An overview of Fuse 3.0. This one-hour webinar presentation focused on providing insight into the advanced project planning quality and execution performance assessment provided by Fuse.TRANSCRIPT
![Page 1: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/1.jpg)
Advanced Project Analysis
Dr. Dan Patterson PMP | CEO & Founder Acumen
enterprise project analysis
![Page 2: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/2.jpg)
� Introductions
� Why sound planning equals success
� Using metrics for project analysis
� Case Study using Fuse 3.0
� Q&A
November 17, 2011
2
Agenda
![Page 3: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/3.jpg)
S1: Build
S2: Critique
S3: Risk-Adjust
S4: Optimize
S5: Validate
� Project Management Software Company � Improving CPM scheduling & analysis � Thought leader in Analytics � Schedule maturity framework
Acumen: Proven Project Analytics
S1 > S5™ Framework Acumen Core Offerings
Risk Assessment Workshops
Acumen Fuse®
Software Training
![Page 4: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/4.jpg)
The Importance of a Sound Basis of Schedule
S1
Schedule Basis Reflects latest scope/contractor updates
S2
Critiqued Schedule Structurally sound, no contingency, sound logic
S3 Risk-Adjusted Schedule Estimate uncertainty, risk events
S4 Optimized Target Scenarios Reduced hot spots, higher confidence
S5 Team Validated Scenario Buy-in on mitigation plans
November 17, 2011
4
� Schedule is a forecast
�
� Used as a benchmark
� Measure performance
� Communicating the plan to stakeholders
![Page 5: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/5.jpg)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0% 10% 20% 30% 40% 50% 60% 70% 80%
Fini
sh C
ompli
ance
Ind
ex™
Fuse Quality Index™
R² = 0.603
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0% 10% 20% 30% 40% 50% 60% 70% 80%
Quality Equals Success?
![Page 6: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/6.jpg)
The Problem with Gantt Charts…
November 17, 2011
6
� Highly vertical in nature � A row per activity required � Humans like timelines!
� Logic adds complexity �
� Detail lost in summaries � Just shows earliest/latest
� Activity-centric � Doesn’t show by resource
![Page 7: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/7.jpg)
� FFuussee:: analytics platform � Improves schedule quality
� Insight into performance
� FFuussee 336600:: goal-based acceleration � Schedule Acceleration � Decision-support
November 17, 2011
7
Fuse: Enterprise Project Analysis
![Page 8: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/8.jpg)
MMeettrriicc AAnnaallyyssiiss WWhhaatt aarree mmeettrriiccss?? Measurable, actionable criteria
� Schedule
� Cost
� Performance & EV
� Risk
Metric Analysis
Analysis Three Analysis Modules
November 17, 2011
8
![Page 9: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/9.jpg)
Metric Analysis
Analysis Three Analysis Modules
November 17, 2011
9
MMeettrriicc AAnnaallyyssiiss BBeennee tt:: � Pinpoint shortcomings � Slice and dice AAbboouutt:: � 250+ metrics � Industry Standard � Unique-to-Fuse metrics � Customizable
![Page 10: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/10.jpg)
LLooggiicc AAnnaallyyssiiss BBeennee tt:: �
� Simplify complexities
AAbboouutt:: � Recognizes multi-project
relationships
Metric Analysis
Logic Analysis
Analysis Three Analysis Modules
November 17, 2011
10
![Page 11: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/11.jpg)
FFoorreennssiicc AAnnaallyyssiiss BBeennee tt::
� Schedule comparison � Calculate variances
� Identify changes
AAbboouutt:: �
� Any number of schedules
Metric Analysis
Logic Analysis
Forensic Analysis
Analysis Three Analysis Modules
November 17, 2011
11
![Page 12: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/12.jpg)
……lleeaaddiinngg ttoo
BBeetttteerr ppllaannnniinngg && eexxeeccuuttiioonn
Analysis Three Analysis Modules
November 17, 2011
12
Metric Analysis
Logic Analysis
Forensic Analysis
![Page 13: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/13.jpg)
� Government agency (compliance) � Government-wide
� Department of Defense (DoD)
� NDIA Generally Accepted Scheduling Principles (GASP)
� best practice) � Project Management Institute (PMI)
� AACE International
� Thought leaders e.g. Acumen
�
November 17, 2011
13
Industry Standards
![Page 14: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/14.jpg)
Reporting Publish Analysis Results
November 17, 2011
14
Exec
Summary of analysis results
To do list Interactive charts & graphs�
API &
� Automation of existing reports�
![Page 15: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/15.jpg)
November 17, 2011
15
Integration Schedule, Cost, Risk, EV
MS Project
P3/P6
Open Plan
Asta Cobra
Prism G2
PRA
Excel/XML
![Page 16: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/16.jpg)
� Schedule validation � Bid analysis � Contractor performance review � Regulatory compliance/scrutiny � Claims analysis
November 17, 2011
16
Demo
![Page 17: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/17.jpg)
FFuussee SSuummmmaarryy Enterprise project analysis
Improved planning & execution
Schedule comparison & forensics
Multi-platform integration
Better plan the work = Better work the plan
![Page 18: Advanced Project Analysis: An Introduction to Fuse 3.0](https://reader033.vdocuments.mx/reader033/viewer/2022052522/54924b80b47959564d8b459c/html5/thumbnails/18.jpg)
More information: White papers: www.projectacumen.com Software Trial: www.projectacumen.com/trial Twitter: @projectacumen
Email: [email protected] PMI PMP PDU: 1!