ADVISORY GROUP 2016 May 17-18, 2016 Paris PPP PROJECTS SHEETS

Upload: others

Post on 16-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

ADVISORYGROUP2016

May 17-18, 2016

Paris

PPPPROJECTSSHEETS

Page 2: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

2

CONTENTS

SUMMARYTABLEOFTHEPPPPROJECTS............................................................................6

MINISTRYOFSTATE,MINISTRYOFTHEINTERIORANDSECURITY.....................................13PROJECTNo.1. BuildingandoperatingtheMallinthePlateau..............................................................14

MINISTRYOFCOMMUNICATION......................................................................................15PROJECTNo.2. Financing,buildingandoperatingtheinfrastructurefortheswitchtodigital

terrestrialtelevision(DTT)...................................................................................................16

MINISTRYOFCULTUREANDFRANCOPHONIE...................................................................17PROJECTNo.3. Rehabilitatingthehistoriccityofgrand-bassam............................................................18PROJECTNo.4. BuildingtheAfricanRenaissanceLibrary(ARL)..............................................................19

MINISTRYOFSPORTANDLEASURE..................................................................................20PROJECTNo.5. BuildingandoperatingthesportshighschoolofBouaké..............................................21PROJECTNo.6. Buildingandoperatingthe“Villages”ofthe2021ACN.................................................22PROJECTNo.7. BuildingandoperatingtheEBIMPEOlympicVillage......................................................23

MINISTRYOFHIGHEREDUCATIONANDSCIENTIFICRESEARCH.........................................24PROJECTNo.8. BuildingandequippingtheUniversityofSanPedro......................................................25

MINISTRYOFHEALTHANDPUBLICHYGIENE....................................................................26PROJECTNo.9. RehabilitatingandmaintainingtheUniversityHospitalofCocody................................27PROJECTNo.10. Rehabilitating,equippingandmaintainingtheUniversityHospitalofTreichville.......28PROJECTNo.11. BuildingandequippingtheNationalCentreforRadiotherapyandMedical

Oncology(CNROM)..............................................................................................................29PROJECTNo.12. RehabilitatingandequippingtheHeartInstituteofAbidjan.......................................30

MINISTRYOFAGRICULTUREANDRURALDEVELOPMENT.................................................31PROJECTNo.13. Operatinga2,000hectarestate-owneddomainfortheproductionandprocessing

ofsoya..................................................................................................................................32

MINISTRYOFANIMALANDFISHRESOURCES...................................................................33PROJECTNo.14. Buildingandoperatingslaughterhousesinthecapitalcitiesoftheinteriorofthe

country(Yamoussoukro,Daloa,BouakéandKorhogo).......................................................34PROJECTNo.15. Projectforbuildingandoperatingtheslaughterhouse-cattlemarketcomplexof

Abidjan-Anyama(CAMA)....................................................................................................35PROJECTNo.16. IntegratedManagementProjectofRanchesandStations(PROGIRS)/

RehabilitatingandoperatingoftheBadikahaseedfarm(BSF)...........................................36PROJECTNo.17. IntegratedManagementProjectofRanchesandStations(PROGIRS)/Meat

productionatNioroningueStation(PBSN)..........................................................................37

Page 3: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

3

PROJECTNo.18. IntegratedManagementProjectofRanchesandBreedingstations(PROGIRS)/MeatproductionatPanyaStation(PSBP)............................................................................38

PROJECTNo.19. IntegratedManagementProjectofRanchesandStations(PROGIRS)/Agro-industrialdairycomplexofToumodi...................................................................................39

MINISTRYOFCOMMERCE................................................................................................40PROJECTNo.20. BuildingandoperatingwholesaleandretailmarketsinAbidjan,Daloa,

Abengourouand7otherprovincialcapitals........................................................................41PROJECTNo.21. BuildingandoperatingtheExhibitionCentreofAbidjan.............................................42

MINISTRYOFPETROLEUMANDENERGY..........................................................................43

PROJECTSINTHEHYDROCARBONSECTOR.......................................................................................44PROJECTNo.22. SupplyingCôted’IvoireinLiquefiedNaturalGas(LNG)...............................................45PROJECTNo.23. Creatingfillingplantsintenlocalities...........................................................................46PROJECTNo.24. BuildingandoperatingahydrocarbondepotandanoilwharfinSanPedro..............47PROJECTNo.25. BuildingofanoilstorageterminalàVridide1100000MT(Phase1)onthewest

sideofthecanal...................................................................................................................48PROJECTSINTHEENERGYSECTOR....................................................................................................49

PROJECTNo.26. Buildingcocoabiomassplants(80MW)......................................................................50PROJECTNo.27. BuildingandoperatingacottonbiomassplantinBoundiali(25MW).........................51PROJECTNo.28. Buildingbiomassplants(10sites,200MW).................................................................52PROJECTNo.29. Buildingphotovoltaicsolarpowerplants(5Sites,100MW).......................................53

MINISTRYOFINDUSTRYANDMINES................................................................................54PROJECTNo.30. ProgrammeforthecreationanddevelopmentofnewindustrialzonesinAbidjan

andtheinteriorofthecountry............................................................................................55PROJECTNo.31. IntegratedminingdevelopmentprojectintheWest(PDMIO)....................................56

MINISTRYOFTOURISM....................................................................................................57PROJECTNo.32. Developingandoperating9“hut-stopovers”..............................................................58PROJECTNo.33. Rehabilitatingandoperating5SIETHOhotels..............................................................59PROJECTNo.34. Rehabilitatingandoperatingthe“HotelPresident”ofYamoussoukro........................60PROJECTNo.35. DevelopingandoperatingthewildlifeparkofAbokouamékro...................................61PROJECTNo.36. RehabilitatingandextendingtheIvoireGolf-ClubofAbidjan......................................62

MINISTRYOFTRANSPORT................................................................................................63

PROJECTSINTHERAILWAYSECTOR..................................................................................................64PROJECTNo.37. BuildingandoperatingLine1oftheAbidjanSubway..................................................65PROJECTNo.38. BuildingandoperatingtheOuangolodougou–Niellé–Sikassorailwayline..............66PROJECTNo.39. RehabilitatingandoperatingtheAbidjan–Ouagadougou–Kayarailwayline.............67

PROJECTSINTHEAIRPORTSECTOR..................................................................................................68PROJECTNo.40. Buildingofthe“Airportcity”ofAbidjan.......................................................................69PROJECTNo.41. Designing,financing,buildingandoperatingthenewinternationalairportofSan

Pedroanditsairportcity......................................................................................................70PROJECTSINTHEROADSECTOR.......................................................................................................71

PROJECTNo.42. Building,equippingandoperatingthebusstationofBouaké.....................................72PROJECTNo.43. BuildingthejuxtaposedborderpostofNigoni(Tingrela)............................................73

Page 4: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

4

PROJECTSINTHEPORTSECTOR........................................................................................................74PROJECTNo.44. RelocatingandextendingthecontainerterminaloftheportofSanPedro................75PROJECTNo.45. Developingandoperatingofa150hectarelogisticshubandindustrialzoneatthe

portofSanPedro.................................................................................................................76PROJECTNo.46. Developingandoperatingamixed-usecommercialterminalattheportofSan

Pedro....................................................................................................................................77PROJECTNo.47. Buildingamixed-useindustrialterminalattheportofSanPedro..............................78PROJECTNo.48. Financing,buildingandoperatingagrainterminalatthePortofAbidjan..................79PROJECTNo.49. Financing,buildingandoperatinganorewharfatthePortofAbidjan.......................80PROJECTNo.50. Financing,buildingandoperatingatreatmentplantofliquidwastefromshipsand

effluentsfromindustriesintheportareaofAbidjan(deballastingstation).......................81PROJECTNo.51. BackfillinganddevelopingthebayofVridi-BietryandbuildingtheVridi-Bietry

bridge...................................................................................................................................82PROJECTNo.52. BuildingofalogisticshubandparkinglotfortrucksatPK26ontheNorthern

HighwaytorelievecongestionintheportareaofAbidjan..................................................83

MINISTRYOFECONOMICINFRASTRUCTURE.....................................................................84PROJECTNo.53. SupplyingdrinkingwatertothecityofAbidjan...........................................................85PROJECTNo.54. DevelopingandoperatingtheAbidjan-SamoHighway................................................86PROJECTNo.55. BuildingandoperatingSection2oftheAbidjan-SanPedro:Dabou-SanPedro

highway................................................................................................................................87

MINISTRYOFURBANWASTEMANAGEMENTANDSANITATION.......................................88PROJECTNo.56. Buildinginfrastructureforthemanagementofdomesticandsimilarwaste(DSMA)

inthedistrictofAbidjan.......................................................................................................89

MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENT.............................90PROJECTNo.57. DevelopmentandtourismvalorisationoftheBancoNationalPark............................91PROJECTNo.58. DevelopmentandtourismvalorisationoftheDalhiaFleurnaturalreserve................92

MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT.............................................93PROJECTNo.59. AGEF/PrivateSectorDevelopmentandLandSales......................................................94PROJECTNo.60. Settingupandoperatingavirtualsingledeskfortheissuingofconstruction

permitsthroughanintegratedinformationsystem............................................................95PROJECTNo.61. Buildingandoperatingthe“PlaceoftheNation”complex..........................................96PROJECTNo.62. Rehabilitatingandoperatingthe“pyramid”building..................................................97PROJECTNo.63. RehabilitatingandoperatingtheBICICIbuilding..........................................................98PROJECTNo.64. Buildingandoperatinga5starHiltonHotel................................................................99

MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES...............................................100PROJECTNo.65. StreetsignageofthedistrictofAbidjan.....................................................................101PROJECTNo.66. Creatingandoperating5,000communitymulti-servicecybercentres.....................102PROJECTNo.67. E-agricultureProgramme...........................................................................................103PROJECTNo.68. Building5,000kmoffibreoptics................................................................................105

MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS........................106PROJECTNo.69. BuildingandoperatingthedryportofFerkessédougou............................................107PROJECTNo.70. BuildingaproductionplantofbiolarvicidesinCôted’Ivoire.....................................108

Page 5: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

5

Page 6: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

6

SUMMARYTABLEOFTHEPPPPROJECTS

Page 7: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

7

NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*

PROJECTN°1. BuildingandoperatingtheMallinthePlateau InteriorandSecurity 60,000 120

PROJECTN°2.Financing,buildingandoperatingtheinfrastructurefortheswitchtoDigitalTerrestrialTelevision(DTT)

Communication 60,000 120

PROJECTN°3. RehabilitatingthehistoriccityofGrand-Bassam CultureandFrancophonie 350,000 700

PROJECTN°4. BuildingtheAfricanRenaissanceLibrary(ARL) CultureandFrancophonie 49,600 99

PROJECTN°5. BuildingandoperatingthesportshighschoolofBouaké SportandLeisure 25,000 50

PROJECTN°6. Buildingandoperatingthe“Villages”ofthe2021ACN SportandLeisure 42,000 84

PROJECTN°7. BuildingandoperatingtheEBIMPEOlympicVillage SportandLeisure 71,000 142

PROJECTN°8. BuildingandequippingtheUniversityofSanPedroHigherEducationandScientific

Research184,000 368

PROJECTN°9. RehabilitatingandoperatingtheUniversityHospitaldeCocody HealthandPublicHygiene 112,500 225

PROJECTN°10.Rehabilitating,equippingandmaintainingtheUniversityHospitalofTreichville

HealthandPublicHygiene 112,500 225

PROJECTN°11.BuildingandequippingtheNationalCentreforRadiotherapyandMedicalOncology(CNROM)

HealthandPublicHygiene 75,000 150

PROJECTN°12. RehabilitatingandequippingtheHeartInstituteofAbidjan HealthandPublicHygiene 10,000 20

PROJECTN°13.Operatinga2,000hectarestate-owneddomainfortheproductionandprocessingofsoya

AgricultureandRuralDevelopment

16,000 32

PROJECTN°14.Buildingandoperatingslaughterhousesinthecapitalcitiesoftheinteriorofthecountry(Yamoussoukro,Daloa,BouakéandKorhogo)

Animalandfishresources 16,690 33

Page 8: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

8

NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*

PROJECTN°15.Projectforbuildingandoperatingtheslaughterhouse-cattlemarketcomplexofAbidjan-Anyama(CAMA)

AnimalandFishResources 21,200 42

PROJECTN°16.IntegratedManagementProjectofRanchesandStations(PROGIRS)/RehabilitatingandoperatingtheBadikahaseedfarm(BSF)

AnimalandFishResources 4,000 8

PROJECTN°17.IntegratedManagementProjectofRanchesandStations(PROGIRS)/MeatproductionatNioroningueStation(PBSN)

AnimalandFishResources 4,000 8

PROJECTN°18.IntegratedManagementProjectofRanchesandBreedingstations(PROGIRS)/MeatproductionatPanyaStation(PSBP)

AnimalandFishResources 4,000 8

PROJECTN°19.IntegratedManagementProjectofRanchesandStations(PROGIRS)/Agro-industrialdairycomplexofToumodi

AnimalandFishResources 6,000 12

PROJECTN°20.BuildingandoperatingwholesaleandretailmarketsinAbidjan,Daloa,Abengourouand7otherprovincialcapitals

Commerce 100,548 201

PROJECTN°21. BuildingandoperatingtheExhibitionCentreofAbidjan Commerce 53,000 106

PROJECTN°22. SupplyingCôted'IvoireinLiquefiedNaturalGas(LNG) Hydrocarbons 110,000 220

PROJECTN°23. Creatingfillingplantsintenlocalities Hydrocarbons 29,100 58

PROJECTN°24.BuildingandoperatingahydrocarbondepotandanoilwharfinSanPedro

Hydrocarbons 32,000 64

PROJECTN°25.Buildingofa1,100,000MT(Phase1)oilstorageterminalinVridionthewestsideofthecanal

Hydrocarbons 394,758 790

PROJECTN°26. Buildingcocoabiomassplants(80MW) Energy 325,400 651

PROJECTN°27.BuildingandoperatingacottonbiomassplantinBoundiali(25MW)

Energy 29,000 58

PROJECTN°28. Buildingbiomassplants(10sites,200MW) Energy 210,000 420

Page 9: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

9

NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*

PROJECTN°29. Buildingphotovoltaicsolarpowerplants(5Sites,100MW) Energy 220,000 440

PROJECTN°30.ProgrammeforthecreationanddevelopmentofnewindustrialzonesinAbidjanandtheinteriorofthecountry

IndustryandMines 105,0001 210

PROJECTN°31. IntegratedminingdevelopmentprojectintheWest(PDMIO) IndustryandMines 1,359,000 2718

PROJECTN°32. Developingandoperating9“hut-stopovers” Tourism 11,7002 23

PROJECTN°33. Rehabilitatingandoperatingof5SIETHOhotels Tourism 11,000 22

PROJECTN°34.Rehabilitatingandoperatingthe“HotelPresident”ofYamoussoukro

Tourism 30,000 60

PROJECTN°35. DevelopingandoperatingthewildlifeparkofAbokouamékro Tourism - -

PROJECTN°36. RehabilitatingandextendingtheIvoireGolf-ClubofAbidjan Tourism 150,000 300

PROJECTN°37. BuildingandoperatingLine1oftheAbidjanSubway Transport 656,000 1312

PROJECTN°38.BuildingandoperatingtheOuangolodougou–Niellé–Sikassorailwayline

Transport 80,000 160

PROJECTN°39.RehabilitatingandoperatingtheAbidjan–Ouagadougou–Kayarailwayline

Transport 350,000 700

PROJECTN°40. Buildingthe“Airportcity”ofAbidjan Transport 88,000 176

PROJECTN°41.Designing,financing,buildingandoperatingthenewinternationalairportofSanPedroanditsairportcity

Transport 45,000 90

1Minimumcostoftheproject(developmentofanindustrialzonewithaminimumsurfaceareaof50hain7cities)2For9hut-stopoversof30roomseach.

Page 10: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

10

NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*

PROJECTN°42. Building,equippingandoperatingthebusstationofBouaké Transport 15,000 30

PROJECTN°43. BuildingthejuxtaposedborderpostofNigoni(Tingrela) Transport 9,020 18

PROJECTN°44.RelocatingandextendingthecontainerterminaloftheportofSanPedro

Transport 260,000 520

PROJECTN°45.Developingandoperatinga150halogisticshubandindustrialzoneattheportofSanPedro

Transport 85,000 170

PROJECTN°46.Developingandoperatingamixed-usecommercialterminalattheportofSanPedro

Transport 5,000 10

PROJECTN°47. Buildingamixed-useindustrialterminalattheportofSanPedro Transport 20,000 40

PROJECTN°48.Financing,buildingandoperatingagrainterminalatthePortofAbidjan

Transport 35,000 70

PROJECTN°49.Financing,buildingandoperatinganorewharfatthePortofAbidjan

Transport 75,000 150

PROJECTN°50.Financing,buildingandoperatingatreatmentplantofliquidwastefromshipsandeffluentsfromindustriesintheportareaofAbidjan(deballastingstation)

Transport 20,000 40

PROJECTN°51.BackfillinganddevelopingthebayofVridi-BietryandbuildingtheVridi-Bietrybridge

Transport 120,000 240

PROJECTN°52.BuildingofalogisticshubandparkinglotfortrucksatPK26ontheNorthernHighwaytorelieveconmanagementintheportareaofAbidjan

Transport 25,000 50

PROJECTN°53. SupplyingdrinkingwatertothecityofAbidjan Drinkingwater 280,000 560

PROJECTN°54. DevelopingandoperatingtheAbidjan-SamoHighway RoadInfrastructure 60,000 120

PROJECTN°55.BuildingandoperatingSection2oftheAbidjan–SanPedro:Dabou-SanPedroHighway

RoadInfrastructure 690,000 1380

Page 11: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

11

NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*

PROJECTN°56.Buildinginfrastructureforthemanagementofdomesticandsimilarwaste(DSMA)inthedistrictofAbidjan

UrbanSanitation 54,000 108

PROJECTN°57.DevelopmentandtourismvalorisationoftheBancoNationalPark

EnvironmentandSustainableDevelopment

11,900 24

PROJECTN°58.DevelopmentandtourismvalorisationoftheDahliaFleurNatureReserve

EnvironmentandSustainableDevelopment

7500 15

PROJECTN°59. AGEF/PrivateSectorDevelopmentandLandSalesConstructionandUrban

Development109,000 218

PROJECTN°60.Settingupandoperatingavirtualsingledeskfortheissuingofconstructionpermitsthroughanintegratedinformationsystem

ConstructionandUrbanDevelopment

15,000 30

PROJECTN°61. Buildingandoperatingthe“PlaceoftheNation”complexConstructionandUrban

Development86,235 172

PROJECTN°62. Rehabilitatingandoperatingthe“pyramid”buildingConstructionandUrban

Development30,000 60

PROJECTN°63. RehabilitatingandoperatingtheBICICIbuildingConstructionandUrban

Development13,400 27

PROJECTN°64. Buildingandoperatinga5starHiltonHotelConstructionandUrban

Development60,000 120

PROJECTN°65. StreetsignageofthedistrictofAbidjanDigitalEconomyandPostal

Services8,000 16

PROJECTN°66.Creatingandoperating5,000communitymulti-servicecybercentres

DigitalEconomyandPostalServices

53,000 106

PROJECTN°67. E-agricultureProgrammeDigitalEconomyandPostal

Services33,500 67

PROJECTN°68. Building5,000kmoffibreopticsDigitalEconomyandPostal

Services50,000 100

PROJECTN°69. BuildingandoperatingthedryportofFerkessédougouAfricanIntegrationandIvoriansLivingOverseas

303,000 606

Page 12: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

12

NUMBER PROJECT SECTOR AMOUNT(MFCFA) AMOUNT(MUSD)*

PROJECTN°70. BuildingaproductionplantofbiolarvicidesinCôted’IvoireAfricanIntegrationandIvoriansLivingOverseas

15,500 31

*(1USD=500CFA)TOTAL 8,162,051 16,323

Page 13: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

13

MINISTRYOFSTATE,MINISTRYOFTHEINTERIORANDSECURITY

Page 14: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

14

PROJECTNo.1. BUILDINGANDOPERATINGTHEMALLINTHEPLATEAU

NDPReference Strategicpriority1/Impact2/Effect1/Output1.4/Action1.4.1ContractingAuthority MINISTRYOFSTATE,MINISTRYOFTHEINTERIORANDSECURITY

FocalUnitoftheContractingAuthority

Mr.YAPIFidelDirectorofStudies,Programmingandmonitoring-evaluation

Tel:(225)20320848Email:[email protected]/[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theaimistobuildonthe9,600m2ofthesiteoftheformermarketofthePlateau,a21-storeytourcomprising:

• Aluxuryhotel,• AR+3shoppingmall,• Officespaces,• Athree-floorundergroundparkinglot(583spaces).

• ThecommuneofthePlateauwillusethevalueofthelandtoacquiresharesinthecapitalofthecompanythatwilltakeuptheproject.

Location • Abidjan-Plateau–SiteoftheformermarketofthePlateau

Project’sbenefit

• ContributetothemodernisationandcoherentdevelopmentoftheCommuneofthePlateau

• Partlyaddresstheshortfallinofficespaces,hotelroomsandparkinglotsintheplateau.

Estimatedcost • FCFA60,000M/EUR91M/USD120M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operation

Anticipateddistributionofinvestments:• Publicinvestment:0%• Privateinvestment:100%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• ValorisationoftheState’sprivatedomain

PROJECT’SSTATUS

Progress • Transactioninprogress

Informationavailable • FrameworkAgreement

Nextstep(s)andtimetable

• Negotiations• Signingofthecontract.

Page 15: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

15

MINISTRYOFCOMMUNICATION

Page 16: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

16

PROJECTNo.2. FINANCING,BUILDINGANDOPERATINGTHEINFRASTRUCTUREFORTHESWITCHTODIGITALTERRESTRIALTELEVISION(DTT)

NDPReference Strategicpriority1/Impact1/Effect3/Output3.5/Action3.5.4

ContractingAuthority PRIMEMINISTER’SOFFICEMINISTRYOFCOMMUNICATION

FocalUnitoftheContractingAuthority

PRIMEMINISTER’SOFFICEMr.KABOREJean-Philippe

ExecutiveSecretaryoftheNationalCommitteefortheSwitchtoDTT

Tel:(225)09836115/(225)20212838Email:[email protected]

MINISTRYOFCOMMUNICATIONMr.KOFFIKoumanAlexis

TechnicalAdviser,InchargeoftheDTTTel:(225)07893354/(225)20212958

Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theaimofthisproject istofinance,buildandoperatetheDTTinfrastructure, inordertoswitchtoterrestrialdigitaltelevision.Itcomprisestwo(2)phases:• Phase1:Abobo-Abidjanpilotproject

- Upgradingofthetechnicalinfrastructureandequipment,- Upgrading of the transport infrastructure from the Cocody production

centre to Abobo by radio relay beams and to the other centres bysatellite.

• Phase2:Nationalproject(throughoutthenationalterritory)- Rehabilitation of 26 initial broadcasting centres, transformation of the

four(4)rebroadcastingcentresandbuildingofnewbroadcastingcentrestoensureacoverofatleast95%ofthenationalterritory

-Networkdeployment.

Location • Nationalterritory

Project’sbenefit• Increaseanddiversificationtheproductionsupplyandtelevisionbroadcasting• Improvingthequalityofthetransmission• Digitaldividends.

Estimatedcost • FCFA60,000M(2015)/EUR91M/USD120M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients(productioncompanies)

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress

• Studiesavailable;• Pilotphaseimplemented;• Consultation document in preparation with a view to launching an

internationalcallfortenders.Informationavailable • TechnicalandfinancialfeasibilitystudyNextstepsandtimetable • Launchtheconsultationprocess

Page 17: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

17

MINISTRYOFCULTUREANDFRANCOPHONIE

Page 18: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

18

PROJECTNo.3. REHABILITATINGTHEHISTORICCITYOFGRAND-BASSAM

NDPReference Strategicpriority3/Impact4/Effect3/Output3.3/Action3.4.3

ContractingAuthority MINISTRYOFCULTUREANDFRANCOPHONIE

FocalUnitoftheContractingAuthority

Mr.COULIBALY-DIAKITÉMamidouZoumanaDirectorofInfrastructureandCulturalEquipment

Tel:(225)20212473Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

The city of Grand-Bassam is a UNESCO-listed World Heritage Site. In order topreserve this rich architectural and urban-planning heritage, which presentssignificantdegradationinplaces,theGovernmenthasdefinedaglobalpreservationplanofinfrastructurerehabilitationandvalorisation.TheaimoftheprojectistherehabilitationandvalorisationofthemonumentsofthehistoriccityofGrand-Bassam,inpartnershipwithprivateoperators.

Location • Grand-Bassam

Project’sbenefit• MaintainingtheUNESCO-listedWorldHeritagestatusofthehistoriccityof

Grand-Bassam.• Valorisationoftheculturalheritageandincreaseoftouristactivity,jobcreation.

Estimatedcost • FCFA350,000M/EUR534M/USD700M(1USD=500CFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefinedbythestudies• Publicinvestment:Tobedefinedbythestudies

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Serviceconcession/concession/BOT

PROJECT’SSTATUS

Progress

• Globalstudiescarriedoutandvalidatedinaworkshop/pendingacadastralplancadastralofthesite.Settingupofaninter-sectoralSteeringCommitteeinprogress.ArchaeologicalandpathologicalstudiesoftheCourthousecarriedout.FinancingoftheVRDacquiredandlodgedatAGEROUTE/identificationofneedsintermsofongoingVRD.

Informationavailable • Technicalstudies

Nextstepsandtimetable

• Additionalstudies• Launchtheconsultationprocess.

Page 19: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

19

PROJECTNo.4. BUILDINGTHEAFRICANRENAISSANCELIBRARY(ARL)

NDPReference Strategicpriority3/Impact1/Effect3/Output3.2/Action3.2.2ContractingAuthority MINISTRYOFCULTUREANDFRANCOPHONIE

FocalUnitoftheContractingAuthority

Mr.COULIBALY-DIAKITÉMamidouZoumanaDirectorofInfrastructureandCulturalEquipment

Tel:(225)20212473Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theaimof thisproject is tobuild,ona1haState-ownedprivatedomain (DECOsite), a 14-floor tour comprising: (i) the African Renaissance Library (ARL)with asurface area of 21,500m2, (ii) a Convention Centre (10,000m2), (iii) commercialand administrative spaces (22,500m2), and (iv) a parking lot (2,400 spaces). Thepremises of the ARL, as well as some administrative spaces shall remain State-owned,whilst other spaces shall fully belong to theprivatepartner,whowill beremuneratedthroughthemarketingandoperationofthespaceshencedeveloped.

Location• CommuneofthePlateau-Abidjan(spaceoccupiedbytheDECOofthe

MinistryofNationalEducation)

Project’sbenefit• Ensure,inanadaptedframework,thepromotionofpropertiesofthenational

culturalheritage.ContributetothemodernisationandcoherentdevelopmentoftheCommuneofthePlateau.

Estimatedcost • FCFA49,600M/EUR75.8M/USD99M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining

Anticipateddistributionofinvestments:• Privateinvestment:FCFA49,000M• Publicinvestment:FCFA600M

Modalitiesfortheremunerationofthepartner:• Users/Taxpayers

Typeofpartnershipenvisaged:• ValorisationoftheState’sprivatedomain

PROJECT’SSTATUS

Progress • Transactionfortheselectionofaprivatepartner

Informationavailable • Functionalprogrammeavailable

Nextstepsandtimetable • Launchtheconsultationprocess

Page 20: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

20

MINISTRYOFSPORTANDLEASURE

Page 21: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

21

PROJECTNo.5. BUILDINGANDOPERATINGTHESPORTSHIGHSCHOOLOFBOUAKÉ

NDPReference Strategicpriority4/Impact1/Effect4/Output4.1/Action4.1.3ContractingAuthority MINISTRYOFSPORTANDLEISURE

FocalUnitoftheContractingAuthority

Mr.KONESalifFinancialServicesAdministrator

Director-GeneralofONSLandline:(225)20304444/(225)20304440Mobile:(225)59012822/(225)03031303

Email:[email protected]/[email protected]

Briefdescription

TheprojectofbuildingthesportshighschoolofBouakéincludes:• The building of an IRB and FIFA standard soccer/rugby field with stands

of1,000to5,000seats• ThebuildingofarunningtrackofaminimumofIAAFstandardof8lanes• Thebuildingofaminimum500seatindoorgymnasium• ThebuildingofanOlympicpoolinthecitiesofBondoukouandSéguéla• Thebuildingofclassrooms(base03)fromYear7toYear12• Thebuildingofanadministrativebuilding• Thebuildingofadininghallandakitchen• Aboardingschoolof1,000beds• HousingaccommodationfortheSchoolofficials.

Location • Bouaké

Project’sbenefit• Detectandprofessionallymonitornewtalents• Contributetothedevelopmentofelitesport.

Estimatedcost • FCFA25,000M/EUR38M/USD50M(1USD=500FCFA)SPECIFICINFORMATIONRELATEDTOPPPSTRUCTURING

Scope of activities to be entrusted to the privatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • Termsofreferenceavailable

Informationavailable • Architecturalandfinancialstudiescarriedoutbysomeoperators

Nextstep(s)andtimetable

• Finalisationofstudies• Launchtheconsultationprocess.

Page 22: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

22

PROJECTNo.6. BUILDINGANDOPERATINGTHE“VILLAGES”OFTHE2021ACN

NDPReference Strategicpriority4/Impact1/Effect4/Output4.1/Action4.1.1ContractingAuthority MINISTRYOFSPORTANDLEISURE

FocalUnitoftheContractingAuthority

Mr.KONESalifFinancialServicesAdministratorDirector-GeneraloftheONS

Landline:(225)20304444/(225)20304440Mobile:(225)59012822/(225)03031303

Email:[email protected]/[email protected]

Briefdescription

Theaimofthisprojectistobuildandoperatetwelve(12)citiesof163-bedroomvillasonasurfaceareaof5haeach,invariousregionsofthecountry,inordertohost the various delegations that will participate to the 2021 African Cup ofNations.Theprojectalsoincludes:• Thebuildingofacentrewithaclinic,a60-seatrestaurant,aweightroomand

afitnessroom• Thebuildingofanequippedtrainingpitch(football/rugby).

Location • Korhogo,Ferkéssédougou,Brobo,Béoumi,Sakassou,Katiola,SanPedro

Project’sbenefit

• Offer real-estate assets to the executives from various regions in the long-term,

• Develop the various cities whose needs in accommodation continue toincrease.

Estimatedcost • FCFA42000M(Indicative)/EUR64M/USD84M(1USD=500FCFA)SPECIFICINFORMATIONRELATEDTOPPPSTRUCTURING

Scope of activities to be entrusted to the privatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement• Valorisationofthedomain

PROJECT’SSTATUS

Progress• TechnicalstudycurrentlybeingcarriedoutbytheBNETD.• BuildingsitesidentifiedinthecitiesofKorhogoandSanPedro• TopographicsurveysbeingcarriedoutbytheBNETD

Informationavailable • Termsofreference

Nextstep(s)andtimetable • Launchtheconsultationprocess

Page 23: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

23

PROJECTNo.7. BUILDINGANDOPERATINGTHEEBIMPEOLYMPICVILLAGE

NDPReference Strategicpriority4/Impact1/Effect4/Output4.1/Action4.1.2

ContractingAuthority MINISTRYOFSPORTANDLEISURE

FocalUnitoftheContractingAuthority

Mr.KONESalifFinancialServicesAdministratorDirector-GeneraloftheONS

Landline:(225)20304444/(225)20304440Mobile:(225)59012822/(225)03031303

Email:[email protected]/[email protected]

GENERALCHARACTERISTICS

Briefdescription

TheOlympicprojecthasthefollowing2components:• TheOlympicStadium(builtwithfinancingfromEximBankChina),• The Olympic Village (building 4 residential parks, 3 sports school groups, a

SportsUniversity,anadministrativezone,acommercialzone,aclinic,a4-starhotelanda9-holegolfcourse)

TheaimisfortheStatetofindapartnerfortheoperationandmaintenanceofthestadiumandthedevelopmentoftheOlympicCity.

Location • Abidjan–Anyama(Ebimpé)

Project’sbenefit• Develop the city of Anyamawith new sport, school, hotel, commercial and

medicalinfrastructure.

Estimatedcost • FCFA71,000M/EUR108.2M/USD142M(1USD=500CFA)

SPECIFICINFORMATIONRELATEDTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefinedbythestudies• Publicinvestment:Tobedefinedbythestudies

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Serviceconcession(managementofthestadium)• Valorisationofthedomain

PROJECT’SSTATUS

Progress • Technicalstudies

Informationavailable • Studiesavailable

Nextstep(s)andtimetable

• Carryingoutofadditionalstudies• Launchtheconsultationprocess.

Page 24: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

24

MINISTRYOFHIGHEREDUCATIONANDSCIENTIFICRESEARCH

Page 25: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

25

PROJECTNo.8. BUILDINGANDEQUIPPINGTHEUNIVERSITYOFSANPEDRO

NDPReference Strategicpriority2/Impact1/Effect3/Output3.2/Action3.2.3

ContractingAuthority MINISTRYOFHIGHEREDUCATIONANDSCIENTIFICRESEARCHPRIMEMINISTER’SOFFICE(UNIVERSITYDECENTRALISATIONPROGRAMME)

FocalUnitoftheContractingAuthority

PRIMEMINISTER’SOFFICEMr.KOUALéon

HeadofOperationsTel:(225)08873029

Email:[email protected]

MINISTRYOFHIGHEREDUCATIONMr.KOUAMEN’Guessan

DirectorofUniversityInfrastructureTel:(225)07855650

Email:[email protected]

Briefdescription

Theaimofthisprojectistobuildandequipauniversitycampusof302hectaresinSanPedrocapableofaccommodating22,000studentswhencompleted.TheUniversityofSanPedrowillbededicatedtosciencesandtechnologyinthefollowingareas:MarineScienceandShipbuilding,AgricultureandAgro-industry,Fishresources,BuildingandPublicWorksandLogistics.Thisprojectwillbeimplementedinthree(3)phases:• Phase1:Accommodation capacity for 3,000 students (2016Academic Year,

fundedbytheGovernment),• Phase 2: Accommodation capacity for 7,000 additional students (2018

AcademicYear,tobedonethroughaPPP),• Phase 3: Accommodation capacity for 12,000 additional students (2020

AcademicYear,tobedonethroughaPPP).Location • SanPedro

Project’sbenefit• Offerstudentsanappropriateenvironmentforqualitytraining• Participateinthedecentralisationofuniversities

Estimatedcost • FCFA184,000M/EUR280M/USD368M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,managingandmaintaining

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users(students)• Taxpayers

Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement

PROJECT’SSTATUS

Progress • Functionalprogrammedefined,• Technicalandfinancialfeasibilitystudycarriedout.

Informationavailable • StudiesavailableNextstepsandtimetable • Launchtheconsultationprocess

Page 26: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

26

MINISTRYOFHEALTHANDPUBLICHYGIENE

Page 27: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

27

PROJECTNo.9. REHABILITATINGANDMAINTAININGTHEUNIVERSITYHOSPITALOFCOCODY

NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3

ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE

FocalUnitoftheContractingAuthority

Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance

Tel:(225)20229224Fax:(225)20223687

Email:[email protected]

Briefdescription

The aim of this project is to rehabilitate and ensure the maintenance of theUniversityHospital of Cocody, in order to strengthen the technical services andprovidetheappropriatetoolsforthisUniversityHospitaltoofferpatientcarethatisascompleteaspossible,fromthediagnosticandtherapeuticpointsofview.

Location • RegionoftheGreatBridges/DistrictofAbidjan/CommuneofCocody

Project’sbenefit

• ImprovementofthetechnicalservicesincreaseintheoperatingrateoftheservicesoftheUniversityHospital

• Improvementinthesupplyandqualityinthedeliveryofhealthcareservices• Improvementinthestateofhealthandwellbeingofthepopulations

Estimatedcost • FCFA112,500M/EUR172M/USD225M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,maintainingandoperatingofservices

(Biomedicalimagery,hospitalisation,laundryservices,cateringservices,pharmacy,etc.)andadministrativemanagement.

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement

PROJECT’SSTATUS

Progress • Studies

Informationavailable • Termsofreferenceavailable

Nextstepsandtimetable

• Preliminarystudiestobecarriedout(APHP/BNETD)• Launchtheconsultationprocess

Page 28: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

28

PROJECTNo.10. REHABILITATING,EQUIPPINGANDMAINTAININGTHEUNIVERSITYHOSPITALOFTREICHVILLE

NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE

FocalUnitoftheContractingAuthority

Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance

Tel:(225)20229224Fax:(225)20223687

Email:[email protected]

Briefdescription

The aim of this project is to rehabilitate, equip and maintain the UniversityHospitalof Treichville, inorder to strengthen the technical servicesandprovidethe appropriate tools for thisUniversityHospital to offer patient care that is ascompleteaspossible,fromthediagnosticandtherapeuticpointsofview.

Location • RegionoftheGreatBridges/DistrictofAbidjan/CommuneofTreichville

Project’sbenefit

• Improvementofthetechnicalservices,increaseintheoperatingrateoftheservicesoftheUniversityHospital

• Improvementinthestateofhealthandwellbeingofthepopulations• Improvementinthesupplyandqualityinthedeliveryofhealthcareservices.

Estimatedcost • FCFA112,500M/EUR172M/USD225M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,maintainingandoperatingservices

(Biomedicalimagery,hospitalisation,laundryservices,cateringservices,pharmacy,etc.)andadministrativemanagement.

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• PublicPaymentPartnershipagreement

PROJECT’SSTATUS

Progress• Termsofreferenceavailable• Analysisofthepresentsituationandproposalfortheorientationforthe

restructuringandextensionforthebuildingandequippingaspects.Informationavailable • PreliminarystudiesundertakenbyAPHP

Nextstepsandtimetable

• Preliminarystudiestobecarriedout(APHP/BNETD)• Studiesandproposals• Launchtheconsultationprocess

Page 29: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

29

PROJECTNo.11. BUILDINGANDEQUIPPINGTHENATIONALCENTREFORRADIOTHERAPYANDMEDICALONCOLOGY(CNROM)

NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE

FocalUnitoftheContractingAuthority

Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance

Tel:(225)20229224Fax:(225)20223687

Email:[email protected]

Briefdescription

TheaimofthisprojectistobuildandequiptheNationalCentreforRadiotherapyandMedicalOncologyona total surface areaof 2hectares inGrand-Bassam toprovidecomprehensivemedicalcaretocancerpatients.NB:AprojectofbuildingaradiotherapytreatmentCentreiscurrentlyongoinginAbidjan,neartheUniversityHospitalofCocody.

Location • Grand-Bassam

Project’sbenefit

• Bettercareforcancerpatients• Improvementofthetechnicalservices• Trainingofthemedicalpersonnelinprovidingcaretocancerpatients• Improvementinthestateofhealthandwellbeingofthepopulations.

Estimatedcost • FCFA75,000M/EUR115M/USD150M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,equippingandmaintaining.

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress • MemorandumofUnderstandingsignedInformationavailable • N/ANextstepsandtimetable • SignatureofafinancingagreementwithKoreaEXIMBANKandSAMSUNG

Page 30: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

30

PROJECTNo.12. REHABILITATINGANDEQUIPPINGTHEHEARTINSTITUTEOFABIDJAN

NDPReference Strategicpriority2/Impact3/Effect1/Output1.2/Action1.2.3ContractingAuthority MINISTRYOFHEALTHANDPUBLICHYGIENE

FocalUnitoftheContractingAuthority

Mr.TRABIYRIEDenisDirectorofInfrastructure,EquipmentandMaintenance

Tel:20229224Fax:20223687

Email:[email protected]

Briefdescription The aim of this project is to rehabilitate the current premises of the Institute,buildnewpremisesandequiptheserviceswithtechnicalandmedicalmaterial.

Location • RegionoftheGreatBridges/DistrictofAbidjan/CommuneofTreichville

Project’sbenefit

• Betterpatientcare• Availabilityofstate-of-the-arttechnicalfacilitiescapableofcarryingoutall

theexplorationsofcardiovascularillnesses• Improvementinthestateofhealthandwellbeingofthepopulations• Improvementinthesupplyandqualityinthedeliveryofhealthcareservices.

Estimatedcost • FCFA10,000M/EUR15M/USD20M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,Rehabilitatingandequipping

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Concession–Partnershipagreement

PROJECT’SSTATUS

Progress • StudiescarriedoutInformationavailable • PreliminarystudiesundertakenbyAPHPNextstepsandtimetable

• Preliminarystudiestobecarriedout(APHP/BNETD)• Launchtheconsultationprocess

Page 31: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

31

MINISTRYOFAGRICULTUREANDRURALDEVELOPMENT

Page 32: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

32

PROJECTNo.13. OPERATINGA2,000HECTARESTATE-OWNEDDOMAINFORTHEPRODUCTIONANDPROCESSINGOFSOYA

NDPReference Strategicpriority3/Impact2/Effect1/Output3.3/Action3.3.3ContractingAuthority MINISTRYOFAGRICULTUREANDRURALDEVELOPMENT

FocalUnitoftheContractingAuthority

Mr.BERNARDKINICOMOEDirectorofPlanning,ProgrammingandFinancing

Tel/Fax:(225)20218526Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription Theoverallaimoftheprojectistooperateastate-owneddomainofaround2,000hectaresfortheproductionofsoyainthenorthofCôted’Ivoire.

Location • PORORegion-NorthofCôted’Ivoire

Project’sbenefit• Increasingtheofferofsoyaforvariousnationalandsub-regionalusers• Improving the incomes of producers by adopting improved and high-

performanceseedsEstimatedcost • FCFA16,000M/EUR24M/USD32M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandextensions

servicestosmallproducers

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• OperatinginaState-owneddomain

PROJECT’SSTATUS

Progress • ProjectideaInformationavailable • TermsofreferenceavailableNextstep(s)andtimetable

• Preliminarystudies• Launchtheconsultationprocess

Page 33: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

33

MINISTRYOFANIMALANDFISHRESOURCES

Page 34: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

34

PROJECTNo.14. BUILDINGANDOPERATINGSLAUGHTERHOUSESINTHECAPITALCITIESOFTHEINTERIOROFTHECOUNTRY(YAMOUSSOUKRO,DALOA,BOUAKÉANDKORHOGO)

NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.1ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES

FocalUnitoftheContractingAuthority

Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister

ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410

Mobile:(225)05052462Email:[email protected]

Mr.COULIBALYDjiakariyaDirectorofPlanning

Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Thedisrepairoftheexisting infrastructure inthe largecities (slaughterhousesofBouaké and Daloa) and the absence of adapted infrastructure in other cities(YamoussoukroandKorhogo)areconstraintsrelatedtotheavailabilityofqualitymeat in those cities. Furthermore, the nutritional insecurity created by animalsillegally slaughtered in informal places is a major risk for health and publichygiene.Therefore,thisprojectaimstomodernisetheslaughteringofanimalsandsupplycircuitofqualitymeattothepopulations.

Location • Yamoussoukro,Bouaké,DaloaandKorhogo

Project’sbenefit

• Reducing the risksofpollution in theurbanenvironmentand thenuisancescausedinthesurroundingnaturalenvironmentforherdsofanimals.

• Improvement of the quality of the products by slaughtering under goodhygieneconditions

• Reorganising the commercialisation and distribution of meat for a betterintegrationofthenationalsectors

• Harmonisation of the building of slaughterhouses with the increase inpopulationinthelargecities

Estimatedcost • FCFA16,690M/EUR25.4M/USD33.4M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financing,operatingand

maintainingtheslaughterhouse

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged: • Build,OwnandOperateContract(BOO)

PROJECT’SSTATUS

Progress

• PreviousstudiescarriedoutbytheDirectorateofPublicWorksdatebackto1987

• AnupdatedstudyoftheMasterPlanoftheslaughterfacilitiesandcattleandmeatmarketinginfrastructureinCôted’IvoireisbeingundertakenbytheBNETD.

Informationavailable • The1987feasibilitystudyisavailableNextstepsandtimetable

• FinalisationofPreliminarystudies• Launchtheconsultationprocess

Page 35: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

35

PROJECTNo.15. PROJECTFORBUILDINGANDOPERATINGTHESLAUGHTERHOUSE-CATTLEMARKETCOMPLEXOFABIDJAN-ANYAMA(CAMA)

NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.1ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES

FocalUnitoftheContractingAuthority

Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister

ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410

Mobile:(225)05052462Email:[email protected]

Mr.COULIBALYDjiakariyaDirectorofPlanning

Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

The aim of this project is to pool the activities of commercialisation andslaughtering of cattle of the city of Abidjan and its suburbs at a single centrelocated in the urban periphery (in the commune of Anyama, 28 km north ofAbidjan)andmeetingthestandardsofqualityandhygieneforthepopulation.

• The operatorwill have to build a slaughterhouse-cattlemarket complex,with acapacity of 745 bovines and 425 sheep/goats per day on a surface area of 41hectaresandagrazingareaof187hectares.

Location • DistrictofAbidjan/Anyama

Project’sbenefit

• Improving the quality of products by slaughtering under good hygieneconditions

• Harmonising the slaughtering activity and the urban environment bytransferringtheslaughterhousetoanappropriatesiteandreducingtherisksofpollution,thankstothetreatmentofby-products,wasteandwastewater.

Estimatedcost • FCFA21,200M/EUR32.3M/USD42.4M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operating

andmaintainingtheslaughterhouse-Cattlemarketcomplex

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Finalcustomers

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress

• PreviousstudiescarriedoutbytheDirectorateofPublicWorksdatebackto1992.Anagreementsignedin2009betweentheCenturyGroupCorporationand the State has not been implemented to date. The private partner hasbeenabletoraisethefinancingnecessary.

• Theprojectpreparationisbeingfinalised.TheupdatedstudyoftheprojectisbeingconductedbytheBNETD.

Informationavailable • The1992feasibilitystudyisavailableNextstepsandtimetable

• Finalisationofpreliminarystudies• Launchtheconsultationprocess

Page 36: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

36

PROJECTNo.16. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDSTATIONS(PROGIRS)/REHABILITATINGANDOPERATINGOFTHEBADIKAHASEEDFARM(BSF)

NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES

FocalUnitoftheContractingAuthority

Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister

ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410

Mobile:(225)05052462Email:[email protected]

Mr.COULIBALYDjiakariyaDirectorofPlanning

Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

• TheBadikahaSeedFarm(BSF)wascreatedin1975withtheaimofimprovingtheforage of animals. This project will be operating on a surface area of 55,000hectares to produce slaughter animals, forage for sale and forage seed. Theoperator will have to rehabilitate the infrastructure of the farm, renew theproductionequipmentandpurchaseacoreherdofbeefcattletoberaised.Theoperation of this farmwill considerable relieve the needs in forage and forageseed foranimals inCôted’Ivoire,aswellas for thoseof thesub-region thatareoftenfacedwithashortageofforageduringthelongdryseasons.

Location • Region:Hambol/Department:Niakaramadougou/Sub-Prefecture:Badikaha

Project’sbenefit

• Strengtheningfoodsecurityinanimalproteinsbyincreasingtheproductionofmeat

• Improvingtheproductivityoflivestockrearingthroughmakingimprovedforageavailable

Estimatedcost • FCFA4,000M/EUR6.10M/USD8M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand

maintainingthefarm

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgeofcustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress

• Termsofreferenceshallbedraftedforastudyofthesituationalanalysis,inordertodeterminethemarketvalueoftheBadikahafarmbeforeitisenteredintoaPPP

• Thetermsofreferenceofthefeasibilitystudyoftheprojectarebeingprepared

Informationavailable • Thetermsofreferenceofthesituationalanalysisstudyareavailable

Nextstepsandtimetable

• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess.

Page 37: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

37

PROJECTNo.17. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDSTATIONS(PROGIRS)/MEATPRODUCTIONATNIORONINGUESTATION(PBSN)

NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES

FocalUnitoftheContractingAuthority

Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister

ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410

Mobile:(225)05052462Email:[email protected]

Mr.COULIBALYDjiakariyaDirectorofPlanning

Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

• The project of meat production at the Nioroningué station (PBSN) aims atestablishing an intensive beef and feeder cattle breeding on a surface area of2,200hectares. Theoperatorwill be able to use a prolific andheavy species ofbeefcattlecapableofacclimatisinglocally.Theintensiveoperationwillbeabletointegrate the processing of themeat with the setting up of and industrial andmarketingunitofanimalproducts.

• TheoperationofthisstationwillmeettheneedsoftheIvorianpopulationinmeatproductsandprovidequalityanimalstothevariousslaughterhouses.

Location • Department:Ouangolodougou/Sub-Prefecture:Ouangolodougou

Project’sbenefit • Strengtheningfoodsecurityinanimalproteinsbyincreasingthenationalmeatproduction

Estimatedcost • FCFA4,000M/EUR6.10M/USD8M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand

maintainingofthestation

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress • Thetermsofreferenceofthefeasibilitystudyoftheprojectarebeingprepared

Informationavailable • TermsofreferenceofthesituationalanalysisstudyareavailableNextstepsandtimetable

• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess

Page 38: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

38

PROJECTNo.18. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDBREEDINGSTATIONS(PROGIRS)/MEATPRODUCTIONATPANYASTATION(PSBP)

NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES

FocalUnitoftheContractingAuthority

Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister

ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410

Mobile:(225)05052462Email:[email protected]

Mr.COULIBALYDjiakariyaDirectorofPlanning

Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

• ThePPPprojectonthemeatproductionstationofPanyaaimsatestablishinganintensivebeefandfeedercattlebreedingonasurfaceareaof10,000hectares.

• Theoperatorwillbeabletouseaprolificandheavyspeciesofbeefcattlecapableofacclimatisinglocally.

• TheoperationofthisstationwillmeettheneedsoftheIvorianpopulationinmeatproducts and provide quality animals to the various slaughterhouses andmeatproductdistributioncentres.

Location • Region:Bagoué/Department:Boundiali/Sub-Prefecture:Boundiali

Project’sbenefit • Strengtheningfoodsecurityinanimalproteinsbyincreasingofthenationalmeatproduction

Estimatedcost • FCFA4,000M/EUR6.10M/USD8M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand

maintainingofthestation

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress • TermsofreferenceofthefeasibilitystudyoftheprojectInformationavailable • TermsofreferenceofthesituationalanalysisstudyNextstepsandtimetable

• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess

Page 39: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

39

PROJECTNo.19. INTEGRATEDMANAGEMENTPROJECTOFRANCHESANDSTATIONS(PROGIRS)/AGRO-INDUSTRIALDAIRYCOMPLEXOFTOUMODI

NDPReference Strategicpriority3/Impact2/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFANIMALANDFISHRESOURCES

FocalUnitoftheContractingAuthority

Mr.KOFFIKoumiMarcelTechnicalAdvisortotheMinister

ChairofthePPPTechnicalCommitteeLandline:(225)20229919/20213410

Mobile:(225)05052462Email:[email protected]

Mr.COULIBALYDjiakariyaDirectorofPlanning

Landline:(225)20229916/20218875Mobile:(225)05771573Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

• Thisprojectaimstobuildanagro-industrialcomplexofreferenceinToumodifortheautomatedproductionandprocessingoffreshmilkinacompletelycontrolledenvironment.Thiswillrequireoftheoperator(i)toimportexoticdairybreeds(Montbéliard,Holstein,…),atleast2,500headsatthebeginningofitsoperationsonthe1,000hectaresoflandavailablefortheoperationand(ii)developthesurfaceeareaavailableforthisproduction(grazinglands,equipments,etc.).

• Inaddition,thestationwilldevelopadairypoolonitspropertiesthroughthesupplyofanimalstobreedersoftheregion.

Location • Lakeregion/Department:Toumodi/Sub-Prefecture:Toumodi

Project’sbenefit

• Strengtheningfoodsecurityinanimalproteinsbyincreasingtheproductionandpromotionoftheanimalproductprocessingindustry,includingmeatandmilkprocessing

• ImprovingtheproductivityofbeefcattleandmilkfarmsEstimatedcost • 6000MFCFA/9,14MEUR/12MUSD(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand

maintainingofthestation

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Valorisationofthedomain

PROJECT’SSTATUS

Progress • TermsofreferenceofthefeasibilitystudyoftheprojectInformationavailable • TermsofreferenceofthesituationalanalysisstudyavailableNextstepsandtimetable

• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess

Page 40: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

40

MINISTRYOFCOMMERCE

Page 41: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

41

PROJECTNo.20. BUILDINGANDOPERATINGWHOLESALEANDRETAILMARKETSINABIDJAN,DALOA,ABENGOUROUAND7OTHERPROVINCIALCAPITALS

NDPReference Strategicpriority3/Impact4/Effect4/Output4.2/Action4.2.5ContractingAuthority MINISTRYOFCOMMERCE

FocalUnitoftheContractingAuthority

Mrs.GOUTHONRoselineDirectorofStatisticalPlanningandProspective

Tel:(225)07094879Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theprojectaims tobuildwholesalemarketsof foodstuffsandmeatproducts inthe cities of Abidjan, Daloa, Abengourou and 07 provincial capitals, in order topromotetheircommercialisationnationwideandtheaccessofthepopulationstofoodstuffs

Location • Abidjan,Daloa,Abengourouand07Provincialcapitalstobedetermined

Project’sbenefit• Developingagriculturalandcommercialactivities• Improvingdistributioncircuits• Contributiontothefightagainstthehighcostofliving.

Estimatedcost • FCFA100,548M/EUR155M/USD201M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating.

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Serviceconcession/Concession/BOT

PROJECT’SSTATUS

Progress • AgreementoftheStudyFundobtainedtocarryoutthefeasibilitystudiesInformationavailable • TermsofreferenceavailableNextstepsandtimetable

• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess.

Page 42: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

42

PROJECTNo.21. BUILDINGANDOPERATINGTHEEXHIBITIONCENTREOFABIDJAN

NDPReference Strategicpriority3/Impact4/Effect4/Output4.2/Action4.2.1ContractingAuthority MINISTRYOFCOMMERCE

FocalUnitoftheContractingAuthority

Mrs.GOUTHONRoselineDirectorofStatisticalPlanningandProspective

Tel:(225)07094879Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theaimof thisproject is toprovide thecityofAbidjan (5million inhabitants),amodernExhibitionCentreintheareaoftheFélixHouphouët-BoignyInternationalAirport(Port-Bouët)andaspartofbuildinganAirportcity.ThisExhibitionCentrewillmake it possible to host national and international exhibitions dedicated toprofessionals and the public at large, as well as large congresses and political,culturalorreligiousgatherings.Theprojectwillconsistindeveloping:• Indoorair-conditionedandnon-airconditionedexhibitareas;• Quaysidesurfaces;• Ancillary services (administration, restaurants, cafeteria,bars,entertainment

centres,parkinglots,etc.)TheboundariesoftheExhibitionCentreproject(100hectares)havebeendeclaredtobeofpublicutilitybyDecreen°97-395of9July1997.

Location • Abidjan

Project’sbenefit• Makingup thedeficitof appropriate spaces for thepromotionofeconomic

activities,• ImprovingtheimageofCôted’Ivoire.

Estimatedcost • FCFA53,000M/EUR81M/USD106M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,designing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged: • Concession/BOT

PROJECT’SSTATUS

Progress • ThetermsofreferenceforthepreliminarystudiesarebeingdraftedInformationavailable • TermsofreferenceavailableNextstepsandtimetable

• Mobilisationoffinancing,inordertocarryoutthepreliminarystudies,• Launchtheconsultationprocess.

Page 43: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

43

MINISTRYOFPETROLEUMANDENERGY

Page 44: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

44

PROJECTSINTHEHYDROCARBONSECTOR

Page 45: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

45

PROJECTNo.22. SUPPLYINGCÔTED’IVOIREINLIQUEFIEDNATURALGAS(LNG)

NDPReference Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.CHEVALIERJacquesTechnicalAdvisor

Tel:(225)20222392Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

ThisprojectaimstosupplyCôted’IvoireinLiquefiedNaturalGas(LNG),withaviewtosecuringthesupplyoftheelectricitysectorandreducetheuseofliquidfuel,by:• Installingafloating,storageandre-gasificationunit(FSRU)inthewatersoff

Grand-Bassam• Buildinganewsectiononshoreandoffshore(oceanandlagoon)• ImportingofLNG.

Location • GrandBassam

Project’sbenefit• Increasingthenationalsupplyofnaturalgas• Securingthesupplyinnaturalgas• Reducingoperatingexpensesincurredinusingliquidfuel.

Estimatedcost • FCFA110,000M/EUR168M/USD220M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingapipeline,installinganFSRU

Unit,importingLNG

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Privateclients

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress • StudiesInformationavailable • Pre-feasibilitystudiesNextstepsandtimetable

• FinalisationofPreliminarystudies• Launchtheconsultationprocess.

Page 46: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

46

PROJECTNo.23. CREATINGFILLINGPLANTSINTENLOCALITIES

NDPReference Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2

ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.KAMSIEGeorgesDirectorofEngineeringandLogisticsatPETROCI

Tel:(225)20202500Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

ButanegasisessentiallyusedinAbidjan(in95%ofhouseholds),ratherthaninthecities in the interior of the country where charcoal remains the first source ofcombustion.Withthisproject,theStateaimstobuildseveralfillingplants(fillingunit for butane gas bottles) in the main cities of the country, in order topopularisetheuseofbutanegasthroughoutthenationalterritoryandbringthisfuelclosertothepeopleintheinteriorofthecountry.

Location• SanPedro,Korhogo,Bouaké,Man,Yamoussoukro,Ferkessédougou,Daloa,

Bondoukou,Abengourou,Gagnoa

Project’sbenefit

• Continuingthe'butanisation'programmeofCôted’Ivoireandputtingastoptodeforestation

• Facilitating the supply in butane gas for the cities of the interior of thecountry

• Increasingthenationalstoragecapacitiesandguaranteeingasecuritystock.

Estimatedcost • FCFA29,100M/EUR44M/USD58M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress • Feasibilitystudies

Informationavailable • Reportofthefeasibilitystudy

Nextstepsandtimetable

• FinalisationofPreliminarystudies• Launchtheconsultationprocess

Page 47: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

47

PROJECTNo.24. BUILDINGANDOPERATINGAHYDROCARBONDEPOTANDANOILWHARFINSANPEDRO

NDPReference Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.KAMSIEGeorgesDirectorofEngineeringandLogistics

atPETROCITel:(225)20202500

Email:[email protected]

Mr.GNANCHOUYvonTechnicalDirectorGESTOCI

Tel:(225)21759806Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

The project aims to (i) build a hydrocarbon storage depot with a capacity of43,000m3 of liquid hydrocarbons and 2,000MT of butane gas, and (ii) build aberthforthemooringofoiltankersofamaximumlengthof180mandacapacityof40,000DWTindeadweightanddraft.

Location • SanPedro–SouthwestofCôted’Ivoire

Project’sbenefit• Reducing the circuits and supply costs in oil products of neighbouring

countries(Liberia,SierraLeone,Guinea);• FacilitatingandimprovingthesupplyinfuelintheWestofCôted’Ivoire

Estimatedcost(depot+ondeckwithoutdredging) • FCFA32,000M/EUR49M/USD64M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Institutionalpartnership

PROJECT’SSTATUS

Progress• Availabilityofthesiteoftheproject(15ha)bytheAutonomousPortofSan

Pedro

Informationavailable • Reportoffeasibilitystudies

Nextstepsandtimetable

• FinalisationofPreliminarystudies• Launchtheconsultationprocess

Page 48: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

48

PROJECTNo.25. BUILDINGOFANOILSTORAGETERMINALÀVRIDIDE1100000MT(PHASE1)ONTHEWESTSIDEOFTHECANAL

NDPReference • Strategicpriority3/Impact1/Effect5/Output5.2/Action5.2.2ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.KAMSIEGeorgesDirectorofEngineeringandLogisticsatPETROCI

Tel:(225)[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theprojectaimstobuildanoilstorageterminalintwophases:• [1stPhase]Capacityof1,100,000MTintwostages:

- stage1:500,000MT(Whiteproducts)- stage2:1,100,000MT(LPG+Whiteproducts+Crudeoils)

• [2ndPhase]Increaseofthecapacityto2,000,000MT(LPG+Whiteproducts+Crudeoils)

TheobjectiveofthisterminalistomakeAbidjanthestorageandsupplycentreofWestandCentralAfricainoilandpetro-chemicalproducts,aswellastheAfricanquotationcentreofoilproducts.Itwillmakeitpossibleto:• Receive, store and re-export all the crude oils products and most of the

crudesofthesub-region• Increasethestrategicstoragecapacityofalltheoilproductscrudes,including

butane• ManagethestrategicstoragecapacitiesforCôted’Ivoireandthecountriesof

thehinterland• Receive in import large cargo ships inorder to reduce the costof supply in

refined products from countries of the sub-region and the hinterland viawharvesandpipelines

The project has the following components: (i) Formalities for the completeacquisitionofthesitefromthePortofAbidjanforworks,(ii)Detailedengineeringstudiesand(iii)building.

Location • Abidjan-Vridi

Project’sbenefit

• StrategicstorageforCôted’Ivoireandthesub-region• Nationalandsub-regionalsupplyCentre• Securingsupplyatalowercost• Securingtheoilandportlogisticinfrastructure.

Estimatedcost • FCFA394,758M/EUR601.8M/USD789.5M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Finalcustomers

Typeofpartnershipenvisaged:• N/A

PROJECT’SSTATUSProgress • TechnicalfeasibilitystudyInformationavailable • TechnicalfeasibilitystudyavailableNextstepsandtimetable

• FinalisationofPreliminarystudies• Launchtheconsultationprocess

Page 49: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

49

PROJECTSINTHEENERGYSECTOR

Page 50: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

50

PROJECTNo.26. BUILDINGCOCOABIOMASSPLANTS(80MW)

NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1

ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.CHEVALIERJacquesTechnicalAdvisor

Tel:(225)20222392Email:[email protected]

Mr.N’GORANKonanNorbertDirectorofNewandRenewable

Energies(DENR)Tel:(225)20206140

Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Thisprojectaimstobuildandoperateseveralcocoabiomassplantswitha totalpower of 80 MW, in order to develop the huge source of renewable energyavailable in Côte d’Ivoire and increase the share of renewable energies in theenergymix.

Location • National

Project’sbenefit• Meetingthedemandforelectricalpowerinthemediumandlongterms.• Increasingtheshareofrenewableenergiesintheenergymix.

Estimatedcost • FCFA325,400M/EUR496M/USD651M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:

• BOO

PROJECT’SSTATUS

Progress • Identification

Informationavailable • N/A

Nextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 51: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

51

PROJECTNo.27. BUILDINGANDOPERATINGACOTTONBIOMASSPLANTINBOUNDIALI(25MW)

NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1

ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.CHEVALIERJacquesTechnicalAdvisor

Tel:(225)20222392Email:[email protected]

Mr.N’GORANKonanNorbertDirectorofNewandRenewableEnergies

(DENR)Tel:(225)20206140

Email:[email protected]

GENERALCHARACTERISTICS

BriefdescriptionThis project aims to build and operate a 25 MW Cotton Biomass Plant inBoundiali,inordertodevelopthehugesourceofrenewableenergyCôted’Ivoirehasandincreasetheshareofrenewableenergiesintheenergymix.

Location • Boundiali

Project’sbenefit• Meetingthedemandforelectricalpowerinthemediumandlongterm.• Increasingtheshareofrenewableenergiesintheenergymix.

Estimatedcost • FCFA29,000M/EUR42.21M/USD58M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperatingtheplant.

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Privateclients

Typeofpartnershipenvisaged:• BOO

PROJECT’SSTATUS

Progress • Identification

Informationavailable • N/A

Nextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 52: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

52

PROJECTNo.28. BUILDINGBIOMASSPLANTS(10SITES,200MW)

NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1

ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.CHEVALIERJacquesTechnicalAdvisor

Tel:(225)20222392Email:[email protected]

Mr.N’GORANKonanNorbertDirectorofNewandRenewableEnergies

(DENR)Tel:(225)20206140

Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theprojectaimstobuildandoperateseveralbiomassplantsontensites,withatotal power 200 MW, with a view to developing the huge renewable energysourceavailableinCôted’Ivoireandincreasetheshareofrenewableenergiesintheenergymix.

Location • National

Project’sbenefit• Meetingthedemandforelectricalpowerinthemediumandlongterm.• Increasingtheshareofrenewableenergiesintheenergymix.

Estimatedcost • FCFA210,000M/EUR320M/USD420M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:

• BOO

PROJECT’SSTATUS

Progress • Identification

Informationavailable • N/A

Nextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 53: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

53

PROJECTNo.29. BUILDINGPHOTOVOLTAICSOLARPOWERPLANTS(5SITES,100MW)

NDPReference Strategicpriority3/Impact1/Effect5/Output5.3/Action5.3.1

ContractingAuthority MINISTRYOFPETROLEUMANDENERGY

FocalUnitoftheContractingAuthority

Mr.CHEVALIERJacquesTechnicalAdvisor

Tel:(225)20222392Email:[email protected]

Mr.N’GORANKonanNorbertDirectorofNewandRenewableEnergies

(DENR)Tel:(225)20206140

Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theprojectaimstobuildandoperatefive(5)photovoltaicsolarpowerplantsof20MW each. The operator will also have to finance and build the associatedtransport infrastructure for theconnectionto thenationalgridonbehalfofandfortheState.

Location • National

Project’sbenefit• Meetingthedemandforelectricalpowerinthelongterm,• Renewableenergycontributingtosustainabledevelopment.

Estimatedcost • FCFA220,000M/EUR335M/USD440M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Building,financing,maintainingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:

• BOO

PROJECT’SSTATUS

Progress • Studiesinprogress

Informationavailable • Termsofreferenceoftheproject

Nextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 54: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

54

MINISTRYOFINDUSTRYANDMINES

Page 55: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

55

PROJECTNo.30. PROGRAMMEFORTHECREATIONANDDEVELOPMENTOFNEWINDUSTRIALZONESINABIDJANANDTHEINTERIOROFTHECOUNTRY

NDPReference Strategicpriority3/Impact3/Effect1/Output1.2/Actions1.2.2;1.2.6to1.2.13

ContractingAuthorityMINISTRYOFINDUSTRYANDMINESAUTHORITYFORTHEMANAGEMENTANDDEVELOPMENTOFINDUSTRIALINFRASTRUCTURE(AGEDI)

FocalUnitoftheContractingAuthority

MINISTRYOFINDUSTRYANDMINESMr.GNAMIENGuillaume

DirectorofCabinetTel:(225)20229831

AGEDIMr.OUATTARAYoussoufDirectorGeneralofAGEDITel:(225)22441788

GENERALCHARACTERISTICS

Briefdescription

Thisprojectaimstodevelop industrialzones inthecitiesofKorhogo,Bonoua,San-Pedro,Bouaké,Yamoussoukro,AdzopéandAboisso,withaviewtoconsolidatingandunclogging the industrial infrastructurebottleneckofAbidjan. Thesedevelopmentswillbeimplementedinsuccessivetranchesof50haforeachcity.ThecityofKorhogohasalreadybeenthesubjectofafeasibilitystudy,aspartoftheconstructionprojectofadryportinFerkessédougou.

Location • Korhogo,Bonoua,San-Pedro,Bouaké,Yamoussoukro,AdzopéandAboisso

Project’sbenefit

• Availabilityofmodernandqualityindustrialinfrastructure• IncreaseinthesupplyofindustriallandsinAbidjanandintheinteriorofthe

countryforthedevelopmentindustrialactivities• UncloggingtheindustrialinfrastructurebottleneckofthecityofAbidjan

Estimatedcostforeachtrancheof50ha

• FCFA15,000M/EUR23M/USD30M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,developingandoperatingindustrial

infrastructure

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • FeasibilitystudiesforthecitiesofBonouaandYamoussoukro

Informationavailable• ReportsoffeasibilitystudiesareavailableforthecitiesofBonouaand

Yamoussoukro

Nextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 56: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

56

PROJECTNo.31. INTEGRATEDMININGDEVELOPMENTPROJECTINTHEWEST(PDMIO)

NDPReference Strategicpriority3/Impact3/Effect2/Output2.2/Action2.2.4ContractingAuthority MINISTRYOFINDUSTRYANDMINES

FocalUnitoftheContractingAuthority

MINISTRYOFINDUSTRYANDMINESMr.GNAMIENGuillaume

DirectorofCabinetTel:(225)20229831

GENERALCHARACTERISTICS

Briefdescription

Theoverallaimoftheprojectisto(i)acceleratetheeconomicdevelopmentofthewesternregionand(ii)openuptheGreatWestofCôted’Ivoirethroughtheextractionofminingdeposits.Itaimsto:• MinetheironoreofmountsKlahoyo(2billiontonnes)andGao(1.2billion

tonnes),thenickel-copper-platinumreservesofSamapleu(50millionsdetonnes)andofthenickelcobaltreservesofTouba-Biankouama(254milliontonnes)

• BuildtheMan–SanPedrorailway(ofatotallengthof500km)linkingorestothefutureironoreterminal

• BuildanironoreterminalattheportofSanPedrowithaprocessingcapacityof50to100milliontonnesperyear

Therailwayandironoreterminalwillthereforemainlyservetotransportandexportmineralsandinputs.

Location • WestofCôted’Ivoire(Man-San-Pedro)

Project’sbenefit• Exploitationofthevariousdepositsandexportoftheminerals• EconomicdevelopmentandopeninguptheGreatWestofCôted’Ivoire

Estimatedcost

• Man-San-Pedrorailway:• àFCFA678,000M/EUR1,033M/USD1,356M(1USD=500FCFA)• Ironoreterminal(includinga200hastoragearea,conveyorsand3berths):• àFCFA681,000M/EUR1,038M/USD1,362M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,Developingandoperatingtransport

infrastructure(railwayandterminal)

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • Studies

Informationavailable

• Generalrailwayprogramme• Pre-feasibilitystudyoftheminingprojectsavailable• Preliminarystudyoftheironoreterminal• 2012-2035MasterPlanoftheAutonomousPortofSanPedrocarriedout,

withtwo(2)variants(deepwatermineralportandmineralwharf).

Nextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 57: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

57

MINISTRYOFTOURISM

Page 58: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

58

PROJECTNo.32. DEVELOPINGANDOPERATING9“HUT-STOPOVERS”

NDPReference Strategicfocus3/Impact4/Effect2/Output2.1/Action2.1.5ContractingAuthority MINISTRYOFTOURISM

FocalUnitoftheContractingAuthority

Mr.VICENSMarcTechnicalAdvisor

Tel:(225)20324492Email:[email protected]

Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs

Tel:(225)56022277/20242883Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Thisprojectaimstobuild“hut-stopovers”togiveanewboosttoinboundtourismand encourage Ivoirians to discover their country by creating ecological touristaccommodation making it possible to discover the natural, cultural andgastronomic riches of Côte d’Ivoire and promote eco and intra-communitytourism.Inanutshell,theaimistobuildineachcityidentifiedathree(3)starhotelof20to 30 air-conditioned rooms, a conference room, a village plaza, a pool, sportsfieldsandplaygrounds,ashopandabicyclepath.Thearchitecturewillbeinspiredby the surrounding environment, with a view to encouraging inbound tourism.Thebuildingofthe9hut-stopoversplanstouselocalmaterialsandsolarenergyforalowoperatingcost.

Location• Assinie,Abengourou,Adzopé,Grand-Bassam,GrandBérébi,Man,Odienné,

Korhogo,Daloa

Project’sbenefit• Creatingwealthandjobsfortheruralpopulations,• Contributingtosustainabledevelopment.

Estimatedcostforeachhut-stopover

• FCFA800M(for20rooms)/EUR1.2M/USD1.6M(1USD=500FCFA)• FCFA1,300M(for30rooms)/1,98MEUR/2,6MUSD(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights.

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain

PROJECT’SSTATUS

Progress • Pilotphase,withthebuildingofahutstopoverinJacquevilleinprogressInformationavailable • Studiesavailable

Nextstepsandtimetable

• Carryoutadditionalstudies• Launchtheconsultationprocess

Page 59: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

59

PROJECTNo.33. REHABILITATINGANDOPERATING5SIETHOHOTELS

NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFTOURISM

FocalUnitoftheContractingAuthority

Mr.VICENSMarcTechnicalAdvisor

Tel:(225)20324492Email:[email protected]

Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs

Tel:(225)56022277/20242883Email:[email protected]

GENERALCHARACTERISTICS

BriefdescriptionThisprojectaimstorehabilitateandoperatetheinfrastructureoftheex-SIETHO(Société Ivoirienne d’Expansion du Tourisme et de l’Hôtellerie) hotels in theinteriorofthecountry,whichwerebuiltandoperatedbytheState.

Location • Daloa,Odienné,Gagnoa,Boundiali,Dimbokro

Project’sbenefit• Increasingthereceptioncapacitiesfortourism,• Developinginboundtourism.

Estimatedcost • FCFA11,000M/EUR16.7M/USD22M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,rehabilitating,equippingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • Termsofreferenceoftheproject

Informationavailable • N/A

Nextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 60: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

60

PROJECTNo.34. REHABILITATINGANDOPERATINGTHE“HOTELPRESIDENT”OFYAMOUSSOUKRO

NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFTOURISM

FocalUnitoftheContractingAuthority

Mr.VICENSMarcTechnicalAdvisor

Tel:(225)20324492Email:[email protected]

Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs

Tel:(225)56022277/20242883Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

TheaimofthisprojectistorenovatetheHôtelPrésidentandbringituptointernationalstandards,inordertoprovideCôted’Ivoirewithqualityhotelestablishments.Itinvolves:• ThecompleterehabilitationandequipmentoftheHôtelPrésident• TheextensionoftheHôtelPrésidenttobuildashoppingmallandasports

complex• ThemanagementtheHotelPresidentatinternationalstandards

Location • Yamoussoukro

Project’sbenefit• RenovationoftheHôtelPrésident• Strengtheningofthehotelaccommodationcapacityofthedistrictof

Yamoussoukro.

Estimatedcost • FCFA30,000M/EUR45.7M/USD60M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Rehabilitating,equippingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • Studiesinprogress

Informationavailable • Termsofreferenceavailable

Nextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 61: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

61

PROJECTNo.35. DEVELOPINGANDOPERATINGTHEWILDLIFEPARKOFABOKOUAMÉKRO

NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3

ContractingAuthority MINISTRYOFTOURISMMINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENT

FocalUnitoftheContractingAuthority

Mr.VICENSMarcTechnicalAdvisor

Tel:(225)20324492Email:[email protected]

Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs

Tel:(225)56022277/20242883Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

TheAbokouamékroWildlifeParkcoversatotalsurfaceareaof20,430ha,ofwhich7,230hawere developed from 1988 to promote the development of tourism inthepoliticalcapitalofCôted’Ivoire.The project aims to repopulate this reserve for tourism, with the rehabilitationprojectofthe“HôtelPrésident”ofYamoussoukro.

Location • Yamoussoukro

Project’sbenefit • StrengtheningthetouristattractivenessofthedistrictofYamoussoukro.Estimatedcost • Tobedetermined

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,developingandrepopulating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefinedbythestudies• Publicinvestment:Tobedefinedbythestudies

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Valorisationofthedomain

PROJECT’SSTATUS

Progress • CarryoutasituationalanalysisInformationavailable • StudiesavailableNextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 62: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

62

PROJECTNo.36. REHABILITATINGANDEXTENDINGTHEIVOIREGOLF-CLUBOFABIDJAN

NDPReference Strategicpriority3/Impact4/Effect2/Output2.1/Action2.1.3ContractingAuthority MINISTRYOFTOURISM

FocalUnitoftheContractingAuthority

Mr.VICENSMarcTechnicalAdvisor

Tel:(225)20324492Email:[email protected]

Mrs.AKA-GAUZEJosianeDirectorofLegalAffairs

Tel:(225)56022277/20242883Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

ThisprojectaimsatrehabilitatingandoperatingtheIvoireGolfClubofAbidjan.Itinvolvestwo(2)mainaspects:• The“Sport-Leisure-GreatEvent”aspect,whichwillbeorganisedaroundtwo

(2)golfcoursesofthesite(oneof9holesandtheotherof18holes),inordertoliftthesaidcoursestointernationalstandards,sothattheycanhostprofessionaltournaments.

• The“Hotel”aspectwhichconsistsinbuildingafive(5)starhotelonthesite.

Location • Abidjan

Project’sbenefit • RepositioningCôted’Ivoireontheinternationalgolfmarket.Estimatedcost • FCFA150,000M/EUR228.6M/USD300M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Rehabilitating,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Serviceconcession/Valorisationofthedomain

PROJECT’SSTATUS

Progress • Studies

Informationavailable • Studiesavailable

Nextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 63: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

63

MINISTRYOFTRANSPORT

Page 64: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

64

PROJECTSINTHERAILWAYSECTOR

Page 65: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

65

PROJECTNo.37. BUILDINGANDOPERATINGLINE1OFTHEABIDJANSUBWAY

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.34ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

Mr.SIDIBENoumoryDeputyDirectorofCabinet

Tel:(225)20344866Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

• This project is part of the search for lasting solutions likely to address thedifficultiesrelatedtopublictransportintheDistrictofAbidjan.Theaimistobuildanurbanandsuburbansubway like railwaysystemof37.5kmwith20stations,whichwillservicethecityofAbidjanfromnorthtosouth,linkingthecommune of Anyama to the commune of Port-Bouët (up to the FélixHouphouët-BoignyInternationalAirport.

• The Project will use the rights-of-way currently used by the Abidjan-Ouagadougou railway line and will be integrated to the existing urbantransportsystems,avecdesfeederlinestoservicebothSOTRA(SociétédesTransport Abidjanais), “wôrô – wôrôs” (collective communal taxis) and“gbakas”(communalmini-buses).

Location • Abidjan

Project’sbenefit

• Relievingcongestiononthemajortraderoutesatpeakhours• OfferinganeconomicmeansoftransporttothepopulationofAbidjan• Reducingthecostoftransportbylinkingtheresidentialareaslocatedinthe

northtothesouthofthecity,wheremosteconomicactivitiestakeplace.Estimatedcost • FCFA656,000M/EUR1,000M/USD1,312M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress

• Signingofaconcessionagreementon06/07/2015withSTAR(SociétédeTransportAbidjanaissurRail)comprisingBouygues,HyundaÏRotem,DongsanEngineeringandKeolis

• PreparatoryworksinprogressInformationavailable • APSStudiesNextstepsandtimetable

• FinalisationofAPDstudies• Financialclose

Page 66: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

66

PROJECTNo.38. BUILDINGANDOPERATINGTHEOUANGOLODOUGOU–NIELLÉ–SIKASSORAILWAYLINE

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.36ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

MR.SIDIBENoumoryDeputyDirectorofCabinet

Tel:(225)20344866Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

ThisprojectispartofalargerraillinkprojectbetweenMaliandCôted’Ivoire,andabranchlinerailwayoftheexistingrailwayfromthecityofOuangolodougou,inCôted’Ivoire,toBamako,inMali,passingthroughBougouniandSikasso.Itisalsopart of the Trans-Sahel corridor,which aims to connect the capitals of Senegal,Mali, Côte d’Ivoire and Burkina Faso over a total of 2,934 km, facilitating themovementsofpersonsandgoodsinthesub-region.

Location • Ouangolodougou/Niellé/Sikasso

Project’sbenefit• Participatinginsub-regionalintegration• Relievingcongestiononarterialroads(reductionofthenumberofheavy

trucks).Estimatedcost • FCFA80,000M/EUR122M/USD160M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating.

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • TermsofreferenceInformationavailable • N/ANextstepsandtimetable • Carryoutthepreliminarystudies

Page 67: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

67

PROJECTNo.39. REHABILITATINGANDOPERATINGTHEABIDJAN–OUAGADOUGOU–KAYARAILWAYLINE

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.33ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

Mr.SIDIBENoumoryDeputyDirectorofCabinet

Tel:(225)20344866Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

The aim of this project is to rehabilitate the existing railway infrastructurebetween Côte d’Ivoire and Burkina Faso, in order to relaunch and revive theoperation of international railway public transport of passengers and goodscarriedoutbySITARAIL.

Location • Côted’Ivoire–BurkinaFaso

Project’sbenefit

• Ensurethesurvivalofrailtransport,• ContributetoincreasingtheactivitiesoftheAutonomousPortofAbidjanand

thoseoftheeconomicoperatorsintherailwaysector(SITARAIL,freightforwarders,miningoperators,etc.).

Estimatedcost • FCFA350,000M/EUR534M/USD700M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,rehabilitatingandoperating.

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • Negotiationinprogresswithaprivatepartner(BolloréGroup)Informationavailable • N/ANextstepsandtimetable • Signingoftheconcessionagreement

Page 68: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

68

PROJECTSINTHEAIRPORTSECTOR

Page 69: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

69

PROJECTNo.40. BUILDINGOFTHE“AIRPORTCITY”OFABIDJAN

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.4ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

Mr.SIDIBENoumoryDeputyDirectorofCabinet

Tel:(225)20344866Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Thisprojectinvolvesthedevelopmentandoperationofanairportcity,locatedinthe periphery of the Félix Houphouët-Boigny Airport, on a surface area of3,500ha.TheAirportCitywill comprisehotel, industrial, residential, commercialandsportscomplexes,aswellaspublicequipment.Thisprojectalsoincludesthebuilding of an Exhibition Centre, in order to host national and internationalevents.

Location • Abidjan

Project’sbenefit • Economicandurbandevelopment.Estimatedcost • FCFA88,000M/EUR134M/USD176M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain

PROJECT’SSTATUS

Progress • PreliminarystudiesInformationavailable • PreliminarystudiesavailableNextstepsandtimetable

• Carryoutthepreliminarystudies• Launchtheconsultationprocess

Page 70: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

70

PROJECTNo.41. DESIGNING,FINANCING,BUILDINGANDOPERATINGTHENEWINTERNATIONALAIRPORTOFSANPEDROANDITSAIRPORTCITY

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.5ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

Mr.SIDIBENoumoryDeputyDirectorofCabinet

Tel:(225)20344866Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Onasurfaceareaoftheairportdomainestimatedataround2,000ha,thisprojectaimsto:• BuildanewinternationalairportinSanPedrocapableofaccommodatingall

kindsofmediumandlong-haulaircrafts,aswellasapassengerandfreightterminal

• Developanairportcitycomprisinghotel,industrial,residential,commercialandsportscomplexes,aswellaspublicequipment

• Buildserviceroadsfortheairportanditsairportcity.Location • SanPedro

Project’sbenefit• TransformingSanPedrointoarealhubofeconomicdevelopmentand

tourism,• DevelopingthetourismpotentialoftheSouthwestregionofCôted’Ivoire.

Estimatedcost • FCFA45,000M/EUR69M/USD90M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain

PROJECT’SSTATUS

Progress • InformationnoticesbeingvalidatedbytheMinistryInformationavailable • TermsofreferenceoftheprojectavailableNextstepsandtimetable • Carryoutthestudies

Page 71: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

71

PROJECTSINTHEROADSECTOR

Page 72: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

72

PROJECTNo.42. BUILDING,EQUIPPINGANDOPERATINGTHEBUSSTATIONOFBOUAKÉ

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.39ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

Mr.SIDIBENoumoryDeputyDirectorofCabinet

Tel:(225)20344866Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

This project is part of a national plan to build bus stations in the regionaleconomic centres (Bouaké, Yamoussoukro, Korhogo, San Pedro, Daloa,Sassandra).InBouaké,theprojectaimstobuild,equipandoperateamodern,functionalandeasilyaccessibleintercitybusstationonapieceoflandof10hectareslocatedontheperipheryofthecity.Thisinfrastructurewill:• Provideaplaceoftransit forthe largevehiclestravellingtothecountriesof

thehinterland(BurkinaFaso,Mali,Niger);• Facilitateaccesstothestationfromalloriginsanddestinationsofthecountry

(East, Centre, North, West and Southwest) and sub-region, thanks to theproximitytotherailwaystationandmajorroads.

Location • Bouaké

Project’sbenefit• Improvingthetransportlogisticschain• Strengtheningthesafetyandcomfortofpassengersbyprovidingappropriate

equipment.Estimatedcost • FCFA15,000M/EUR23M/USD30M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,equippingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgecustomaryrights

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress• Termsofreference• Determinationofthedusiteoftheproject

Informationavailable • Termsofreferenceoftheprojectavailable.

Nextstepsandtimetable

• Securethesite• Carryoutthepreliminarystudies• Launchtheconsultationprocess.

Page 73: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

73

PROJECTNo.43. BUILDINGTHEJUXTAPOSEDBORDERPOSTOFNIGONI(TINGRELA)

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.48ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

Mr.SIDIBENoumoryDeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

Briefdescription The aim of this project is to build a border postin Nigoni, in order to secureregionalroadtransport.

Location • Tingrela

Project’sbenefit• Reducingtheprocessingandcrossingtimeattheborder;• SecuringGovernmentrevenueandreducingtransportcostsfromGuineato

Côted’Ivoire.Estimatedcost • FCFA9,020M/EUR14M/USD18M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financingandbuilding

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Taxpayers

Typeofpartnershipenvisaged:• Partnershipagreementonpublicfunding

PROJECT’SSTATUS

Progress • TermsofreferenceoftheprojectInformationavailable • TermsofreferenceavailableNextstepsandtimetable • Carryoutthestudies

Page 74: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

74

PROJECTSINTHEPORTSECTOR

Page 75: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

75

PROJECTNo.44. RELOCATINGANDEXTENDINGTHECONTAINERTERMINALOFTHEPORTOFSANPEDRO

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.19

ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP

Tel:(225)34717200Email:[email protected]

[email protected]

Briefdescription

The aim of this project is to move and enlarge the container terminal of SanPedro,withaviewofmeeting thegrowthrequirementsof theport (insufficientcapacityforthestorageandevacuationofgoods).Itplansto:• Buildatleast700metresofquaylengths,18metresdeep• Buildaccessroads• Developquaysidesurfacesover28hasurfacearea,withacapacityof

1,000,000TEUs/year• Supplyandinstalltranshipmentequipment• Thedredgingofthebasin,swingingcircleandaccesschannelat17m

Location • SanPedro

Project’sbenefit• Improvetheofferandqualityofportservices,• StrengthenthecompetitivenessoftheportofSanPedro.

Estimatedcost • FCFA260,000M/EUR395M/USD520M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Developquaysidesurfacesandbuild

superstructures• Equipandoperatethecontainerterminal.

Anticipateddistributionofinvestments:• Privateinvestment:FCFA120,000M• Publicinvestment:FCFA140,000M

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress

• Stabilisingoftheproject’stechnicalperimeter• Finalisingthecontractdocuments• Carryingoutdetailedtechnicalstudies• SettingupaNegotiationCommittee• Preparingtheconditionsofthenegotiations.

Informationavailable• Interimreportsoftechnicalstudies• Draftcontractdocuments• DecreeonthesettingupofaNegotiationCommittee.

Nextstepsandtimetable

• Negotiationsoftheconditionsoftheconcessionagreement• Completionofthedetailedtechnicalstudies• Searchforfinancingtocarryouttheworks• Conducttheinfrastructurework• Equippingandoperatingthecontainerterminal

Page 76: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

76

PROJECTNo.45. DEVELOPINGANDOPERATINGOFA150HECTARELOGISTICSHUBANDINDUSTRIALZONEATTHEPORTOFSANPEDRO

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.22

ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP

Tel:(225)34717200Email:[email protected]

[email protected]

Briefdescription

Theaimofthisproject istodevelopandoperate150haoftheportareaofSanPedro, in order to encourage the establishment of industrial units and logisticsandhelpsupportthedevelopmentofactivitiesattheportofSanPedroTheactivitieswillconsistin:• Carryingoutthebackfillingoftheportdomain• Dividingupthesurfaceareaobtained• Servicethelands(buildroadsandvariousnetworks,VRD).

Location • SanPedro

Project’sbenefit• Increasetrafficandtheport'saddedvalue• Establishatleast50additionaleconomicoperatorswhentheworkis

completedEstimatedcost • FCFA85,000M/EUR130M/USD170M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,developingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedetermined• Publicinvestment:Tobedetermined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Valorisationofthedomain

PROJECT’SSTATUS

Progress• Carryingoutdetailedtechnicalstudies• Seekingfundingtocarryouttheworks.

Informationavailable • Summaryreportsofdraftprojectstudiesavailable

Nextstepsandtimetable

• Launchtheconsultationprocess• Seekingfunding• Carryoutthebackfillingandservicingworks• Operationofareabackfilledandserviced.

Page 77: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

77

PROJECTNo.46. DEVELOPINGANDOPERATINGAMIXED-USECOMMERCIALTERMINALATTHEPORTOFSANPEDRO

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.20

ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP

Tel:(225)34717200Email:[email protected]

[email protected]

Briefdescription

The aim of this project is to develop, within the bonded port boundaries, acommercial mixed-use terminal for the treatment of conventional goods, ro-rotraffic, palm-oil export and cereal imports, especiallywith an Economic InterestGroup(EIG)ofoperatorsoftheportplatform.Thisterminalwillhaveasurfaceareaofaround5hectaresand2warehouses.

Location • SanPedro

Project’sbenefit• Optimisingtheoperationoftheport• ImprovingthecompetitivenessoftheportofSanPedroanditsrevenues.

Estimatedcost • FCFA5,000M/EUR7.5M/USD10M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • Technicalandfinancialpre-feasibilitystudy

Informationavailable• Reportoffinancialfeasibilitystudies• Draftcontractdocuments.

Nextstepsandtimetable • StartofdiscussionswiththeEIG

Page 78: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

78

PROJECTNo.47. BUILDINGAMIXED-USEINDUSTRIALTERMINALATTHEPORTOFSANPEDRO

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.21

ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFSANPEDRO(PASP)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFSANPEDROMr.LAMIZANAHilaireMarcelDirector-GeneralofthePASP

Tel:(225)34717200Email:[email protected]

[email protected]

Briefdescription

Thisprojectaimsto:• Builda14metredeep270metrelinearwharf• Developastoreareaof10haforthetrafficofminerals(ironore,manganese)• Supplyandinstallthetranshipmentequipment.Thebuildingofthisportinfrastructurewillmakeitpossibletocapturetheflowofgoodsfrom(i)theoperationofironoreandmanganesecomingfromMonogagaandLauzoua(townslocatedneartheportofSanPedro)and(ii)theimportationoffertilizersforagriculturalfarmsinthehinterlandoftheport.

Location • SanPedro

Project’sbenefit• Improvingthesupplyandqualityofportservices• IncreasethecapacitiesoftheportofSanPedro• StrengthenthecompetitivenessoftheportofSanPedro.

Estimatedcost • FCFA20,000M/EUR30M/USD40M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession/BOT

PROJECT’SSTATUS

Progress• Finalreportsofsummarypreliminaryprojectstudiesavailable• Carryoutthetechnicalfeasibilitystudies

Informationavailable • ReportssummarypreliminaryprojectstudiesNextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 79: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

79

PROJECTNo.48. FINANCING,BUILDINGANDOPERATINGAGRAINTERMINALATTHEPORTOFABIDJAN

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.11

ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFABIDJANMr.HienSIE

Director-GeneralofthePAATel:(225)21238101

Email:[email protected]

Briefdescription

Theaimoftheprojectisto:• Buildthree(03)cerealberthsthatcancaterforbulkcarrierswithadraughtof

13.5m• Develop5hectaresof lands tobuildwarehousesofferingoperators storage

capacities in bonded areas, with modern and high-performance handlingequipment.

Location • Abidjan(Treichville)

Project’sbenefit

• ModernisingthehandlingequipmentoftheportofAbidjan,• Achievingeconomiesofscaleonthecarryingcostsforoperators• Reducingvesselwaitingtimes• Increasingstoragecapacitiesinbondedareasforoperators.

Estimatedcost • FCFA35,000M(2014)/EUR53.3M/USD70M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operation

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Makingtheinfrastructure

available(berthsandbackfilling)Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • Preliminarystudies

Informationavailable• Availabletodate:geo-technicalsoundings,bathymetricsurveys,thefloor

plan,thepreliminaryreportofthetechnicalfeasibilitystudy.

Nextstepsandtimetable

• Carryoutadditionalstudies• Launchtheconsultationprocess

Page 80: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

80

PROJECTNo.49. FINANCING,BUILDINGANDOPERATINGANOREWHARFATTHEPORTOFABIDJAN

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.12

ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFABIDJANMr.HienSIE

Director-GeneralofthePAATel:(225)21238101

Email:[email protected]

Briefdescription

Theaimofthisproject is tomodernisetheexisting infrastructure, inorderto(i)increase the operational capacities, (ii) cater for bulk carrierswith a draught of13.5mand(iii)offertheprofessionalsofthesectorworkinginCôted’Ivoireandinthecountriesofthehinterland,betterexportandimportconditionsofminingproducts.Therefore,theobjectiveisto:• Buildthree(3)newberths• Backfillof9haofquaysidesurfaces,• Developindoorstorageareas• Install conveyorbelts fortheautomateddeliveryofproductstothestorage

areas.

Location • Abidjan(Treichville)

Project’sbenefit• Efficientlymeetingthedemandoftheminingoperatorsfromthehinterland,• Increasingtheflowofminerals• Reducingpollution.

Estimatedcost • FCFA7,000M(2014)/EUR114.3/USD150M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Makingtheinfrastructure

available(berthsandbackfilling)Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession

PROJECT’SSTATUS

Progress • PreliminarystudiesInformationavailable • Technicalpreliminarystudies.Nextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 81: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

81

PROJECTNo.50. FINANCING,BUILDINGANDOPERATINGATREATMENTPLANTOFLIQUIDWASTEFROMSHIPSANDEFFLUENTSFROMINDUSTRIESINTHEPORTAREAOFABIDJAN(DEBALLASTINGSTATION)

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.17

ContractingAuthorityMINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFABIDJANMr.HienSIE

Director-GeneralofthePAATel:(225)21238101

Email:[email protected]

Briefdescription

Theaimofthisprojectistobuildamodernplantforthetreatmentofwasteandliquidresidues(slops)fromshipsandindustriesoftheportareaofAbidjan.This type of installationwill help avoid haphazard dumping of toxic products inthewatersandonthelandsofthesub-region.

Location • Abidjan(Treichville)

Project’sbenefit

• Provide the port of Abidjan amodern infrastructure to collect and treat itsindustrialwasteandslops

• Offershipsandindustriesthepossibilityofdisposingoftheirliquidwaste• Contributetotheprotectionofthemarineandlagoonenvironment• MeettherequirementsoftheMARPOL73/78Convention.

Estimatedcost • FCFA20,000M(2013)/EUR30.5M/USD40M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• BOT/Concession

PROJECT’SSTATUS

Progress • CarryoutstudiesInformationavailable • CompleteAPDtypedossieravailableNextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 82: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

82

PROJECTNo.51. BACKFILLINGANDDEVELOPINGTHEBAYOFVRIDI-BIETRYANDBUILDINGTHEVRIDI-BIETRYBRIDGE

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6/Action1.6.10

ContractingAuthority MINISTRYOFTRANSPORTAUTONOMOUSPORTOFABIDJAN(PAA)

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFABIDJANMr.HienSIE

Director-GeneralofthePAATel:(225)21238101

Email:[email protected]

Briefdescription

The Autonomous Port of Abidjan (PAA) decided to launch an importantinvestmentprogrammetocreateindustrialspacesbybackfillingandrelievingthecongestionoftheportarea,inorderto:• Solvetheissueofthesaturationofthe800haoftheexistingportdomain• Offerbetterconditionstotransitingheavygoodsvehicles• Make available to private operators port lands for the development of

industrialandlogisticsactivitiescausingadditionaltrafficbutcreatingjobs.Thisprogrammecomprisesseverallargecomponents,including:• Thebackfillinganddevelopmentprojectof100hectaresof landatthe level

ofthelagoonbayofVridi(Phase2),ofwhichapilotphase(Phase1)isalreadyinprogress

• TheprojectofbuildingtheVridi-BietrybridgeLocation • Abidjan(Treichville)

Project’sbenefit

• Relievingtrafficcongestionintheportareaandtheareainthevicinityoftheport

• Improvingthecompetitivenessoftheport• Providingportlandsforthedevelopmentofindustrialactivitiesandlogistics.

Estimatedcost • FCFA120,000M(2015)/EUR182,9M/USD240M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financinganddeveloping(35habythePAAina

pilotphase)• Financing,buildingandoperating(65habythe

partner)

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined.

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession/BOT/Valorisationofthedomain

PROJECT’SSTATUSProgress • Pilotphaseinprogress(35habythePAAinadditiontothe100ha)

Informationavailable • Referencedocumentsofthepilotphaseoftheprojectavailable• Technicalstudiesavailable

Nextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 83: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

83

PROJECTNo.52. BUILDINGOFALOGISTICSHUBANDPARKINGLOTFORTRUCKSATPK26ONTHENORTHERNHIGHWAYTORELIEVECONGESTIONINTHEPORTAREAOFABIDJAN

NDPReference Strategicpriority4/Impact1/Effect1/Output1.6./Action1.6.16ContractingAuthority MINISTRYOFTRANSPORT

FocalUnitoftheContractingAuthority

MINISTRYOFTRANSPORTMr.SIDIBENoumory

DeputyDirectorofCabinetTel:(225)20344866

Email:[email protected]

AUTONOMOUSPORTOFABIDJANMr.HienSIE

Director-GeneralofthePAATel:(225)21238101

Email:[email protected]

Briefdescription

Thisprojectformspartofthepolicyofrelievingcongestionintheareaoftheportof Abidjan. The site planned for the logistics hub is located at PK26, on theNorthernHighway,10kmfromthecorridorofYopougon-Gescoandextendsoverasurfaceareaof25ha.Theparking lot for heavy goods vehicleshas a capacityof 800 to1,000parkingspaces andwill have a place for living for the drivers (resting space, a cateringspace,a space forprayer,a space for recreation). Furthermore, the loadingandoffloadingofheavygoodsvehicles fromthehinterlandwill take in thisareaandaccesstotheportareaforthesevehicleswillalsobeorganisedfromthishub.Thiswill significantly reduce theanarchicparking that contributes to cloggingup theportdomain.

Location • Abidjan

Project’sbenefit

• Regulatingtheparkingofheavygoodsvehicles• RelievingcongestionatthePortofAbidjan;• Consolidating theplaceof leaderof thePortofAbidjan for traffic from the

hinterland• Reducingthecostsofportcrossing.

Estimatedcost • FCFA25,000M/EUR38M/USD50M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Makingthedomainavailable

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• BOT/Concession

PROJECT’SSTATUS

Progress• Securingthesite• Preliminarystudies

Informationavailable • Studiesavailable

Nextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 84: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

84

MINISTRYOFECONOMICINFRASTRUCTURE

Page 85: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

85

PROJECTNo.53. SUPPLYINGDRINKINGWATERTOTHECITYOFABIDJAN

NDPReference Strategicpriority4/Impact1/Effect2/Output2.5/Action2.5.41ContractingAuthority MINISTRYOFECONOMICINFRASTRUCTURE

FocalUnitoftheContractingAuthority

Mrs.SISSOKOCoralieProjectCoordinator

Tel:(225)20347338/(225)01136860Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Theaimofthisprojectistofindalong-termsolutiontothecityofAbidjanhavingaccess to drinkingwater from surfacewater, through the detection of a viablesourceofwaterthatcouldsupplythecityofAbidjanforthenext20yearsatleast.The project plans for a production capacity of 300,000 m³/day and theconstructionofthefollowinginfrastructure:• Awaterintaketoweronthewatersource,includingtherawwaterpumping

station.• Acompleteconventionaltreatmentplant,withacapacityof300,000m³/day.• Atreatedwaterpumpingstation.• ThenetworkofthetrunkpipelineforcarryingdrinkingwatertoAbidjan• TerminalstoragefacilitiesinAbidjan,withatotalcapacityof80,000m³.

Location • Tobedetermined

Project’sbenefit • SecuringthesupplyofdrinkingwatertothecityofAbidjanEstimatedcost • FCFA280,000M(2013)/EUR427M/USD560M(1USD=500CFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financing,operatingand

maintainingoftheproductionandstorageunits,aswellasthewatertransportsystem

Anticipateddistributionofinvestments:• Privateinvestment:Tobedetermined• Publicinvestment:Tobedetermined

Modalitiesfortheremunerationoftheprivatepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Serviceconcession/Concession

PROJECT’SSTATUS

Progress • PreliminarystudiesInformationavailable • Preliminarystudiesavailable

Nextstepsandtimetable

• Selectionofthewatersource;• Carryoutadditionalpreliminarystudies;• Launchtheconsultationprocess.

Page 86: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

86

PROJECTNo.54. DEVELOPINGANDOPERATINGTHEABIDJAN-SAMOHIGHWAY

NDPReference Strategicpriority4/Impact1/Effect1/Output1.5/Action1.5.2ContractingAuthority MINISTRYOFECONOMICINFRASTRUCTURE

FocalUnitoftheContractingAuthority

Mrs.SISSOKOCoralieProjectCoordinator

Tel:(225)20347338/(225)01136860Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

TheBassam–Samohighwayproject(40kmfromBassam)isthesecondphaseofbuildingoftheIvoriansectionoftheAbidjan-LagosHighwayCorridor.ThisprojectwillfacilitateroadaccesstotheseasideresortofAssinie,eastofthecityofAbidjan.

Location • Bassam-Bonoua

Project’sbenefit• Improvingtheinfrastructureallowingthefluidityoftrafficintheeastofthe

country;• TourismdevelopmentoftheseasideresortofAssinie.

Estimatedcost • FCFA60,000M(2013)/EUR91.5M/USD120M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operatingandmaintaining

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Serviceconcession/Concession

PROJECT’SSTATUS

Progress • SeekingfundingInformationavailable • Feasibilitystudyand“DAO”availableNextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.

Page 87: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

87

PROJECTNo.55. BUILDINGANDOPERATINGSECTION2OFTHEABIDJAN-SANPEDRO:DABOU-SANPEDROHIGHWAY

NDPReference Strategicpriority4/Impact1/Effect1/Output1.5/Action1.5.4

ContractingAuthority MINISTRYOFECONOMICINFRASTRUCTURE

FocalUnitoftheContractingAuthority

Mrs.SISSOKOCoralieProjectCoordinator

Tel:(225)20347338/(225)01136860Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

TheaimofthisprojectistorehabilitatetheroadbetweenDabouandSanPedro(around400km), in order tomaintain a viable access to the southwest of Côted’Ivoire,areaofthebiggestagro-industrialproductionandofthesecondportofthecountry.ThefirstphaseofthisprojectconcernstheAbidjan–DabouHighway(around50km).

Location • Dabou,SanPedro

Project’sbenefit • MaintainingaviableaccesstothesouthwestofCôted’Ivoire,areaofthebiggestagro-industrialproductionandofthesecondportofthecountry.

Estimatedcost • FCFA690,000M(2014)/EUR915M/USD1,200M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,developing,financing,operatingand

maintaining

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients• Taxpayers

Typeofpartnershipenvisaged:• Serviceconcession/Concession

PROJECT’SSTATUS

Progress • Termsofreferenceavailable

Informationavailable • N/A

Nextstepsandtimetable

• FinalisationofstudiesoftheAbidjan-Dabousection• Closureoffinancingarrangements• Launchtheconsultationprocess.

Page 88: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

88

MINISTRYOFURBANWASTEMANAGEMENTANDSANITATION

Page 89: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

89

PROJECTNo.56. BUILDINGINFRASTRUCTUREFORTHEMANAGEMENTOFDOMESTICANDSIMILARWASTE(DSMA)INTHEDISTRICTOFABIDJAN

NDPReference Strategicpriority4/Impact2/Effect3/Output3.3/Action3.3.2ContractingAuthority MINISTRYOFURBANWASTEMANAGEMENTANDSANITATION(MSUA)

FocalUnitoftheContractingAuthority

DirectorateofPlanning:Mr.SERIKanonJeanY.DirectorateofPlanningTel:(225)07627282

E-mail:[email protected]

DirectorateoftheInfrastructureforSanitationandValorisationofWaste

(DISVD):• DrYESSOMax-Médard

• Tel:(225)07785516

E-mail:[email protected]

Briefdescription

Theaimof thisproject is tobuildacollectioncircuitandstorage infrastructuresforthevalorisationanddisposalofwasteinlandfillsintheAutonomousDistrictofAbidjan. It also aims to build, per zone ofwaste production, groupage centres,transfercentres,sortingandwastevalorisationunitsandtechnicallandfillcentresfor non-recoverable waste for a good management of the urban waste of theDistrictofAbidjan.To thisend, theDistrictwillbedivided into3 zones,eachofwhichwillbeassignedtoanoperator.Theprojectwillalsoinvolve3phases:• Phase1:Sweeping,collectingandtransportingthewaste• Phase2:Wastelandfilling,withthebuildingof3technicallandfillcentres• Phase3:Mechanismofvalorisationofthewaste.

The implementationofthetotalityofPhase1andthecommissioningofat leastonelandfillcentreareplannedforearly2017.

Location • DistrictofAbidjan

Project’sbenefit

• Availabilityofadequateinfrastructureforagoodmanagementofdomesticandsimilarwaste

• Modernisingthemanagementofurbanwaste,transferofcleantechnology• ProtectionoftheenvironmentandcontributionofCôted’Ivoiretothefight

againstclimatechange• Creationgreencompaniesandjobs.

Estimatedcost • FCFA54,000M(2016)/EUR82.3M/USD108M(1USD=500CFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Designing,financing,developing,operatingand

maintainingofalltheinfrastructurebuilt

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:Purgesofcustomaryrightson

thebuildingsitesandavailabilityofthegroupagecentres

Modalitiesfortheremunerationofthepartner: • User/Privateclients

Typeofpartnershipenvisaged:• Publicservicedelegation

PROJECT’SSTATUS

Progress• CharacterisationandvalorisationstudiesoftheurbanwasteofAbidjan• Draftingofdossiersforthecallforexpressionofinterestandthecallfor

tendersforPhase1.

Informationavailable • Technicalstudies• Additionalpreliminarystudies

Nextstepsandtimetable • Launchtheconsultationprocess

Page 90: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

90

MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENT

Page 91: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

91

PROJECTNo.57. DEVELOPMENTANDTOURISMVALORISATIONOFTHEBANCONATIONALPARK

NDPReference Strategicpriority4/Impact2/Effect4/Output4.3/Action4.3.3

ContractingAuthority MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENTOFFICEIVOIRIENDESPARCSETRESERVES(OIPR)

FocalUnitoftheContractingAuthority

Mr.TONDOSSAMAAdamaDirector-GeneraloftheOfficeIvoiriendesParcsetRéserves(OIPR)

Tel:(225)07617526E-mail:[email protected]

GENERALCHARACTERISTICS

Briefdescription

TheBancoNationalParkisaforestmassifexceptionallypreservedintheheartofthecityofAbidjan. It isanareaofpedagogical,culturaldiscoveryandleisure,aswellasaspaceforrejuvenation.The aim of this project is to find partners who can help the OIPR develop andvalorise tourism on this site and strengthen the establishment of qualityinfrastructureinthePark.In order to valorise the Park, in addition to the grant from the IvorianGovernment, the OIPR has been receiving the support of the Government ofJapansince2010.This support is focusedon thecreationofaReceptionCentreandthebuildingofworksfortheprotection(8kmperimeterfence)andclean-upof the Park’s surroundings. A financing agreement was also obtained from theGlobalEnvironmentalFacilityforitssustainablemanagement.

Location • Abidjan

Project’sbenefit

• DevelopingEcotourismwithinthecityofAbidjan• RaisingenvironmentalawarenessinthemindsofthepopulationofAbidjan• ChangingthenegativeimageoftheforestintheAbidjanpopular

consciousnessintermsofsecurityEstimatedcost • FCFA11,900M(2016)/EUR18.1M/USD23.8M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Developmentofsightseeingtours• Creationofacanopy-walk• Rehabilitationandcreationoftourism

infrastructureand18kmofaperimeterfence• Operatingandmaintaining

Anticipateddistributionofinvestments:• Privateinvestment:FCFA11,100M• Publicinvestment:FCFA800M

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Valorisationofthedomain

PROJECT’SSTATUS

Progress • Carryingoutstudies• BuildingofthegatehouseoftheReceptionCentre.

Informationavailable

• Feasibilityandsocioeconomicstudies• Biophysicalevaluationoftheeco-systemicservicesoftheBancoNational

Park• Studyfortheestimateofthestockcarbonandthecarbonsequestration

potentialoftheBancoNationalPark• DescriptionofthetouristiczoningoftheBancoNationalPark.

Nextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.

Page 92: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

92

PROJECTNo.58. DEVELOPMENTANDTOURISMVALORISATIONOFTHEDALHIAFLEURNATURALRESERVE

NDPReference Strategicfocus4/Impact2/Effect4/Output4.3/Action4.3.3

ContractingAuthority MINISTRYOFTHEENVIRONMENTANDSUSTAINABLEDEVELOPMENTOFFICEIVOIRIENDESPARCSETRESERVES(OIPR)

FocalUnitoftheContractingAuthority

Mr.TONDOSSAMAAdamaDirector-GeneraloftheOfficeIvoiriendesParcsetRéserves(OIPR)

Tel:(225)07617526E-mail:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Endowedwithawealthof floraand fauna, theDahliaFleurNaturalReservehaspedagogical,hydrological,culturalandtouristicfunctions.Beyondtheseassets,itholds a privileged position within this network, due to its location in theCommuneofCocody,alongtheEbriélagoon.Thevalorisationofits30hawillnotonlymakeitpossibletoreduceerosioninthebayofCocodyandthestrongrealestatepressurethatithastoendure,butwillalsodevelopecotourismwithinthecityofAbidjan.Planned foraperiodof three (3) years, theaimof theproject is toprotectandvalorise the Dahlia Fleur Natural Reserve through the validation of thearchitectural concept of the ecotourism centre and the creation of a modernbotanicalandzoologicalparkwithinthereserve.

Location • Abidjan

Project’sbenefit

• DevelopingecotourismwithinthecityofAbidjan• RaisingenvironmentalawarewithinthepopulationofAbidjan• Contributingtosocioeconomicdevelopmentbyestablishingeconomic

operators,thesaleofartefacts,thecreationofdirectandindirectjobsEstimatedcost • FCFA7,500M(2016)/EUR11.43M/USD15M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Buildingand/orrehabilitatingtourism

infrastructure(receptioncentre,botanicalandzoologicalpark,etc.)

• Equippingtourisminfrastructure• Operatingandtourismpromotion.

Anticipateddistributionofinvestments:• Privateinvestment:FCFA7,379millions• Publicinvestment:FCFA121millions

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Valorisationofthedomain

PROJECT’SSTATUSProgress • TermsofreferenceInformationavailable • DecreeonthecreationoftheReserveNextstepsandtimetable

• Carryoutpreliminarystudies• Launchtheconsultationprocess

Page 93: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

93

MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT

Page 94: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

94

PROJECTNo.59. AGEF/PRIVATESECTORDEVELOPMENTANDLANDSALES

NDPReference Strategicpriority4/Impact2/Effect2/Output2.2/Action2.2.1ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT

FocalUnitoftheContractingAuthority

Mr.ZONGOClaudeTechnicalAdvisor

InchargeofprojectmonitoringTel:(225)20334160/(225)07064247

Email:[email protected]

Mr.NABELEDIOuattaraDirectorofEvaluationPlanningand

StatisticsTel:(225)20334185/(225)05055864

Email:[email protected]

Briefdescription

Thegeneralobjectiveofthisprojectistohave1,280hectaresofdevelopedlands(constructionofprimaryVRD)peryear,ofwhich500hectares for theDistrictofAbidjan and 780 hectares for the cities of the interior. Making these landsavailablewillallowtheprivatesectorstobuildhouses,withaviewtofacilitatingaccess to housing for the general population, but also build community-basedfacilities,especiallycommercialandhealthfacilities,etc.

Location • Abidjan,Yamoussoukro

Project’sbenefit • Avoiduncontrolledallotments• Putdevelopedurbanlandsonthemarket.

Estimatedcost • FCFA109,000M/EUR166M/USD218M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Development(VRD),landsale

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Developmentconcession

PROJECT’SSTATUS

Progress • PreliminarystudiesInformationavailable • PreliminarystudiesNextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.

Page 95: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

95

PROJECTNo.60. SETTINGUPANDOPERATINGAVIRTUALSINGLEDESKFORTHEISSUINGOFCONSTRUCTIONPERMITSTHROUGHANINTEGRATEDINFORMATIONSYSTEM

NDPReference Strategicpriority4/Impact2/Effect1/Output1.1/Action1.1.3ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT

FocalUnitoftheContractingAuthority

Mr.ZONGOClaudeTechnicalAdvisor,

InchargeofprojectmonitoringTel:(225)20334160/(225)07064247

Email:[email protected]

Mr.NABELEDIOuattaraDirectorofEvaluationPlanningand

StatisticsTel:(225)20334185/(225)05055864

Email:[email protected]

Briefdescription

The aim of this project is to put in place a Virtual Management System ofconstructionpermitthatwillbeacomputerplatformof interactionbetweenthecompanies,individuals,decision-makersoftheMinistryofConstruction,Housing,SanitationandUrbanDevelopmentandotheractorsinvolvedintheappraisalanddeliveryprocedureofthebuildingpermit.Thevariousphasesoftheprojectareasfollows:• Phase 1: The setting up of a virtual management system of the building

permit(SGVPC)• Phase 2: The digitisation and safeguarding of the archives of the building

permitdossiers• Phase3:Theestablishmentofworkflowsofthe“ACD”reforminAbidjanand

intheinteriorofthecountry• Phase 4: The operation and functioning of the Geographic Information

Systemoftheurbanland.Location • Abidjan

Project’sbenefit

• Facilitatingtheprocedureforissuingthebuildingpermit• Securingthedata• Removingsomeadministrativered-tapefoundintheappraisalanddelivery

procedureofthebuildingpermit,someofwhichare:(i)theslowtreatmentofthedossiersofbuildingpermits(ii)thelossofdossiers(iii)archivingissues.

Estimatedcost • 15000MFCFA/22,9MEUR/30MUSD(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,designing,supplying,equippingand

operating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Publicservicedelegation

PROJECT’SSTATUS

Progress • Preliminarystudies• Physicalspaceavailableanddevelopmentinprogress.

Informationavailable• Preliminarystudies• Termsofreferenceforin-depthstudies.

Nextstepsandtimetable

• Carryoutpreliminarystudies• Launchtheconsultationprocess.

Page 96: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

96

PROJECTNo.61. BUILDINGANDOPERATINGTHE“PLACEOFTHENATION”COMPLEX

NDPReference Strategicfocus4/Impact2/Effect2/Output2.3/Action2.3.4ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT

FocalUnitoftheContractingAuthority

Mr.ZONGOClaudeTechnicalAdvisor,

InchargeofprojectmonitoringTel:(225)20334160/(225)07064247

Email:[email protected]

Briefdescription

Theaimofthisprojectistobuildon3hectares(siteof60housingunitsandBressolesandBriandsquare):• 2officetours:18,000m²• A26,000m2shoppingmall• A15-storey5starhotel• 3,250undergroundparkinglots.In exchange for its land, the State could purchase shares in the capital of theprojectcompanyorgrantalong-termleasetotheprivateoperator.

Location • Abidjan-Plateau-siteof60housingunitsandBressolesandBriandsquare

Project’sbenefit • ContributingtothemodernisationandcoherentdevelopmentofthecommuneofthePlateau

Estimatedcost • FCFA86,235M(2013)/EUR131M/USD172M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Availabilityofthedomain

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Valorisationofthedomain

PROJECT’SSTATUS

Progress • Projectcurrentlybeingnegotiatedwithaconsortium:Frameworkagreementsignedon03/11/2015

Informationavailable • StudiesNextstepsandtimetable

• Continuationandfinalisationofthenegotiations• Signingofthecontract

Page 97: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

97

PROJECTNo.62. REHABILITATINGANDOPERATINGTHE“PYRAMID”BUILDING

NDPReference Strategicpriority4/Impact2/Effect2/Output2.3/Action2.3.5ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT

FocalUnitoftheContractingAuthority

MR.ZONGOClaudeTechnicalAdvisor,

InchargeofprojectmonitoringTel:(225)20334160/(225)07064247

Email:[email protected]

Briefdescription

The "Pyramid" building, a twelve-storey public building for offices, shops andapartments was built in the 1970s and has been seriously damaged for someyearsnow.This project involves the rehabilitation of all aspects of building engineering,especially the structural works, the glazed carpentry (aluminium and wood),sealed coatings, false ceiling, painting, fire security, electricity (strong andweakcurrent), air-conditioning, cooking facilities and generator. Theupgradingof thetechnicalinstallationstocurrentstandardsandavideosurveillancesystem.

Location • Abidjan-Plateau

Project’sbenefit

• Contributing to the modernisation and coherent development of thecommuneofthePlateau,

• PreservetheState'spropertyportfolio,• Address,inpart,thelackofficespaces.

Estimatedcost • FCFA30,000M/EUR46M/USD60M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,rehabilitation,exploitationand

maintaining

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Availabilityoftheland

Modalitiesfortheremunerationofthepartner:• Taxpayers

Typeofpartnershipenvisaged:• PublicPaymentPartnershipAgreement.

PROJECT’SSTATUS

Progress • PreliminarystudiesInformationavailable • PreliminarystudiesNextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.

Page 98: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

98

PROJECTNo.63. REHABILITATINGANDOPERATINGTHEBICICIBUILDING

NDPReference Strategicpriority4/Impact2/Effect2/Output2.3/Action2.3.5ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT

FocalUnitoftheContractingAuthority

Mr.ZONGOClaudeTechnicalAdvisor,

InchargeofprojectmonitoringTel:(225)20334160/(225)07064247

Email:[email protected]

Briefdescription

Theaimofthisprojectistorehabilitateandoperatethe17-storeyBICICIbuilding(Groundfloor+Mezzanine+15floors+parkinglots),co-ownedbytheStateandthe BICICI (Banque Internationale pour le Commerce et l'Industrie of the Côted'Ivoire),asubsidiaryoftheBNPParibasGroup.• Theprivatepartnershallfinancethebuyoutoftheseven(7)floorsownedby

theBICICIinthenameofandonbehalfoftheState• Thegroundfloorandmezzanineshallbeoccupiedbytheprivatepartnerfor

thebuildingandoperationofashoppingmallandvariousotheradministrativeand/orcommercialactivities.

• TheotherrehabilitatedfloorsshallbeleasedbytheStateforadministrativeservices.

Location • Abidjan-Plateau

Project’sbenefit• Contributingtothemodernisationandcoherentdevelopmentofthe

communeofthePlateau• Address,inpart,thelackofficespaces.

Estimatedcost • FCFA13,400M/EUR20M/USD27M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,Rehabilitatingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedetermined• Publicinvestment:Availabilityoftheland

Modalitiesfortheremunerationofthepartner:• Taxpayers

Typeofpartnershipenvisaged:• PublicPaymentPartnershipAgreement.

PROJECT’SSTATUS

Progress • NegotiationinprogresswiththeprivateoperatorInformationavailable • StudiesNextstepsandtimetable

• Continuationandfinalisationofthenegotiations• Signingofthecontract

Page 99: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

99

PROJECTNo.64. BUILDINGANDOPERATINGA5STARHILTONHOTEL

NDPReference Strategicpriority4/Impact2/Effect2/Output2.3/Action2.3.2ContractingAuthority MINISTRYOFCONSTRUCTIONANDURBANDEVELOPMENT

FocalUnitoftheContractingAuthority

Mr.ZONGOClaudeTechnicalAdvisor,

InchargeofprojectmonitoringTel:(225)20334160/(225)07064247

Email:[email protected]

Briefdescription

Theaimofthisprojectistobuilda5-starhotelandoperateona9,000m2siteoftheAgenceIvoiriennedePresse(AIP).TheStatecouldeitherusethevalueofthelandtobuysharesinthecapitaloftheprojectcompanyorgrantalong-termleasetotheprivateoperator.

Location • Abidjan-Plateau–AIPsite

Project’sbenefit• Contributingtothemodernisationandcoherentdevelopmentofthe

communeduPlateau• Address,inpart,thelackofhotelroomsinthePlateau.

Estimatedcost(onthebasisoftheaveragecostofa5starhotel)

• FCFA60,000M/EUR91M/USD120M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Availabilityoftheland

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Tobedefined

PROJECT’SSTATUS

Progress • NegotiationinprogresswithaconsortiumInformationavailable • FeasibilitystudiesandfinancialstudiesNextstepsandtimetable

• Continuationandfinalisationofnegotiations• Signingofthecontract.

Page 100: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

100

MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES

Page 101: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

101

PROJECTNo.65. STREETSIGNAGEOFTHEDISTRICTOFABIDJAN

NDPReference Strategicpriority1/Impact2/Effect1/Output1.4/Action1.4.2ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES

FocalUnitoftheContractingAuthority

Mr.SAKOAhmedTechnicalAdvisor

Tel:(225)20347387Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Street signage aims to make it possible for each citizen to have a precisegeographical address. It provides for rapid location, emergency interventions(Samu, fire fighters, medical doctors, gendarmerie…), serves as a basis for thedevelopmentofpostalservicesandfacilitatescommercialtransactions.Thisprojectaimsto:• CodifyallthestreetsofthedistrictofAbidjan• Providesignsandnumbersforallthestreets• Adaptanumbersystemofplotsanddwellings• Produceandmakeavailableplansandadaptedmaps.

Location • Abidjan,withthepossibilityofextensiontotheGreaterAbidjan

Project’sbenefit • ProvidingthecityofAbidjanamodernmeansoflocationandplanning.Estimatedcost • FCFA8,000M/EUR12M/USD16M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURINGScopeofactivitiestobeentrustedtotheprivatepartner:• Financingandequipmentsupply

Anticipateddistributionofinvestments:• Privateinvestment:100%• Publicinvestment:0%

Modalitiesfortheremunerationofthepartner:• Taxpayers

Typeofpartnershipenvisaged:• PublicPaymentPartnershipAgreement

PROJECT’SSTATUS Progress • Studies

Informationavailable• 1998studiesavailable,tobeupdated• Streetsignagemodelvalidated

Nextstep(s)andtimetable

• Updatingoftechnicalstudies• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 102: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

102

PROJECTNo.66. CREATINGANDOPERATING5,000COMMUNITYMULTI-SERVICECYBERCENTRES

NDPReference Strategicpriority1/Impactresult2/Effect1/Output1.1/Action1.1.10ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES

FocalUnitoftheContractingAuthority

Mr.DÉDÉDadiéRogerDirectorofICTs

Tel:(225)20344511Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

The aim of this project is to create and operate, in each commune and rurallocalityofmorethan500 inhabitants,communitymulti-servicecybercentres, inorder to offer proximity services allowing the rural populations to come out ofisolation, to send and receive emails, obtain simple administrative documentswithouthavingtotravel.Thephasesoftheprojectareasfollows:• Phase1:Creationof1,000cyber-centresinthefirstyear• Phase2:Creationof2,000cyber-centresinthesecondyear• Phase3:Creationof2,000cyber-centresinthethirdyear.

Location • Throughoutthenationalterritory

Project’sbenefit

• Contributing to the implementation of the policy of decentralisation anddevelopmentoftheterritory,

• Creatingjobs,increasingtheincomesoftheruralpopulationsandimprovingtheirlivingconditions,

• Deployinginalocationorintheprimaryschoolsofvillagesofmorethan500inhabitants,cyber-centresconnectedtotheInternetnetwork

• Promoting community-based information through the various ICTapplications (telephone and electronic message services) and distancelearningforchildrenandadults

• Offeringpublicservicestousersforthe issuingofadministrativedocumentson line (Registrations, exam results, medical consultations, registration ofbirthsanddeaths)

• Identifying, empowering and building the capacities of volunteer schoolteachers and the youth from the communities to ensure the supervisionofcyber-centres.

Estimatedcost • FCFA53,000M/EUR81M/USD106M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Tobedetermined

PROJECT’SSTATUS

Progress• Studiesforredefiningtheprojecttobecarriedout.14pilotsitesidentifiedin

14localitiesthroughoutthecountry.Economicmodelbeingdeveloped.• FundingrequestmadetotheWorldBank.

Informationavailable • StudiesavailableNextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess

Page 103: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

103

PROJECTNo.67. E-AGRICULTUREPROGRAMME

NDPReference Strategicpriority3/Impact1/Effect3/Output3.1/Action3.1.1ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES

FocalUnitoftheContractingAuthority

Mr.DanonHenriProgrammeCoordinatorTel:(225)07685615

Email:[email protected]

Briefdescription

The e-agriculture Programme aims to (i) develop and modernise Ivorianagriculture and (ii) promote good governance of the sector through ICTs. Itcomprises14aspects:

1. ThecreationofruralICTCommunityCentres2. Thesettingupofaninformationsystemofagriculturalmarkets3. Thesettingupofanintegratedmanagementsystemofforestactivities4. ThesettingupofaNationalAnimalandFishInformationSystem5. ThecreationofanAgro-meteorologicalObservatory6. ThesettingupofaStrategicMonitoringSystem7. The setting up of a Geographic Information System of Agricultural

irrigationdevelopments8. TheequippingoftheMinistriesofAgriculture,AnimalandFishResources

andtheEconomyandFinance9. TheequippingofANADER10. TheequippingoftheCNRA,OCPV,SODEFORandCNA11. ThesettingupofanAgriculturalInformationSystem12. ThesettingupofaWebPortaloftheAgriculturalWorld13. ThesettingupofanIntranet14. ThesettingupofanSMS,VMSinformationserviceandCallcentre.

Location • Throughoutthenationalterritory

Project’sbenefit

EnsurethatIvorianagricultureis:• Performingandcompetitiveintermsofproductioncostandquality,tomeet

therequirementsofthenational,sub-regionalandinternationalmarket• Profitable for producers and capable of bringing them substantial and

sustainablerevenues• Mechanised,withgoodwatermanagement• Organisedinsectorthathavecontroloverthewholevaluechain

Estimatedcost • FCFA33,500M/EUR52M/USD70M(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• BOT

PROJECT’SSTATUS

Progress

• Studiescarriedout- DraftingoftheNationalStrategyDocument(NSD)fore-Agriculture

(2012)- ProjectPriorityDocumentoftheNSD(2013)- OperationalisationstudyoftheNSDprojects(2014)- Draftingofthespecificationsforimplementation(2015).

• Ongoingstepandprogress:- Arrangementsforthestartandconductofastudyonthedefinitionof

theeconomicmodeloftheprogrammeInformationavailable • NSDavailable

Page 104: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

104

• Specificationsavailable. Nextstepsandtimetable • Launchtheconsultationprocess

Page 105: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

105

PROJECTNo.68. BUILDING5,000KMOFFIBREOPTICS

NDPReference Strategicpriority4/Impact1/Effect3/Output3.1/Action3.1.1

ContractingAuthority MINISTRYOFDIGITALECONOMYANDPOSTALSERVICES

FocalUnitoftheContractingAuthority

Mr.DÉDÉDadiéRogerDirectorofICTs

Tel:(225)20344511Email:[email protected]

GENERALCHARACTERISTICS

Briefdescription

Thebuildingof5,000kmoffibreopticscomprises3lots:• Thecontractsforthefirsttwolotshavebeenawarded• Thecallfortendersforthe3rdlotof1,000kmoffibreswillbemadeshortlyThe Contracting Authority is therefore looking for private operators for theoperation of the two first lots, aswell as for the building and operation of thethirdlot.

Location • Nationalterritory

Project’sbenefit • Digitalcoverageofthenationalterritory

Estimatedcost • FCFA50,000M/EUR76M/USD100M(1USD=500CFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,buildingandoperating

Anticipateddistributionofinvestments:• Privateinvestment:Tobedefined• Publicinvestment:Tobedefined

Modalitiesfortheremunerationofthepartner:• Users/clients

Typeofpartnershipenvisaged• Serviceconcession/Concession

PROJECT’SSTATUS

Progress • Preparationforthecallfortenders

Informationavailable • Studiesonthefirsttwolots

Nextstepsandtimetable

• Carryoutadditionalpreliminarystudies• Launchtheconsultationprocess.

Page 106: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

106

MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS

Page 107: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

107

PROJECTNo.69. BUILDINGANDOPERATINGTHEDRYPORTOFFERKESSÉDOUGOU

NDPReference Strategicpriority5/Impact1/Effect1/Output1.4/Action1.4.1ContractingAuthority MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS

FocalUnitoftheContractingAuthority

Mr.AbdoulayeALLIAGUI,ProjectManager

DirectorofCommunityPoliciesofInfrastructuresandICTsLandline:(225)20337030/(225)20242575Mobile:(225)01477281/(225)48281292

Email:[email protected]

Briefdescription

The aim is to build and operate the infrastructure of a dry port ofFerkessédougou,inordertoreducecongestionandbringtheAutonomousPortofAbidjan closer to its regional partners (Mali, Burkina Faso and Niger). Thisinfrastructurecomprisesthree(3)maincomponents:• Alogisticsplatform(warehouses,coldchain,etc.)• Ahydrocarbondepot• Aregionalslaughterhouseandcattlemarket• Anindustrialzonefordevelopingagriculturalandminingprocessingactivities.ThisprojectispartofpriorityprojectsfortheemergenceofCôted’Ivoirein2020.At the sub-regional level, the West African Economic and Monetary Union(WAEMU)alsoretainedthisprojectaspartoftheRegionalEconomicProgramme(REP),PhaseII.

Location • Ferkessédougou,TchologoRegion,600KmfromAbidjan

Project’sbenefit

• Makingalastingcontributiontothedevelopmentofthenorthernregionsofthecountry

• DevelopingtheeconomicpotentialoftheDistrictsoftheSavannas(Poro,Tchologo,Bagoué)andtheZanzan(Bounkani,Gontougo)andleveragetheeconomicpotentialoftheborderregions:Sikasso(Mali)andBobo-Dioulasso(Burkina)

• Givingfreshimpetusandconsolidatingthegainsofrailwaytransporttothecountriesofthehinterland

• Makingavailabletotheeconomicoperatorsoptimalconditionsofreception,servicesandtheuseofthemultimodalplatform.

Estimatedcost • 303000MFCFA/462MEUR/606MUSD(1USD=500FCFA)INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Development,financing,operationofthethree

components:themultimodalplatform,thehydrocarbondepot,theregionalslaughterhouse

Anticipateddistributionofinvestments:• Privateinvestment:FCFA153,985M• Publicinvestment:FCFA149,015M

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Concession/Valorisationofthedomain

PROJECT’SSTATUS

Progress • Identificationofthesiteoftheproject• Finalisationofthereportofthedetaileddraftproject

Informationavailable • Studyreportsandinterimreportsavailable

Nextstepsandtimetable

• Declarationofthesiteoftheprojectasasiteofpublicutility• Purgecustomaryrights• Launchtheconsultationprocess

Page 108: ADVISORY GROUP 2016 PPP PROJECTS SHEETS€¦ · switch to Digital Terrestrial Television (DTT) Communication 60,000 120 PROJECT N°3. Rehabilitating the historic city of Grand-Bassam

108

PROJECTNo.70. BUILDINGAPRODUCTIONPLANTOFBIOLARVICIDESINCÔTED’IVOIRE

NDPReference Strategicpriority5/Impact1/Effect1/Output1.4/Action1.4.4

ContractingAuthority MINISTRYOFAFRICANINTEGRATIONANDIVORIANSLIVINGOVERSEAS

FocalUnitoftheContractingAuthority

Mr.AbdoulayeALLIAGUIDirectorofCommunityPoliciesofInfrastructuresandICTs

Landline:(225)20337030/(225)20242575Mobile:(225)01477281/(225)48281292

Email:[email protected]

Briefdescription

Theprojectofbuildingabiolarvicideplantaimsto:• Producebiolarvicideslocally• Reduce the mortality rate of the vulnerable populations by eliminating

breedingsites• Reduce the price of access to products by 25% of the current price in the

interestofthepeopleIn the context of an ECOWAS initiative, Côte d’Ivoire, Ghana and Nigeria haveobtainedproductionequipmentfortheoperationoftheseplants. InthecaseofCôted’Ivoire,theStateislookingforaprivatepartnerwhosemissionitwillbetofinancetheconstructionofbuildingstohousethisproductiontoolandoperateit.Thisplantisintendedtobeasub-regionalplant.

Location • NewindustrialzonePK24,Yopougon,Abidjan

Project’sbenefit

• ThisprojectwillcontributetotheeradicationofmalariainCôted’Ivoireinparticular,andinWestAfricaingeneral.

• ThefirstbeneficiarieswillbeallthecommunitieslivinginCôted’Ivoireandthemigrantpopulations

Estimatedcost • FCFA15,500M/EUR23.63M/USD31M(1USD=500FCFA)

INFORMATIONSPECIFICTOPPPSTRUCTURING

Scopeofactivitiestobeentrustedtotheprivatepartner:• Financing,building,operationandmaintaining

Anticipateddistributionofinvestments:• StateofCôted’Ivoire:24%orFCFA3,720M• Privatesector:24%orFCFA3,720M• Donor:52%orFCFA8,060M

Modalitiesfortheremunerationofthepartner:• Users/Privateclients

Typeofpartnershipenvisaged:• Serviceconcession

PROJECT’SSTATUS

Progress

• AnECOWAS/Venezuela/CubatripartiteMemorandumofUnderstandinghasbeensigned

• TheRepublicofVenezuelahasmadeavailabletoECOWASitsshareofthefundingforthework

• TheofficiallaunchoftheconstructionworkoftheplantsinCôted’Ivoire,NigeriaandGhanahavetakenplace

• Thelandfortheplantisavailable.

Informationavailable• Reportofthefeasibilitystudyoftheproject(threeplants)available• Termsofreferenceofthetechnicalfeasibilitystudyavailable.

Nextstepsandtimetable

• Updatethetechnicalfeasibilitystudy(processinprogress);• Launchtheconsultationprocess