ADVANCEDPROPULSION CENTRE:

APC17 BRIEFING EVENT

25TH AUGUST 2020

Page 3: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

AGENDA

10:00 - 10:10 - Welcome - Jon Beasley (APC)

10:10 - 10:30 - Competition scope and timelines - Zoe Hall (APC)

10:30 - 10:50 - Value for money (VfM) guidance for applicants - Charlotte Fleetwood and Sefret Cela (BEIS)

10:50 - 11:10 - Competition application process - Laura Thomas & Rachael Evans(Innovate UK)

11:10 - 11:20 - Next steps - Dan Bunting (APC)

11:20 - 11:30 - Q&A

Page 4: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

WELCOME

JON BEASLEY

Page 5: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

CHANGE IS A COMING – EVEN AFTER COVID19

Timing maybe affected, but intent will not disappear

Page 6: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

AND APC IS HELPING YOU FACILITATE THAT CHANGE

17th

Round of competition

51successful applicants to date

178organisations engaged

29live projects

APC team is extremely PROUD OF YOUR

RESULTS to date

APC team is HERE TO HELP, before, during

and after projects

YOU AND WE are representing the

Automotive Industry, so we should be proud

Page 7: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

REALISING A BALANCE

Consortia freedom

v

Governance

“APC works to

maintain the

balance”

Good value for the use of public funds

Ability to adapt to real time events

Success for Industry and commerce

Fairness

Results to be proud of

Page 8: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

WHERE ARE WE HELPING

Late stage industrial and experimental R&D Roadmaps illuminate the future, but can be challenged

Page 9: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

HOW WE ARE HELPING – DRIVING A COLLABORATION PLATFORM

“The whole is greater

than the sums

of its parts.”

Aristotle

Consortia do sometimes need to change, that is not a crime, just

needs management

Best project outputs are where individual goals and values are

recognised, respected and realised

Collaboration does not happen automatically

Best project teams work with each other and not through each

other

Page 10: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

THE REST IS UP TO YOU (AND WE WILL HELP )

OPTION

Page 11: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

COMPETITION SCOPE AND TIMELINES

ZOE HALL

Page 12: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

TIMELINES

FIRST STAGE

OPENING DATE 17TH AUGUST 2020

BRIEFING EVENT 25TH AUGUST 2020

APPLICATION DEADLINE 14TH OCTOBER 2020 NOON 11:00am

SECOND STAGE

APPLICANTS INFORMED 10TH NOVEMBER 2020

APPLICANTS RESPONSES 24TH NOVEMBER 2020

APPLICANTS PRESENTATIONS 24TH NOVEMER 2020

INTERVIEW PANEL 7TH DECEMBER 2020 FOR A WEEK

PLANNED ANNOUNCEMENT MID JANUARY 2021

Page 13: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 SCOPE

Align with one of the 4 strategic technology areas for the UK Auto Industry

• Electric Machines & Power Electronics

• Energy Storage & Energy Management

• Lightweight vehicle & Powertrain structures

• Thermal propulsion

Projects that support the UK’s long-term capabilities and supply chain in the design, build and manufacture of zero-tailpipe emission vehicles, and help make those capabilities a permanent part of the UK supply chain. Develop UK capability and supply chain in this field

First application must be for the automotive industry – on or off highway vehicles and heavy duty

Be collaborative, business led, match funded & UK based.

UK based R&D projects that significantly reduce carbon dioxide emissions and improve air quality, compared to best in class.

Page 14: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 SCOPE CONTINUED

Contain a vehicle manufacturer or a tier 1 supplier

Contain an SME partner

Project duration should be between 18 – 42 months

Projects total eligible costs should range between £5 and £40 million and be match funded up to a maximum of 50/50

Clear route to market at the end of the project

Demonstrate how it will increase upskilling and knowledge sharing in the UK

Page 15: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 APPLICATION OVERVIEW

INITIAL QUESTIONS

• PROJECT SUMMARY 400 WORDS SUITABLE FOR FUNDING YES / NO

• PUBLIC DESCRIPTION 400 WORDS PUBLISHED IF SUCCESSFUL

• PROJECT SCOPE 400 WORDS YES / NO

PART 1

• QUESTIONS 1 - 4

• THE BUSINESS

CASE

PART 2

• QUESTIONS 5 – 8

• PROJECT

DETAILS

PART 3

• QUESTIONS 9 – 10

• FUNDING AND

ADDED VALUE

PART 4

• QUESTIONS 11 -16

• ECONOMIC

ASSESSMENT –

VALUE FOR

MONEY

Page 16: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 1

BUSINESS

CASE

• Outline the business opportunity

• Detail the expected outputs of the project

• What does the project team need to do to address opportunity

• Describe potential issues facing the project and its customers

• How will the outputs address these issues.

Page 17: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 2

• Size of the market opportunities that this project might open up

• Detail the current nature of the specific markets you are targeting,

• Market dynamics - size, actual and predicted growth rates

• Outline your strategy for targeting the projected market share, with justification in the light of any potential competitors

• If your technology is being purchased by an original equipment manufacturer outside the consortium then provide evidence on who the buyers will be

SIZE OF THE MARKET

Page 18: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 3

• How will this protect anchor, grow or significantly improve the productivity and competitiveness of the UK supply chain.

• Outline the potential outputs of the project by partners and organisations who are not project partners.

• Describe by partner how these will be exploited

- including the route to market & commercialisation

- how your project benefits the long term UK supply chain during

and after the project

- deliver benefit for the automotive environment

- reconfiguration of the value system

- How the consortium members leverage additional investment in

the UK supply chain

- changes to business models and business processes

- other methods of exploitation and protection (IP and patents)

OUTPUTS

HOW WILL THE RESULTS OF THE PROJECT BE EXPLOITED

IN THE END MARKET AND SUPPLY CHAIN

Page 19: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 4

• Identify the economic benefits from the project to those inside and

outside the project.

• Identify any expected social and environmental impacts, either positive

or negative.

• Impact to your competitors if they are UK based.

• How carbon dioxide and air quality will be delivered

- Split by each piece of tech where appropriate

• How fuel savings will work for the customers

• Where will you be located and the reasons why and the impacts to the

area?

IMPACT OF THE PROJECT

Page 20: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 5

• Describe the main work packages of the project, and who is leading

• Your approach to project management and reporting lines

• Your approach to managing the most innovative aspects of the project

• Detailed project plan

• How your project will enhance the manufacturing maturity of the technology?

• Describe rival technologies and alternative R&D strategies and how your proposal will offer a better outcome

TECHNICAL APPROACH

Page 21: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 6

• How is project innovative both commercially and technically

• Whether your project is looking to apply existing technologies in new areas

• Clearly demonstrate you have freedom to operate, that your IP is free from restriction and able to be readily exploited

• Provide evidence that the intended work is innovative.

WHAT IS INNOVATIVE ABOUT

THIS PROJECT?

Page 22: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 7

• Identify the main risks and uncertainties of the project, including the technical, commercial, managerial and environmental risks

• Highlight the most significant ones and provide a risk register

• Explain how these risks will be mitigated

• Example of risks are

- funding gaps

- investment needed for production facility

- future sales risks

- carbon dioxide savings

- supply chain capacity and OEM purchasing

• For UK based manufacturing, why this would occur in the UK and identify any risks to this occurring.

MAIN RISKS?

Page 23: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 8

• Describe the roles, skills, track record and relevant experience of all members of the project team in relation to the approach you will be taking

• Describe the resources, equipment and facilities required for the project

• Details of any vital external parties, including sub-contractors, why these roles cannot be filled within the consortium

• Examine the current relationships between the project partners and how these will change as a result of the project

• Why the project partners came together and what benefits you each bring to the project

PROJECT TEAM SKILLS &

EXPERIENCE?

Page 24: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 9

• What is the anticipated project cost - describe the level of contribution from any project participants and level of grant funding required.

• Areas that will be assessed are:-

- is the budget realistic for the scale and complexity of the project?

- have you demonstrated a financial commitment from other sources for the balance?

- has a realistic budget breakdown been provided?

- have work package breakdowns been described and costs justified adequately?

• Detail the total investment needed to bring the technology to production.

• List any other public funds, that the consortium has applied for, or received, that relate to this project or application.

• Describe and clearly quantify the return on investment that the project could achieve.

WHAT IS THE FINANCIAL COMMITMENT

REQUIRED FOR THE PROJECT?

Page 25: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 QUESTION 10

• Why is this level of funding required?

• Explain scenario with or without APC funding?

• What will happen to the project if you are not successful?

• Why this project cant be funded internally?

• Additional investment this project will generate?

• If the project could not go ahead in the UK without APC funding, then where would it be located and why?

ADDED VALUE

Page 26: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

VALUE FOR MONEY (VFM) GUIDANCE FOR APPLICANTS

CHARLOTTE FLEETWOOD AND SEFRET CELA

Page 27: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 27

APC Value for Money Guidance for Applicants

August 2020

Sefret Cela & Charlotte FleetwoodBEIS / Sector Analysis

Page 28: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 28

Value for Money

Projects must demonstrate good value for the public purse.

BEIS analysts will undertake a value for money assessment of each project to ensure that projects that deliver the best value for money and societal benefits are invested in by Government.

Page 29: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 29

How do we measure Value for Money?

Benefit Cost Ratio

Calculate costs (government funding)

Calculate benefits (R&D spillovers, jobs, carbon/fuel savings)

Adjust for additionality and risk

Page 30: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 30

Calculating benefitsR&D spillovers Jobs Carbon and fuel savings

R&D expenditure figures. Jobs created and safeguarded, split by partner, including:location, salary, NVQ level.Provide an explanation of how you have calculated these job figures.

Details of up to 4 vehicle platforms which will use the new technology, including improved CO2 tailpipe emissions and/or improved fuel use of the vehicles vs the comparator vehicle.

Also provide details of forecast vehicle sales.

Describe potential outputs of the project that can be exploited.Describe how these outputs will be exploited by partners (and externally).Provide a supply chain or value stream map in your supporting evidence.

Provide further narrative to support/evidence the job estimates particularly in Q4.

Provide an explanation for each vehicle including why the particular comparator is appropriate and the basis on which your figures have been calculated, particularly the vehicle sales figures.

VFM

W

ork

she

etW

ritt

en

Fo

rm

Page 31: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 31

AdditionalityWhat is required

Why does this project need APC funding to go ahead? Why this particular amount?• Unable to raise sufficient funds from other sources – provide proof of declined credit.• Expected return insufficient for project to go ahead in its proposed form- provide the analysis which shows this.• A non-UK location is being considered which offers higher returns/lower cost than UK- provide the analysis comparing the locations and showing the cost gap.

What is the likely outcome of the project if APC funding is not available? (what’s the counterfactual?)• Will the project go ahead on a smaller scale? Or to a different timescale?• Would the project be undertaken overseas? (international mobility).

Will any additional R&D spending /investment be made by project partners as a result of the APC project?• E.g. this project produces a demonstrator which will unlock investment of a manufacturing facility.

Page 32: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 32

What are the main risks to project success?What is required

Outline risks to explain why expected outputs of the project may not materialise:• Funding gaps• Sales risks• Uncertainty around CO2/fuel savings• Supply chain uncertainties• Risk that the manufacturing will be moved outside of the UK• Level and availability of investment needed for future production facility

Describe project risk mitigation strategy and project management tools in risk register to be used to assess and minimise risks.

Include any follow-on investments needed and risks associated with achieving those investments.

Page 33: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 33

Summary of Evidence / Steps

• Outline need for funding – Why is APC required?

• Provide evidence of economic benefits

• Explain additionality – why would these benefits not occur without APC?

• Clarify contribution / benefits for different project partners

Written application

(Q1-11)

• Provide quantitative estimates of economic benefits

• Justify/provide evidence to support the scale of benefits claimed

• Download VFM worksheet and upload completed version as an appendix for Q12

Value for money Excel worksheet

(Q12-17)

Page 34: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 34

Value for Money Worksheet: Q12-17

• Download VFM worksheet and upload completed version as an appendix for Q12

• Enter all data in grey cells or using drop-down menus in orange

• Yellow cells are automatic internal calculation cells

• Don’t forget to fill in the “evidence/assumptions” box!

Page 35: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 35

Q12– Project Expenditure

Don’t forget to fill in these boxes!

What is the £Xm of capital expenditure being spent on?

Page 36: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 36

Q13 – JobsWhy are these X jobs being created as a result of APC funding?

How have you calculated them?

Page 37: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 37

Q14 – Vehicle Sales and Details

How much of these savings are

attributable to this specific APC

project?

Page 38: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 38

Q15 – Carbon and Fuel Savings

What comparator vehicle has been chosen and why is

it the comparable best in class vehicle?

Page 39: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 39

Q16 – Training

Page 40: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC17 VFM Guidance for Applicants 40

Q17 – Technical improvements from R&D activities

Page 41: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

COMPETITION APPLICATION PROCESS

LAURA THOMAS & RACHAEL EVANS

Page 42: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Eligibility criteria

Page 43: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Project eligibility

To lead a project you must:• have an active registered business base in the UK• be a grant recipient• involve at least one micro, small or medium-sized enterprise (SME)• include, as part of your consortium, a vehicle manufacturer or tier 1

supplier who supplies parts directly to an original equipment manufacturer

• collaborate with others• carry out the work in the UK• intend to exploit the results from or in the UK

Project cost £5m to £40m (minimum of 50% match funded)

Project length Start on 1st April 2021 - between 18 and 42 months

Eligibility criteria

Page 44: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Resubmission Not a resubmission

A resubmission is:an application Innovate UK judges as not materially

different from one you've submitted before (but it can be updated based on the assessors' feedback)

A brand new application/project/idea that you have not previously submitted into an Innovate UK

competition

OR

A previously unsuccessful or ineligible application: has been updated based on assessor feedback and is materially different from the application

submitted before and fits with the scope of this competition

Resubmissions

This competition does allow resubmissions.

Page 45: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

• Business – Small/Micro, Medium or Large (EU definition) registered in the UK

• Research Organisation (RO):

• Universities (HEIs)

• Non profit distributing Research & Technology Organisation (RTO) including Catapults

• Public Sector Research Establishments (PSRE)

• Research Council Institutes (RCI)

• Public sector organisations and charities doing research activity

• Check out the EU definition of a business (it may affect the grant you are able to claim) http://ec.europa.eu/growth/smes/business-friendly-environment/sme-definition_en

• If you are 100% owned by a large parent company as a small subsidiary this means by EU rules you are classed as a large company and will only be entitled to the relevant grant

Types of organisations we fund

Page 46: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Eligibility for State Aid

• Innovate UK is offering funding for this competition under the General Block Exemption Regulation. This is available to eligible UK businesses.

• We are unable to grant funding to limited liability companies meeting the condition known as ‘undertakings in difficulty’.

• This is where more than half of a company’s subscribed share capital has disappeared as a result of accumulated losses.

• This test only applies to companies that are more than 3 years old.

• If you have a parent company the test can be performed on your parent or holding company.

• When submitting an application you must certify that you are eligible for state aid. If you are unsure, please take legal advice before applying.

• Should you be successful, we will apply this test as part of our viability checks before confirming the grant offer.

• Further information is available on our website in the general guidance under state aid

Page 47: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

State Aid – Article 25

• Funding for R&D projects split in to 3 categories; Feasibility studies, Industrial research & Experimental development.

• Applies to almost all sectors of the economy and has a wide range of eligible costs. Pre-approved state aid covers:

o Aid for research and development and innovation,

o Regional aid

o Aid to SMEs in the form of investment aid, operating aid

and SMEs access to finance,

o Aid for environmental protection,

o Training aid,

o Recruitment and employment aid for disadvantaged

workers or workers with disabilities.

o Aid to make good the damage caused by certain natural

disasters,

o Social aid for transport for residents for remote regions,

o Aid for broadband infrastructures,

o Aid for culture and heritage conservation,

o Aid for sport and multifunctional recreational

infrastructures,

o Aid for local infrastructure.

• Special rules apply to:

o Fisheries, agriculture,

o Companies in difficulty,

o Companies undergoing a state aid recovery order.

Page 48: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

• The aim of our State Aid scheme is to:

• optimise the level of funding to business and

• recognise the importance of research base to project

• At least 70% of total eligible project costs must be incurred by business

• The maximum level (30% of project costs) is shared by all research organisations in the project

Participation Rules

Page 49: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

In all collaborative projects there must be:

• at least two organisations claiming grant within the application (including the lead)

• a business or RTO-led consortium, which may involve both business and the research base and

• evidence of effective collaboration

• we would expect to see the structure and rationale of the collaboration described in the application.

What is collaboration?

Page 50: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Other Innovate UK projects

• If you have an outstanding final claim and/or Independent Accountant Report (IAR) on a live Innovate UK project, you will not be eligible to apply for grant funding in this competition, as a lead or a partner organisation.

• If you applied to a previous competition as the lead or sole company and were awarded funding by Innovate UK, but did not make a substantial effort to exploit that award, we will award no more funding to you.

Page 51: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Timeline Dates

Competition Opens 17th August 2020

Briefing Event 25th August 2020

Submission Deadline 11am 14th October 2020

Interviews 7th December 2020 (week commencing)

Applicants informed 8th January 2021

Key Dates

Page 52: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Innovation Funding

Service (IFS)

Page 53: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Search for a funding competition and review criteria

Page 54: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Applicant: create an account

To create your account:

UK based businesses - Use Companies House

lookup as it speeds up our checks by providing your

company number and your are unable to enter it at a

later date

Research organisations, academics &

Universities - Enter your information manually so

you’re not listed as a business on IFS and ensure you

receive the correct funding

Page 55: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Project Details

• Application Team

- Collaborators: Invite organisations who you are working with on the project

- Contributors: Invite colleagues from your own organisation to help you complete your application

• Application Details

- Title, Timescales, Research Category, Innovation Area & Resubmission (y/n)

• Project Summary

- Short summary and objectives of the project including what is innovative about it

• Public Description

- Description of your project which will be published if you are successful

• Scope - How does your project align with the scope of this competition?

- If your project is not in scope, it will be ineligible for funding

Page 56: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Project Details

• Equality, diversity & inclusion

- Complete the EDI survey- The survey will ask you questions on your gender, age, ethnicity and disability

status. You will always have the option to ‘prefer not to say’ if you do not feel comfortable sharing this

information.

Page 57: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Application form

Question 1 What business opportunity does this project address?

Question 2 What is the size of market that you are targeting?

Question 3 How will the results of the project be exploited, in the end market and supply chain, and disseminated?

Question 4 What impact might this project have inside and outside the project collaboration?

Question 5 What technical approach will be adopted and how will you manage the project effectively?

Question 6 What is innovative about this project?

Question 7 What are the main technical, commercial and environmental risks to project success?

Question 8 Does your project team have the right skills, experience and access to facilities to deliver your project?

Question 9 What is the financial commitment required for the project?

Question 10 How does financial support from APC and its funding collaborators add value?

Application Questions

Detailed Guidance Available on IFS

Op

tion

al app

end

ices Q1

-10

Page 58: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Application form – Value for Money (VfM) worksheet

Question 11 What is the proposed research and development (R&D) investment in the project?

Question 12 How will the project lead to job creation and safeguarding?

Question 13 What vehicles are expected to adopt the APC technologies under development?

Question 14 For each vehicle, what are the expected vehicle sales carbon and fuel savings forecasts for adopting the APC technology under development?

Question 15 Detail the number of employees upskilled and apprentices, MSc and PhD students working on the project

Question 16 How will the Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) of the developed technologies progress through this project?

Application Questions - continued

Detailed Guidance Available on the VfMworksheet

Up

load

sup

po

rting in

form

ation

as an ap

pen

dix to

Q

16

Page 59: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Value for money (VfM) worksheet

Download your Value for money (VfM) worksheet from Q11 – R&D expenditure

Upload your completed worksheet

Page 60: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Application finances

Page 61: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

To claim funding:Your business does not have to be UK registered with Companies House when you apply but it must be registered before you can receive funding.

You are unable to claim funding if:• You are an overseas organisation: your company number begins with FC

• Your organisation is setup as a branch: your company number begins with BR

• Your company is based in Jersey: your company number begins with JE

Page 62: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Ineligible:

• Dividends

• Bonuses

• Non productive time

Eligible:

• Staff working directly on

project

• Paid by PAYE

• NI, pension, non-

discretionary costs

Labour

Page 63: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

OverheadsInnovate UK’s definition: additional costs and operational expenses incurred directly as a result of the project. These could include additional costs for administrative staff, general IT, rent and utilities

Indirect (administration) overheads

• please ensure they are additional and directly attributable to the delivery of the project

Direct overheads

• E.g. office utilities, IT infrastructure, laptop provision not covered by capital usage

• must be directly attributable to the project

• Provide detailed breakdown together with methodology/basis of apportionment

Page 64: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Material costs

Please be clear on what the

materials are, just putting

consumables doesn’t provide

enough detail and we will

request more information

should you be successful

Page 65: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Capital equipment usage

Eligible:

• Used in the project or shared with

day-to-day production

Calculations will need to be in line with your

accounting practices.

Even if the equipment is depreciated fully over the

life of the project this must be added under capital

equipment.

Page 66: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Subcontractors

Eligible:

• Justified and quantified

• If using non-UK sub-contractors

are being used you will need to

provide strong justification on why

an UK-based sub-contractor is not

being used

• If you’re sub-contracting to a

parent or sister company, please

ensure you list at cost and do not

include profit.

Page 67: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Travel & subsistence

Eligible:

Costs must be directly linked to the

project

Please breakdown your costs as

follows:

• Travel

• Accommodation

• Subsistence

If you have an annual trip to visit

the parent company this is not an

eligible cost

Page 68: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Other costs

Eligible:

• Costs that could not be added under

previous headings.

• Do not double count

• Patent filing costs for new IP – SMEs

up to £7,500

Page 69: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Under new laws within the State Aid scheme we are required to ask you whether you are planning to undertake commercial or economic activities (‘selective advantage’) as part of your project.

• This will be asked every time you apply to any competition even on multiple applications within the same competition

• Applies to all organisation types

• Will affect the amount you are able to claim

Define your activities within a project

Page 70: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Academic partners

Page 71: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Why Je-S?

• We use the Research Councils’ Joint Electronic Submission System (Je-S) to collect academic finances

• The Je-S system automates the collection of Full Economic Costs (FEC) based costs from academic partners and tells them exactly what numbers should be used in the application form for their costs

• Also to collect project finance details from non-HEIs (e.g. RTOs) that are claiming they are carrying out academic quality work and want to be funded on an FEC basis

• Using Je-S means that Innovate UK follows standard Research Council guidelines on funding universities and enables Research Councils to easily co-fund Innovate UK projects

Page 72: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

• Enter the TSB reference number here

• Enter the TSB Contribution column figures from your J-eS output document into the project costs section of the application

• Upload the Je-S with council status form as a PDF at the bottom of the screen

Project costs – academic partners

Page 73: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Je-S application elements

Full details on the Je-S system

Queries about Je-S via the Je-S Helpdesk

[email protected]

• 01793 444164

Page 74: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Submitting your

application

Page 75: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Project cost summary

All organisations can see a

summary of project costs

Ensure the highlighted costs

fits the criteria for this

competition

Page 76: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Checking your finances are complete

IFS checks

• all organisations have marked their finances as complete

• research organisation participation is no greater than 30% of the total project costs

Page 77: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Submit your application early!

Be aware of the

potential for last

minute technical

issues!

Page 78: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Assessment

Page 79: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Application assessment

All applications are assessed by independent assessors drawn from industry and academia

What do they look for?

• Clear and concise answers

• The right amount of information

• not too much detail

• no assumptions

• Quantification and justification

• A proposal that presents a viable opportunity for growth, a level of innovation that necessitates public sector investment and has the right team and approach to be successful

Keep your assessors engaged and interested in your proposal. You want them to be fascinated and excited by your idea!

Page 80: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Note on feedback

• The feedback is compiled using the written comments of the independent assessors who review and assess the applications.

• It is intended to be constructive in nature and to highlight both the strong as well as the weak areas of your application.

• Please bear in mind that because applications are assessed by a number of assessors, you may receive information which appears to be conflicting. This may reflect their different interpretations of the proposal that you submitted.

• It must also be noted that some proposals may appear to have been favourably assessed based on their comments, in such instances it could be that your proposal simply fell below the funding

threshold, with others achieving a higher merit score overall.

Page 81: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Assessor feedback

Page 82: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Assessor feedback (2)

Applications that proceed to interview will receive technical and economic feedback via an FTP site.

You will have the opportunity to submit a response to this feedback ahead of your interview

Page 83: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Interviews

If you are invited to progress to interview:

• You can bring up to nine people to attend the interview

• You will have 30 minutes to present a maximum of 30 PowerPoint slides, with no videos or embedded links

• There is an initial 45 minute Q&A session lead by members of the panel

• You may be asked back for a further 15 minute Q&A session if required

• Ahead of your interview you will be asked to provide:

• a list of attendees

• your interview presentation slides

• written response to the technical assessors' feedback

• written response to the BEIS economic value assessors' feedback

Page 84: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Project setup for

successful applicants

Page 85: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

IFS for successful applicants

Project Set up: 8 steps to complete

• Applicable to all grant claiming partners

• Must be completed within 30 days - projects

must start within 90 days or funding may be

withdrawn

• Confirmation of your bank account is required to

ensure we are paying the correct organisation

you may/will be asked to provide a redacted

bank statement to confirm this

• Project change requests cannot be submitted

before the project starts

Page 86: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Project set up

All grant claiming project partners will be required to complete project set up. To avoid delays you should consider:

• Who will be the project manager?

• Who will be the finance contact for each consortium member?

• How will your consortium be set up? (if applicable)

Page 87: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Collaboration agreement

Original agreement signed by all participants

Key Features:

• Who is in the consortium?

• What are the aims, and how is the work divided up?

• Ownership of IPR

• Management of consortium

Negotiating a Collaboration Agreement can be complex and time consuming. Start work on this at an early stage in the process.

Page 88: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Grant claims and payments

• All grants are claimable quarterly in arrears

• Claims can only be made for costs incurred and paid between the project start and end dates

• Claims may be subject to an independent audit (including all academic partners) according to grant size

• Claims are only paid once quarterly reporting and necessary audits are complete

• Projects over 6 months are monitored on a quarterly basis including a visit from the appointed Monitoring Officer. Anything outside of this will be discussed on a case by case basis.

• The monitoring will be carried out against a detailed project plan and financial forecast

Page 89: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Customer Support Services:

0300 321 4357 (Mon-Fri 9am to 11:30am and 2pm to 4:30pm)

[email protected]

Knowledge Transfer Network:

www.ktn-uk.co.uk

Innovate UK:

https://www.gov.uk/government/organisations/innovate-uk

Q&A

Page 90: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

@InnovateUK Innovate UKInnovate UK

Page 91: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

AVOIDING COMMON PITFALLS NEXT STEPS

DAN BUNTING

Page 92: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

AVOIDING COMMON PITFALLS (1)

• Terms & Conditions are a standard for the Lead aren’t they?

• Ill just submit my Application as it is,

even though its not fully fleshed out, that will be OK wont it?

• Why am I asking for Public Funding?

• What is my Route to Market? Is it realistic & robust?

• I can just complete the application on everyone’s behalf, can’t I?

• The Assessors will know about my Technology or Project wont they,

after all its closely linked to a previous IUK/APC/ISCF project?

?

“This is a promising proposal, but a weak application “

Page 93: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

AVOIDING COMMON PITFALLS (2)

• Ill just rush through Finances, Im sure it will get through?

• Does it all add up?

• Are the numbers correctly allocated?

• Are all the costs defined? This is particularly pertinent for Sub-Contract….

• OVERHEADS – 20% rule

• We were going to do this anyway, we can work out a way to get public funding for it, cant we?

• Public Funding covers 50% of the Project Cost, we’ll just divide the

cost in half, that will be alright won’t it?

Page 94: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

APC16 NEXT STEPSSubmission Deadline:

14h October 2020, 11am

What could possibly go

wrong?!

• ‘To Do’ List…• Register for APC17 NOW!

• Talk to us about your project

• Clear high level vision• But…the devil is in the detail

• Gaps / weaknesses / concerns

• UK Supply Chain…

• Provide evidence, evidence, evidence

• If at first you don’t succeed…respond to feedback!

Page 95: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition

Q&A

Page 96: ADVANCED PROPULSION CENTRE - APCUK€¦ · PROPULSION CENTRE: APC17 BRIEFING EVENT 25TH AUGUST 2020. AGENDA 10:00 - 10:10 - Welcome - Jon Beasley (APC) 10:10 - 10:30 - Competition