AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1 Marie Ostrowski - Lighting/Electrical - April 14, 2010. INTRODUCTION. Project Overview College within the State University of New York system School of Natural and Social Sciences - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

Buffalo State College–

Marie Ostrowski - Lighting/Electrical - April 14, 2010

Page 2: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

College within the State University of New York systemSchool of Natural and Social Sciences

New Science Building Phase 1 Addition - 96,000 ft2

INTRODUCTION

Buffalo State College

source: www.buffalostate.edu

BSC Campus

source: www.maps.google.com

N

Courtesy of Cannon Design

Criteria:

Maintain Architect’s theme + Design Intent

Establish energy consumption/savings

Evaluate alternative motor controller arrangement

Page 3: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

pts

LIGHTING DEPTH

1. Director’s Office *2. Genetics Teaching Lab3. Facade4. Atrium

*Not presented

Page 4: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

F13

F14

F15

F16

F17

LIGHTING DEPTH – WORKING SPACE

GoalsFlexible, efficient space

Criteria•LPD ≤ 1.4 W/ft2

•50 fc at task plane (36”)•Uniformity at Task Surfaces

Materials:

Furniture Flooring Walls Ceiling

Page 5: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

LIGHTING DEPTH – WORKING SPACE

Performance:•LPD = 1.29W/ft2

•Maximum ceiling luminance = 550 cd/m2

2 ) Average Illuminance: 33.75 fcSwitched Ambient, Board + Perimeter On

3) Average Illuminance: 22.98 fcSwitched Ambient, Board On

2 )

1 ) 2)

3)

Average Illuminance: 52.64 fcAll ambient and perimeter on

Page 6: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

L1 F11 F12

LIGHTING DEPTH – OUTDOOR SPACE

GoalsExpose interior corridor walls, create depth with varying light levels

Criteria•LPD :

30 W/lin. Ft. (Entrance)1 W/lin. Ft. (Walkway)0.2 W/sq. ft (Façade)

•5fc at the entrance and walkway

Materials:•Alternating aluminum and clear glass panels

Page 7: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

LIGHTING DEPTH – OUTDOOR SPACE

Performance:•LPD complies with 26W to spare considering the 5% unrestricted allowance

•Average walkway illuminance 3.7fc

Page 8: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

F6 F7 F8 M1

LIGHTING DEPTH – ATRIUM

GoalsHighlight height of space, create a sense of movement, mimic rectilinear geometries

Criteria•LPD :

0.6 W/ft2 (Level 1)0.5 W/ft2 (Level 2 + 3)

•Horizontal Illuminance: 10fc

Materials:

Existing Walls

Corridor Walls

Ceiling Floor/Accent Wall

A B

A

B

Page 9: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

F6 F7 F8 M1

LIGHTING DEPTH – ATRIUM

Existing Walls

Corridor Walls

Ceiling Floor/Accent Wall

A B

A

B

GoalsHighlight height of space, create a sense of movement, mimic rectilinear geometries

Criteria•LPD :

0.6 W/ft2 (Level 1)0.5 W/ft2 (Level 2 + 3)

•Horizontal Illuminance: 10fc

Materials:

Page 10: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

F6 F7 F8 M1

LIGHTING DEPTH – ATRIUM

Existing Walls

Corridor Walls

Ceiling Floor/Accent Wall

A B

A

B

GoalsHighlight height of space, create a sense of movement, mimic rectilinear geometries

Criteria•LPD :

0.6 W/ft2 (Level 1)0.5 W/ft2 (Level 2 + 3)

•Horizontal Illuminance: 10fc

Materials:

Page 11: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

LIGHTING DEPTH – ATRIUM

Performance:• LPD

• Level One = 0.62• Level Two = 0.28• Level Three = 0.35

• Complies Overall

• Average Illuminance • One: 12.84 fc• Two: 12.54 fc• Three: 18.67 fc

Page 12: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

Available Daylight

DAYLIGHTING

Level One – DA 12/21 Level Two – DA 12/21 Level Three – DA 12/21

Page 13: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

Electric Light Integration - Open Loop Switching - Three Zones

Energy Savings Summary

DAYLIGHTING

0.627 0.6250.627 0.625 0.623 0.625

0.605 0.624 0.622 0.618 0.6190.609 0.621 0.623 0.615 0.6160.603 0.619 0.623 0.628 0.6220.601 0.617 0.619 0.618 0.6210.585 0.614 0.618 0.62 0.6210.585 0.611 0.61 0.616 0.6090.574 0.614 0.606 0.608 0.6170.568 0.611 0.61 0.604 0.6130.563 0.605 0.609 0.602 0.615

0.55 0.601 0.602 0.597 0.6080.555 0.582 0.601 0.59 0.6030.562 0.581 0.594 0.593 0.595

0.54 0.587 0.583 0.587 0.5810.515 0.568 0.58 0.576 0.5850.478 0.554 0.581 0.576 0.566 0.5870.484 0.563 0.574 0.538 0.558 0.5920.383 0.515 0.547 0.549 0.565 0.5890.433 0.534 0.536 0.54 0.513 0.6020.362 0.516 0.497 0.506 0.532 0.6140.344 0.496 0.514 0.514 0.525 0.6140.247 0.479 0.478 0.492 0.457 0.6050.227 0.394 0.389 0.418 0.469 0.6140.134 0.401 0.415 0.437 0.435 0.6120.143 0.381 0.583 0.611 0.413 0.6180.029 0.418 0.592 0.592 0.588 0.6210.042 0.468 0.589 0.595 0.594 0.6210.124 0.495 0.594 0.601 0.589 0.6180.123 0.496 0.607 0.605 0.601 0.6160.131 0.518 0.611 0.615 0.613 0.620.125 0.478 0.61 0.617 0.61 0.6230.133 0.533 0.612 0.62 0.615 0.6260.135 0.534 0.614 0.62 0.618 0.6250.134 0.545 0.619 0.623 0.619 0.6220.138 0.572 0.618 0.623 0.619 0.6260.151 0.564 0.617 0.623 0.619 0.6240.156 0.572 0.62 0.625 0.621 0.6320.168 0.573 0.618 0.619 0.619 0.6240.167 0.59 0.62 0.621 0.628 0.6270.188 0.596 0.621 0.624 0.625 0.630.208 0.592 0.621 0.625 0.626 0.6280.212 0.605 0.623 0.632 0.624 0.6250.215 0.591 0.633 0.632 0.627 0.6290.236 0.595 0.631 0.631 0.624 0.63

0.27 0.6 0.628 0.63 0.625 0.6310.256 0.62 0.625 0.627 0.624 0.6320.291 0.609 0.628 0.627 0.621 0.6280.284 0.622 0.629 0.632 0.622 0.627

0.34 0.619 0.626 0.633 0.598 0.6270.363 0.616 0.626 0.63 0.617 0.6230.425 0.622 0.629 0.631 0.623 0.6290.402 0.619 0.629 0.63 0.629 0.6320.457 0.621 0.629 0.631 0.636 0.6260.464 0.622 0.628 0.628 0.634 0.63

0.46 0.624 0.634 0.628 0.629 0.6250.501 0.624 0.635 0.631 0.625 0.6260.502 0.627 0.629 0.631 0.627 0.6310.522 0.628 0.628 0.637 0.632 0.6280.509 0.626 0.633 0.635 0.627 0.6240.514 0.625 0.633 0.631 0.632 0.6240.557 0.626 0.634 0.631 0.632 0.6280.556 0.628 0.634 0.632 0.632 0.630.549 0.622 0.625 0.632 0.635 0.627

0.56 0.63 0.625 0.633 0.628 0.6240.567 0.631 0.629 0.633 0.634 0.6280.575 0.625 0.629 0.635 0.632 0.6280.579 0.626 0.63 0.632 0.633 0.6290.567 0.627 0.629 0.632 0.63 0.6290.575 0.628 0.632 0.631 0.628 0.6330.607 0.627 0.63 0.632 0.629 0.6240.585 0.629 0.629 0.633 0.629 0.6260.582 0.631 0.629 0.635 0.63 0.63

0.6 0.632 0.631 0.635 0.63 0.6260.596 0.626 0.632 0.634 0.63 0.6330.584 0.626 0.63 0.634 0.63 0.6250.585 0.631 0.628 0.629 0.631 0.6240.577 0.63 0.631 0.629 0.628 0.6260.572 0.627 0.629 0.634 0.628 0.6250.572 0.626 0.628 0.635 0.628 0.6250.573 0.628 0.626 0.624 0.627 0.6280.571 0.629 0.635 0.628 0.628 0.6320.566 0.625 0.634 0.629 0.628 0.6280.566 0.626 0.635 0.635 0.626 0.6270.568 0.63 0.634 0.631 0.634 0.6290.557 0.63 0.63 0.632 0.623 0.6310.554 0.629 0.629 0.63 0.626 0.630.537 0.629 0.627 0.63 0.629 0.6270.539 0.622 0.628 0.631 0.632 0.6280.547 0.621 0.627 0.631 0.635 0.6280.538 0.633 0.627 0.631 0.634 0.6310.511 0.632 0.632 0.63 0.63 0.6260.505 0.629 0.631 0.631 0.631 0.6280.495 0.629 0.635 0.634 0.631 0.625

0.51 0.626 0.633 0.63 0.627 0.630.489 0.626 0.631 0.631 0.627 0.6220.447 0.629 0.63 0.637 0.625 0.6340.471 0.625 0.635 0.638 0.633 0.6350.466 0.628 0.635 0.628 0.632 0.6290.386 0.627 0.635 0.628 0.632 0.6310.304 0.63 0.634 0.632 0.631 0.6330.416 0.63 0.63 0.633 0.629 0.633

0.28 0.629 0.631 0.633 0.629 0.6330.311 0.622 0.631 0.633 0.629 0.6350.321 0.625 0.629 0.633 0.628 0.6320.249 0.623 0.625 0.635 0.625 0.6250.255 0.624 0.625 0.631 0.629 0.6320.215 0.63 0.633 0.633 0.629 0.6230.195 0.63 0.633 0.629 0.626 0.6280.184 0.63 0.63 0.629 0.626 0.630.149 0.625 0.63 0.63 0.627 0.620.151 0.627 0.632 0.629 0.63 0.6280.135 0.626 0.631 0.631 0.626 0.6270.135 0.629 0.632 0.631 0.6290.121 0.624 0.63 0.627 0.6290.114 0.623 0.622 0.625 0.6140.107 0.619 0.62 0.628 0.6130.097 0.621 0.628 0.629 0.6240.099 0.617 0.627 0.633 0.6250.094 0.619 0.628 0.632 0.6290.092 0.617 0.628 0.628 0.6230.077 0.62 0.626 0.628 0.6280.071 0.618 0.625 0.629 0.6280.066 0.617 0.632 0.628 0.6270.064 0.61 0.63 0.627 0.622

Total Annual Energy Savings from SwitchingLevel One 2117.812

Level Two 1155.335Level Three 1452.712

4725.859 kWh

Page 14: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

Carpeting vs. Tile Flooring

1) Existing2) Level One Replaced w/ Carpeting3) All Atrium Flooring Replaced w/ Carpeting

Comparison at 1,000 Hz

ACOUSTICAL BREADTH

Target Range: 1.3-1.9 s

Results:

1) RT = 1.752) RT = 1.363) RT = 1.16

Page 15: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

LED STUDY

1) 21 luminaires arranged perpendicular to tables2) 16 luminaires parallel and in between lab tables

Scenario 1 Scenario 2

Average Illuminance: 44.4 fcPayback Period: 16 years

Average Illuminance: 41.5 fcPayback Period: 7 years

Page 16: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

Existing Distribution

Direct Replacement: Motor Loads = 2867.9 ARemoving Chillers: Motor Loads = 1341.9 A

-reduces size of incoming feeder bus

ELECTRICAL DEPTH

Page 17: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1

LIGHTING: Illuminated spaces to satisfy IESNA standards and ASHRAE power requirements

DAYLIGHTING: Reduced annual energy consumption by over 50% with integrated photosensor system

ACOUSTICS: Validated improvements with alternative flooring; not critical to implement

LED STUDY: Alternative general illumination system for labs insufficient

ELECTRICAL: MCC designed for mechanical penthouse is not practical

PROJECT SUMMARY

Page 18: AE Senior Thesis 2010 Buffalo State College Science Building – Phase 1