africas network readiness. by william hearmon , chairman of the african broadband forum

12
IMAGINE AFRICA, CONNECTED IMAGINE AFRICA, CONNECTED

Upload: itnewsafrica

Post on 12-Jan-2015

645 views

Category:

Travel


0 download

DESCRIPTION

Africas Network Readiness. By William Hearmon , Chairman of the African Broadband Forum. Presented at the IT News Africa Innovation Dinner (www.innovationdinner.co.za) on the 31st of July 2012.

TRANSCRIPT

Page 1: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum

IMAGINE AFRICA, CONNECTEDIMAGINE AFRICA, CONNECTED

Page 2: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum

PROTO-INTERNET

FAMILIARISATION

EARLY DAYS

EXTENSIVE

INTENSIVE

(Internet familiarity)

(Internet usage)

(household connections)

(broadband)

Threshold Perspective: Country Internet Stages

Page 3: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum

PROTO-INTERNET

FAMILIARISATION

EARLY DAYS

EXTENSIVE

INTENSIVE

(39 countries: 3 in Africa)

(32 countries: 11 in Africa)

(45 countries: 31 in Africa)

(18 countries: none in Africa)

(23 countries: none in Africa)

Country Internet Stages

Worldwide and in Africa

Page 4: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum
Page 5: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum
Page 6: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum
Page 7: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum

7

Page 8: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum
Page 9: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum
Page 10: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum

Peak Data RatesPeak Data Rate (Mobile)

Commercial Availability200220012000 200520042003 200619951993

WWAN Bandwidth in a Mobile Environment

2007

“Always on”packet data connections

IMT-2000TechnologiesIMT-2000

Technologies

20092008 2010 2011

1xEV

EV-DO Rel 0 (Data Optimized)2.4/ 0.153 Mbps

(1.25 MHz)

IS-95

1X

153.6 kbps(1.25MHz)

1xEV

EV-DO Rev A3.1/1.8 Mbps*(1.25 MHz)

14.4 - 64 kbps

1xEV

EV-DO Rev BScalable Bandwidth EV-DO

73.5 / 27 Mbps(20 MHz)

LTE

LTE291/79 Mbps(20 MHz)

9.6 kbps

384 kbps(5 MHz)

WCDMA

< 160 kbpsEDGE

GPRS< 60 kbpsGSM

HSDPA

3GPP Rel 57.2/ 0.384 Mbps**

(5 MHz) HSUPA

3GPP Rel 614.4/5.8 Mbps***

(5 MHz)

LTE

LTE278/57 Mbps(20 MHz)

Page 11: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum

11

Page 12: Africas Network Readiness. By William Hearmon ,  Chairman of the African Broadband Forum

Network Readiness IndexNRI Clusters to determine recommended TAM vs GDP

Stage 1-4 NRI Rating 0-3.02TAM/GDP Ratio: 0.059%Examples: Angola, Cameroon, Mozambique, Tanzania, Uganda

Stage 5 NRI Rating 3.03 – 3.35TAM/GDP Ratio: 0.078%Examples: Algeria, Kenya, Libya, Pakistan, Tajikistan

Stage 6 NRI Rating 3.36 – 3.67TAM/GDP Ratio: 0.080%Examples: Argentina, Nigeria, Morocco, Peru, Serbia

Stage 7 NRI Rating 3.68 – 3.87TAM/GDP Ratio: 0.104%Examples: Egypt, Mexico, Poland, Russia, Bulgaria

Stage 8 NRI Rating 3.88 – 4.23TAM/GDP Ratio: 0.122%Examples: Brazil ,South Africa, Turkey, Jordan, Kuwait

Stage 9 NRI Rating 4.24 – 5.10TAM/GDP Ratio: 0.167%Examples: Chile, Czech Republic, KSA, UAE, Bahrain, Hungary

Stage 10 NRI Rating 5.11 – 5.85TAM/GDP Ratio: 0.205%Examples: Hong Kong, Singapore, UK, USA, Germany