter State Transmission System and related matters) Regulations, 2009,application for thegrant of Connectivity to ISTS consisting of following documents(as per regulation) for each ofabove project dully filled in is submitted :

1. Format - CON-1 (Affidavit)2. Format - CON-2 (Application)3. DD No. 123426 Dated 22/04/2013 for Rs. 2,00,000/-4. DD No. 123427 Dated- 22/04/2013 for Rs. 2,00,000/-

The basic scheme indicating renewable project connecting to the existing connection pointwith ISTS through electrical system of generating station is also enclosed(Flag A).

As you are kindly aware that these Renewab le project (particularly -Solar PV) have shortcommissioning schedule(Sept 2013),the connectivity of above projects may please begranted at the earliest. The LTA application for Singrauli Hydro Plant has already beenapplied and LTAapplication for Unchhar Solar PV plant is being submitted shortly.

Thanking You,

Yours faithfully,•

31f1l\!l iSl q; 1 q; liQIC'l ll ~, ~ of. tJ-BtJ . ~-24. tffic iITCR1 of . 13 .~ (~3JJ.) ftr-f-201301

ENGINEER ING OF FICE COMPLEX. Plot No. A-SA. Sector-24 . Post Sox No. 13. NOIDA (U.P.) Pin-201301t f(;:rq;t~ : 0120-2410333 (10 ~) 0120- 2410116 (5~) ~iffi : 0120-2410136, 0120-2410137Telephone : 0120-2410333 (10 Lines) 0120-2410116 (5Lines) Fax : 0120-2410 136. 0120-2410137quf) <tl tl~~ :~. <!tolft.~. l1cA".~ q;IJQ~ Q'd . 7 . {te'lt'<.'W"lC'!~ . ffiQt m .Off~ -110003

Regd. Office : NTPC Shawano SCOPE Complex, 7, Institutional Area, Lodhi Road . New Delhi-110003

00559
Typewritten Text
ANNEXURE-3
Page 30: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

E

I

o•

AFFIDAVIT

In the matter of filling application to Power Grid Corporation of India Limited, for!?grant of Connecti ity under CERC Regulations, 2009 for Unchaha r Solar 10 MWp

, S.S.Mishra Sio Late Shri Shyam Sunder Mishra, working as Additional GeneralManager in Project Engineering Department(Electrical) of NTPC Ltd., having its

f egistered office at NTPC Bhawan, Sco pe Complex, 7 Inst itutional area, Lodi Road,New Delhi-l lO003 do solemnly affirm and say as follows:

6, . I am the Additional General Manager of TPC Ltd. , the repre entative in theabo e matter and am duly authorized to file the abo e application and to make thisaffida it.

ignature ). .Mishra

AGM(PE-Elect)TPC Ltd.

ATT~O_

5.S. GUPTA, ADVOCATENOTARYPUBLIC

Oelhl &NaidaG. . Nagar (U.P.)

25 P 3

that all the details given in the enclosed application for grant of~~I;1ti v i ty along with necessary documents are true and correct and nothing

al has been concealed thereof.

.To be du l atte ted by otary )

TPC Ltd., is a Go ernment Company registered under Companiesct, 56 a public limited ompan . nder the Article of A ociation of the

r A Co P v and in accordance with the pro ision of Electricity Act, 20031 relevantReg lati n( ) of ERCC, the compan can file the enclosed application.

ld0 ' \ l • .\

... \3. ': .' ' 3'" Sj{ ' .•• 0 .

Page 31: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Format·CON-2

S.No. Descsr'int iou Details1. Name the Applicant NTPC Limited2. Address for correspondence AGM(PE-Eleet),NTPC LT D.

Engineer ing Office Complex,A-8A, Sector-24,NOIDA-201301(U.P)

3. Contact DetailsPrime Contact Person Sh ri S.S.MishraDesignation AGM(PE-Elec tl

Phone No. (Landline) 0120-2410729Phone No. (Mobile) 09650991145Fax 0120-2410102EMail ssmishra(Q),ntpceoc.co.inAlternate Contact Person Ms. S.Mo haotvDesiunation DGM(PE-Elecl)Phone No. ILand line) 0120-3318421Phone No. (Mobile) 9650991556Fax 0120-24 10102EMail sai!a rikat'WntDceoc.co.in

4. Nature of AnnlicationGenerator (other than captive) GeneratorCaotive GeneratorBu lk Consumer

5. Details of Connectivity5 a. Capacity (MW) for which l D MWp

connectivity is required5b Date from which connectivity is Sept"2013

required6. Location of the Generating (i.) P lace : Unchahar

Station/Bulk consumerNearest Village/Town Town : RaibereliDistrictState Utta r P radeshLatitude No rth :25 De a 54 MinLongitude East :8 1 Oe D 18 Min

7. Installed Capacity of theGenerating: StationExisting - 1050 MW(2 x 210 thermal stage-

1.2x2 10 MW thermal stage-ll &Ix210 MW Stage-Ill)

8. Commissioning Schedule of the Sept 2013Generating Station

Page 32: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

9. Details of the Generation Station

f---- - Name of the Power Plant UnchaharSolar PV plant-- - - _ ._ -Promoter NTPC Ltd.Fuel Renewable

Source of Fuel Sol arGeneration Voltage 265 V AC(conveted through

inverter from DC)Step-up voltage Solar power is pooled at 33 kV

level and further connectedthrough the existing 220 kVswitchyard (S ingle Line Diagramattached)

Is it an identified project by CEA NoBase Load/Peak load Infirm Power

10. Deta ils of Nearest 4001220/1 32kV 220 kV Unchahar Switchyard

SubstationsOwner NTPC

I I. Details of e-transactionI (Application Fee)

Amount (in Rs.} 2,00.000/-rtwo lakh onlv)Transaction Ref. No 0 .0 No : 1 J. ." 4 J. .,

Date 2 2.( O L" I 2-0 \ \

Bank Name I <U>'''- 1>.""",, -c " ,,""'-\ ....Branch Name f- . , -,c . - .,.., 1

V

Page 33: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

INFORMATION REQUIRED TO BE SUBMIlT ED WITH THEAPPI. IC ATION I'OR CONNH'TIVITY BY GFNFRAT1NG STATION :

PROJECT NAME: Unchahar Solar PV Plant(IO MWp)S.No. Descrintion Information Detail1.0 Site identification and land Existing project,ava ilable and belongs to

acquisition NTPC.

2.0 Environmental clearance for -NA-the power station

3.0 Forest Clearance (if -NA-applicable) for the land forthe Dower station

4.0 Fuel Arrangements -NA-

5.0 Water linkage -NA-

Page 34: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

400KV SIJYDICT- I 'AY ICT- Z .... '1''-T-' --T-- O£oo.<"" (£N(IlATOll

~. .~

<y cr, ,.' .'

ICT- I ~' 4QO/1 3ZI(V 4fXI/ l32KV ~-i ICT-2 X'" X O£.,"< ,""". 10000A ,,. ,., ,

I132KV .... ' ~ ~ 132KV .... , r£N Vt:nJ(V ~ GOl V /33KV

--~ ---- 132KV svYD --- r ~ n-""'. ""'.''''" "...

!, ,, .'

J Ic:n.DiY TIl -I '---i 13Z1111CV 13<'II I1CV ~-i CI:llJn' TIl·Z

i'"f' IZ.5MV 1l \Z.5MV A \ ,

• , ,- II I ~uo·, ,,,,.,jI I .......------T--~....r... _l~Y_!:'E" nseev ""'"

"'"! .! I , , -m T"'IJ"I

, ,~T"'iV f~, ,

~ I .. .. .. . 1\\1:"1:") "''\, ,M,"1:I~ ", , rOto

" " •! I, ,

\'O) ....'t"

I I ~ uo·, uo-, ~

" r l~r T-I IICV S'J(;R

! Ii i , , , ,

I1I33KV ~ I j I j i 11/3J1(V• • 1 a J • 10 MYAt ! 10 MYA Cll.1>fr F'£EDEIlS

dI I

OIH LINE

f II .

• LEGEND

I e GENERATOR

I § CIRCUIT BREAKER ORAWOUT TYPE

[....."'...1 P'! "l'bft~,~

8 H TP C tflI£..1J.m.i,1~TAANSFORMER - S1NGRAtIU '!;;tti.'fYl'KO PROlIC'I'

X '" INTDCOHNRCnOi'l or Illi'IGR.uru SIU.U. BYDRO- - - - - E~ISTING PROJlCT 1m1I m9TIi'1G 9YSTI:II-- PllOPOSEO - --- n- 1-'-• -

SlNG-BYDL-SLDl .D1FG

Page 35: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

FGUTPP 220KV SWITCHYARDBAY NO.5

--~---- TR. BUS- I-- - - - BUS- II- - T - - BUS- I

220KV

33 /220 TRANSF.

-H -

33KV CABLE/OVERHEAD

KV

CORE-2CL: 0.2

CORE-lCL:5P20

PV CELLS PV CELLSTYPICAL

KV

33 KV POOLING SWGR

CORE-2CL:0.2

CORE-lCL:5P 20

PV CELLS PV CELLS

TYPICAL

~ "t k

[ i§ "~ •~

! t~.k

r I• 'Ii

~ 1

~~

FGUTPP- SOLAR PROJECT

0000-999- POE- J- 001 a

SIN GLE liNE DIAGRAMo 220 S

Page 36: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

NTPC LimitedfA Govt. of India Entorprise)

~ <PI"llf<:;ro/Corporate Centre

Ref: 01:CD: 706 Dated: 14th May 2013

ToCOO (CTU)Power Grid Corporation of India Ltd."Saudamini" Plot No. 2Sector-29, Gurgaon-12202 1HaryanaFax No. : 0124-2571809

Sub: Long Term Access (LTA) application for Unchahaar Solar (l0 MW)

Sir

Yours faithfull y

~y(A. K. Bish oi)

AG M (Commercial)

)•

-Thanking you

Please find enclosed the LTA appli cation for Unchahaar Solar (l0 MW) including Format LTA­1 and LTA-2 along with the proof of application fees of Rs. 2,00,000 (Rupees Two lacs only)already paid by RTGS vide CMS No 150804549 on 7.05.2013 as per CERC Regulations on"Grant of Connectivity, Long Term Access and Medium-term Open Access in inter-StateTransmission and related matters Regulations" 2009 and subsequent procedures dated31.12.2009. Application for Grant of Connectivity has already been made vide our letter dated23.04.2013 (copy of letter enclosed). NTPC is making this application on behalf of thebeneficiary i.e DYC . DYC shall be signing any necessary agreements including BPTA etc. withPowergrid / other transmission licensee and shall be responsible for payment of appli cablecharges. It is requested that the enclosed application may be processed at your end. We wouldfurther like to indicate that since NTPC is making this application on behalf of DYC, LTA maybe granted in the name of DYC.

Enc1 : 1. L TA-l- Affidav it2. LTA- 23. Proofofpayment vide CMS No 150804549 on 7.05.20134. Letter dated 23.04.2013 for Grant of Connectivity>. pV(.'!. O\.M~o~c:Uvt'vv Wt-vCJl/4. 7- ~''}{)IY

"

lfT it 1ft~ WA" M CfiIi1j~Cffi , 7, ~~~<J:~ I'1("l ~, m-ar"'Us, ~~-110003 , hrfTel.: 24360100,~/Fax : 011-24361018

NTPC Shawan, SCOPE Comple, 7, Institutional Area, Lodhl Road, New Delhl-110003,~lWebsl le : www.ntpc.cO.ln

00559
Typewritten Text
ANNEXURE-4
Page 37: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

. \

' .:

, (I~Q, only)

IN·DL191554581 06902K05~Sep·201 2 }1 :29 AM~

IMPACC (IV)/dI"132103/ DELHI/ Dt-DU~SUBIN-DLDL7321033849531 0877321K"

NTPC LTD

Article 4 Aff idavit

NA

o ,: '(Zer~)

NTPC LTD.) ..

NA

NTPC L:-TD " .':. 1. • - 1 ' '' ' . •

::'10

Slaluatory A lert :

1. The authenticity of the Stamp Certificate can be verified at Authorised Collection Centers (ACCs), SHCll Offices and Sub-ragistrar Offices (SROs) .2. The Contact Details of ACCs, SHCll Offices and SROs are available on the Web site ..www.shcilestamp.com..

I A. K. Bishoi S/o Shr i Somnath-'Blsh . worki ng as Additional General M anager(Commercial) in NTPC Ltd, hav· il~.i!s :reg:i~t~?i lic e at NTPC Bhawan. SCOPE Complex, 7,Institutional Area , l .odi Road, '~ ~~)lje.I~~,~ ~9g.% "" () l em n lY affi rm and say as fo llows:

~. " ~" . • ~\ -a\ .. ',. «:;.- " " •• ~'" J- I," . 0 (. ~il'. -:.. ~ (

~

AFFIDAVITIn the matter of filing app lication to Power Gri d Cor poration of Ind ia Limited , for grant of Lang­term Access under CERC Reg ulat ions 2009.

Ii I

II! :i II ,! I

iiIII IIIi II jI I! II I! I

i!i II ,

! . ~ 1 \

:• • • • ••• •• • ••• •_•••• • •• •••• ••• •• • •••••• •• _.- - -.Please write or type below this line•••••• •• • • • • • •• • •_••••• ••• _.- _••• - _•••••••• '1-1

i , I, : I

FORMAT-LT A-l II! I!iIi

III',I

~-=:=U____.__J j

I:IIFirst PartyI 'I;Second Party,I ; Stamp Duty Paid ByI ,i!Stamp Duty Amount(Rs.)

, ' 'Rf'4Aq~I ;

l ie rt'f' t N! : e 11C8 e o.I:Certificate Issued Date

I:Account Reference

I!Unique Doc. Reference '

! ;Purchased by

Description of Document

Property Description

Consideration Price (Rs.) ii

Page 38: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

" ..'

1. I am the Additional General Manager of NTPC Ltd . the representative in the above matterand am duly author ized to file the above appli cation and to make thi s affidav it.

I submit that Mis N TPC Ltd. is a registered company Public Ltd. Registered under CompaniesAct. Under the Article of Association of the Company and in acc ordance with the provision s ofElectricity Act, 2003/re levant Regulation(s) of CERC, the company can fi Ie the enclosedapplication.

I submit that all the detail s given in the enclosed application for gra nt of Long Term Accessalongwith necessary documents are true and correct and nothing material has been concealedthereof.

Cti1~(A.K. Bishoi)

ATTta:oNOTA ...

Page 39: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

..

FORMAT-LTA-2

Application for Grant of Long -term Access (LTA)

1 Name the Applicant

2 Address for Correspondence

3 Contact DetailsPrim e Contact Person

DesignationPhone No .(Landline)

Phone No.(Mobile)Fax

E-Mail

Alternate Contact PersonDesi gnation

Phone No.(Landline)Phone No.(Mobile)

FaxE-Mail

4 Nature of the ApplicantNormal Gen erator (other than captive)

Captive GeneratorBulk Consumer

Electricity TraderDi stribution Licensee

5 Details for Long Term Access (LTA)

5a Quantum (MW) for which LTArequired

5b Date from wh ich LTA required(not earlier than 3 years from the lastday ofthe month in which application

has been received)

5c Date upto which LTA required(1 2 years to 25 years from the date

from which LTA is required)

NTPC Limited (on behalf of DVe)

NTPC Bhavan, Core-7, Scope Complex,7, Institutional Area, Lodhi Road,New Delhi-ll0003

A. K. BishoiAdditional General [email protected]

S. K . SharmaAddit ional General [email protected]

Yes

10MW

01.08 .2013

1.08.2038

Page 1 of 2

Page 40: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

5d Injection of Power (more thanone only in case of single Drawal)

Entity- lState/Region

Quantum- lConnectivity with the Grid

5e Drawal of Power (more thanone only in case of single Injection)

Entity- 1State/Reg ion

Quantum- 1Connectivity with the Grid

NTPC,Unchahaar SolarU.P. /NR10MWNTPC Unchahaar Switchyard

DVCWest Bengal /ER10MWVarious CTU Substations in DVC area

6 Details of DD/Cheque e-transaction(Application Fee)

Amount (in Rs.) Two lacs onlyDD/Ch eque transaction No. 150804549

Date 07.05.2013Bank Name ICICI Bank

Branch Name Connaught Place

7 Details of Bank GuaranteeAmo unt (in Rs) N/A

Bank NamePer iod of Validity

Page 2 of2

Page 41: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

/

, ~,

Ref. No: CC:PEE:NTPC/REN/CONN/'I

Cli lef Operating Officer(CTUjPower Grid Corporation of India Limited,"Saudamini", Plot No.2, Sector-29,Near IFFCO Chowk,Gurgaon-12200 1Fax: 0124-2571809

rpr 'i!t r8 i'If JiJrf1It5(ITmf~. 7fi1 ;mrij

---"'--C---r.-' infte--(A Govt. of India·Eni erprise) ,

(Formerly Nalienai Thermal PowerCorporation Ltd.)

m'""{r1l ,,",*,1'1/ Co rporate CentreDate: 23-04-2013

Sub: Application for Grant of Connectiv ity to ISTS for Renewable Projects

Dear Sir,

With reference to the above subject , please find enclosed herewith our application for Grantof Connectivity for following NTPC Projects :.

I) Singrauli small Hydro Plant (2x 4 MW)II) Unchahar Sola r PV Plant (10 Mwp)

In line with the CERC connectivity regulation publishedfor renewable plant of capac ity lessthan 50 MW, and detailed procedure of Central Transmission Utility Under Regulation 27(1)of the CERC (Grant of Connectiv lty, Long term Access and Medium - term Open Access in

.. Inter State Transmission System and related matters) Requlatlons, 2009 ,applicat ion for thegrant of Connectiv ity to ISTS consist ing of following documents(as per regulation) for each ofabove project dully filled in is submitted ;.

1. Format - CON-1 (Affidavit) .2. Format>- CON-2 (Application)3. DO No. 123426 Dated 22/04/20 13 for Rs. 2 ,00,000/-4. DO No. 123427 Dated- 22/04/2013 for Rs. 2 ,00 ,000/-

The basic scheme indicating renewable project connecting to the existing connection pointwith ISTS through electrical system of generating station is also enclosed(Flag A).

As you are kindly aware that these Renewable project (particularly -Solar PV) have shortcommissio ning schedule(Sept 2013),the connectivity of above projects may please begranted at the earliest. ' The LTA application for Singrau li Hydro Plant has already beenapplied and LTAapplication for Unchhar Solar PV plant is being submitted shortly.

Thanking You,

31f4"l if3l <l>I ~ ~, tffiC -.r. IHll! . ~-24 , tl1R:~ -.r.13 ,~T (<J .lT:) fiFf~201301ENGINEERING OFFICE COMPLEX, Pldt No. A·8A. Sector-24, Post Box No. 13, NOIDA (UP.) Pin-201301tfa-q;'-.r: 0 120--24 10333 (10~) 0120- 24 101 16 (5 B~) Tjh f'ff : 0 120·-2 410136 , 01 20 ,....24 10 13 7~e~~~~one : 9 '1 20-24103~3 _ ( 1~ Lines) 0120-2410116 (5Lines) Fax: 0120·2410136. 0120-2410137

Page 42: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

~ Limited/) Govl 0/ Ind•• Enlerp " n j

Ji""tffi:R/ Unchahar

Ref. No. : US/GM/400Date: 3 1.07.20 13

ToCOO (CTV)Power Grid Corporation or India Ltd."Saudamini" Plot No.2Sector-29, Gurgaon-122021HaryanaFax No. : 0124-2571809

Sub: Coordination for " nchahar Solar Plant" by."Feroze Gandhi Unchahar Thermal PowerPlant"

Sir,

This has reference to your letter dated 10.07.2013 in regards to application for Connectivity for"Unchahar Solar Plant" . In this regard we would like to indicate that since "Unchahar Solar Plant"is also under ownership of NTPC, Shift Charge Engineer of "Feroze Gandhi Unchahar ThermalPower Plant" will be responsible for all day to day coordination with RLDC in regard to declarationof schedules, submission of metered data etc in regard to "Unchahar Solar Plant". Further "FerozeGandhi Unchahar Thermal Power Plant" agrees to act as principal Generator on behalf of"Unchahar Solar Plant" and agrees to undertake all operational & commercial responsibilities for"Unchahar Solar Plant" in following the provision of IEGC & all other Regulation of CERe.However "U nchahar Solar Plant" will be considered as a separate "User" for which energyaccounts need to be issued separately.

Thanking youYours fa'

( Prakash iwari )General Manager

Copy to: NRLDC

~ 'fitfi~m ~~. ~~~.~ ,(llliij~clt ("G".~.}-229406

Fcroze Gandhi nc ha ha r T hermal Power Sta tion, P.O: Unc ha ha r, Di stt: Raebareli (U P) - 229 406 ~/Fax 05311·278072

Regd. Office: NTPC Bhawan, Scope Complex. 7, Institutional Area, Lodhi Road, New Delhi - 11 0 003

Page 43: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

! -r; -c.. ; '; ~ ; • ..;

[;]

' U>coue' , u~

:9l.. . .. , DA!YI()DAR VALLEY C()RP()I{A'I 'I() i'\'

COI\1M [({CIA L DEPARTM EN:rDVC: T()W«~RS ; V.L P. ROA D

KOLKATA: 700 054 .

1 \ \ " "

OFFICE COpy

:'-; 11, ( '01111 .'01"1"1'( ','1. 1i \ / ? b.(,

·, ··t r : ~ ~ ..~ : I i\ ., ..~ ., 1( -.·. · , : , ·,I II \.. \ J\"11",. 1 ,-\I . VI ~lIhl:\"'1 \,-,. \Illll l l""'-'''\ J }

, Nali(Jnili Thenn ul Power Corporati on Limited

~l:( ) pe COlllp l e~. , ,

7. ln sritutional Area. l. odhi Road, , N~<\' D~lj' i- 1 1 1 1 OJ

, h~,-.; ;10:0 1L~ 2 4 3 60j 5 H

,Sub: Arrangeme nt of LTi\ on.bchal ror IweDear Sir,

f)a lc : 0" , 7 MA.Yiu12

Thi-, IS ' Ii ' refere nce ttl the discussio n with Mr. P, K. Ghoxa]. l) (j !'vl (Commercia l).Kol k~IItL NT PC. rega rdi ng arrangeme nt of Lon g Te rm i\cqcss 10 avai l sol ar power tro m var ious

~TPC Projects. Dy e ente red into { IV O a~eclllcllis with NTPC Lim ilcll Oil (it h .lanua ry ·]Oi2 I'llI'

p urchase 0" I() f'vl \V solar power each Irom 'Ia lcher Kanihu So lar ilV Power Project and

Unchahar So lar PV Power SImian t)1' NlPC. For transm issiount those powe r lromthc So lar

power stations or NT PC lei DVC system using. ('TU network. l.ong Term Access li'l1111 ell! is ,' . . i . J •

necessary,

Dur in g di scussion. Mr. P.K. d )()sal, D G IVt" (COimnlen.: i,il). NT PC co rn niunicatcd tha: f'

N:''P( i~ agreea b le lO ~i) p'I )' ITA' (>n.ijeh ~ Jro l ' Dye 10 avail so lar power a~ ·. p~ r PPI\ will,Nll'C.Acc ordingly. it is requested to kindly ;,~ a kc ' al~~ !\ i, gen'H::nl i o r bch<ill' lll" DYC to appl y iTA for,\ vailil{g s(; l a r p~.l~\'cr lrom.lJrichahiiii ,lnd Ta lcili.: r i<.al~j ha Project o r NT'PC.

' . . . . ; , ; . . ! .' .

, cc:

i[ '

,-. - ' \ NOO:

1) The Directo rl Co mmcrc ial). DVe. Ko lka ta

1 ) The Chie f" Eng ineer (CI.D) . D Ve. ivl ai l l l(~ 11

,Hoj

.'.., ..~ ~ . '.......

.... ~ _ _-_.-..- ' .'

Page 44: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Ref. i 0: CC:Pc E:i TPCIKE ICOI /1

C-l;:- < C;:.:rc: ti:-.,; Cfficei\ (~T:";~

Power Grid Corporat ion of India Limited,"Saudamini" , Plot No.2, Sector-29,Near IFFCO Chowk,Gurgaon-12200 1Fax: 0124-2571809

(A Gov!. oJIndia Enlerpnse)(Formerly a' Thermal PCMe!Corpotalion Lid I

/ Corporate centre

Date: 23-04-2013

Sub: Application for Grant of Connectivity to ISTS for Renewable Projects

Dear Sir,

With reference to the above subject, please find enclosed herewith our application for Grantof Conn ectivity for following NTPC Projects :

I) Singrauli sma ll Hydro Plant (2x 4 MW)II) Unchahar Solar PV Plant (10 Mwp)

In line with the CERC connectivity regu lation published for renewable plant of capacity lessthan 50 MW, and deta iled procedure of Central Transmission Utility Under Regu lation 27(1)of the CERC (Grant of Connectiv ity, Long term Access and Medium - term Open Access inInter State Transm ission System and related matters) Regulations, 2009 ,application for thegrant of Connectivity to ISTS consisting of following documents(as per regulation) for each ofabove project dully filled in is submitted ;

1. Format - CON -1 (Affidavit)2. Format - CON-2 (Application)3. DO No . 123426 Dated 22/04/2013 for Rs. 2,00,000/-4. DO No . 123427 Dated- 22104/2013 for Rs. 2,00,000/-

The basic scheme indicating renewa ble project connecting to the existing connection pointwith ISTS through electrical system of generating sta tion is also enclosed (Flag A) .

As you are kindly awa re that these Renewable project (particu larly -Solar PV) have shortcommissioning schedule(Sept 2013),the connectivity of above projects may please begranted at the earliest. The LTA applicat ion for Singrauli Hydro Plant has already beenapplied and LTA application for Unchhar Solar PV plant is being submitted shortly.

Thanking You ,

Yours faithfull y,•

31f11 ~ i F-l <t> 1 q) 1~rC1~ lJfn:R . tRTC «. r-ev. ~-24 . ~ 1{1lffi ri . 13 ,~ t-ur. ) flt;r-201301ENGINEERING OFFICE COMPLEX, Plot No. A-8A, Sector-24. Post Box No. 13, NOIDA (U.P.) Pin-201301t~"t : 01 20 -2410333 (10~) 0 120-24 10 1 16 (5 t"rr~ ) Jtcm : 0120-241 0 136. 0 120-2410137Telephone : 0120-2410333 (10 Lines) 0120-2410116 (5Lines) Fax : 0120-2410136, 0120-2410137q~ <t>J1rl~ : lr-f . tt, tft.~. ~,~ CfjI "l~CRt , 7 . ll'i'i!li;,<g l"l('l tTftm. C1tt1t m.~~ -110003Regd. Office : N ;PC 8 hawan, SCOPE Complex. 7, Institutional Area, Lodhi Road , New Delhi-110003

00559
Typewritten Text
ANNEXURE-5
Page 45: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

E

J 2

AFFIDAVIT

"In the matter of filling application to PO\ er Grid Corporation of India Limited, forgrant of Connecti it under CER Regulations, 2009 for Singrauli small Hydro

~08MW

I, S. .Mishra S/o Late Shr i Shyam Sunder Mishra, working as Additional General~Manager in Project Engineering Department(Electrical) of NTPC Ltd., having itsregiste red office at NtpC Bhawan cope Complex, 7 Institutional area Lodi Road

e Delhi-l l0 003 do solemnl atlirm and say as folio s:

5 APR20J3

T~S.5. GUP.T1\ , OVOCATE

~ ' OT py PUBLICO· I i &Noida G.B. Nagar (U.P.)..(To be dul y attested by otary)

~

t that all the details given in the enclosed application for grant of;-"1'--:-."(_OlrlJ)(~tivi t along \ ith neces ary documents e true and correct and nothing

erial has been concealed thereof. ,

J . I am the Additional General anager of TPC Ltd. the repre entati e in theabove matter and am dul authorized to file the abo e application and to make this

~~--"'~lda it.

Page 46: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Format-CON-2

S.Nu. Desesriptiun DetailsI. Name the Aoo licant NTPC Limited2. Address for correspondence AGM(PE-Elecl),NTPC LTO.

E.ngineering Office Comp lex,A-8A, 8«to r-14,NOIDA·20130HU.Pl

3. Contact DetailsPrime Contact Person Shri S.S.MishraDesiznation AGMIPE-EI«tl

Phone No. (Landline) 0120-2410729Phone No. (Mo bile} 09650991145Fax 0120-1410102E Mail ssmish ral'Qlntpceoc.co.inAlternate Contact Person Ms. 8.MohanlYDesignation OGM(PE·ElectlPhone No. (Landline} 0120-3318421Phone No. (Mobile) 9650991556Fax 0120-2410 102E Mail sagarika(a:ln tnceoc.co.in

4. Nature of ApplicationGenerator (other than caotivel GeneratorCaptive GeneratorBulk Consumer

5. Details ofConnectivitv5 a. Capacity (MW) for which BMW

connectivity is required5h Date from which connectivity is Feh'2 014

reouired6. Location of the Generating (L) Place : Singrauli

Station/Bulk consumerNearest Vil lace/Town Town : Shaktinacar

District SonebhadraState Uttar PradeshLatitude 24 Oeg 11 Min N

Lonuitudc 82 deg 45 min E,

7. Installed Capacity of theGeneratine StationExisting - 2000 MW(5x 200 MW stage -I

and 2x500 MW-stage-II) thermalI nlant

8. Commissioning Schedule of the Feh 2014Generatine Station

Page 47: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

9. Details of the Generatio n Sta tionName of the Power Plant Singrauli small Hydro

_.- Promoter NTPC I.td . . -._ - - -- - ---Fuel Renewable

Source of Fuel HydroGenerat ion Voltaue I I kV

Sten-un voltage 33 kVIs it an identified orciect by CEA NoBase Load/Peak load Base Load

10. Details or Nearest 400/2201l32kV Singra uli 400/ 132 kV Switch yard

Substat ions The 8 MW small Hydro units are steppedup to 33 kV and integrated through theelectrical system ""d generatingstarlom l.e. II kV/ 132 kV/400 kV) as perenclosed Sin rle Line Diagram .

Owner NTPCtl. Detail s ofe-transaction

IAnnlication Fee \Amount lin Rs .) 2,OO,OOO/-(lwo lakh onlv\

Transactio n Ref. No D.DNo: \ :< 3 1.; 2.. &Date 2- 2- I" ... /~ o'~

Bank Name ~",'''- Q~ ....... , t: " .1.. l (\..\..C\d..

Branch Name p,~~. "1""0'" 1\,\".-0

Page 48: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

INFORMATION REQ UIRED TO BE SUBMITTED WITH THEAPPLI CATION FOR rONNECTIVITY BY GENERATING STATION:

PROJECT NAM E: Singrauli small Hydro Project (2X4MW)

S.No. Descrmtion Information Detail1.0 Site identification and land Existing projectavailab le and belongs

acquisition to NTPC.

2.0 Environmental clearance for -NA-the power station

3.0 Forest Clearance (if -NA-applicab le) for the land forthe Dower station

4.0 Fuel Arrangements -NA-

5.0 Water linkage Existing cooling water return channel ofSingrauli Super Thermal Power Station

Page 49: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

P'f i!/ rtflama m?m< llST 3mf)

(AGoo. of IndiaEnterpriSe)

~~ / Corporate Centre

Ref: 01:CD: 706

ToExecutive Director (SEF & CE)Power Grid Corporation oflndia Ltd."Saudamini" Plot No.2Sector-29, Gurgaon-122021HaryanaFax No. : 0124-2571809

Dated: 25th May'2012

Sub: Long Term Access (LTA) application for Singrauli Hydro (2 X 4 MW)

Sir

Please find enclosed the LTA application including Format LTA-1 and LTA-2 along with theapplication fees of Rs. 2,00,000 (Rupees Three lacs only) vide bankers cheque No. 745222 dated24.05.2012 as per CERC Regulations on "Grant of Connectivity, Long Term Access andMedium-term Open Access in inter-State Transmission and related matters Regulations" 2009and subsequent procedures dated 31.12.2009. The drawals of various beneficiaries considered inthe application are considered as per existing Gol guidelines. Final allocation of power shall benotified by Gol at the time of commissioning of station. The power from Singrauli Hydro shallbe transmitted via existing evacuation system through displacement (Single Line diagramattached for reference). NTPC is making this application on behalf of the beneficiaries. Thebeneficiaries have agreed for subsequent signing of all necessary agreements including BPTAetc. with Powergrid / other transmission licensee developing the identified transmission systemand payment of applicable charges, corresponding to their final share of allocated capacity fromthe project. It is requested that the enclosed application may be processed at your end. We wouldfurther like to indicate that since NTPC is making this application on behalf of its beneficiaries,LTA may be granted in the name of beneficiaries.Thanking you

Yours faithfully

(A.B~'5DGM (Commercial)

Encl: 1. L TA-1- Affidavit2. LTA-23. Bankers Cheque No. 7452224. Single Line Diagram for Singrauli Hydro

1!Ol i\ tit <It :mlGI~ 4iioqilllf<i, 7, ~dl¥ld01cl ~, oi\tl\"i\i;,~~-110003. ~ /Tel. : 2436 0100 ililffi IFax: 011-2436 1018

NTPC Bhawan. Scope Compiex, 7, Institutional Area, lodl Road, New DelhI-110003.~ IWebsite: www.ntpc.co.in

00559
Typewritten Text
ANNEXURE-6
Page 50: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

47AA 246998

FORMAT-LTA-lAFFIDAVIT

In te matter of filing application to Power Grid Corporation of India Limited, for grant of Long-term Access under CERC Regulations 2009. . .

I 1. Basu Roy Slo Late Shri S. C. Basu Roy working as Deputy General Manager(Commercial) in NTPC Ltd, having its registered office at NTPC Bhawan, SCOPE Complex, 7,In~itutional Area, Lodi Road, New Delhi-I 10003, do solemnly affirm and say as follows:

I. ~ am the Deputy General Manager of NTPC Ltd. the representative in the above matter andarri'dulyauthorized to file the above application and to make this affidavit.

1 ~bmit that MIs NTPC Ltd. is a registered company Public Ltd. Registered under CompaniesAcJ:, Under the Article of Association of the Company and in accordance with the provisions ofEI~tricity Act, 2003/relevant Regulation(s) of CERC, the company can file the enclosedapplication.

I stbmit that all the details given in the enclosed application for grant of Long Term AccessalTgwith necessary documents are true and correct and nothing material has been concealedthereof.

a~~~(A. BasuR.oY) '1-' \V

f~-PUS.. q,.../"" ....;lEv" .

tlO ~

rf;;;q ~. -~il«j•...'V ..~

" ~, jl,(j.~~,\.,* '~",Il%" ,,,,• . .~ ~x

~Z,;:r.~S·~~~~·

Page 51: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

FORMAT-LTA-2

Application for Grant of Long -term Access (LTA)

1 Name the Applicant

2 Address for Correspondence

3 Contact DetailsPrime Contact Person

DesignationPhone No.(Landline)

Phone No.(Mobile)·,Fax

E-Mail

Alternate Contact PersonDesignation

Phone No.(Landline)Phone No.(Mobile)

FaxE-Mail

4 Nature of the ApplicantNormal Generator (other than captive)

Captive GeneratorBulk Consumer

Electricity TraderDistribution Licensee

S Details for Long Term Access (LTA)

Sa Quantum (MW) for which LTArequired

Sb Date from which LTA required(not earlier than 3 years from the lastday ofthe month in which application

has been received)

Sc Date upto which LTA required

NTPC Limited (on behalf ofbeneficiaries listed at Se)

NTPC Bhavan, Corc-7,Scope Complex,7, Institutional Area, Lodhi Road,New Delhi-110003

A. Basu RoyDeputy General [email protected]

C.K. MondolAdditional General [email protected]

Yes

8MW

01.07.2013

01.07.2038

Page 1 of2

Page 52: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

(12 years to 25 years from the datefrom which ITA is required)

Sd Injection of Power (more thanone only in case of single Drawal)

Entity-IState/Region

Quantum-IConnectivity with the Grid

5e Drawal of Power (more thanone only in case of single Injection)

Entity-IState/Region

Quantum-IConnectivity with the Grid

Entity-ZState/Region

Quantum-2Connectivity with the Grid

Entity-3State/Region

Quantum-3Connectivity with the Grid

NTPC,singrauli HydroUttar Pradesh / NR8MWNTPC Singrauli Switchyard

UPPCLU.PINR4.1MWVarious CTU substations in U.P.

DELHI DISCOMDELHIINR2.1MWVarious CTU substations in Delhi

RAJASTHAN DISCOMSRAJASTHANINR1.8MWVarious CTU substations in Rajasthan

6 Details of DD/Cheque e-transaction(Application Fee)

Amount (in Rs.) Two lacs onlyDD/Cheque transaction No. 745222

Date 24.05.2012Bank Name State Bank of Hyderabad

Branch Name New Delhi, Scope Complex (Code:205ll)

7 Details of Bank GuaranteeAmount (in Rs) N/A

Bank NamePeriod of Validity

Page 2 of2

Page 53: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

400KV S\JYD

e1I/33KV ~10 MVA 1

1LEGEND

e GENERATOR

~ CIRCUIT BREAKER DRAWOUT TYPEv8 TRANSFORMER

X GCB

----- EXISTING-- PROPOSED

1tKY S"'GRt_~ 10 MVA

l O/H LINE

O/H LINE

GENERATOR4MI/

YXGCB

GEN Y/33KY ~~5MVA G"'-bYndll =

GENERATOR4MI/

C(XGCB

GEN V/33KV ("~5MVA .;"*Yndll =

33KV

-- SlNGRAUlJ SMALL_~RO PROJECT(2X4Mln

~CONNECTION OF SINGRAUlJ sw.u. HYDROPROJECT.llITH EX1S1'lNG SYSTEM

SING HYDL-SLDl.Dl'lG

Page 54: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

Page 1 of 1

V. Thiagarajan

From: [email protected]

To: [email protected]

Subject: Fw: Connectivity appli cati on of Singrau li Hydro

From: [email protected]: Friday, May 10, 2013 11:47 AMTo: V. ThlagarajanCc: [email protected]: Re: Connectivity app lication of Singrauli Hydro

Dear Sir,

It is confirmed t hat the Singrauli small Hdro {zx 4 MW) is within existing generating st at ion asdefined in CERe and is connected through the electrical system of the generation sta tion.

reg's

Sagarika Mohanty

NTPC

From: V. ThiagarajanSent: Friday, May 10, 2013 11:29 AMTo: [email protected] ; [email protected]: Connectivity app lication of Singrauli Hydro

Sir,Regarding the connecti vity appl ication of Singrauli Hydro please confirm that the proposed Singrauli Hydro(2x4MW) and is with in ex isting Singrauli generation as de fined in the CERC regu lations.

Regards,

V .ThiagarajanChief ManagerPOWERGRID

10-05-2011

Page 55: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

[ttOf8"'~ ]NTPC

"""""'"--/coo (CTUj

Power Grid Corporation of In d ia Ltd ." Soudamini " Plot No.2Sector 29 , Gurgaon - 122021HARYANA Fax : 0124 2571809

NTPC Limited(A 1>"", 01 Jh~ ~ntoI~1

~/Singrau l l

03 1/ GM/August 3 1,2013

Sub: Co-ord inatio n for " Singrauli Small Hydro Plant" bySingrauli Super Thermal Power Station

Sir ,

This has reference to your letter dated 10 /07 /201 3 in regard to application forConnectivity for "Sin gra u li Small Hydro Plant" . In this regard , we would like toindicate that since " Singrauli Small Hydro Plant" is also under ownership of NTPC ,Shift Ch arge Engineer of Singrauli Super Thermal Power Station will be responsiblefor all day- to- day co-ordination with RLDC in regard to declaration of schedules,submission of metered data etc in regard to "Singra u li Small Hydro Plant" . FurtherSingrauli Super Thermal Power Station agrees to act as principal Generator onbehalf of "Singrauli Small Hydro Plant" and agrees to undertake al l operational &commercial responsibilities for "Singrauli Small Hydro Plant" in following theprovision of lEG C & a ll other Regulations of CERC. Howerver "Singra u li Small HydroPlant" will be considered as a separate "User" for which energy accou nts need to beissued separately .

Thanking you , ..,......,) You rs faithfully ,

'~lGENERAL MANAGER

Copy : NRLDC

1litTM~ wfH Q1"CR~ . qJ.3l1.- ~lffiAll'< . f3rMr-~ (3.)1".) ·231 222. tc:!h./ Tet. : 05446-232441

Singrauli Super Thermal Power Station, P.O.-Shaktinagar, Distt.-Sonebhadra (U.P.)-231 222, ~lFax : 05446·232405

~~ : e"'ltl4"l'ff'1 \l'CR"~(f)IAl~iffi . 7 $w::&'Icq~1"4C1 mtm. C1Ttft '<'15. ~~-1 10003E-mail : [email protected]

00559
Typewritten Text
Annexure-7
Page 56: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

S. No. Name or Generators Capacity (in MW) Associated Transmission lines LTA Status

1 Lata Tapovan(NTPC) 171 220kV D/c Twin Zebra Lata Tapovan-Josimath line Not applied

2 Tamak Lata(UJVNL) 250

LILO of one circuit of 220KV D/c Twin Zebra Lata Tapovan-

Josimath line at 250MW Tamak Lata HEP Not applied

3 Bhunder Ganga(Super Hydro) 24.3 220KV D/c Twin Zebra Bhunder Ganga-Josimath line Not applied

4 Badrinath(GMR) 300

220KV D/c Twin Zebra line from 300MW Badrinath HEP to LILO

point on One circuit of 220 KV Bhunder Ganga-Joshimath line Applied

5 Vishnugad(NTPC) 520

400KV D/c Twin Moose Vishnugad-Pipalkoti line & LILO of

Vishnuprayag Muzaffarnagar line at Pipalkoti Applied

6 Pipalkoti(THDC) 444

LILO of one circuit of 400KV D/c Quad Moose Pipalkoti

Karanprayag line at 444MW Pipalkoti HEP Not applied

7 Devsari(SJVNL) 252 220KV D/c Twin Zebra Devsari-Karanprayag line Not applied

8 Bawala Nandprayag(UJVNL) 300 220KV D/c Twin Zebra Bawala Nandprayag- Karanprayag line Not applied

9 Langrasu(UJVNL) 100

LILO of one circuit of 220KV D/c twin Zebra Bawala Nandprayag-

Karanprayag line at 100MW Langrasu HEP Not applied

10 Phatabyung(Lanco) 76 220KV D/C Single Zebra Phatabyung-Baramwari line Applied

11 Rambara(Lanco) 76

LILO of one circuit of 220KV Phatabyung-Baramwari line at 76MW

Rambara HEP Applied

12 Singoli Bhatwari(L&T) 99

LILO of one circuit of 220KV Baramwari-Srinagar line at 99MW

Singoli-Bhatwari HEP Not applied

13 Srinagar HEP(GVK) 330 400KV D/c Twin Moose Srinagar-Srinagar HEP line Not applied

Total MW 2942.3

Details of the Alaknanda Basin transmission system to be associated with various generation projects

00559
Typewritten Text
ANNEXURE-8
Page 57: Agenda for Connectivity/Long term Access to Generation projects … · 2016-07-28 · Connectivity & LTA agenda for meeting to be held with 32nd NR SCM Page 2 of 15 1.0 Connectivity

S. No. Name of Transmission line

Line length(ckt kms)

/capacity in MVA

1 400KV S/s GIS Pipalkoti 630MVA

2 400KV D/c Pipalkoti-Karanprayag-Srinagar line(Quad Moose) 184ckm

3 LILO of Vishnuprayag-Muzaffarnagar line at Pipalkoti 1ckm

4 400kV D/c Srinagar-Kashipur line (Quad Bersimis) 304ckm

5 400kV S/s Srinagar 630MVA

6 400kV Bay at 400kV S/s Kashipur 2 Nos.

7 220kV D/c Lata Tapovan-Josimath line (Twin Zebra) 22ckm

8 220kV D/c Josimath-Pipalkoti line (Twin Zebra) 49 ckm

9 220kV S/s Josimath 2X50 MVA

10 220kV S/s Baramwari 2X50 MVA

11 220kV D/c Baramwari-Srinagar line 220ckm

Details of the Common Transmission scheme of Alaknanda Basin

00559
Typewritten Text
ANNEXURE-9