AEP Ohio’s Continuous Energy

Improvement Initiative

Saving Energy Without Investing Capital Dollars Through No/Low

Cost Opportunities 18th Annual Ohio Energy Management Conference

February 18, 2014

Page 2: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

2 © 2013 Triple Point Energy

• Michelle Cross : Overview and Background

– AEP Ohio Energy Efficiency Business Programs Coordinator

• Richard Miller: How it Works

– CEI Program Manager, Triple Point Energy

• Samuel Day : Putting into Practice

– Energy Coordinator, Columbus Castings

Today’s Presenters

Page 3: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

3 © 2013 Triple Point Energy

Overview and Background

AEP Ohio is helping customers Save Energy and Money

Through Energy efficiency incentives

Page 4: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

4 © 2013 Triple Point Energy

Incentive Program Highlights

Actual Energy and Money Savings

* Numbers assume the average household energy consumption of 12,000 kwh per yr and a 10 year measure life

Enough to power 48,600 homes for 10 years*

2013 Annual Energy Savings Achieved- 587 Million kWh

Paid $46 Million in incentives

Since 2009 AEP Ohio customers have saved 2,280 Million kWh

Enough to power 190,000 homes for

10 years*

Page 5: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

5 © 2013 Triple Point Energy

Overview and Background

Why Energy Efficiency?

Lowest cost alternative to new generation Reduces wasteful use of electricity and frees

up customer resources Provides sustainable green jobs in Ohio Supports the achievement of SB 221

benchmark requirements

Page 6: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

6 © 2013 Triple Point Energy

What is different about CEI? CEI is a Strategic Management Approach to Achieving Low/No-Cost Energy Savings at Industrial Sites

Capital Intensive

“One and Done” concept

Traditional Programs Holistic

Overview of Energy Savings Opportunities

Adds Energy Component to existing CI initiatives

CEI Program

Page 7: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

7 © 2013 Triple Point Energy

37 Industrial Participants

Identified 62 Million kWh

in Opportunities

Realized 23 Million KWh Saved in first

year

200% above our target

savings Estimating $1,380,000 incentives over 3 years

2013 Energy Savings Results

Page 8: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

8 © 2013 Triple Point Energy

2013 Energy Savings Results

• Shut down 1 of 2 chemical wash blowers saving – 770,000 kWh and ~ $38,000 per year

• Shut down 1 of 2 dilution pumps savings – 513,000 kWh and ~ $26,000 per year

Identified Immediate Savings during on-site Energy Scans

Page 9: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

9 © 2013 Triple Point Energy

Catalyst for Capital Projects

The CEI Program has influenced Energy Efficiency Capital Projects

Building an Energy Team

Engaging Employees

Identify Opportunities

Measure the Results

CEI Participants have applied for an additional 11 Million kWh’s in Capital Projects

AEP Ohio Working with Customers

Page 10: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

10 © 2013 Triple Point Energy

Building Better Relationships

Monthly Customer Meetings Positive feedback from Customer Surveys – score of 4.4 out of 5

– Written Materials – Presentations – Workshop Usefulness

Your Trusted Energy Advisor

Page 11: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

11 © 2013 Triple Point Energy

Customer Testimonials

“CEI has also given us metrics we have not had before. In past all we had is our bills and now we have a model to predict our usage.”

“ A great process for developing our Energy Management Program.”

“Looking forward to working with AEP on engaging management & staff to realize additional energy savings.”

“I appreciate the discussion from different companies. Very open, and we all realize we are on the same journey.”

Page 12: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

12 © 2013 Triple Point Energy

Closing

AEP Ohio’s CEI Program is helping customers

Save Energy and Money

Thank you to our customers and partners for supporting our

Energy Efficiency programs!

Page 13: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

13 © 2013 Triple Point Energy

How it Works

Page 14: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

14 © 2013 Triple Point Energy

Keys to No/Low Cost Savings

• Recognize the opportunity • Set the foundation for change • Track progress • Engage the organization • Utilize CEI program resources

Page 15: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

15 © 2013 Triple Point Energy

What are No/Low Cost Activities?

• Typically referred to as “Behaviors” • Cost less than $5,000 (generally much less) • Process and equipment operation • Maintenance activities • Process and equipment setup and optimization • Process scheduling and throughput improvement • Productivity and quality improvement

Page 16: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

16 © 2013 Triple Point Energy

• VOC Stripping Towers

• Used to outgas well water before bringing into the process

No/Low Cost Examples #1

Page 17: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

17 © 2013 Triple Point Energy

No/Low Cost Example #2

• Electric Heated Curing Oven

• Ran 24x7

• Capable of higher through put

Page 18: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

18 © 2013 Triple Point Energy

How Much Opportunity is There?

No/Low Cost Savings • 5% • 10% • 20% +

Page 19: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

19 © 2013 Triple Point Energy

Foundation for Change

• Recruit an Executive Sponsor • Deploy a charter for action • Identify an

Energy Champion and provide a team

Page 20: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

20 © 2013 Triple Point Energy

Track Progress – Establish Baseline

Create a baseline of past performance based on the drivers that determine energy performance.

Linear Regression Model

Page 21: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

21 © 2013 Triple Point Energy

Track Progress - Through Comparison

• Actual minus predicted energy usage • Sum the differences over time

Page 22: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

22 © 2013 Triple Point Energy

Engage the Organization

• Generate ideas – Internal resources – Combined with external resources

• Support and implement changes – Resolve fear and concerns – Ownership

• Integrate saving energy into existing organization initiatives

Page 23: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

23 © 2013 Triple Point Energy

Utilize Program Resources

CEI provides the following – Structured network group – Tools and resources

• Identify and opportunities • measure savings

– Positive reinforcement • Incentives ($) • Recognition

– A call to action

Page 24: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

24 © 2013 Triple Point Energy

Putting Into Practice

Page 25: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

CONTINUOUS ENERGY IMPROVEMENT

COLUMBUS OHIO COHORT 2013

Page 26: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Energy Team

Goal: Develop cross-sectional energy team with members from varying facility backgrounds

Energy Champion – Samuel Day: Energy Coordination and Engineering

Executive Sponsor – Randy Parish: VP of Operations Team Members Curtis Battrell: Manufacturing Engineering/Maintenance John Ice: Operations Supervisor Troy Justice: Melting Operations Supervisor Don Strong: Facilities Engineering

Page 27: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Energy Focus

Energy Policy Committing to a more focused approach toward managing

energy resources and have an overall goal to reduce energy usage by 10% annually.

Energy Awareness Activities Company Newsletters Employee Engagement Events Employee Interactions

Energy Audits Energy usage audits during shutdown periods Leak detection audits Running operation audits

Page 28: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Energy Tracking/Monitoring System

“If you cannot measure it, you cannot improve it.” -Lord Kelvin Develop baseline model 2 years of baseline data Regression used to predict energy usage from baseline data Difference between actual and predicted used to determine

savings

Create graphical representation of the effect of savings projects Cumulative sum of savings implemented Savings percentages

Page 29: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Savings Opportunities

Utilized CEI program technical resources to generate no/low cost opportunities Over 5 million kWh/year savings identified

Leak detection and repair – Continuous process of leak detection and repair Compressed Air, Natural Gas, Compressed Gasses Team to detect and repair leaks

Standardized shutdown procedures Department shutdown checklists Department shutdown audits Optimize dust collection system runtime

Page 30: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Savings Opportunities (continued)

Systems operation standardization Reduce over heating Maximize quantity of parts heated per batch

Efficiency upgrades Improved insulation Gas burner tuning Calibrate and adjust temperature set-points

Utilities misuse reduction Employee awareness of poor or improper tooling usage Reduce misuse or overuse of tooling that requires compressed

air, compressed gases, or natural gas

Page 31: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Successes and Challenges

Successes Employees willingness to adapt to policy/process changes Management support Production scheduling to minimize partial shift operations Minimized runtime promotes equipment longevity

Challenges Changing the mid-set of veteran employees Continuation of leak detection/repairs Changes in production volumes and scheduling Upkeep of implemented programs Resource acquisition (man power and/or funding)

Page 32: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

CUSUM - No/Low Cost Savings Tracking

-10,000,000

-8,000,000

-6,000,000

-4,000,000

-2,000,000

0

2,000,000

1/23

/201

1

2/23

/201

13/

23/2

011

4/23

/201

1

5/23

/201

1

6/23

/201

1

7/23

/201

1

8/23

/201

1

9/23

/201

1

10/2

3/20

11

11/2

3/20

11

12/2

3/20

11

1/23

/201

2

2/23

/201

23/

23/2

012

4/23

/201

2

5/23

/201

2

6/23

/201

2

7/23

/201

2

8/23

/201

2

9/23

/201

2

10/2

3/20

12

11/2

3/20

12

12/2

3/20

12

1/23

/201

3

2/23

/201

33/

23/2

013

4/23

/201

3

5/23

/201

3

6/23

/201

3

7/23

/201

3

8/23

/201

3

9/23

/201

3

10/2

3/20

13

11/2

3/20

13

12/2

3/20

13

Ele

ctri

city

Sav

ings

(kW

h)

Electrical CUSUM [kWh] Leak Detection Implementation

Department Shutdown Standardization

Department Shutdown Implementation

Leak Repair Implementation

Dust Collection Optimization

Additional Leak Repair Resources

Holiday Shutdown Period

Underground Air Line Repairs

Page 33: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Future Projects – No/Low Cost

Pressure set-point reduction – 600,000 kWh/year savings estimate

Continuation of leak tag/repair program Continuation of department shutdown and

scheduling efficiencies

Page 34: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Also Pursuing Capital Projects

Replace 1000 watt sodium lighting with high efficiency LED lighting with motion detection – 7,000,000 kWh/year savings estimate

Replace old compressors with new high efficiency compressors – 4,000,000 kWh/year savings estimate

Variable staging compressor automation to efficiently trim air production – 300,000 kWh/year savings estimate

Page 35: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

Thank You

Columbus Castings would like to thank AEP Ohio for the opportunity to participate in the Continuous Energy Improvement Program. This program has resulted in significant savings through the first year of application and is projected to provide even greater savings in the years to come.

Advice to future participants: Utilize the resources you

have at your disposal as soon as you can. It is never to early to start saving money on utilities costs.

Page 36: AEP Ohio’s Continuous Energy Improvement Initiative · PDF file · 2017-11-22AEP Ohio’s Continuous Energy Improvement Initiative ... In past all we had is our bills and now

36 © 2013 Triple Point Energy

Wrap Up

Thanks for Attending!