ADVISORYGROUP2016
May 17-18, 2016
Paris
PPPPROJECTSSHEETS
2
CONTENTS
SUMMARYTABLEOFTHEPPPPROJECTS............................................................................6
MINISTRYOFSTATE,MINISTRYOFTHEINTERIORANDSECURITY.....................................13PROJECTNo.1. BuildingandoperatingtheMallinthePlateau..............................................................14
MINISTRYOFCOMMUNICATION......................................................................................15PROJECTNo.2. Financing,buildingandoperatingtheinfrastructurefortheswitchtodigital
terrestrialtelevision(DTT)...................................................................................................16
MINISTRYOFCULTUREANDFRANCOPHONIE...................................................................17PROJECTNo.3. Rehabilitatingthehistoriccityofgrand-bassam............................................................18PROJECTNo.4. BuildingtheAfricanRenaissanceLibrary(ARL)..............................................................19
MINISTRYOFSPORTANDLEASURE..................................................................................20PROJECTNo.5. BuildingandoperatingthesportshighschoolofBouaké..............................................21PROJECTNo.6. Buildingandoperatingthe“Villages”ofthe2021ACN.................................................22PROJECTNo.7. BuildingandoperatingtheEBIMPEOlympicVillage......................................................23
MINISTRYOFHIGHEREDUCATIONANDSCIENTIFICRESEARCH.........................................24PROJECTNo.8. BuildingandequippingtheUniversityofSanPedro......................................................25
MINISTRYOFHEALTHANDPUBLICHYGIENE....................................................................26PROJECTNo.9. RehabilitatingandmaintainingtheUniversityHospitalofCocody................................27PROJECTNo.10. Rehabilitating,equippingandmaintainingtheUniversityHospitalofTreichville.......28PROJECTNo.11. BuildingandequippingtheNationalCentreforRadiotherapyandMedical
Oncology(CNROM)..............................................................................................................29PROJECTNo.12. RehabilitatingandequippingtheHeartInstituteofAbidjan.......................................30
MINISTRYOFAGRICULTUREANDRURALDEVELOPMENT.................................................31PROJECTNo.13. Operatinga2,000hectarestate-owneddomainfortheproductionandprocessing
ofsoya..................................................................................................................................32
MINISTRYOFANIMALANDFISHRESOURCES...................................................................33PROJECTNo.14. Buildingandoperatingslaughterhousesinthecapitalcitiesoftheinteriorofthe
country(Yamoussoukro,Daloa,BouakéandKorhogo).......................................................34PROJECTNo.15. Projectforbuildingandoperatingtheslaughterhouse-cattlemarketcomplexof
Abidjan-Anyama(CAMA)....................................................................................................35PROJECTNo.16. IntegratedManagementProjectofRanchesandStations(PROGIRS)/
RehabilitatingandoperatingoftheBadikahaseedfarm(BSF)...........................................36PROJECTNo.17. IntegratedManagementProjectofRanchesandStations(PROGIRS)/Meat
productionatNioroningueStation(PBSN)..........................................................................37
3
PROJECTNo.18. IntegratedManagementProjectofRanchesandBreedingstations(PROGIRS)/MeatproductionatPanyaStation(PSBP)............................................................................38
PROJECTNo.19. IntegratedManagementProjectofRanchesandStations(PROGIRS)/Agro-industrialdairycomplexofToumodi...................................................................................39
MINISTRYOFCOMMERCE................................................................................................40PROJECTNo.20. BuildingandoperatingwholesaleandretailmarketsinAbidjan,Daloa,
Abengourouand7otherprovincialcapitals........................................................................41PROJECTNo.21. BuildingandoperatingtheExhibitionCentreofAbidjan.............................................42
MINISTRYOFPETROLEUMANDENERGY..........................................................................43
PROJECTSINTHEHYDROCARBONSECTOR.......................................................................................44PROJECTNo.22. SupplyingCôted’IvoireinLiquefiedNaturalGas(LNG)...............................................45PROJECTNo.23. Creatingfillingplantsintenlocalities...........................................................................46PROJECTNo.24. BuildingandoperatingahydrocarbondepotandanoilwharfinSanPedro..............47PROJECTNo.25. BuildingofanoilstorageterminalàVridide1100000MT(Phase1)onthewest
sideofthecanal...................................................................................................................48PROJECTSINTHEENERGYSECTOR....................................................................................................49
PROJECTNo.26. Buildingcocoabiomassplants(80MW)......................................................................50PROJECTNo.27. BuildingandoperatingacottonbiomassplantinBoundiali(25MW).........................51PROJECTNo.28. Buildingbiomassplants(10sites,200MW).................................................................52PROJECTNo.29. Buildingphotovoltaicsolarpowerplants(5Sites,100MW).......................................53
MINISTRYOFINDUSTRYANDMINES................................................................................54PROJECTNo.30. ProgrammeforthecreationanddevelopmentofnewindustrialzonesinAbidjan
andtheinteriorofthecountry............................................................................................55PROJECTNo.31. IntegratedminingdevelopmentprojectintheWest(PDMIO)....................................56
MINISTRYOFTOURISM....................................................................................................57PROJECTNo.32. Developingandoperating9“hut-stopovers”..............................................................58PROJECTNo.33. Rehabilitatingandoperating5SIETHOhotels..............................................................59PROJECTNo.34. Rehabilitatingandoperatingthe“HotelPresident”ofYamoussoukro........................60PROJECTNo.35. DevelopingandoperatingthewildlifeparkofAbokouamékro...................................61PROJECTNo.36. RehabilitatingandextendingtheIvoireGolf-ClubofAbidjan......................................62
MINISTRYOFTRANSPORT................................................................................................63
PROJECTSINTHERAILWAYSECTOR..................................................................................................64PROJECTNo.37. BuildingandoperatingLine1oftheAbidjanSubway..................................................65PROJECTNo.38. BuildingandoperatingtheOuangolodougou–Niellé–Sikassorailwayline..............66PROJECTNo.39. RehabilitatingandoperatingtheAbidjan–Ouagadougou–Kayarailwayline.............67
PROJECTSINTHEAIRPORTSECTOR..................................................................................................68PROJECTNo.40. Buildingofthe“Airportcity”ofAbidjan.......................................................................69PROJECTNo.41. Designing,financing,buildingandoperatingthenewinternationalairportofSan
Pedroanditsairportcity......................................................................................................70PROJECTSINTHEROADSECTOR.......................................................................................................71
PROJECTNo.42. Building,equippingandoperatingthebusstationofBouaké.....................................72PROJECTNo.43. BuildingthejuxtaposedborderpostofNigoni(Tingrela)............................................73
4
PROJECTSINTHEPORTSECTOR........................................................................................................74PROJECTNo.44. RelocatingandextendingthecontainerterminaloftheportofSanPedro................75PROJECTNo.45. Developingandoperatingofa150hectarelogisticshubandindustrialzoneatthe
portofSanPedro.................................................................................................................76PROJECTNo.46. Developingandoperatingamixed-usecommercialterminalattheportofSan
Pedro....................................................................................................................................77PROJECTNo.47. Buildingamixed-useindustrialterminalattheportofSanPedro..............................78PROJECTNo.48. Financing,buildingandoperatingagrainterminalatthePortofAbidjan..................79PROJECTNo.49. Financing,buildingandoperatinganorewharfatthePortofAbidjan.......................80PROJECTNo.50. Financing,buildingandoperatingatreatmentplantofliquidwastefromshipsand
effluentsfromindustriesintheportareaofAbidjan(deballastingstation).......................81PROJECTNo.51. BackfillinganddevelopingthebayofVridi-BietryandbuildingtheVridi-Bietry
bridge...................................................................................................................................82PROJECTNo.52. BuildingofalogisticshubandparkinglotfortrucksatPK26ontheNorthern
HighwaytorelievecongestionintheportareaofAbidjan..................................................83
MINISTRYOFECONOMICINFRASTRUCTURE.....................................................................84PROJECTNo.53. SupplyingdrinkingwatertothecityofAbidjan...........................................................85PROJECTNo.54. DevelopingandoperatingtheAbidjan-SamoHighway................................................86PROJECTNo.55. BuildingandoperatingSection2oftheAbidjan-SanPedro:Dabou-SanPedro
highway................................................................................................................................87
MINISTRYOFURBANWASTEMANAGEMENTANDSANITATION.......................................88PROJECTNo.56. Buildinginfrastructureforthemanagementofdomesticandsimilarwaste(DSMA)
inthedistrictofAbidjan.......................................................................................................89
MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENT.............................90PROJECTNo.57. DevelopmentandtourismvalorisationoftheBancoNationalPark............................91PROJECTNo.58. DevelopmentandtourismvalorisationoftheDalhiaFleurnaturalreserve................92
MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT.............................................93PROJECTNo.59. AGEF/PrivateSectorDevelopmentandLandSales......................................................94PROJECTNo.60. Settingupandoperatingavirtualsingledeskfortheissuingofconstruction
permitsthroughanintegratedinformationsystem............................................................95PROJECTNo.61. Buildingandoperatingthe“PlaceoftheNation”complex..........................................96PROJECTNo.62. Rehabilitatingandoperatingthe“pyramid”building..................................................97PROJECTNo.63. RehabilitatingandoperatingtheBICICIbuilding..........................................................98PROJECTNo.64. Buildingandoperatinga5starHiltonHotel................................................................99
MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES...............................................100PROJECTNo.65. StreetsignageofthedistrictofAbidjan.....................................................................101PROJECTNo.66. Creatingandoperating5,000communitymulti-servicecybercentres.....................102PROJECTNo.67. E-agricultureProgramme...........................................................................................103PROJECTNo.68. Building5,000kmoffibreoptics................................................................................105
MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS........................106PROJECTNo.69. BuildingandoperatingthedryportofFerkessédougou............................................107PROJECTNo.70. BuildingaproductionplantofbiolarvicidesinCôted’Ivoire.....................................108
5
6
SUMMARYTABLEOFTHEPPPPROJECTS
7
NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*
PROJECTN°1. BuildingandoperatingtheMallinthePlateau InteriorandSecurity 60,000 120
PROJECTN°2.Financing,buildingandoperatingtheinfrastructurefortheswitchtoDigitalTerrestrialTelevision(DTT)
Communication 60,000 120
PROJECTN°3. RehabilitatingthehistoriccityofGrand-Bassam CultureandFrancophonie 350,000 700
PROJECTN°4. BuildingtheAfricanRenaissanceLibrary(ARL) CultureandFrancophonie 49,600 99
PROJECTN°5. BuildingandoperatingthesportshighschoolofBouaké SportandLeisure 25,000 50
PROJECTN°6. Buildingandoperatingthe“Villages”ofthe2021ACN SportandLeisure 42,000 84
PROJECTN°7. BuildingandoperatingtheEBIMPEOlympicVillage SportandLeisure 71,000 142
PROJECTN°8. BuildingandequippingtheUniversityofSanPedroHigherEducationandScientific
Research184,000 368
PROJECTN°9. RehabilitatingandoperatingtheUniversityHospitaldeCocody HealthandPublicHygiene 112,500 225
PROJECTN°10.Rehabilitating,equippingandmaintainingtheUniversityHospitalofTreichville
HealthandPublicHygiene 112,500 225
PROJECTN°11.BuildingandequippingtheNationalCentreforRadiotherapyandMedicalOncology(CNROM)
HealthandPublicHygiene 75,000 150
PROJECTN°12. RehabilitatingandequippingtheHeartInstituteofAbidjan HealthandPublicHygiene 10,000 20
PROJECTN°13.Operatinga2,000hectarestate-owneddomainfortheproductionandprocessingofsoya
AgricultureandRuralDevelopment
16,000 32
PROJECTN°14.Buildingandoperatingslaughterhousesinthecapitalcitiesoftheinteriorofthecountry(Yamoussoukro,Daloa,BouakéandKorhogo)
Animalandfishresources 16,690 33
8
NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*
PROJECTN°15.Projectforbuildingandoperatingtheslaughterhouse-cattlemarketcomplexofAbidjan-Anyama(CAMA)
AnimalandFishResources 21,200 42
PROJECTN°16.IntegratedManagementProjectofRanchesandStations(PROGIRS)/RehabilitatingandoperatingtheBadikahaseedfarm(BSF)
AnimalandFishResources 4,000 8
PROJECTN°17.IntegratedManagementProjectofRanchesandStations(PROGIRS)/MeatproductionatNioroningueStation(PBSN)
AnimalandFishResources 4,000 8
PROJECTN°18.IntegratedManagementProjectofRanchesandBreedingstations(PROGIRS)/MeatproductionatPanyaStation(PSBP)
AnimalandFishResources 4,000 8
PROJECTN°19.IntegratedManagementProjectofRanchesandStations(PROGIRS)/Agro-industrialdairycomplexofToumodi
AnimalandFishResources 6,000 12
PROJECTN°20.BuildingandoperatingwholesaleandretailmarketsinAbidjan,Daloa,Abengourouand7otherprovincialcapitals
Commerce 100,548 201
PROJECTN°21. BuildingandoperatingtheExhibitionCentreofAbidjan Commerce 53,000 106
PROJECTN°22. SupplyingCôted'IvoireinLiquefiedNaturalGas(LNG) Hydrocarbons 110,000 220
PROJECTN°23. Creatingfillingplantsintenlocalities Hydrocarbons 29,100 58
PROJECTN°24.BuildingandoperatingahydrocarbondepotandanoilwharfinSanPedro
Hydrocarbons 32,000 64
PROJECTN°25.Buildingofa1,100,000MT(Phase1)oilstorageterminalinVridionthewestsideofthecanal
Hydrocarbons 394,758 790
PROJECTN°26. Buildingcocoabiomassplants(80MW) Energy 325,400 651
PROJECTN°27.BuildingandoperatingacottonbiomassplantinBoundiali(25MW)
Energy 29,000 58
PROJECTN°28. Buildingbiomassplants(10sites,200MW) Energy 210,000 420
9
NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*
PROJECTN°29. Buildingphotovoltaicsolarpowerplants(5Sites,100MW) Energy 220,000 440
PROJECTN°30.ProgrammeforthecreationanddevelopmentofnewindustrialzonesinAbidjanandtheinteriorofthecountry
IndustryandMines 105,0001 210
PROJECTN°31. IntegratedminingdevelopmentprojectintheWest(PDMIO) IndustryandMines 1,359,000 2718
PROJECTN°32. Developingandoperating9“hut-stopovers” Tourism 11,7002 23
PROJECTN°33. Rehabilitatingandoperatingof5SIETHOhotels Tourism 11,000 22
PROJECTN°34.Rehabilitatingandoperatingthe“HotelPresident”ofYamoussoukro
Tourism 30,000 60
PROJECTN°35. DevelopingandoperatingthewildlifeparkofAbokouamékro Tourism - -
PROJECTN°36. RehabilitatingandextendingtheIvoireGolf-ClubofAbidjan Tourism 150,000 300
PROJECTN°37. BuildingandoperatingLine1oftheAbidjanSubway Transport 656,000 1312
PROJECTN°38.BuildingandoperatingtheOuangolodougou–Niellé–Sikassorailwayline
Transport 80,000 160
PROJECTN°39.RehabilitatingandoperatingtheAbidjan–Ouagadougou–Kayarailwayline
Transport 350,000 700
PROJECTN°40. Buildingthe“Airportcity”ofAbidjan Transport 88,000 176
PROJECTN°41.Designing,financing,buildingandoperatingthenewinternationalairportofSanPedroanditsairportcity
Transport 45,000 90
1Minimumcostoftheproject(developmentofanindustrialzonewithaminimumsurfaceareaof50hain7cities)2For9hut-stopoversof30roomseach.
10
NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*
PROJECTN°42. Building,equippingandoperatingthebusstationofBouaké Transport 15,000 30
PROJECTN°43. BuildingthejuxtaposedborderpostofNigoni(Tingrela) Transport 9,020 18
PROJECTN°44.RelocatingandextendingthecontainerterminaloftheportofSanPedro
Transport 260,000 520
PROJECTN°45.Developingandoperatinga150halogisticshubandindustrialzoneattheportofSanPedro
Transport 85,000 170
PROJECTN°46.Developingandoperatingamixed-usecommercialterminalattheportofSanPedro
Transport 5,000 10
PROJECTN°47. Buildingamixed-useindustrialterminalattheportofSanPedro Transport 20,000 40
PROJECTN°48.Financing,buildingandoperatingagrainterminalatthePortofAbidjan
Transport 35,000 70
PROJECTN°49.Financing,buildingandoperatinganorewharfatthePortofAbidjan
Transport 75,000 150
PROJECTN°50.Financing,buildingandoperatingatreatmentplantofliquidwastefromshipsandeffluentsfromindustriesintheportareaofAbidjan(deballastingstation)
Transport 20,000 40
PROJECTN°51.BackfillinganddevelopingthebayofVridi-BietryandbuildingtheVridi-Bietrybridge
Transport 120,000 240
PROJECTN°52.BuildingofalogisticshubandparkinglotfortrucksatPK26ontheNorthernHighwaytorelieveconmanagementintheportareaofAbidjan
Transport 25,000 50
PROJECTN°53. SupplyingdrinkingwatertothecityofAbidjan Drinkingwater 280,000 560
PROJECTN°54. DevelopingandoperatingtheAbidjan-SamoHighway RoadInfrastructure 60,000 120
PROJECTN°55.BuildingandoperatingSection2oftheAbidjan–SanPedro:Dabou-SanPedroHighway
RoadInfrastructure 690,000 1380
11
NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*
PROJECTN°56.Buildinginfrastructureforthemanagementofdomesticandsimilarwaste(DSMA)inthedistrictofAbidjan
UrbanSanitation 54,000 108
PROJECTN°57.DevelopmentandtourismvalorisationoftheBancoNationalPark
EnvironmentandSustainableDevelopment
11,900 24
PROJECTN°58.DevelopmentandtourismvalorisationoftheDahliaFleurNatureReserve
EnvironmentandSustainableDevelopment
7500 15
PROJECTN°59. AGEF/PrivateSectorDevelopmentandLandSalesConstructionandUrban
Development109,000 218
PROJECTN°60.Settingupandoperatingavirtualsingledeskfortheissuingofconstructionpermitsthroughanintegratedinformationsystem
ConstructionandUrbanDevelopment
15,000 30
PROJECTN°61. Buildingandoperatingthe“PlaceoftheNation”complexConstructionandUrban
Development86,235 172
PROJECTN°62. Rehabilitatingandoperatingthe“pyramid”buildingConstructionandUrban
Development30,000 60
PROJECTN°63. RehabilitatingandoperatingtheBICICIbuildingConstructionandUrban
Development13,400 27
PROJECTN°64. Buildingandoperatinga5starHiltonHotelConstructionandUrban
Development60,000 120
PROJECTN°65. StreetsignageofthedistrictofAbidjanDigitalEconomyandPostal
Services8,000 16
PROJECTN°66.Creatingandoperating5,000communitymulti-servicecybercentres
DigitalEconomyandPostalServices
53,000 106
PROJECTN°67. E-agricultureProgrammeDigitalEconomyandPostal
Services33,500 67
PROJECTN°68. Building5,000kmoffibreopticsDigitalEconomyandPostal
Services50,000 100
PROJECTN°69. BuildingandoperatingthedryportofFerkessédougouAfricanIntegrationandIvoriansLivingOverseas
303,000 606
12
NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*
PROJECTN°70. BuildingaproductionplantofbiolarvicidesinCôted’IvoireAfricanIntegrationandIvoriansLivingOverseas
15,500 31
*(1USD=500CFA)TOTAL 8,162,051 16,323
13
MINISTRYOFSTATE,MINISTRYOFTHEINTERIORANDSECURITY
14
PROJECTNo.1. BUILDINGANDOPERATINGTHEMALLINTHEPLATEAU
NDPReference Strategicpriority1/Impact2/Effect1/Output1.4/Action1.4.1ContractingAuthority MINISTRYOFSTATE,MINISTRYOFTHEINTERIORANDSECURITY
FocalUnitoftheContractingAuthority
Mr.YAPIFidelDirectorofStudies,Programmingandmonitoring-evaluation
Tel:(225)20320848Email:[email protected]/[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theaimistobuildonthe9,600m2ofthesiteoftheformermarketofthePlateau,a21-storeytourcomprising:
• Aluxuryhotel,• AR+3shoppingmall,• Officespaces,• Athree-floorundergroundparkinglot(583spaces).
• ThecommuneofthePlateauwillusethevalueofthelandtoacquiresharesinthecapitalofthecompanythatwilltakeuptheproject.
Location • Abidjan-Plateau–SiteoftheformermarketofthePlateau
Project’sbenefit
• ContributetothemodernisationandcoherentdevelopmentoftheCommuneofthePlateau
• Partlyaddresstheshortfallinofficespaces,hotelroomsandparkinglotsintheplateau.
Estimatedcost • FCFA60,000M/EUR91M/USD120M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operation
Anticipateddistributionofinvestments:• Publicinvestment:0%• Privateinvestment:100%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• ValorisationoftheState’sprivatedomain
PROJECT’SSTATUS
Progress • Transactioninprogress
Informationavailable • FrameworkAgreement
Nextstep(s)andtimetable
• Negotiations• Signingofthecontract.
15
MINISTRYOFCOMMUNICATION
16
PROJECTNo.2. FINANCING,BUILDINGANDOPERATINGTHEINFRASTRUCTUREFORTHESWITCHTODIGITALTERRESTRIALTELEVISION(DTT)
NDPReference Strategicpriority1/Impact1/Effect3/Output3.5/Action3.5.4
ContractingAuthority PRIMEMINISTER’SOFFICEMINISTRYOFCOMMUNICATION
FocalUnitoftheContractingAuthority
PRIMEMINISTER’SOFFICEMr.KABOREJean-Philippe
ExecutiveSecretaryoftheNationalCommitteefortheSwitchtoDTT
Tel:(225)09836115/(225)20212838Email:[email protected]
MINISTRYOFCOMMUNICATIONMr.KOFFIKoumanAlexis
TechnicalAdviser,InchargeoftheDTTTel:(225)07893354/(225)20212958
Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theaimofthisproject istofinance,buildandoperatetheDTTinfrastructure, inordertoswitchtoterrestrialdigitaltelevision.Itcomprisestwo(2)phases:• Phase1:Abobo-Abidjanpilotproject
- Upgradingofthetechnicalinfrastructureandequipment,- Upgrading of the transport infrastructure from the Cocody production
centre to Abobo by radio relay beams and to the other centres bysatellite.
• Phase2:Nationalproject(throughoutthenationalterritory)- Rehabilitation of 26 initial broadcasting centres, transformation of the
four(4)rebroadcastingcentresandbuildingofnewbroadcastingcentrestoensureacoverofatleast95%ofthenationalterritory
-Networkdeployment.
Location • Nationalterritory
Project’sbenefit• Increaseanddiversificationtheproductionsupplyandtelevisionbroadcasting• Improvingthequalityofthetransmission• Digitaldividends.
Estimatedcost • FCFA60,000M(2015)/EUR91M/USD120M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients(productioncompanies)
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress
• Studiesavailable;• Pilotphaseimplemented;• Consultation document in preparation with a view to launching an
internationalcallfortenders.Informationavailable • TechnicalandfinancialfeasibilitystudyNextstepsandtimetable • Launchtheconsultationprocess
17
MINISTRYOFCULTUREANDFRANCOPHONIE
18
PROJECTNo.3. REHABILITATINGTHEHISTORICCITYOFGRAND-BASSAM
NDPReference Strategicpriority3/Impact4/Effect3/Output3.3/Action3.4.3
ContractingAuthority MINISTRYOFCULTUREANDFRANCOPHONIE
FocalUnitoftheContractingAuthority
Mr.COULIBALY-DIAKITÉMamidouZoumanaDirectorofInfrastructureandCulturalEquipment
Tel:(225)20212473Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
The city of Grand-Bassam is a UNESCO-listed World Heritage Site. In order topreserve this rich architectural and urban-planning heritage, which presentssignificantdegradationinplaces,theGovernmenthasdefinedaglobalpreservationplanofinfrastructurerehabilitationandvalorisation.TheaimoftheprojectistherehabilitationandvalorisationofthemonumentsofthehistoriccityofGrand-Bassam,inpartnershipwithprivateoperators.
Location • Grand-Bassam
Project’sbenefit• MaintainingtheUNESCO-listedWorldHeritagestatusofthehistoriccityof
Grand-Bassam.• Valorisationoftheculturalheritageandincreaseoftouristactivity,jobcreation.
Estimatedcost • FCFA350,000M/EUR534M/USD700M(1USD=500CFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefinedbythestudies• Publicinvestment:Tobedefinedbythestudies
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Serviceconcession/concession/BOT
PROJECT’SSTATUS
Progress
• Globalstudiescarriedoutandvalidatedinaworkshop/pendingacadastralplancadastralofthesite.Settingupofaninter-sectoralSteeringCommitteeinprogress.ArchaeologicalandpathologicalstudiesoftheCourthousecarriedout.FinancingoftheVRDacquiredandlodgedatAGEROUTE/identificationofneedsintermsofongoingVRD.
Informationavailable • Technicalstudies
Nextstepsandtimetable
• Additionalstudies• Launchtheconsultationprocess.
19
PROJECTNo.4. BUILDINGTHEAFRICANRENAISSANCELIBRARY(ARL)
NDPReference Strategicpriority3/Impact1/Effect3/Output3.2/Action3.2.2ContractingAuthority MINISTRYOFCULTUREANDFRANCOPHONIE
FocalUnitoftheContractingAuthority
Mr.COULIBALY-DIAKITÉMamidouZoumanaDirectorofInfrastructureandCulturalEquipment
Tel:(225)20212473Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theaimof thisproject is tobuild,ona1haState-ownedprivatedomain (DECOsite), a 14-floor tour comprising: (i) the African Renaissance Library (ARL)with asurface area of 21,500m2, (ii) a Convention Centre (10,000m2), (iii) commercialand administrative spaces (22,500m2), and (iv) a parking lot (2,400 spaces). Thepremises of the ARL, as well as some administrative spaces shall remain State-owned,whilst other spaces shall fully belong to theprivatepartner,whowill beremuneratedthroughthemarketingandoperationofthespaceshencedeveloped.
Location• CommuneofthePlateau-Abidjan(spaceoccupiedbytheDECOofthe
MinistryofNationalEducation)
Project’sbenefit• Ensure,inanadaptedframework,thepromotionofpropertiesofthenational
culturalheritage.ContributetothemodernisationandcoherentdevelopmentoftheCommuneofthePlateau.
Estimatedcost • FCFA49,600M/EUR75.8M/USD99M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining
Anticipateddistributionofinvestments:• Privateinvestment:FCFA49,000M• Publicinvestment:FCFA600M
Modalitiesfortheremunerationofthepartner:• Users/Taxpayers
Typeofpartnershipenvisaged:• ValorisationoftheState’sprivatedomain
PROJECT’SSTATUS
Progress • Transactionfortheselectionofaprivatepartner
Informationavailable • Functionalprogrammeavailable
Nextstepsandtimetable • Launchtheconsultationprocess
20
MINISTRYOFSPORTANDLEASURE
21
PROJECTNo.5. BUILDINGANDOPERATINGTHESPORTSHIGHSCHOOLOFBOUAKÉ
NDPReference Strategicpriority4/Impact1/Effect4/Output4.1/Action4.1.3ContractingAuthority MINISTRYOFSPORTANDLEISURE
FocalUnitoftheContractingAuthority
Mr.KONESalifFinancialServicesAdministrator
Director-GeneralofONSLandline:(225)20304444/(225)20304440Mobile:(225)59012822/(225)03031303
Email:[email protected]/[email protected]
Briefdescription
TheprojectofbuildingthesportshighschoolofBouakéincludes:• The building of an IRB and FIFA standard soccer/rugby field with stands
of1,000to5,000seats• ThebuildingofarunningtrackofaminimumofIAAFstandardof8lanes• Thebuildingofaminimum500seatindoorgymnasium• ThebuildingofanOlympicpoolinthecitiesofBondoukouandSéguéla• Thebuildingofclassrooms(base03)fromYear7toYear12• Thebuildingofanadministrativebuilding• Thebuildingofadininghallandakitchen• Aboardingschoolof1,000beds• HousingaccommodationfortheSchoolofficials.
Location • Bouaké
Project’sbenefit• Detectandprofessionallymonitornewtalents• Contributetothedevelopmentofelitesport.
Estimatedcost • FCFA25,000M/EUR38M/USD50M(1USD=500FCFA)SPECIFICINFORMATIONRELATEDTOPPPSTRUCTURING
Scope of activities to be entrusted to the privatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • Termsofreferenceavailable
Informationavailable • Architecturalandfinancialstudiescarriedoutbysomeoperators
Nextstep(s)andtimetable
• Finalisationofstudies• Launchtheconsultationprocess.
22
PROJECTNo.6. BUILDINGANDOPERATINGTHE“VILLAGES”OFTHE2021ACN
NDPReference Strategicpriority4/Impact1/Effect4/Output4.1/Action4.1.1ContractingAuthority MINISTRYOFSPORTANDLEISURE
FocalUnitoftheContractingAuthority
Mr.KONESalifFinancialServicesAdministratorDirector-GeneraloftheONS
Landline:(225)20304444/(225)20304440Mobile:(225)59012822/(225)03031303
Email:[email protected]/[email protected]
Briefdescription
Theaimofthisprojectistobuildandoperatetwelve(12)citiesof163-bedroomvillasonasurfaceareaof5haeach,invariousregionsofthecountry,inordertohost the various delegations that will participate to the 2021 African Cup ofNations.Theprojectalsoincludes:• Thebuildingofacentrewithaclinic,a60-seatrestaurant,aweightroomand
afitnessroom• Thebuildingofanequippedtrainingpitch(football/rugby).
Location • Korhogo,Ferkéssédougou,Brobo,Béoumi,Sakassou,Katiola,SanPedro
Project’sbenefit
• Offer real-estate assets to the executives from various regions in the long-term,
• Develop the various cities whose needs in accommodation continue toincrease.
Estimatedcost • FCFA42000M(Indicative)/EUR64M/USD84M(1USD=500FCFA)SPECIFICINFORMATIONRELATEDTOPPPSTRUCTURING
Scope of activities to be entrusted to the privatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement• Valorisationofthedomain
PROJECT’SSTATUS
Progress• TechnicalstudycurrentlybeingcarriedoutbytheBNETD.• BuildingsitesidentifiedinthecitiesofKorhogoandSanPedro• TopographicsurveysbeingcarriedoutbytheBNETD
Informationavailable • Termsofreference
Nextstep(s)andtimetable • Launchtheconsultationprocess
23
PROJECTNo.7. BUILDINGANDOPERATINGTHEEBIMPEOLYMPICVILLAGE
NDPReference Strategicpriority4/Impact1/Effect4/Output4.1/Action4.1.2
ContractingAuthority MINISTRYOFSPORTANDLEISURE
FocalUnitoftheContractingAuthority
Mr.KONESalifFinancialServicesAdministratorDirector-GeneraloftheONS
Landline:(225)20304444/(225)20304440Mobile:(225)59012822/(225)03031303
Email:[email protected]/[email protected]
GENERALCHARACTERISTICS
Briefdescription
TheOlympicprojecthasthefollowing2components:• TheOlympicStadium(builtwithfinancingfromEximBankChina),• The Olympic Village (building 4 residential parks, 3 sports school groups, a
SportsUniversity,anadministrativezone,acommercialzone,aclinic,a4-starhotelanda9-holegolfcourse)
TheaimisfortheStatetofindapartnerfortheoperationandmaintenanceofthestadiumandthedevelopmentoftheOlympicCity.
Location • Abidjan–Anyama(Ebimpé)
Project’sbenefit• Develop the city of Anyamawith new sport, school, hotel, commercial and
medicalinfrastructure.
Estimatedcost • FCFA71,000M/EUR108.2M/USD142M(1USD=500CFA)
SPECIFICINFORMATIONRELATEDTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefinedbythestudies• Publicinvestment:Tobedefinedbythestudies
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Serviceconcession(managementofthestadium)• Valorisationofthedomain
PROJECT’SSTATUS
Progress • Technicalstudies
Informationavailable • Studiesavailable
Nextstep(s)andtimetable
• Carryingoutofadditionalstudies• Launchtheconsultationprocess.
24
MINISTRYOFHIGHEREDUCATIONANDSCIENTIFICRESEARCH
25
PROJECTNo.8. BUILDINGANDEQUIPPINGTHEUNIVERSITYOFSANPEDRO
NDPReference Strategicpriority2/Impact1/Effect3/Output3.2/Action3.2.3
ContractingAuthority MINISTRYOFHIGHEREDUCATIONANDSCIENTIFICRESEARCHPRIMEMINISTER’SOFFICE(UNIVERSITYDECENTRALISATIONPROGRAMME)
FocalUnitoftheContractingAuthority
PRIMEMINISTER’SOFFICEMr.KOUALéon
HeadofOperationsTel:(225)08873029
Email:[email protected]
MINISTRYOFHIGHEREDUCATIONMr.KOUAMEN’Guessan
DirectorofUniversityInfrastructureTel:(225)07855650
Email:[email protected]
Briefdescription
Theaimofthisprojectistobuildandequipauniversitycampusof302hectaresinSanPedrocapableofaccommodating22,000studentswhencompleted.TheUniversityofSanPedrowillbededicatedtosciencesandtechnologyinthefollowingareas:MarineScienceandShipbuilding,AgricultureandAgro-industry,Fishresources,BuildingandPublicWorksandLogistics.Thisprojectwillbeimplementedinthree(3)phases:• Phase1:Accommodation capacity for 3,000 students (2016Academic Year,
fundedbytheGovernment),• Phase 2: Accommodation capacity for 7,000 additional students (2018
AcademicYear,tobedonethroughaPPP),• Phase 3: Accommodation capacity for 12,000 additional students (2020
AcademicYear,tobedonethroughaPPP).Location • SanPedro
Project’sbenefit• Offerstudentsanappropriateenvironmentforqualitytraining• Participateinthedecentralisationofuniversities
Estimatedcost • FCFA184,000M/EUR280M/USD368M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,managingandmaintaining
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users(students)• Taxpayers
Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement
PROJECT’SSTATUS
Progress • Functionalprogrammedefined,• Technicalandfinancialfeasibilitystudycarriedout.
Informationavailable • StudiesavailableNextstepsandtimetable • Launchtheconsultationprocess
26
MINISTRYOFHEALTHANDPUBLICHYGIENE
27
PROJECTNo.9. REHABILITATINGANDMAINTAININGTHEUNIVERSITYHOSPITALOFCOCODY
NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3
ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE
FocalUnitoftheContractingAuthority
Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance
Tel:(225)20229224Fax:(225)20223687
Email:[email protected]
Briefdescription
The aim of this project is to rehabilitate and ensure the maintenance of theUniversityHospital of Cocody, in order to strengthen the technical services andprovidetheappropriatetoolsforthisUniversityHospitaltoofferpatientcarethatisascompleteaspossible,fromthediagnosticandtherapeuticpointsofview.
Location • RegionoftheGreatBridges/DistrictofAbidjan/CommuneofCocody
Project’sbenefit
• ImprovementofthetechnicalservicesincreaseintheoperatingrateoftheservicesoftheUniversityHospital
• Improvementinthesupplyandqualityinthedeliveryofhealthcareservices• Improvementinthestateofhealthandwellbeingofthepopulations
Estimatedcost • FCFA112,500M/EUR172M/USD225M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,maintainingandoperatingofservices
(Biomedicalimagery,hospitalisation,laundryservices,cateringservices,pharmacy,etc.)andadministrativemanagement.
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement
PROJECT’SSTATUS
Progress • Studies
Informationavailable • Termsofreferenceavailable
Nextstepsandtimetable
• Preliminarystudiestobecarriedout(APHP/BNETD)• Launchtheconsultationprocess
28
PROJECTNo.10. REHABILITATING,EQUIPPINGANDMAINTAININGTHEUNIVERSITYHOSPITALOFTREICHVILLE
NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE
FocalUnitoftheContractingAuthority
Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance
Tel:(225)20229224Fax:(225)20223687
Email:[email protected]
Briefdescription
The aim of this project is to rehabilitate, equip and maintain the UniversityHospitalof Treichville, inorder to strengthen the technical servicesandprovidethe appropriate tools for thisUniversityHospital to offer patient care that is ascompleteaspossible,fromthediagnosticandtherapeuticpointsofview.
Location • RegionoftheGreatBridges/DistrictofAbidjan/CommuneofTreichville
Project’sbenefit
• Improvementofthetechnicalservices,increaseintheoperatingrateoftheservicesoftheUniversityHospital
• Improvementinthestateofhealthandwellbeingofthepopulations• Improvementinthesupplyandqualityinthedeliveryofhealthcareservices.
Estimatedcost • FCFA112,500M/EUR172M/USD225M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,maintainingandoperatingservices
(Biomedicalimagery,hospitalisation,laundryservices,cateringservices,pharmacy,etc.)andadministrativemanagement.
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement
PROJECT’SSTATUS
Progress• Termsofreferenceavailable• Analysisofthepresentsituationandproposalfortheorientationforthe
restructuringandextensionforthebuildingandequippingaspects.Informationavailable • PreliminarystudiesundertakenbyAPHP
Nextstepsandtimetable
• Preliminarystudiestobecarriedout(APHP/BNETD)• Studiesandproposals• Launchtheconsultationprocess
29
PROJECTNo.11. BUILDINGANDEQUIPPINGTHENATIONALCENTREFORRADIOTHERAPYANDMEDICALONCOLOGY(CNROM)
NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE
FocalUnitoftheContractingAuthority
Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance
Tel:(225)20229224Fax:(225)20223687
Email:[email protected]
Briefdescription
TheaimofthisprojectistobuildandequiptheNationalCentreforRadiotherapyandMedicalOncologyona total surface areaof 2hectares inGrand-Bassam toprovidecomprehensivemedicalcaretocancerpatients.NB:AprojectofbuildingaradiotherapytreatmentCentreiscurrentlyongoinginAbidjan,neartheUniversityHospitalofCocody.
Location • Grand-Bassam
Project’sbenefit
• Bettercareforcancerpatients• Improvementofthetechnicalservices• Trainingofthemedicalpersonnelinprovidingcaretocancerpatients• Improvementinthestateofhealthandwellbeingofthepopulations.
Estimatedcost • FCFA75,000M/EUR115M/USD150M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,equippingandmaintaining.
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress • MemorandumofUnderstandingsignedInformationavailable • N/ANextstepsandtimetable • SignatureofafinancingagreementwithKoreaEXIMBANKandSAMSUNG
30
PROJECTNo.12. REHABILITATINGANDEQUIPPINGTHEHEARTINSTITUTEOFABIDJAN
NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE
FocalUnitoftheContractingAuthority
Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance
Tel:20229224Fax:20223687
Email:[email protected]
Briefdescription The aim of this project is to rehabilitate the current premises of the Institute,buildnewpremisesandequiptheserviceswithtechnicalandmedicalmaterial.
Location • RegionoftheGreatBridges/DistrictofAbidjan/CommuneofTreichville
Project’sbenefit
• Betterpatientcare• Availabilityofstate-of-the-arttechnicalfacilitiescapableofcarryingoutall
theexplorationsofcardiovascularillnesses• Improvementinthestateofhealthandwellbeingofthepopulations• Improvementinthesupplyandqualityinthedeliveryofhealthcareservices.
Estimatedcost • FCFA10,000M/EUR15M/USD20M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,Rehabilitatingandequipping
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Concession–Partnershipagreement
PROJECT’SSTATUS
Progress • StudiescarriedoutInformationavailable • PreliminarystudiesundertakenbyAPHPNextstepsandtimetable
• Preliminarystudiestobecarriedout(APHP/BNETD)• Launchtheconsultationprocess
31
MINISTRYOFAGRICULTUREANDRURALDEVELOPMENT
32
PROJECTNo.13. OPERATINGA2,000HECTARESTATE-OWNEDDOMAINFORTHEPRODUCTIONANDPROCESSINGOFSOYA
NDPReference Strategicpriority3/Impact2/Effect1/Output3.3/Action3.3.3ContractingAuthority MINISTRYOFAGRICULTUREANDRURALDEVELOPMENT
FocalUnitoftheContractingAuthority
Mr.BERNARDKINICOMOEDirectorofPlanning,ProgrammingandFinancing
Tel/Fax:(225)20218526Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription Theoverallaimoftheprojectistooperateastate-owneddomainofaround2,000hectaresfortheproductionofsoyainthenorthofCôted’Ivoire.
Location • PORORegion-NorthofCôted’Ivoire
Project’sbenefit• Increasingtheofferofsoyaforvariousnationalandsub-regionalusers• Improving the incomes of producers by adopting improved and high-
performanceseedsEstimatedcost • FCFA16,000M/EUR24M/USD32M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandextensions
servicestosmallproducers
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• OperatinginaState-owneddomain
PROJECT’SSTATUS
Progress • ProjectideaInformationavailable • TermsofreferenceavailableNextstep(s)andtimetable
• Preliminarystudies• Launchtheconsultationprocess
33
MINISTRYOFANIMALANDFISHRESOURCES
34
PROJECTNo.14. BUILDINGANDOPERATINGSLAUGHTERHOUSESINTHECAPITALCITIESOFTHEINTERIOROFTHECOUNTRY(YAMOUSSOUKRO,DALOA,BOUAKÉANDKORHOGO)
NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.1ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES
FocalUnitoftheContractingAuthority
Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister
ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410
Mobile:(225)05052462Email:[email protected]
Mr.COULIBALYDjiakariyaDirectorofPlanning
Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Thedisrepairoftheexisting infrastructure inthe largecities (slaughterhousesofBouaké and Daloa) and the absence of adapted infrastructure in other cities(YamoussoukroandKorhogo)areconstraintsrelatedtotheavailabilityofqualitymeat in those cities. Furthermore, the nutritional insecurity created by animalsillegally slaughtered in informal places is a major risk for health and publichygiene.Therefore,thisprojectaimstomodernisetheslaughteringofanimalsandsupplycircuitofqualitymeattothepopulations.
Location • Yamoussoukro,Bouaké,DaloaandKorhogo
Project’sbenefit
• Reducing the risksofpollution in theurbanenvironmentand thenuisancescausedinthesurroundingnaturalenvironmentforherdsofanimals.
• Improvement of the quality of the products by slaughtering under goodhygieneconditions
• Reorganising the commercialisation and distribution of meat for a betterintegrationofthenationalsectors
• Harmonisation of the building of slaughterhouses with the increase inpopulationinthelargecities
Estimatedcost • FCFA16,690M/EUR25.4M/USD33.4M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financing,operatingand
maintainingtheslaughterhouse
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged: • Build,OwnandOperateContract(BOO)
PROJECT’SSTATUS
Progress
• PreviousstudiescarriedoutbytheDirectorateofPublicWorksdatebackto1987
• AnupdatedstudyoftheMasterPlanoftheslaughterfacilitiesandcattleandmeatmarketinginfrastructureinCôted’IvoireisbeingundertakenbytheBNETD.
Informationavailable • The1987feasibilitystudyisavailableNextstepsandtimetable
• FinalisationofPreliminarystudies• Launchtheconsultationprocess
35
PROJECTNo.15. PROJECTFORBUILDINGANDOPERATINGTHESLAUGHTERHOUSE-CATTLEMARKETCOMPLEXOFABIDJAN-ANYAMA(CAMA)
NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.1ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES
FocalUnitoftheContractingAuthority
Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister
ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410
Mobile:(225)05052462Email:[email protected]
Mr.COULIBALYDjiakariyaDirectorofPlanning
Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
The aim of this project is to pool the activities of commercialisation andslaughtering of cattle of the city of Abidjan and its suburbs at a single centrelocated in the urban periphery (in the commune of Anyama, 28 km north ofAbidjan)andmeetingthestandardsofqualityandhygieneforthepopulation.
• The operatorwill have to build a slaughterhouse-cattlemarket complex,with acapacity of 745 bovines and 425 sheep/goats per day on a surface area of 41hectaresandagrazingareaof187hectares.
Location • DistrictofAbidjan/Anyama
Project’sbenefit
• Improving the quality of products by slaughtering under good hygieneconditions
• Harmonising the slaughtering activity and the urban environment bytransferringtheslaughterhousetoanappropriatesiteandreducingtherisksofpollution,thankstothetreatmentofby-products,wasteandwastewater.
Estimatedcost • FCFA21,200M/EUR32.3M/USD42.4M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operating
andmaintainingtheslaughterhouse-Cattlemarketcomplex
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Finalcustomers
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress
• PreviousstudiescarriedoutbytheDirectorateofPublicWorksdatebackto1992.Anagreementsignedin2009betweentheCenturyGroupCorporationand the State has not been implemented to date. The private partner hasbeenabletoraisethefinancingnecessary.
• Theprojectpreparationisbeingfinalised.TheupdatedstudyoftheprojectisbeingconductedbytheBNETD.
Informationavailable • The1992feasibilitystudyisavailableNextstepsandtimetable
• Finalisationofpreliminarystudies• Launchtheconsultationprocess
36
PROJECTNo.16. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDSTATIONS(PROGIRS)/REHABILITATINGANDOPERATINGOFTHEBADIKAHASEEDFARM(BSF)
NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES
FocalUnitoftheContractingAuthority
Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister
ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410
Mobile:(225)05052462Email:[email protected]
Mr.COULIBALYDjiakariyaDirectorofPlanning
Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
• TheBadikahaSeedFarm(BSF)wascreatedin1975withtheaimofimprovingtheforage of animals. This project will be operating on a surface area of 55,000hectares to produce slaughter animals, forage for sale and forage seed. Theoperator will have to rehabilitate the infrastructure of the farm, renew theproductionequipmentandpurchaseacoreherdofbeefcattletoberaised.Theoperation of this farmwill considerable relieve the needs in forage and forageseed foranimals inCôted’Ivoire,aswellas for thoseof thesub-region thatareoftenfacedwithashortageofforageduringthelongdryseasons.
Location • Region:Hambol/Department:Niakaramadougou/Sub-Prefecture:Badikaha
Project’sbenefit
• Strengtheningfoodsecurityinanimalproteinsbyincreasingtheproductionofmeat
• Improvingtheproductivityoflivestockrearingthroughmakingimprovedforageavailable
Estimatedcost • FCFA4,000M/EUR6.10M/USD8M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand
maintainingthefarm
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgeofcustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress
• Termsofreferenceshallbedraftedforastudyofthesituationalanalysis,inordertodeterminethemarketvalueoftheBadikahafarmbeforeitisenteredintoaPPP
• Thetermsofreferenceofthefeasibilitystudyoftheprojectarebeingprepared
Informationavailable • Thetermsofreferenceofthesituationalanalysisstudyareavailable
Nextstepsandtimetable
• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess.
37
PROJECTNo.17. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDSTATIONS(PROGIRS)/MEATPRODUCTIONATNIORONINGUESTATION(PBSN)
NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES
FocalUnitoftheContractingAuthority
Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister
ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410
Mobile:(225)05052462Email:[email protected]
Mr.COULIBALYDjiakariyaDirectorofPlanning
Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
• The project of meat production at the Nioroningué station (PBSN) aims atestablishing an intensive beef and feeder cattle breeding on a surface area of2,200hectares. Theoperatorwill be able to use a prolific andheavy species ofbeefcattlecapableofacclimatisinglocally.Theintensiveoperationwillbeabletointegrate the processing of themeat with the setting up of and industrial andmarketingunitofanimalproducts.
• TheoperationofthisstationwillmeettheneedsoftheIvorianpopulationinmeatproductsandprovidequalityanimalstothevariousslaughterhouses.
Location • Department:Ouangolodougou/Sub-Prefecture:Ouangolodougou
Project’sbenefit • Strengtheningfoodsecurityinanimalproteinsbyincreasingthenationalmeatproduction
Estimatedcost • FCFA4,000M/EUR6.10M/USD8M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand
maintainingofthestation
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress • Thetermsofreferenceofthefeasibilitystudyoftheprojectarebeingprepared
Informationavailable • TermsofreferenceofthesituationalanalysisstudyareavailableNextstepsandtimetable
• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess
38
PROJECTNo.18. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDBREEDINGSTATIONS(PROGIRS)/MEATPRODUCTIONATPANYASTATION(PSBP)
NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES
FocalUnitoftheContractingAuthority
Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister
ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410
Mobile:(225)05052462Email:[email protected]
Mr.COULIBALYDjiakariyaDirectorofPlanning
Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
• ThePPPprojectonthemeatproductionstationofPanyaaimsatestablishinganintensivebeefandfeedercattlebreedingonasurfaceareaof10,000hectares.
• Theoperatorwillbeabletouseaprolificandheavyspeciesofbeefcattlecapableofacclimatisinglocally.
• TheoperationofthisstationwillmeettheneedsoftheIvorianpopulationinmeatproducts and provide quality animals to the various slaughterhouses andmeatproductdistributioncentres.
Location • Region:Bagoué/Department:Boundiali/Sub-Prefecture:Boundiali
Project’sbenefit • Strengtheningfoodsecurityinanimalproteinsbyincreasingofthenationalmeatproduction
Estimatedcost • FCFA4,000M/EUR6.10M/USD8M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand
maintainingofthestation
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress • TermsofreferenceofthefeasibilitystudyoftheprojectInformationavailable • TermsofreferenceofthesituationalanalysisstudyNextstepsandtimetable
• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess
39
PROJECTNo.19. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDSTATIONS(PROGIRS)/AGRO-INDUSTRIALDAIRYCOMPLEXOFTOUMODI
NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES
FocalUnitoftheContractingAuthority
Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister
ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410
Mobile:(225)05052462Email:[email protected]
Mr.COULIBALYDjiakariyaDirectorofPlanning
Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
• Thisprojectaimstobuildanagro-industrialcomplexofreferenceinToumodifortheautomatedproductionandprocessingoffreshmilkinacompletelycontrolledenvironment.Thiswillrequireoftheoperator(i)toimportexoticdairybreeds(Montbéliard,Holstein,…),atleast2,500headsatthebeginningofitsoperationsonthe1,000hectaresoflandavailablefortheoperationand(ii)developthesurfaceeareaavailableforthisproduction(grazinglands,equipments,etc.).
• Inaddition,thestationwilldevelopadairypoolonitspropertiesthroughthesupplyofanimalstobreedersoftheregion.
Location • Lakeregion/Department:Toumodi/Sub-Prefecture:Toumodi
Project’sbenefit
• Strengtheningfoodsecurityinanimalproteinsbyincreasingtheproductionandpromotionoftheanimalproductprocessingindustry,includingmeatandmilkprocessing
• ImprovingtheproductivityofbeefcattleandmilkfarmsEstimatedcost • 6000MFCFA/9,14MEUR/12MUSD(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand
maintainingofthestation
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Valorisationofthedomain
PROJECT’SSTATUS
Progress • TermsofreferenceofthefeasibilitystudyoftheprojectInformationavailable • TermsofreferenceofthesituationalanalysisstudyavailableNextstepsandtimetable
• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess
40
MINISTRYOFCOMMERCE
41
PROJECTNo.20. BUILDINGANDOPERATINGWHOLESALEANDRETAILMARKETSINABIDJAN,DALOA,ABENGOUROUAND7OTHERPROVINCIALCAPITALS
NDPReference Strategicpriority3/Impact4/Effect4/Output4.2/Action4.2.5ContractingAuthority MINISTRYOFCOMMERCE
FocalUnitoftheContractingAuthority
Mrs.GOUTHONRoselineDirectorofStatisticalPlanningandProspective
Tel:(225)07094879Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theprojectaims tobuildwholesalemarketsof foodstuffsandmeatproducts inthe cities of Abidjan, Daloa, Abengourou and 07 provincial capitals, in order topromotetheircommercialisationnationwideandtheaccessofthepopulationstofoodstuffs
Location • Abidjan,Daloa,Abengourouand07Provincialcapitalstobedetermined
Project’sbenefit• Developingagriculturalandcommercialactivities• Improvingdistributioncircuits• Contributiontothefightagainstthehighcostofliving.
Estimatedcost • FCFA100,548M/EUR155M/USD201M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating.
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Serviceconcession/Concession/BOT
PROJECT’SSTATUS
Progress • AgreementoftheStudyFundobtainedtocarryoutthefeasibilitystudiesInformationavailable • TermsofreferenceavailableNextstepsandtimetable
• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess.
42
PROJECTNo.21. BUILDINGANDOPERATINGTHEEXHIBITIONCENTREOFABIDJAN
NDPReference Strategicpriority3/Impact4/Effect4/Output4.2/Action4.2.1ContractingAuthority MINISTRYOFCOMMERCE
FocalUnitoftheContractingAuthority
Mrs.GOUTHONRoselineDirectorofStatisticalPlanningandProspective
Tel:(225)07094879Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theaimof thisproject is toprovide thecityofAbidjan (5million inhabitants),amodernExhibitionCentreintheareaoftheFélixHouphouët-BoignyInternationalAirport(Port-Bouët)andaspartofbuildinganAirportcity.ThisExhibitionCentrewillmake it possible to host national and international exhibitions dedicated toprofessionals and the public at large, as well as large congresses and political,culturalorreligiousgatherings.Theprojectwillconsistindeveloping:• Indoorair-conditionedandnon-airconditionedexhibitareas;• Quaysidesurfaces;• Ancillary services (administration, restaurants, cafeteria,bars,entertainment
centres,parkinglots,etc.)TheboundariesoftheExhibitionCentreproject(100hectares)havebeendeclaredtobeofpublicutilitybyDecreen°97-395of9July1997.
Location • Abidjan
Project’sbenefit• Makingup thedeficitof appropriate spaces for thepromotionofeconomic
activities,• ImprovingtheimageofCôted’Ivoire.
Estimatedcost • FCFA53,000M/EUR81M/USD106M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,designing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged: • Concession/BOT
PROJECT’SSTATUS
Progress • ThetermsofreferenceforthepreliminarystudiesarebeingdraftedInformationavailable • TermsofreferenceavailableNextstepsandtimetable
• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess.
43
MINISTRYOFPETROLEUMANDENERGY
44
PROJECTSINTHEHYDROCARBONSECTOR
45
PROJECTNo.22. SUPPLYINGCÔTED’IVOIREINLIQUEFIEDNATURALGAS(LNG)
NDPReference Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.CHEVALIERJacquesTechnicalAdvisor
Tel:(225)20222392Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
ThisprojectaimstosupplyCôted’IvoireinLiquefiedNaturalGas(LNG),withaviewtosecuringthesupplyoftheelectricitysectorandreducetheuseofliquidfuel,by:• Installingafloating,storageandre-gasificationunit(FSRU)inthewatersoff
Grand-Bassam• Buildinganewsectiononshoreandoffshore(oceanandlagoon)• ImportingofLNG.
Location • GrandBassam
Project’sbenefit• Increasingthenationalsupplyofnaturalgas• Securingthesupplyinnaturalgas• Reducingoperatingexpensesincurredinusingliquidfuel.
Estimatedcost • FCFA110,000M/EUR168M/USD220M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingapipeline,installinganFSRU
Unit,importingLNG
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Privateclients
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress • StudiesInformationavailable • Pre-feasibilitystudiesNextstepsandtimetable
• FinalisationofPreliminarystudies• Launchtheconsultationprocess.
46
PROJECTNo.23. CREATINGFILLINGPLANTSINTENLOCALITIES
NDPReference Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2
ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.KAMSIEGeorgesDirectorofEngineeringandLogisticsatPETROCI
Tel:(225)20202500Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
ButanegasisessentiallyusedinAbidjan(in95%ofhouseholds),ratherthaninthecities in the interior of the country where charcoal remains the first source ofcombustion.Withthisproject,theStateaimstobuildseveralfillingplants(fillingunit for butane gas bottles) in the main cities of the country, in order topopularisetheuseofbutanegasthroughoutthenationalterritoryandbringthisfuelclosertothepeopleintheinteriorofthecountry.
Location• SanPedro,Korhogo,Bouaké,Man,Yamoussoukro,Ferkessédougou,Daloa,
Bondoukou,Abengourou,Gagnoa
Project’sbenefit
• Continuingthe'butanisation'programmeofCôted’Ivoireandputtingastoptodeforestation
• Facilitating the supply in butane gas for the cities of the interior of thecountry
• Increasingthenationalstoragecapacitiesandguaranteeingasecuritystock.
Estimatedcost • FCFA29,100M/EUR44M/USD58M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress • Feasibilitystudies
Informationavailable • Reportofthefeasibilitystudy
Nextstepsandtimetable
• FinalisationofPreliminarystudies• Launchtheconsultationprocess
47
PROJECTNo.24. BUILDINGANDOPERATINGAHYDROCARBONDEPOTANDANOILWHARFINSANPEDRO
NDPReference Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.KAMSIEGeorgesDirectorofEngineeringandLogistics
atPETROCITel:(225)20202500
Email:[email protected]
Mr.GNANCHOUYvonTechnicalDirectorGESTOCI
Tel:(225)21759806Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
The project aims to (i) build a hydrocarbon storage depot with a capacity of43,000m3 of liquid hydrocarbons and 2,000MT of butane gas, and (ii) build aberthforthemooringofoiltankersofamaximumlengthof180mandacapacityof40,000DWTindeadweightanddraft.
Location • SanPedro–SouthwestofCôted’Ivoire
Project’sbenefit• Reducing the circuits and supply costs in oil products of neighbouring
countries(Liberia,SierraLeone,Guinea);• FacilitatingandimprovingthesupplyinfuelintheWestofCôted’Ivoire
Estimatedcost(depot+ondeckwithoutdredging) • FCFA32,000M/EUR49M/USD64M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Institutionalpartnership
PROJECT’SSTATUS
Progress• Availabilityofthesiteoftheproject(15ha)bytheAutonomousPortofSan
Pedro
Informationavailable • Reportoffeasibilitystudies
Nextstepsandtimetable
• FinalisationofPreliminarystudies• Launchtheconsultationprocess
48
PROJECTNo.25. BUILDINGOFANOILSTORAGETERMINALÀVRIDIDE1100000MT(PHASE1)ONTHEWESTSIDEOFTHECANAL
NDPReference • Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.KAMSIEGeorgesDirectorofEngineeringandLogisticsatPETROCI
Tel:(225)[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theprojectaimstobuildanoilstorageterminalintwophases:• [1stPhase]Capacityof1,100,000MTintwostages:
- stage1:500,000MT(Whiteproducts)- stage2:1,100,000MT(LPG+Whiteproducts+Crudeoils)
• [2ndPhase]Increaseofthecapacityto2,000,000MT(LPG+Whiteproducts+Crudeoils)
TheobjectiveofthisterminalistomakeAbidjanthestorageandsupplycentreofWestandCentralAfricainoilandpetro-chemicalproducts,aswellastheAfricanquotationcentreofoilproducts.Itwillmakeitpossibleto:• Receive, store and re-export all the crude oils products and most of the
crudesofthesub-region• Increasethestrategicstoragecapacityofalltheoilproductscrudes,including
butane• ManagethestrategicstoragecapacitiesforCôted’Ivoireandthecountriesof
thehinterland• Receive in import large cargo ships inorder to reduce the costof supply in
refined products from countries of the sub-region and the hinterland viawharvesandpipelines
The project has the following components: (i) Formalities for the completeacquisitionofthesitefromthePortofAbidjanforworks,(ii)Detailedengineeringstudiesand(iii)building.
Location • Abidjan-Vridi
Project’sbenefit
• StrategicstorageforCôted’Ivoireandthesub-region• Nationalandsub-regionalsupplyCentre• Securingsupplyatalowercost• Securingtheoilandportlogisticinfrastructure.
Estimatedcost • FCFA394,758M/EUR601.8M/USD789.5M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Finalcustomers
Typeofpartnershipenvisaged:• N/A
PROJECT’SSTATUSProgress • TechnicalfeasibilitystudyInformationavailable • TechnicalfeasibilitystudyavailableNextstepsandtimetable
• FinalisationofPreliminarystudies• Launchtheconsultationprocess
49
PROJECTSINTHEENERGYSECTOR
50
PROJECTNo.26. BUILDINGCOCOABIOMASSPLANTS(80MW)
NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1
ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.CHEVALIERJacquesTechnicalAdvisor
Tel:(225)20222392Email:[email protected]
Mr.N’GORANKonanNorbertDirectorofNewandRenewable
Energies(DENR)Tel:(225)20206140
Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Thisprojectaimstobuildandoperateseveralcocoabiomassplantswitha totalpower of 80 MW, in order to develop the huge source of renewable energyavailable in Côte d’Ivoire and increase the share of renewable energies in theenergymix.
Location • National
Project’sbenefit• Meetingthedemandforelectricalpowerinthemediumandlongterms.• Increasingtheshareofrenewableenergiesintheenergymix.
Estimatedcost • FCFA325,400M/EUR496M/USD651M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:
• BOO
PROJECT’SSTATUS
Progress • Identification
Informationavailable • N/A
Nextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
51
PROJECTNo.27. BUILDINGANDOPERATINGACOTTONBIOMASSPLANTINBOUNDIALI(25MW)
NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1
ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.CHEVALIERJacquesTechnicalAdvisor
Tel:(225)20222392Email:[email protected]
Mr.N’GORANKonanNorbertDirectorofNewandRenewableEnergies
(DENR)Tel:(225)20206140
Email:[email protected]
GENERALCHARACTERISTICS
BriefdescriptionThis project aims to build and operate a 25 MW Cotton Biomass Plant inBoundiali,inordertodevelopthehugesourceofrenewableenergyCôted’Ivoirehasandincreasetheshareofrenewableenergiesintheenergymix.
Location • Boundiali
Project’sbenefit• Meetingthedemandforelectricalpowerinthemediumandlongterm.• Increasingtheshareofrenewableenergiesintheenergymix.
Estimatedcost • FCFA29,000M/EUR42.21M/USD58M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperatingtheplant.
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Privateclients
Typeofpartnershipenvisaged:• BOO
PROJECT’SSTATUS
Progress • Identification
Informationavailable • N/A
Nextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
52
PROJECTNo.28. BUILDINGBIOMASSPLANTS(10SITES,200MW)
NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1
ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.CHEVALIERJacquesTechnicalAdvisor
Tel:(225)20222392Email:[email protected]
Mr.N’GORANKonanNorbertDirectorofNewandRenewableEnergies
(DENR)Tel:(225)20206140
Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theprojectaimstobuildandoperateseveralbiomassplantsontensites,withatotal power 200 MW, with a view to developing the huge renewable energysourceavailableinCôted’Ivoireandincreasetheshareofrenewableenergiesintheenergymix.
Location • National
Project’sbenefit• Meetingthedemandforelectricalpowerinthemediumandlongterm.• Increasingtheshareofrenewableenergiesintheenergymix.
Estimatedcost • FCFA210,000M/EUR320M/USD420M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:
• BOO
PROJECT’SSTATUS
Progress • Identification
Informationavailable • N/A
Nextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
53
PROJECTNo.29. BUILDINGPHOTOVOLTAICSOLARPOWERPLANTS(5SITES,100MW)
NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1
ContractingAuthority MINISTRYOFPETROLEUMANDENERGY
FocalUnitoftheContractingAuthority
Mr.CHEVALIERJacquesTechnicalAdvisor
Tel:(225)20222392Email:[email protected]
Mr.N’GORANKonanNorbertDirectorofNewandRenewableEnergies
(DENR)Tel:(225)20206140
Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theprojectaimstobuildandoperatefive(5)photovoltaicsolarpowerplantsof20MW each. The operator will also have to finance and build the associatedtransport infrastructure for theconnectionto thenationalgridonbehalfofandfortheState.
Location • National
Project’sbenefit• Meetingthedemandforelectricalpowerinthelongterm,• Renewableenergycontributingtosustainabledevelopment.
Estimatedcost • FCFA220,000M/EUR335M/USD440M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Building,financing,maintainingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:
• BOO
PROJECT’SSTATUS
Progress • Studiesinprogress
Informationavailable • Termsofreferenceoftheproject
Nextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
54
MINISTRYOFINDUSTRYANDMINES
55
PROJECTNo.30. PROGRAMMEFORTHECREATIONANDDEVELOPMENTOFNEWINDUSTRIALZONESINABIDJANANDTHEINTERIOROFTHECOUNTRY
NDPReference Strategicpriority3/Impact3/Effect1/Output1.2/Actions1.2.2;1.2.6to1.2.13
ContractingAuthorityMINISTRYOFINDUSTRYANDMINESAUTHORITYFORTHEMANAGEMENTANDDEVELOPMENTOFINDUSTRIALINFRASTRUCTURE(AGEDI)
FocalUnitoftheContractingAuthority
MINISTRYOFINDUSTRYANDMINESMr.GNAMIENGuillaume
DirectorofCabinetTel:(225)20229831
AGEDIMr.OUATTARAYoussoufDirectorGeneralofAGEDITel:(225)22441788
GENERALCHARACTERISTICS
Briefdescription
Thisprojectaimstodevelop industrialzones inthecitiesofKorhogo,Bonoua,San-Pedro,Bouaké,Yamoussoukro,AdzopéandAboisso,withaviewtoconsolidatingandunclogging the industrial infrastructurebottleneckofAbidjan. Thesedevelopmentswillbeimplementedinsuccessivetranchesof50haforeachcity.ThecityofKorhogohasalreadybeenthesubjectofafeasibilitystudy,aspartoftheconstructionprojectofadryportinFerkessédougou.
Location • Korhogo,Bonoua,San-Pedro,Bouaké,Yamoussoukro,AdzopéandAboisso
Project’sbenefit
• Availabilityofmodernandqualityindustrialinfrastructure• IncreaseinthesupplyofindustriallandsinAbidjanandintheinteriorofthe
countryforthedevelopmentindustrialactivities• UncloggingtheindustrialinfrastructurebottleneckofthecityofAbidjan
Estimatedcostforeachtrancheof50ha
• FCFA15,000M/EUR23M/USD30M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,developingandoperatingindustrial
infrastructure
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • FeasibilitystudiesforthecitiesofBonouaandYamoussoukro
Informationavailable• ReportsoffeasibilitystudiesareavailableforthecitiesofBonouaand
Yamoussoukro
Nextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
56
PROJECTNo.31. INTEGRATEDMININGDEVELOPMENTPROJECTINTHEWEST(PDMIO)
NDPReference Strategicpriority3/Impact3/Effect2/Output2.2/Action2.2.4ContractingAuthority MINISTRYOFINDUSTRYANDMINES
FocalUnitoftheContractingAuthority
MINISTRYOFINDUSTRYANDMINESMr.GNAMIENGuillaume
DirectorofCabinetTel:(225)20229831
GENERALCHARACTERISTICS
Briefdescription
Theoverallaimoftheprojectisto(i)acceleratetheeconomicdevelopmentofthewesternregionand(ii)openuptheGreatWestofCôted’Ivoirethroughtheextractionofminingdeposits.Itaimsto:• MinetheironoreofmountsKlahoyo(2billiontonnes)andGao(1.2billion
tonnes),thenickel-copper-platinumreservesofSamapleu(50millionsdetonnes)andofthenickelcobaltreservesofTouba-Biankouama(254milliontonnes)
• BuildtheMan–SanPedrorailway(ofatotallengthof500km)linkingorestothefutureironoreterminal
• BuildanironoreterminalattheportofSanPedrowithaprocessingcapacityof50to100milliontonnesperyear
Therailwayandironoreterminalwillthereforemainlyservetotransportandexportmineralsandinputs.
Location • WestofCôted’Ivoire(Man-San-Pedro)
Project’sbenefit• Exploitationofthevariousdepositsandexportoftheminerals• EconomicdevelopmentandopeninguptheGreatWestofCôted’Ivoire
Estimatedcost
• Man-San-Pedrorailway:• àFCFA678,000M/EUR1,033M/USD1,356M(1USD=500FCFA)• Ironoreterminal(includinga200hastoragearea,conveyorsand3berths):• àFCFA681,000M/EUR1,038M/USD1,362M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,Developingandoperatingtransport
infrastructure(railwayandterminal)
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • Studies
Informationavailable
• Generalrailwayprogramme• Pre-feasibilitystudyoftheminingprojectsavailable• Preliminarystudyoftheironoreterminal• 2012-2035MasterPlanoftheAutonomousPortofSanPedrocarriedout,
withtwo(2)variants(deepwatermineralportandmineralwharf).
Nextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
57
MINISTRYOFTOURISM
58
PROJECTNo.32. DEVELOPINGANDOPERATING9“HUT-STOPOVERS”
NDPReference Strategicfocus3/Impact4/Effect2/Output2.1/Action2.1.5ContractingAuthority MINISTRYOFTOURISM
FocalUnitoftheContractingAuthority
Mr.VICENSMarcTechnicalAdvisor
Tel:(225)20324492Email:[email protected]
Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs
Tel:(225)56022277/20242883Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Thisprojectaimstobuild“hut-stopovers”togiveanewboosttoinboundtourismand encourage Ivoirians to discover their country by creating ecological touristaccommodation making it possible to discover the natural, cultural andgastronomic riches of Côte d’Ivoire and promote eco and intra-communitytourism.Inanutshell,theaimistobuildineachcityidentifiedathree(3)starhotelof20to 30 air-conditioned rooms, a conference room, a village plaza, a pool, sportsfieldsandplaygrounds,ashopandabicyclepath.Thearchitecturewillbeinspiredby the surrounding environment, with a view to encouraging inbound tourism.Thebuildingofthe9hut-stopoversplanstouselocalmaterialsandsolarenergyforalowoperatingcost.
Location• Assinie,Abengourou,Adzopé,Grand-Bassam,GrandBérébi,Man,Odienné,
Korhogo,Daloa
Project’sbenefit• Creatingwealthandjobsfortheruralpopulations,• Contributingtosustainabledevelopment.
Estimatedcostforeachhut-stopover
• FCFA800M(for20rooms)/EUR1.2M/USD1.6M(1USD=500FCFA)• FCFA1,300M(for30rooms)/1,98MEUR/2,6MUSD(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights.
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain
PROJECT’SSTATUS
Progress • Pilotphase,withthebuildingofahutstopoverinJacquevilleinprogressInformationavailable • Studiesavailable
Nextstepsandtimetable
• Carryoutadditionalstudies• Launchtheconsultationprocess
59
PROJECTNo.33. REHABILITATINGANDOPERATING5SIETHOHOTELS
NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFTOURISM
FocalUnitoftheContractingAuthority
Mr.VICENSMarcTechnicalAdvisor
Tel:(225)20324492Email:[email protected]
Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs
Tel:(225)56022277/20242883Email:[email protected]
GENERALCHARACTERISTICS
BriefdescriptionThisprojectaimstorehabilitateandoperatetheinfrastructureoftheex-SIETHO(Société Ivoirienne d’Expansion du Tourisme et de l’Hôtellerie) hotels in theinteriorofthecountry,whichwerebuiltandoperatedbytheState.
Location • Daloa,Odienné,Gagnoa,Boundiali,Dimbokro
Project’sbenefit• Increasingthereceptioncapacitiesfortourism,• Developinginboundtourism.
Estimatedcost • FCFA11,000M/EUR16.7M/USD22M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,rehabilitating,equippingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • Termsofreferenceoftheproject
Informationavailable • N/A
Nextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
60
PROJECTNo.34. REHABILITATINGANDOPERATINGTHE“HOTELPRESIDENT”OFYAMOUSSOUKRO
NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFTOURISM
FocalUnitoftheContractingAuthority
Mr.VICENSMarcTechnicalAdvisor
Tel:(225)20324492Email:[email protected]
Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs
Tel:(225)56022277/20242883Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
TheaimofthisprojectistorenovatetheHôtelPrésidentandbringituptointernationalstandards,inordertoprovideCôted’Ivoirewithqualityhotelestablishments.Itinvolves:• ThecompleterehabilitationandequipmentoftheHôtelPrésident• TheextensionoftheHôtelPrésidenttobuildashoppingmallandasports
complex• ThemanagementtheHotelPresidentatinternationalstandards
Location • Yamoussoukro
Project’sbenefit• RenovationoftheHôtelPrésident• Strengtheningofthehotelaccommodationcapacityofthedistrictof
Yamoussoukro.
Estimatedcost • FCFA30,000M/EUR45.7M/USD60M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Rehabilitating,equippingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • Studiesinprogress
Informationavailable • Termsofreferenceavailable
Nextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
61
PROJECTNo.35. DEVELOPINGANDOPERATINGTHEWILDLIFEPARKOFABOKOUAMÉKRO
NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3
ContractingAuthority MINISTRYOFTOURISMMINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENT
FocalUnitoftheContractingAuthority
Mr.VICENSMarcTechnicalAdvisor
Tel:(225)20324492Email:[email protected]
Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs
Tel:(225)56022277/20242883Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
TheAbokouamékroWildlifeParkcoversatotalsurfaceareaof20,430ha,ofwhich7,230hawere developed from 1988 to promote the development of tourism inthepoliticalcapitalofCôted’Ivoire.The project aims to repopulate this reserve for tourism, with the rehabilitationprojectofthe“HôtelPrésident”ofYamoussoukro.
Location • Yamoussoukro
Project’sbenefit • StrengtheningthetouristattractivenessofthedistrictofYamoussoukro.Estimatedcost • Tobedetermined
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,developingandrepopulating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefinedbythestudies• Publicinvestment:Tobedefinedbythestudies
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Valorisationofthedomain
PROJECT’SSTATUS
Progress • CarryoutasituationalanalysisInformationavailable • StudiesavailableNextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
62
PROJECTNo.36. REHABILITATINGANDEXTENDINGTHEIVOIREGOLF-CLUBOFABIDJAN
NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFTOURISM
FocalUnitoftheContractingAuthority
Mr.VICENSMarcTechnicalAdvisor
Tel:(225)20324492Email:[email protected]
Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs
Tel:(225)56022277/20242883Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
ThisprojectaimsatrehabilitatingandoperatingtheIvoireGolfClubofAbidjan.Itinvolvestwo(2)mainaspects:• The“Sport-Leisure-GreatEvent”aspect,whichwillbeorganisedaroundtwo
(2)golfcoursesofthesite(oneof9holesandtheotherof18holes),inordertoliftthesaidcoursestointernationalstandards,sothattheycanhostprofessionaltournaments.
• The“Hotel”aspectwhichconsistsinbuildingafive(5)starhotelonthesite.
Location • Abidjan
Project’sbenefit • RepositioningCôted’Ivoireontheinternationalgolfmarket.Estimatedcost • FCFA150,000M/EUR228.6M/USD300M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Rehabilitating,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Serviceconcession/Valorisationofthedomain
PROJECT’SSTATUS
Progress • Studies
Informationavailable • Studiesavailable
Nextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
63
MINISTRYOFTRANSPORT
64
PROJECTSINTHERAILWAYSECTOR
65
PROJECTNo.37. BUILDINGANDOPERATINGLINE1OFTHEABIDJANSUBWAY
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.34ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
Mr.SIDIBENoumoryDeputyDirectorofCabinet
Tel:(225)20344866Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
• This project is part of the search for lasting solutions likely to address thedifficultiesrelatedtopublictransportintheDistrictofAbidjan.Theaimistobuildanurbanandsuburbansubway like railwaysystemof37.5kmwith20stations,whichwillservicethecityofAbidjanfromnorthtosouth,linkingthecommune of Anyama to the commune of Port-Bouët (up to the FélixHouphouët-BoignyInternationalAirport.
• The Project will use the rights-of-way currently used by the Abidjan-Ouagadougou railway line and will be integrated to the existing urbantransportsystems,avecdesfeederlinestoservicebothSOTRA(SociétédesTransport Abidjanais), “wôrô – wôrôs” (collective communal taxis) and“gbakas”(communalmini-buses).
Location • Abidjan
Project’sbenefit
• Relievingcongestiononthemajortraderoutesatpeakhours• OfferinganeconomicmeansoftransporttothepopulationofAbidjan• Reducingthecostoftransportbylinkingtheresidentialareaslocatedinthe
northtothesouthofthecity,wheremosteconomicactivitiestakeplace.Estimatedcost • FCFA656,000M/EUR1,000M/USD1,312M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress
• Signingofaconcessionagreementon06/07/2015withSTAR(SociétédeTransportAbidjanaissurRail)comprisingBouygues,HyundaÏRotem,DongsanEngineeringandKeolis
• PreparatoryworksinprogressInformationavailable • APSStudiesNextstepsandtimetable
• FinalisationofAPDstudies• Financialclose
66
PROJECTNo.38. BUILDINGANDOPERATINGTHEOUANGOLODOUGOU–NIELLÉ–SIKASSORAILWAYLINE
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.36ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
MR.SIDIBENoumoryDeputyDirectorofCabinet
Tel:(225)20344866Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
ThisprojectispartofalargerraillinkprojectbetweenMaliandCôted’Ivoire,andabranchlinerailwayoftheexistingrailwayfromthecityofOuangolodougou,inCôted’Ivoire,toBamako,inMali,passingthroughBougouniandSikasso.Itisalsopart of the Trans-Sahel corridor,which aims to connect the capitals of Senegal,Mali, Côte d’Ivoire and Burkina Faso over a total of 2,934 km, facilitating themovementsofpersonsandgoodsinthesub-region.
Location • Ouangolodougou/Niellé/Sikasso
Project’sbenefit• Participatinginsub-regionalintegration• Relievingcongestiononarterialroads(reductionofthenumberofheavy
trucks).Estimatedcost • FCFA80,000M/EUR122M/USD160M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating.
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • TermsofreferenceInformationavailable • N/ANextstepsandtimetable • Carryoutthepreliminarystudies
67
PROJECTNo.39. REHABILITATINGANDOPERATINGTHEABIDJAN–OUAGADOUGOU–KAYARAILWAYLINE
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.33ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
Mr.SIDIBENoumoryDeputyDirectorofCabinet
Tel:(225)20344866Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
The aim of this project is to rehabilitate the existing railway infrastructurebetween Côte d’Ivoire and Burkina Faso, in order to relaunch and revive theoperation of international railway public transport of passengers and goodscarriedoutbySITARAIL.
Location • Côted’Ivoire–BurkinaFaso
Project’sbenefit
• Ensurethesurvivalofrailtransport,• ContributetoincreasingtheactivitiesoftheAutonomousPortofAbidjanand
thoseoftheeconomicoperatorsintherailwaysector(SITARAIL,freightforwarders,miningoperators,etc.).
Estimatedcost • FCFA350,000M/EUR534M/USD700M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,rehabilitatingandoperating.
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • Negotiationinprogresswithaprivatepartner(BolloréGroup)Informationavailable • N/ANextstepsandtimetable • Signingoftheconcessionagreement
68
PROJECTSINTHEAIRPORTSECTOR
69
PROJECTNo.40. BUILDINGOFTHE“AIRPORTCITY”OFABIDJAN
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.4ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
Mr.SIDIBENoumoryDeputyDirectorofCabinet
Tel:(225)20344866Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Thisprojectinvolvesthedevelopmentandoperationofanairportcity,locatedinthe periphery of the Félix Houphouët-Boigny Airport, on a surface area of3,500ha.TheAirportCitywill comprisehotel, industrial, residential, commercialandsportscomplexes,aswellaspublicequipment.Thisprojectalsoincludesthebuilding of an Exhibition Centre, in order to host national and internationalevents.
Location • Abidjan
Project’sbenefit • Economicandurbandevelopment.Estimatedcost • FCFA88,000M/EUR134M/USD176M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain
PROJECT’SSTATUS
Progress • PreliminarystudiesInformationavailable • PreliminarystudiesavailableNextstepsandtimetable
• Carryoutthepreliminarystudies• Launchtheconsultationprocess
70
PROJECTNo.41. DESIGNING,FINANCING,BUILDINGANDOPERATINGTHENEWINTERNATIONALAIRPORTOFSANPEDROANDITSAIRPORTCITY
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.5ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
Mr.SIDIBENoumoryDeputyDirectorofCabinet
Tel:(225)20344866Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Onasurfaceareaoftheairportdomainestimatedataround2,000ha,thisprojectaimsto:• BuildanewinternationalairportinSanPedrocapableofaccommodatingall
kindsofmediumandlong-haulaircrafts,aswellasapassengerandfreightterminal
• Developanairportcitycomprisinghotel,industrial,residential,commercialandsportscomplexes,aswellaspublicequipment
• Buildserviceroadsfortheairportanditsairportcity.Location • SanPedro
Project’sbenefit• TransformingSanPedrointoarealhubofeconomicdevelopmentand
tourism,• DevelopingthetourismpotentialoftheSouthwestregionofCôted’Ivoire.
Estimatedcost • FCFA45,000M/EUR69M/USD90M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain
PROJECT’SSTATUS
Progress • InformationnoticesbeingvalidatedbytheMinistryInformationavailable • TermsofreferenceoftheprojectavailableNextstepsandtimetable • Carryoutthestudies
71
PROJECTSINTHEROADSECTOR
72
PROJECTNo.42. BUILDING,EQUIPPINGANDOPERATINGTHEBUSSTATIONOFBOUAKÉ
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.39ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
Mr.SIDIBENoumoryDeputyDirectorofCabinet
Tel:(225)20344866Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
This project is part of a national plan to build bus stations in the regionaleconomic centres (Bouaké, Yamoussoukro, Korhogo, San Pedro, Daloa,Sassandra).InBouaké,theprojectaimstobuild,equipandoperateamodern,functionalandeasilyaccessibleintercitybusstationonapieceoflandof10hectareslocatedontheperipheryofthecity.Thisinfrastructurewill:• Provideaplaceoftransit forthe largevehiclestravellingtothecountriesof
thehinterland(BurkinaFaso,Mali,Niger);• Facilitateaccesstothestationfromalloriginsanddestinationsofthecountry
(East, Centre, North, West and Southwest) and sub-region, thanks to theproximitytotherailwaystationandmajorroads.
Location • Bouaké
Project’sbenefit• Improvingthetransportlogisticschain• Strengtheningthesafetyandcomfortofpassengersbyprovidingappropriate
equipment.Estimatedcost • FCFA15,000M/EUR23M/USD30M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,equippingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress• Termsofreference• Determinationofthedusiteoftheproject
Informationavailable • Termsofreferenceoftheprojectavailable.
Nextstepsandtimetable
• Securethesite• Carryoutthepreliminarystudies• Launchtheconsultationprocess.
73
PROJECTNo.43. BUILDINGTHEJUXTAPOSEDBORDERPOSTOFNIGONI(TINGRELA)
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.48ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
Mr.SIDIBENoumoryDeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
Briefdescription The aim of this project is to build a border postin Nigoni, in order to secureregionalroadtransport.
Location • Tingrela
Project’sbenefit• Reducingtheprocessingandcrossingtimeattheborder;• SecuringGovernmentrevenueandreducingtransportcostsfromGuineato
Côted’Ivoire.Estimatedcost • FCFA9,020M/EUR14M/USD18M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financingandbuilding
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Taxpayers
Typeofpartnershipenvisaged:• Partnershipagreementonpublicfunding
PROJECT’SSTATUS
Progress • TermsofreferenceoftheprojectInformationavailable • TermsofreferenceavailableNextstepsandtimetable • Carryoutthestudies
74
PROJECTSINTHEPORTSECTOR
75
PROJECTNo.44. RELOCATINGANDEXTENDINGTHECONTAINERTERMINALOFTHEPORTOFSANPEDRO
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.19
ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP
Tel:(225)34717200Email:[email protected]
Briefdescription
The aim of this project is to move and enlarge the container terminal of SanPedro,withaviewofmeeting thegrowthrequirementsof theport (insufficientcapacityforthestorageandevacuationofgoods).Itplansto:• Buildatleast700metresofquaylengths,18metresdeep• Buildaccessroads• Developquaysidesurfacesover28hasurfacearea,withacapacityof
1,000,000TEUs/year• Supplyandinstalltranshipmentequipment• Thedredgingofthebasin,swingingcircleandaccesschannelat17m
Location • SanPedro
Project’sbenefit• Improvetheofferandqualityofportservices,• StrengthenthecompetitivenessoftheportofSanPedro.
Estimatedcost • FCFA260,000M/EUR395M/USD520M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Developquaysidesurfacesandbuild
superstructures• Equipandoperatethecontainerterminal.
Anticipateddistributionofinvestments:• Privateinvestment:FCFA120,000M• Publicinvestment:FCFA140,000M
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress
• Stabilisingoftheproject’stechnicalperimeter• Finalisingthecontractdocuments• Carryingoutdetailedtechnicalstudies• SettingupaNegotiationCommittee• Preparingtheconditionsofthenegotiations.
Informationavailable• Interimreportsoftechnicalstudies• Draftcontractdocuments• DecreeonthesettingupofaNegotiationCommittee.
Nextstepsandtimetable
• Negotiationsoftheconditionsoftheconcessionagreement• Completionofthedetailedtechnicalstudies• Searchforfinancingtocarryouttheworks• Conducttheinfrastructurework• Equippingandoperatingthecontainerterminal
76
PROJECTNo.45. DEVELOPINGANDOPERATINGOFA150HECTARELOGISTICSHUBANDINDUSTRIALZONEATTHEPORTOFSANPEDRO
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.22
ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP
Tel:(225)34717200Email:[email protected]
Briefdescription
Theaimofthisproject istodevelopandoperate150haoftheportareaofSanPedro, in order to encourage the establishment of industrial units and logisticsandhelpsupportthedevelopmentofactivitiesattheportofSanPedroTheactivitieswillconsistin:• Carryingoutthebackfillingoftheportdomain• Dividingupthesurfaceareaobtained• Servicethelands(buildroadsandvariousnetworks,VRD).
Location • SanPedro
Project’sbenefit• Increasetrafficandtheport'saddedvalue• Establishatleast50additionaleconomicoperatorswhentheworkis
completedEstimatedcost • FCFA85,000M/EUR130M/USD170M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,developingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedetermined• Publicinvestment:Tobedetermined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Valorisationofthedomain
PROJECT’SSTATUS
Progress• Carryingoutdetailedtechnicalstudies• Seekingfundingtocarryouttheworks.
Informationavailable • Summaryreportsofdraftprojectstudiesavailable
Nextstepsandtimetable
• Launchtheconsultationprocess• Seekingfunding• Carryoutthebackfillingandservicingworks• Operationofareabackfilledandserviced.
77
PROJECTNo.46. DEVELOPINGANDOPERATINGAMIXED-USECOMMERCIALTERMINALATTHEPORTOFSANPEDRO
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.20
ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP
Tel:(225)34717200Email:[email protected]
Briefdescription
The aim of this project is to develop, within the bonded port boundaries, acommercial mixed-use terminal for the treatment of conventional goods, ro-rotraffic, palm-oil export and cereal imports, especiallywith an Economic InterestGroup(EIG)ofoperatorsoftheportplatform.Thisterminalwillhaveasurfaceareaofaround5hectaresand2warehouses.
Location • SanPedro
Project’sbenefit• Optimisingtheoperationoftheport• ImprovingthecompetitivenessoftheportofSanPedroanditsrevenues.
Estimatedcost • FCFA5,000M/EUR7.5M/USD10M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • Technicalandfinancialpre-feasibilitystudy
Informationavailable• Reportoffinancialfeasibilitystudies• Draftcontractdocuments.
Nextstepsandtimetable • StartofdiscussionswiththeEIG
78
PROJECTNo.47. BUILDINGAMIXED-USEINDUSTRIALTERMINALATTHEPORTOFSANPEDRO
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.21
ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP
Tel:(225)34717200Email:[email protected]
Briefdescription
Thisprojectaimsto:• Builda14metredeep270metrelinearwharf• Developastoreareaof10haforthetrafficofminerals(ironore,manganese)• Supplyandinstallthetranshipmentequipment.Thebuildingofthisportinfrastructurewillmakeitpossibletocapturetheflowofgoodsfrom(i)theoperationofironoreandmanganesecomingfromMonogagaandLauzoua(townslocatedneartheportofSanPedro)and(ii)theimportationoffertilizersforagriculturalfarmsinthehinterlandoftheport.
Location • SanPedro
Project’sbenefit• Improvingthesupplyandqualityofportservices• IncreasethecapacitiesoftheportofSanPedro• StrengthenthecompetitivenessoftheportofSanPedro.
Estimatedcost • FCFA20,000M/EUR30M/USD40M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession/BOT
PROJECT’SSTATUS
Progress• Finalreportsofsummarypreliminaryprojectstudiesavailable• Carryoutthetechnicalfeasibilitystudies
Informationavailable • ReportssummarypreliminaryprojectstudiesNextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
79
PROJECTNo.48. FINANCING,BUILDINGANDOPERATINGAGRAINTERMINALATTHEPORTOFABIDJAN
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.11
ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFABIDJANMr.HienSIE
Director-GeneralofthePAATel:(225)21238101
Email:[email protected]
Briefdescription
Theaimoftheprojectisto:• Buildthree(03)cerealberthsthatcancaterforbulkcarrierswithadraughtof
13.5m• Develop5hectaresof lands tobuildwarehousesofferingoperators storage
capacities in bonded areas, with modern and high-performance handlingequipment.
Location • Abidjan(Treichville)
Project’sbenefit
• ModernisingthehandlingequipmentoftheportofAbidjan,• Achievingeconomiesofscaleonthecarryingcostsforoperators• Reducingvesselwaitingtimes• Increasingstoragecapacitiesinbondedareasforoperators.
Estimatedcost • FCFA35,000M(2014)/EUR53.3M/USD70M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operation
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Makingtheinfrastructure
available(berthsandbackfilling)Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • Preliminarystudies
Informationavailable• Availabletodate:geo-technicalsoundings,bathymetricsurveys,thefloor
plan,thepreliminaryreportofthetechnicalfeasibilitystudy.
Nextstepsandtimetable
• Carryoutadditionalstudies• Launchtheconsultationprocess
80
PROJECTNo.49. FINANCING,BUILDINGANDOPERATINGANOREWHARFATTHEPORTOFABIDJAN
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.12
ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFABIDJANMr.HienSIE
Director-GeneralofthePAATel:(225)21238101
Email:[email protected]
Briefdescription
Theaimofthisproject is tomodernisetheexisting infrastructure, inorderto(i)increase the operational capacities, (ii) cater for bulk carrierswith a draught of13.5mand(iii)offertheprofessionalsofthesectorworkinginCôted’Ivoireandinthecountriesofthehinterland,betterexportandimportconditionsofminingproducts.Therefore,theobjectiveisto:• Buildthree(3)newberths• Backfillof9haofquaysidesurfaces,• Developindoorstorageareas• Install conveyorbelts fortheautomateddeliveryofproductstothestorage
areas.
Location • Abidjan(Treichville)
Project’sbenefit• Efficientlymeetingthedemandoftheminingoperatorsfromthehinterland,• Increasingtheflowofminerals• Reducingpollution.
Estimatedcost • FCFA7,000M(2014)/EUR114.3/USD150M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Makingtheinfrastructure
available(berthsandbackfilling)Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession
PROJECT’SSTATUS
Progress • PreliminarystudiesInformationavailable • Technicalpreliminarystudies.Nextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
81
PROJECTNo.50. FINANCING,BUILDINGANDOPERATINGATREATMENTPLANTOFLIQUIDWASTEFROMSHIPSANDEFFLUENTSFROMINDUSTRIESINTHEPORTAREAOFABIDJAN(DEBALLASTINGSTATION)
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.17
ContractingAuthorityMINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFABIDJANMr.HienSIE
Director-GeneralofthePAATel:(225)21238101
Email:[email protected]
Briefdescription
Theaimofthisprojectistobuildamodernplantforthetreatmentofwasteandliquidresidues(slops)fromshipsandindustriesoftheportareaofAbidjan.This type of installationwill help avoid haphazard dumping of toxic products inthewatersandonthelandsofthesub-region.
Location • Abidjan(Treichville)
Project’sbenefit
• Provide the port of Abidjan amodern infrastructure to collect and treat itsindustrialwasteandslops
• Offershipsandindustriesthepossibilityofdisposingoftheirliquidwaste• Contributetotheprotectionofthemarineandlagoonenvironment• MeettherequirementsoftheMARPOL73/78Convention.
Estimatedcost • FCFA20,000M(2013)/EUR30.5M/USD40M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• BOT/Concession
PROJECT’SSTATUS
Progress • CarryoutstudiesInformationavailable • CompleteAPDtypedossieravailableNextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
82
PROJECTNo.51. BACKFILLINGANDDEVELOPINGTHEBAYOFVRIDI-BIETRYANDBUILDINGTHEVRIDI-BIETRYBRIDGE
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.10
ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFABIDJANMr.HienSIE
Director-GeneralofthePAATel:(225)21238101
Email:[email protected]
Briefdescription
The Autonomous Port of Abidjan (PAA) decided to launch an importantinvestmentprogrammetocreateindustrialspacesbybackfillingandrelievingthecongestionoftheportarea,inorderto:• Solvetheissueofthesaturationofthe800haoftheexistingportdomain• Offerbetterconditionstotransitingheavygoodsvehicles• Make available to private operators port lands for the development of
industrialandlogisticsactivitiescausingadditionaltrafficbutcreatingjobs.Thisprogrammecomprisesseverallargecomponents,including:• Thebackfillinganddevelopmentprojectof100hectaresof landatthe level
ofthelagoonbayofVridi(Phase2),ofwhichapilotphase(Phase1)isalreadyinprogress
• TheprojectofbuildingtheVridi-BietrybridgeLocation • Abidjan(Treichville)
Project’sbenefit
• Relievingtrafficcongestionintheportareaandtheareainthevicinityoftheport
• Improvingthecompetitivenessoftheport• Providingportlandsforthedevelopmentofindustrialactivitiesandlogistics.
Estimatedcost • FCFA120,000M(2015)/EUR182,9M/USD240M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financinganddeveloping(35habythePAAina
pilotphase)• Financing,buildingandoperating(65habythe
partner)
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined.
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession/BOT/Valorisationofthedomain
PROJECT’SSTATUSProgress • Pilotphaseinprogress(35habythePAAinadditiontothe100ha)
Informationavailable • Referencedocumentsofthepilotphaseoftheprojectavailable• Technicalstudiesavailable
Nextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
83
PROJECTNo.52. BUILDINGOFALOGISTICSHUBANDPARKINGLOTFORTRUCKSATPK26ONTHENORTHERNHIGHWAYTORELIEVECONGESTIONINTHEPORTAREAOFABIDJAN
NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.16ContractingAuthority MINISTRYOFTRANSPORT
FocalUnitoftheContractingAuthority
MINISTRYOFTRANSPORTMr.SIDIBENoumory
DeputyDirectorofCabinetTel:(225)20344866
Email:[email protected]
AUTONOMOUSPORTOFABIDJANMr.HienSIE
Director-GeneralofthePAATel:(225)21238101
Email:[email protected]
Briefdescription
Thisprojectformspartofthepolicyofrelievingcongestionintheareaoftheportof Abidjan. The site planned for the logistics hub is located at PK26, on theNorthernHighway,10kmfromthecorridorofYopougon-Gescoandextendsoverasurfaceareaof25ha.Theparking lot for heavy goods vehicleshas a capacityof 800 to1,000parkingspaces andwill have a place for living for the drivers (resting space, a cateringspace,a space forprayer,a space for recreation). Furthermore, the loadingandoffloadingofheavygoodsvehicles fromthehinterlandwill take in thisareaandaccesstotheportareaforthesevehicleswillalsobeorganisedfromthishub.Thiswill significantly reduce theanarchicparking that contributes to cloggingup theportdomain.
Location • Abidjan
Project’sbenefit
• Regulatingtheparkingofheavygoodsvehicles• RelievingcongestionatthePortofAbidjan;• Consolidating theplaceof leaderof thePortofAbidjan for traffic from the
hinterland• Reducingthecostsofportcrossing.
Estimatedcost • FCFA25,000M/EUR38M/USD50M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Makingthedomainavailable
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• BOT/Concession
PROJECT’SSTATUS
Progress• Securingthesite• Preliminarystudies
Informationavailable • Studiesavailable
Nextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
84
MINISTRYOFECONOMICINFRASTRUCTURE
85
PROJECTNo.53. SUPPLYINGDRINKINGWATERTOTHECITYOFABIDJAN
NDPReference Strategicpriority4/Impact1/Effect2/Output2.5/Action2.5.41ContractingAuthority MINISTRYOFECONOMICINFRASTRUCTURE
FocalUnitoftheContractingAuthority
Mrs.SISSOKOCoralieProjectCoordinator
Tel:(225)20347338/(225)01136860Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Theaimofthisprojectistofindalong-termsolutiontothecityofAbidjanhavingaccess to drinkingwater from surfacewater, through the detection of a viablesourceofwaterthatcouldsupplythecityofAbidjanforthenext20yearsatleast.The project plans for a production capacity of 300,000 m³/day and theconstructionofthefollowinginfrastructure:• Awaterintaketoweronthewatersource,includingtherawwaterpumping
station.• Acompleteconventionaltreatmentplant,withacapacityof300,000m³/day.• Atreatedwaterpumpingstation.• ThenetworkofthetrunkpipelineforcarryingdrinkingwatertoAbidjan• TerminalstoragefacilitiesinAbidjan,withatotalcapacityof80,000m³.
Location • Tobedetermined
Project’sbenefit • SecuringthesupplyofdrinkingwatertothecityofAbidjanEstimatedcost • FCFA280,000M(2013)/EUR427M/USD560M(1USD=500CFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financing,operatingand
maintainingoftheproductionandstorageunits,aswellasthewatertransportsystem
Anticipateddistributionofinvestments:• Privateinvestment:Tobedetermined• Publicinvestment:Tobedetermined
Modalitiesfortheremunerationoftheprivatepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Serviceconcession/Concession
PROJECT’SSTATUS
Progress • PreliminarystudiesInformationavailable • Preliminarystudiesavailable
Nextstepsandtimetable
• Selectionofthewatersource;• Carryoutadditionalpreliminarystudies;• Launchtheconsultationprocess.
86
PROJECTNo.54. DEVELOPINGANDOPERATINGTHEABIDJAN-SAMOHIGHWAY
NDPReference Strategicpriority4/Impact1/Effect1/Output1.5/Action1.5.2ContractingAuthority MINISTRYOFECONOMICINFRASTRUCTURE
FocalUnitoftheContractingAuthority
Mrs.SISSOKOCoralieProjectCoordinator
Tel:(225)20347338/(225)01136860Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
TheBassam–Samohighwayproject(40kmfromBassam)isthesecondphaseofbuildingoftheIvoriansectionoftheAbidjan-LagosHighwayCorridor.ThisprojectwillfacilitateroadaccesstotheseasideresortofAssinie,eastofthecityofAbidjan.
Location • Bassam-Bonoua
Project’sbenefit• Improvingtheinfrastructureallowingthefluidityoftrafficintheeastofthe
country;• TourismdevelopmentoftheseasideresortofAssinie.
Estimatedcost • FCFA60,000M(2013)/EUR91.5M/USD120M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Serviceconcession/Concession
PROJECT’SSTATUS
Progress • SeekingfundingInformationavailable • Feasibilitystudyand“DAO”availableNextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.
87
PROJECTNo.55. BUILDINGANDOPERATINGSECTION2OFTHEABIDJAN-SANPEDRO:DABOU-SANPEDROHIGHWAY
NDPReference Strategicpriority4/Impact1/Effect1/Output1.5/Action1.5.4
ContractingAuthority MINISTRYOFECONOMICINFRASTRUCTURE
FocalUnitoftheContractingAuthority
Mrs.SISSOKOCoralieProjectCoordinator
Tel:(225)20347338/(225)01136860Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
TheaimofthisprojectistorehabilitatetheroadbetweenDabouandSanPedro(around400km), in order tomaintain a viable access to the southwest of Côted’Ivoire,areaofthebiggestagro-industrialproductionandofthesecondportofthecountry.ThefirstphaseofthisprojectconcernstheAbidjan–DabouHighway(around50km).
Location • Dabou,SanPedro
Project’sbenefit • MaintainingaviableaccesstothesouthwestofCôted’Ivoire,areaofthebiggestagro-industrialproductionandofthesecondportofthecountry.
Estimatedcost • FCFA690,000M(2014)/EUR915M/USD1,200M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financing,operatingand
maintaining
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers
Typeofpartnershipenvisaged:• Serviceconcession/Concession
PROJECT’SSTATUS
Progress • Termsofreferenceavailable
Informationavailable • N/A
Nextstepsandtimetable
• FinalisationofstudiesoftheAbidjan-Dabousection• Closureoffinancingarrangements• Launchtheconsultationprocess.
88
MINISTRYOFURBANWASTEMANAGEMENTANDSANITATION
89
PROJECTNo.56. BUILDINGINFRASTRUCTUREFORTHEMANAGEMENTOFDOMESTICANDSIMILARWASTE(DSMA)INTHEDISTRICTOFABIDJAN
NDPReference Strategicpriority4/Impact2/Effect3/Output3.3/Action3.3.2ContractingAuthority MINISTRYOFURBANWASTEMANAGEMENTANDSANITATION(MSUA)
FocalUnitoftheContractingAuthority
DirectorateofPlanning:Mr.SERIKanonJeanY.DirectorateofPlanningTel:(225)07627282
E-mail:[email protected]
DirectorateoftheInfrastructureforSanitationandValorisationofWaste
(DISVD):• DrYESSOMax-Médard
• Tel:(225)07785516
E-mail:[email protected]
Briefdescription
Theaimof thisproject is tobuildacollectioncircuitandstorage infrastructuresforthevalorisationanddisposalofwasteinlandfillsintheAutonomousDistrictofAbidjan. It also aims to build, per zone ofwaste production, groupage centres,transfercentres,sortingandwastevalorisationunitsandtechnicallandfillcentresfor non-recoverable waste for a good management of the urban waste of theDistrictofAbidjan.To thisend, theDistrictwillbedivided into3 zones,eachofwhichwillbeassignedtoanoperator.Theprojectwillalsoinvolve3phases:• Phase1:Sweeping,collectingandtransportingthewaste• Phase2:Wastelandfilling,withthebuildingof3technicallandfillcentres• Phase3:Mechanismofvalorisationofthewaste.
The implementationofthetotalityofPhase1andthecommissioningofat leastonelandfillcentreareplannedforearly2017.
Location • DistrictofAbidjan
Project’sbenefit
• Availabilityofadequateinfrastructureforagoodmanagementofdomesticandsimilarwaste
• Modernisingthemanagementofurbanwaste,transferofcleantechnology• ProtectionoftheenvironmentandcontributionofCôted’Ivoiretothefight
againstclimatechange• Creationgreencompaniesandjobs.
Estimatedcost • FCFA54,000M(2016)/EUR82.3M/USD108M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand
maintainingofalltheinfrastructurebuilt
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgesofcustomaryrightson
thebuildingsitesandavailabilityofthegroupagecentres
Modalitiesfortheremunerationofthepartner: • User/Privateclients
Typeofpartnershipenvisaged:• Publicservicedelegation
PROJECT’SSTATUS
Progress• CharacterisationandvalorisationstudiesoftheurbanwasteofAbidjan• Draftingofdossiersforthecallforexpressionofinterestandthecallfor
tendersforPhase1.
Informationavailable • Technicalstudies• Additionalpreliminarystudies
Nextstepsandtimetable • Launchtheconsultationprocess
90
MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENT
91
PROJECTNo.57. DEVELOPMENTANDTOURISMVALORISATIONOFTHEBANCONATIONALPARK
NDPReference Strategicpriority4/Impact2/Effect4/Output4.3/Action4.3.3
ContractingAuthority MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENTOFFICEIVOIRIENDESPARCSETRESERVES(OIPR)
FocalUnitoftheContractingAuthority
Mr.TONDOSSAMAAdamaDirector-GeneraloftheOfficeIvoiriendesParcsetRéserves(OIPR)
Tel:(225)07617526E-mail:[email protected]
GENERALCHARACTERISTICS
Briefdescription
TheBancoNationalParkisaforestmassifexceptionallypreservedintheheartofthecityofAbidjan. It isanareaofpedagogical,culturaldiscoveryandleisure,aswellasaspaceforrejuvenation.The aim of this project is to find partners who can help the OIPR develop andvalorise tourism on this site and strengthen the establishment of qualityinfrastructureinthePark.In order to valorise the Park, in addition to the grant from the IvorianGovernment, the OIPR has been receiving the support of the Government ofJapansince2010.This support is focusedon thecreationofaReceptionCentreandthebuildingofworksfortheprotection(8kmperimeterfence)andclean-upof the Park’s surroundings. A financing agreement was also obtained from theGlobalEnvironmentalFacilityforitssustainablemanagement.
Location • Abidjan
Project’sbenefit
• DevelopingEcotourismwithinthecityofAbidjan• RaisingenvironmentalawarenessinthemindsofthepopulationofAbidjan• ChangingthenegativeimageoftheforestintheAbidjanpopular
consciousnessintermsofsecurityEstimatedcost • FCFA11,900M(2016)/EUR18.1M/USD23.8M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Developmentofsightseeingtours• Creationofacanopy-walk• Rehabilitationandcreationoftourism
infrastructureand18kmofaperimeterfence• Operatingandmaintaining
Anticipateddistributionofinvestments:• Privateinvestment:FCFA11,100M• Publicinvestment:FCFA800M
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Valorisationofthedomain
PROJECT’SSTATUS
Progress • Carryingoutstudies• BuildingofthegatehouseoftheReceptionCentre.
Informationavailable
• Feasibilityandsocioeconomicstudies• Biophysicalevaluationoftheeco-systemicservicesoftheBancoNational
Park• Studyfortheestimateofthestockcarbonandthecarbonsequestration
potentialoftheBancoNationalPark• DescriptionofthetouristiczoningoftheBancoNationalPark.
Nextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.
92
PROJECTNo.58. DEVELOPMENTANDTOURISMVALORISATIONOFTHEDALHIAFLEURNATURALRESERVE
NDPReference Strategicfocus4/Impact2/Effect4/Output4.3/Action4.3.3
ContractingAuthority MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENTOFFICEIVOIRIENDESPARCSETRESERVES(OIPR)
FocalUnitoftheContractingAuthority
Mr.TONDOSSAMAAdamaDirector-GeneraloftheOfficeIvoiriendesParcsetRéserves(OIPR)
Tel:(225)07617526E-mail:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Endowedwithawealthof floraand fauna, theDahliaFleurNaturalReservehaspedagogical,hydrological,culturalandtouristicfunctions.Beyondtheseassets,itholds a privileged position within this network, due to its location in theCommuneofCocody,alongtheEbriélagoon.Thevalorisationofits30hawillnotonlymakeitpossibletoreduceerosioninthebayofCocodyandthestrongrealestatepressurethatithastoendure,butwillalsodevelopecotourismwithinthecityofAbidjan.Planned foraperiodof three (3) years, theaimof theproject is toprotectandvalorise the Dahlia Fleur Natural Reserve through the validation of thearchitectural concept of the ecotourism centre and the creation of a modernbotanicalandzoologicalparkwithinthereserve.
Location • Abidjan
Project’sbenefit
• DevelopingecotourismwithinthecityofAbidjan• RaisingenvironmentalawarewithinthepopulationofAbidjan• Contributingtosocioeconomicdevelopmentbyestablishingeconomic
operators,thesaleofartefacts,thecreationofdirectandindirectjobsEstimatedcost • FCFA7,500M(2016)/EUR11.43M/USD15M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Buildingand/orrehabilitatingtourism
infrastructure(receptioncentre,botanicalandzoologicalpark,etc.)
• Equippingtourisminfrastructure• Operatingandtourismpromotion.
Anticipateddistributionofinvestments:• Privateinvestment:FCFA7,379millions• Publicinvestment:FCFA121millions
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Valorisationofthedomain
PROJECT’SSTATUSProgress • TermsofreferenceInformationavailable • DecreeonthecreationoftheReserveNextstepsandtimetable
• Carryoutpreliminarystudies• Launchtheconsultationprocess
93
MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT
94
PROJECTNo.59. AGEF/PRIVATESECTORDEVELOPMENTANDLANDSALES
NDPReference Strategicpriority4/Impact2/Effect2/Output2.2/Action2.2.1ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT
FocalUnitoftheContractingAuthority
Mr.ZONGOClaudeTechnicalAdvisor
InchargeofprojectmonitoringTel:(225)20334160/(225)07064247
Email:[email protected]
Mr.NABELEDIOuattaraDirectorofEvaluationPlanningand
StatisticsTel:(225)20334185/(225)05055864
Email:[email protected]
Briefdescription
Thegeneralobjectiveofthisprojectistohave1,280hectaresofdevelopedlands(constructionofprimaryVRD)peryear,ofwhich500hectares for theDistrictofAbidjan and 780 hectares for the cities of the interior. Making these landsavailablewillallowtheprivatesectorstobuildhouses,withaviewtofacilitatingaccess to housing for the general population, but also build community-basedfacilities,especiallycommercialandhealthfacilities,etc.
Location • Abidjan,Yamoussoukro
Project’sbenefit • Avoiduncontrolledallotments• Putdevelopedurbanlandsonthemarket.
Estimatedcost • FCFA109,000M/EUR166M/USD218M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Development(VRD),landsale
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Developmentconcession
PROJECT’SSTATUS
Progress • PreliminarystudiesInformationavailable • PreliminarystudiesNextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.
95
PROJECTNo.60. SETTINGUPANDOPERATINGAVIRTUALSINGLEDESKFORTHEISSUINGOFCONSTRUCTIONPERMITSTHROUGHANINTEGRATEDINFORMATIONSYSTEM
NDPReference Strategicpriority4/Impact2/Effect1/Output1.1/Action1.1.3ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT
FocalUnitoftheContractingAuthority
Mr.ZONGOClaudeTechnicalAdvisor,
InchargeofprojectmonitoringTel:(225)20334160/(225)07064247
Email:[email protected]
Mr.NABELEDIOuattaraDirectorofEvaluationPlanningand
StatisticsTel:(225)20334185/(225)05055864
Email:[email protected]
Briefdescription
The aim of this project is to put in place a Virtual Management System ofconstructionpermitthatwillbeacomputerplatformof interactionbetweenthecompanies,individuals,decision-makersoftheMinistryofConstruction,Housing,SanitationandUrbanDevelopmentandotheractorsinvolvedintheappraisalanddeliveryprocedureofthebuildingpermit.Thevariousphasesoftheprojectareasfollows:• Phase 1: The setting up of a virtual management system of the building
permit(SGVPC)• Phase 2: The digitisation and safeguarding of the archives of the building
permitdossiers• Phase3:Theestablishmentofworkflowsofthe“ACD”reforminAbidjanand
intheinteriorofthecountry• Phase 4: The operation and functioning of the Geographic Information
Systemoftheurbanland.Location • Abidjan
Project’sbenefit
• Facilitatingtheprocedureforissuingthebuildingpermit• Securingthedata• Removingsomeadministrativered-tapefoundintheappraisalanddelivery
procedureofthebuildingpermit,someofwhichare:(i)theslowtreatmentofthedossiersofbuildingpermits(ii)thelossofdossiers(iii)archivingissues.
Estimatedcost • 15000MFCFA/22,9MEUR/30MUSD(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,designing,supplying,equippingand
operating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Publicservicedelegation
PROJECT’SSTATUS
Progress • Preliminarystudies• Physicalspaceavailableanddevelopmentinprogress.
Informationavailable• Preliminarystudies• Termsofreferenceforin-depthstudies.
Nextstepsandtimetable
• Carryoutpreliminarystudies• Launchtheconsultationprocess.
96
PROJECTNo.61. BUILDINGANDOPERATINGTHE“PLACEOFTHENATION”COMPLEX
NDPReference Strategicfocus4/Impact2/Effect2/Output2.3/Action2.3.4ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT
FocalUnitoftheContractingAuthority
Mr.ZONGOClaudeTechnicalAdvisor,
InchargeofprojectmonitoringTel:(225)20334160/(225)07064247
Email:[email protected]
Briefdescription
Theaimofthisprojectistobuildon3hectares(siteof60housingunitsandBressolesandBriandsquare):• 2officetours:18,000m²• A26,000m2shoppingmall• A15-storey5starhotel• 3,250undergroundparkinglots.In exchange for its land, the State could purchase shares in the capital of theprojectcompanyorgrantalong-termleasetotheprivateoperator.
Location • Abidjan-Plateau-siteof60housingunitsandBressolesandBriandsquare
Project’sbenefit • ContributingtothemodernisationandcoherentdevelopmentofthecommuneofthePlateau
Estimatedcost • FCFA86,235M(2013)/EUR131M/USD172M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Availabilityofthedomain
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Valorisationofthedomain
PROJECT’SSTATUS
Progress • Projectcurrentlybeingnegotiatedwithaconsortium:Frameworkagreementsignedon03/11/2015
Informationavailable • StudiesNextstepsandtimetable
• Continuationandfinalisationofthenegotiations• Signingofthecontract
97
PROJECTNo.62. REHABILITATINGANDOPERATINGTHE“PYRAMID”BUILDING
NDPReference Strategicpriority4/Impact2/Effect2/Output2.3/Action2.3.5ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT
FocalUnitoftheContractingAuthority
MR.ZONGOClaudeTechnicalAdvisor,
InchargeofprojectmonitoringTel:(225)20334160/(225)07064247
Email:[email protected]
Briefdescription
The "Pyramid" building, a twelve-storey public building for offices, shops andapartments was built in the 1970s and has been seriously damaged for someyearsnow.This project involves the rehabilitation of all aspects of building engineering,especially the structural works, the glazed carpentry (aluminium and wood),sealed coatings, false ceiling, painting, fire security, electricity (strong andweakcurrent), air-conditioning, cooking facilities and generator. Theupgradingof thetechnicalinstallationstocurrentstandardsandavideosurveillancesystem.
Location • Abidjan-Plateau
Project’sbenefit
• Contributing to the modernisation and coherent development of thecommuneofthePlateau,
• PreservetheState'spropertyportfolio,• Address,inpart,thelackofficespaces.
Estimatedcost • FCFA30,000M/EUR46M/USD60M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,rehabilitation,exploitationand
maintaining
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Availabilityoftheland
Modalitiesfortheremunerationofthepartner:• Taxpayers
Typeofpartnershipenvisaged:• PublicPaymentPartnershipAgreement.
PROJECT’SSTATUS
Progress • PreliminarystudiesInformationavailable • PreliminarystudiesNextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.
98
PROJECTNo.63. REHABILITATINGANDOPERATINGTHEBICICIBUILDING
NDPReference Strategicpriority4/Impact2/Effect2/Output2.3/Action2.3.5ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT
FocalUnitoftheContractingAuthority
Mr.ZONGOClaudeTechnicalAdvisor,
InchargeofprojectmonitoringTel:(225)20334160/(225)07064247
Email:[email protected]
Briefdescription
Theaimofthisprojectistorehabilitateandoperatethe17-storeyBICICIbuilding(Groundfloor+Mezzanine+15floors+parkinglots),co-ownedbytheStateandthe BICICI (Banque Internationale pour le Commerce et l'Industrie of the Côted'Ivoire),asubsidiaryoftheBNPParibasGroup.• Theprivatepartnershallfinancethebuyoutoftheseven(7)floorsownedby
theBICICIinthenameofandonbehalfoftheState• Thegroundfloorandmezzanineshallbeoccupiedbytheprivatepartnerfor
thebuildingandoperationofashoppingmallandvariousotheradministrativeand/orcommercialactivities.
• TheotherrehabilitatedfloorsshallbeleasedbytheStateforadministrativeservices.
Location • Abidjan-Plateau
Project’sbenefit• Contributingtothemodernisationandcoherentdevelopmentofthe
communeofthePlateau• Address,inpart,thelackofficespaces.
Estimatedcost • FCFA13,400M/EUR20M/USD27M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,Rehabilitatingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedetermined• Publicinvestment:Availabilityoftheland
Modalitiesfortheremunerationofthepartner:• Taxpayers
Typeofpartnershipenvisaged:• PublicPaymentPartnershipAgreement.
PROJECT’SSTATUS
Progress • NegotiationinprogresswiththeprivateoperatorInformationavailable • StudiesNextstepsandtimetable
• Continuationandfinalisationofthenegotiations• Signingofthecontract
99
PROJECTNo.64. BUILDINGANDOPERATINGA5STARHILTONHOTEL
NDPReference Strategicpriority4/Impact2/Effect2/Output2.3/Action2.3.2ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT
FocalUnitoftheContractingAuthority
Mr.ZONGOClaudeTechnicalAdvisor,
InchargeofprojectmonitoringTel:(225)20334160/(225)07064247
Email:[email protected]
Briefdescription
Theaimofthisprojectistobuilda5-starhotelandoperateona9,000m2siteoftheAgenceIvoiriennedePresse(AIP).TheStatecouldeitherusethevalueofthelandtobuysharesinthecapitaloftheprojectcompanyorgrantalong-termleasetotheprivateoperator.
Location • Abidjan-Plateau–AIPsite
Project’sbenefit• Contributingtothemodernisationandcoherentdevelopmentofthe
communeduPlateau• Address,inpart,thelackofhotelroomsinthePlateau.
Estimatedcost(onthebasisoftheaveragecostofa5starhotel)
• FCFA60,000M/EUR91M/USD120M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Availabilityoftheland
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Tobedefined
PROJECT’SSTATUS
Progress • NegotiationinprogresswithaconsortiumInformationavailable • FeasibilitystudiesandfinancialstudiesNextstepsandtimetable
• Continuationandfinalisationofnegotiations• Signingofthecontract.
100
MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES
101
PROJECTNo.65. STREETSIGNAGEOFTHEDISTRICTOFABIDJAN
NDPReference Strategicpriority1/Impact2/Effect1/Output1.4/Action1.4.2ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES
FocalUnitoftheContractingAuthority
Mr.SAKOAhmedTechnicalAdvisor
Tel:(225)20347387Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Street signage aims to make it possible for each citizen to have a precisegeographical address. It provides for rapid location, emergency interventions(Samu, fire fighters, medical doctors, gendarmerie…), serves as a basis for thedevelopmentofpostalservicesandfacilitatescommercialtransactions.Thisprojectaimsto:• CodifyallthestreetsofthedistrictofAbidjan• Providesignsandnumbersforallthestreets• Adaptanumbersystemofplotsanddwellings• Produceandmakeavailableplansandadaptedmaps.
Location • Abidjan,withthepossibilityofextensiontotheGreaterAbidjan
Project’sbenefit • ProvidingthecityofAbidjanamodernmeansoflocationandplanning.Estimatedcost • FCFA8,000M/EUR12M/USD16M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Financingandequipmentsupply
Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%
Modalitiesfortheremunerationofthepartner:• Taxpayers
Typeofpartnershipenvisaged:• PublicPaymentPartnershipAgreement
PROJECT’SSTATUS Progress • Studies
Informationavailable• 1998studiesavailable,tobeupdated• Streetsignagemodelvalidated
Nextstep(s)andtimetable
• Updatingoftechnicalstudies• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
102
PROJECTNo.66. CREATINGANDOPERATING5,000COMMUNITYMULTI-SERVICECYBERCENTRES
NDPReference Strategicpriority1/Impactresult2/Effect1/Output1.1/Action1.1.10ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES
FocalUnitoftheContractingAuthority
Mr.DÉDÉDadiéRogerDirectorofICTs
Tel:(225)20344511Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
The aim of this project is to create and operate, in each commune and rurallocalityofmorethan500 inhabitants,communitymulti-servicecybercentres, inorder to offer proximity services allowing the rural populations to come out ofisolation, to send and receive emails, obtain simple administrative documentswithouthavingtotravel.Thephasesoftheprojectareasfollows:• Phase1:Creationof1,000cyber-centresinthefirstyear• Phase2:Creationof2,000cyber-centresinthesecondyear• Phase3:Creationof2,000cyber-centresinthethirdyear.
Location • Throughoutthenationalterritory
Project’sbenefit
• Contributing to the implementation of the policy of decentralisation anddevelopmentoftheterritory,
• Creatingjobs,increasingtheincomesoftheruralpopulationsandimprovingtheirlivingconditions,
• Deployinginalocationorintheprimaryschoolsofvillagesofmorethan500inhabitants,cyber-centresconnectedtotheInternetnetwork
• Promoting community-based information through the various ICTapplications (telephone and electronic message services) and distancelearningforchildrenandadults
• Offeringpublicservicestousersforthe issuingofadministrativedocumentson line (Registrations, exam results, medical consultations, registration ofbirthsanddeaths)
• Identifying, empowering and building the capacities of volunteer schoolteachers and the youth from the communities to ensure the supervisionofcyber-centres.
Estimatedcost • FCFA53,000M/EUR81M/USD106M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Tobedetermined
PROJECT’SSTATUS
Progress• Studiesforredefiningtheprojecttobecarriedout.14pilotsitesidentifiedin
14localitiesthroughoutthecountry.Economicmodelbeingdeveloped.• FundingrequestmadetotheWorldBank.
Informationavailable • StudiesavailableNextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess
103
PROJECTNo.67. E-AGRICULTUREPROGRAMME
NDPReference Strategicpriority3/Impact1/Effect3/Output3.1/Action3.1.1ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES
FocalUnitoftheContractingAuthority
Mr.DanonHenriProgrammeCoordinatorTel:(225)07685615
Email:[email protected]
Briefdescription
The e-agriculture Programme aims to (i) develop and modernise Ivorianagriculture and (ii) promote good governance of the sector through ICTs. Itcomprises14aspects:
1. ThecreationofruralICTCommunityCentres2. Thesettingupofaninformationsystemofagriculturalmarkets3. Thesettingupofanintegratedmanagementsystemofforestactivities4. ThesettingupofaNationalAnimalandFishInformationSystem5. ThecreationofanAgro-meteorologicalObservatory6. ThesettingupofaStrategicMonitoringSystem7. The setting up of a Geographic Information System of Agricultural
irrigationdevelopments8. TheequippingoftheMinistriesofAgriculture,AnimalandFishResources
andtheEconomyandFinance9. TheequippingofANADER10. TheequippingoftheCNRA,OCPV,SODEFORandCNA11. ThesettingupofanAgriculturalInformationSystem12. ThesettingupofaWebPortaloftheAgriculturalWorld13. ThesettingupofanIntranet14. ThesettingupofanSMS,VMSinformationserviceandCallcentre.
Location • Throughoutthenationalterritory
Project’sbenefit
EnsurethatIvorianagricultureis:• Performingandcompetitiveintermsofproductioncostandquality,tomeet
therequirementsofthenational,sub-regionalandinternationalmarket• Profitable for producers and capable of bringing them substantial and
sustainablerevenues• Mechanised,withgoodwatermanagement• Organisedinsectorthathavecontroloverthewholevaluechain
Estimatedcost • FCFA33,500M/EUR52M/USD70M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• BOT
PROJECT’SSTATUS
Progress
• Studiescarriedout- DraftingoftheNationalStrategyDocument(NSD)fore-Agriculture
(2012)- ProjectPriorityDocumentoftheNSD(2013)- OperationalisationstudyoftheNSDprojects(2014)- Draftingofthespecificationsforimplementation(2015).
• Ongoingstepandprogress:- Arrangementsforthestartandconductofastudyonthedefinitionof
theeconomicmodeloftheprogrammeInformationavailable • NSDavailable
104
• Specificationsavailable. Nextstepsandtimetable • Launchtheconsultationprocess
105
PROJECTNo.68. BUILDING5,000KMOFFIBREOPTICS
NDPReference Strategicpriority4/Impact1/Effect3/Output3.1/Action3.1.1
ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES
FocalUnitoftheContractingAuthority
Mr.DÉDÉDadiéRogerDirectorofICTs
Tel:(225)20344511Email:[email protected]
GENERALCHARACTERISTICS
Briefdescription
Thebuildingof5,000kmoffibreopticscomprises3lots:• Thecontractsforthefirsttwolotshavebeenawarded• Thecallfortendersforthe3rdlotof1,000kmoffibreswillbemadeshortlyThe Contracting Authority is therefore looking for private operators for theoperation of the two first lots, aswell as for the building and operation of thethirdlot.
Location • Nationalterritory
Project’sbenefit • Digitalcoverageofthenationalterritory
Estimatedcost • FCFA50,000M/EUR76M/USD100M(1USD=500CFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating
Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined
Modalitiesfortheremunerationofthepartner:• Users/clients
Typeofpartnershipenvisaged• Serviceconcession/Concession
PROJECT’SSTATUS
Progress • Preparationforthecallfortenders
Informationavailable • Studiesonthefirsttwolots
Nextstepsandtimetable
• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.
106
MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS
107
PROJECTNo.69. BUILDINGANDOPERATINGTHEDRYPORTOFFERKESSÉDOUGOU
NDPReference Strategicpriority5/Impact1/Effect1/Output1.4/Action1.4.1ContractingAuthority MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS
FocalUnitoftheContractingAuthority
Mr.AbdoulayeALLIAGUI,ProjectManager
DirectorofCommunityPoliciesofInfrastructuresandICTsLandline:(225)20337030/(225)20242575Mobile:(225)01477281/(225)48281292
Email:[email protected]
Briefdescription
The aim is to build and operate the infrastructure of a dry port ofFerkessédougou,inordertoreducecongestionandbringtheAutonomousPortofAbidjan closer to its regional partners (Mali, Burkina Faso and Niger). Thisinfrastructurecomprisesthree(3)maincomponents:• Alogisticsplatform(warehouses,coldchain,etc.)• Ahydrocarbondepot• Aregionalslaughterhouseandcattlemarket• Anindustrialzonefordevelopingagriculturalandminingprocessingactivities.ThisprojectispartofpriorityprojectsfortheemergenceofCôted’Ivoirein2020.At the sub-regional level, the West African Economic and Monetary Union(WAEMU)alsoretainedthisprojectaspartoftheRegionalEconomicProgramme(REP),PhaseII.
Location • Ferkessédougou,TchologoRegion,600KmfromAbidjan
Project’sbenefit
• Makingalastingcontributiontothedevelopmentofthenorthernregionsofthecountry
• DevelopingtheeconomicpotentialoftheDistrictsoftheSavannas(Poro,Tchologo,Bagoué)andtheZanzan(Bounkani,Gontougo)andleveragetheeconomicpotentialoftheborderregions:Sikasso(Mali)andBobo-Dioulasso(Burkina)
• Givingfreshimpetusandconsolidatingthegainsofrailwaytransporttothecountriesofthehinterland
• Makingavailabletotheeconomicoperatorsoptimalconditionsofreception,servicesandtheuseofthemultimodalplatform.
Estimatedcost • 303000MFCFA/462MEUR/606MUSD(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Development,financing,operationofthethree
components:themultimodalplatform,thehydrocarbondepot,theregionalslaughterhouse
Anticipateddistributionofinvestments:• Privateinvestment:FCFA153,985M• Publicinvestment:FCFA149,015M
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain
PROJECT’SSTATUS
Progress • Identificationofthesiteoftheproject• Finalisationofthereportofthedetaileddraftproject
Informationavailable • Studyreportsandinterimreportsavailable
Nextstepsandtimetable
• Declarationofthesiteoftheprojectasasiteofpublicutility• Purgecustomaryrights• Launchtheconsultationprocess
108
PROJECTNo.70. BUILDINGAPRODUCTIONPLANTOFBIOLARVICIDESINCÔTED’IVOIRE
NDPReference Strategicpriority5/Impact1/Effect1/Output1.4/Action1.4.4
ContractingAuthority MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS
FocalUnitoftheContractingAuthority
Mr.AbdoulayeALLIAGUIDirectorofCommunityPoliciesofInfrastructuresandICTs
Landline:(225)20337030/(225)20242575Mobile:(225)01477281/(225)48281292
Email:[email protected]
Briefdescription
Theprojectofbuildingabiolarvicideplantaimsto:• Producebiolarvicideslocally• Reduce the mortality rate of the vulnerable populations by eliminating
breedingsites• Reduce the price of access to products by 25% of the current price in the
interestofthepeopleIn the context of an ECOWAS initiative, Côte d’Ivoire, Ghana and Nigeria haveobtainedproductionequipmentfortheoperationoftheseplants. InthecaseofCôted’Ivoire,theStateislookingforaprivatepartnerwhosemissionitwillbetofinancetheconstructionofbuildingstohousethisproductiontoolandoperateit.Thisplantisintendedtobeasub-regionalplant.
Location • NewindustrialzonePK24,Yopougon,Abidjan
Project’sbenefit
• ThisprojectwillcontributetotheeradicationofmalariainCôted’Ivoireinparticular,andinWestAfricaingeneral.
• ThefirstbeneficiarieswillbeallthecommunitieslivinginCôted’Ivoireandthemigrantpopulations
Estimatedcost • FCFA15,500M/EUR23.63M/USD31M(1USD=500FCFA)
INFORMATIONSPECIFICTOPPPSTRUCTURING
Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operationandmaintaining
Anticipateddistributionofinvestments:• StateofCôted’Ivoire:24%orFCFA3,720M• Privatesector:24%orFCFA3,720M• Donor:52%orFCFA8,060M
Modalitiesfortheremunerationofthepartner:• Users/Privateclients
Typeofpartnershipenvisaged:• Serviceconcession
PROJECT’SSTATUS
Progress
• AnECOWAS/Venezuela/CubatripartiteMemorandumofUnderstandinghasbeensigned
• TheRepublicofVenezuelahasmadeavailabletoECOWASitsshareofthefundingforthework
• TheofficiallaunchoftheconstructionworkoftheplantsinCôted’Ivoire,NigeriaandGhanahavetakenplace
• Thelandfortheplantisavailable.
Informationavailable• Reportofthefeasibilitystudyoftheproject(threeplants)available• Termsofreferenceofthetechnicalfeasibilitystudyavailable.
Nextstepsandtimetable
• Updatethetechnicalfeasibilitystudy(processinprogress);• Launchtheconsultationprocess