    Multi-yearProgramPlan20162020OfficeofElectricityDeliveryandEnergyReliabilityAugust2016

    AdvancedDistributionManagementSystem(ADMS)Program

  • i

    AcknowledgmentTheMulti-YearProgramPlan(MYPP)fortheAdvancedDistributionManagementSystem(ADMS)Program within the U.S. Department of Energy (DOE) Office of Electricity Delivery & EnergyReliability(OE)wasdevelopedthroughtheeffortsoftheTechnicalTeam.TheTechnicalTeamwasledbyEricLightner(OE)andcomprisedofthefollowingnationallaboratorymembers:RonMelton,KevinSchneider,andKaranjitKalsi (PNNL);MuraliBagguandBryanPalmintier(NREL);ScottBackhaus(LANL);DuncanCallaway(LBNL);andLiangMin(LLNL). Significant inputtothedevelopment of the MYPP was received from the DOE ADMS Program Steering Committee,comprisingthefollowingthoughtleadersandexpertsfromindustry:GaryRackliffe(ABB);KevinDing (Centerpoint Energy); Rick Geiger (Cisco Systems); Ted Thomas (Duke Energy); AvnaeshJayantilal(GE);PaulDuncan(GSDEnergyConsultants);RonAmbrosio(IBM),WayneCarr(Milsoft);andScottKoehler(SchneiderElectric).TheDOEfurtheracknowledgesreviewcommentsreceivedfromthefollowingprofessionaland/orutilityassociationsandtheirmemberorganizations: IEEE,EPRI,PSERC,EEI,NRECA,andAPPA.TheircommentshavebeenincorporatedintothiseditionoftheMYPP.Lastly,DOEacknowledgestheeffortsofEnergy&EnvironmentalResourcesGroup,LLC,(E2RG)fortheiroverallsupportindevelopingthisMYPP.

  • ii

    TableofContents

    ExecutiveSummary(DOE)..............................................................................................................iv

    1.Introduction................................................................................................................................1

    1.1. U.S.DepartmentofEnergy(DOE)DefinitionofADMS...........................................1

    1.2. Vision.......................................................................................................................1

    1.3. ChallengesandOpportunities.................................................................................2

    1.4. MYPPTechnicalAreas.............................................................................................4

    1.5. ProgramCoordination.............................................................................................5

    1.6. ProgramGoalsandMulti-YearTargets...................................................................6

    2.ProgramBenefits........................................................................................................................6

    3.TechnicalAreas...........................................................................................................................6

    3.1. ADMSDevelopmentPlatform.................................................................................7

    3.1.1. Technicalgoalandobjective...............................................................................7

    3.1.2. Technicalchallenge.............................................................................................7

    3.1.3. Technicalscope...................................................................................................7

    3.1.4 Statusofcurrentdevelopment...........................................................................7

    3.1.5. Federalrole.........................................................................................................8

    3.1.6. Technicalactivitydescriptions.............................................................................8

    3.1.7. Milestones.........................................................................................................11

    3.2. ADMSTestbed.......................................................................................................13

    3.2.1. Technicalgoalandobjectives............................................................................13

    3.2.2. Technicalchallenges..........................................................................................14

    3.2.3. Technicalscope.................................................................................................15

    3.2.4. Statusofcurrentdevelopment.........................................................................18

    3.2.5. Federalrole.......................................................................................................19

    3.2.6. Technicalactivitydescriptions...........................................................................19

    3.2.7. Milestones.........................................................................................................21

    3.3. ADMSApplications................................................................................................21

    3.3.1. Technicalgoalandobjective.............................................................................21

    3.3.2. Technicalchallenges..........................................................................................22

    3.3.3 Technicalscope.................................................................................................23

    3.3.4. Statusofcurrentdevelopment.........................................................................24

    3.3.5. Federalrole.......................................................................................................24

  • iii

    3.3.6. Technicalactivitydescriptions...........................................................................25

    3.3.7. Milestones.........................................................................................................26

    3.4. ADMSFoundational:AdvancedControl...............................................................27

    3.4.1. Technicalgoalandobjective.............................................................................27

    3.4.2. Technicalchallenges..........................................................................................28

    3.4.3. Technicalscope.................................................................................................28

    3.4.4. Statusofcurrentdevelopment.........................................................................30

    3.4.5. Federalrole.......................................................................................................31

    3.4.6. Technicalactivitydescriptions...........................................................................32

    3.4.7. Milestones.........................................................................................................33

    3.5. ADMSIntegrationwithEMSandBEMS.................................................................36

    3.5.1. Technicalgoalandobjectives............................................................................36

    3.5.2. Technicalchallenges..........................................................................................37

    3.5.3. Technicalscope.................................................................................................37

    3.5.4. Statusofcurrentdevelopment.........................................................................38

    3.5.5. Federalrole.......................................................................................................40

    3.5.6. Technicalactivitydescriptions...........................................................................41

    3.5.7. Milestones.........................................................................................................42

    4.ProgramManagementandStakeholderEngagement.............................................................42

    4.1 ProgramPortfolioManagementApproach...............................................................42

    4.2 StakeholderEngagement..........................................................................................43

  • iv

    ExecutiveSummary(DOE)The AdvancedDistributionManagement System (ADMS) Programwas established in FY 2016withintheU.S.DepartmentofEnergy(DOE)OfficeofElectricityDeliveryandEnergyReliability(OE)SmartGridR&DProgram.ThemissionofthisnewProgramistodevelopasoftwareplatformcapableofintegratingcurrentandemergingdistributionutilitydata,includingreal-time,spatialdataofallconnecteddevices,andtosupportdevelopmentofvendorindependentmeasurementand control applications tomanage and optimize distribution utility operations for improvedreliability,resiliency,efficiency,assetprotection,andintegrationofdistributedenergyresources(DERs).Traditionaldistributionmanagementsystems(DMSs)facekeytechnicalchallengesinmanagingand optimizing a modernized grid. These challenges include managing the complexity ofoperatingthedistributionsystemswithincreasinglevelsofvariabilityinbothgenerationandloadassets; implementing a holistic approach to coordinate and manage grid operations fromtransmission, to distribution, and to local energy networks such as microgrids and buildings;utilizingreal-time,spatialdataofallconnecteddevicesindeterminingthegridstateforimprovedoperational planning, protection, control, and optimization; and achieving interoperable andintegratedoperationsbetweenlegacyandnewandemergingsystemsandapplications.TheADMSProgramisdesignedtoovercomethesechallengeswiththefollowingvision:By 2030, electric distribution gridmanagement systemswill be transformed from proprietary,vendor specific products to systems based on an open architecture and standards-based dataexchange thatwill enable integratingandmanagingall assets and functionsacross theutilityenterprise regardlessof vendoror technology. Through this transformation,DMSvendorswilladopt the DOE open, standards-based framework approach in the development of futureADMSproductofferingsandapplicationsforutilitycustomers.TheADMSProgramactivitiesareorganizedintothefollowingfivet