HMBP welcome you to our annual newsletter highlighting some of our projects which have been successfully completed in 2014. We are pleased to have provided Quantity Surveying, Cost Consultancy and CDM Co-ordinator Services to both new and retained Clients on such a varied portfolio. Further details of these and other projects together with the services we provide can be obtained by visiting our website: www.quantity-surveyors.co.uk ‘Do Not Scale’ All Saints Church of England Primary School HMB were delighted to have been appointed as Quantity Surveyors and CDM Coordinator’s for the construction of a new Primary School in Peterborough. The Project was phased to enable the continued occupation and expansion of the school. Despite the difficulties of a restricted site, a narrow access and the challenging economic environment, thanks to a good team approach by the Design Team and the Contractors the project was successfully completed on budget and the finished school certainly is impressive. Client: The Diocese of Peterborough/Peterborough City Council Lead Consultant: Grayling Thomas Architects Structural Engineers: Ian Harban Consulting Engineers M & E Consultants: Vector Design Main Contractor: Jeakins Weir Contract Value: £4,200,000

Upload: others

Post on 15-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ‘Do Not Scale’ - Hadland Manning Bullock Chartered Quantity ...€¦ · HMB continued their relationship with Bupa and provided Quantity Surveyor Services on a number of Dental

HMBP welcome you to our annual newsletter highlighting some of our projects which have been successfully completed in 2014.

We are pleased to have provided Quantity Surveying, Cost Consultancy and CDM Co-ordinator Services to both new and retained Clients on such a varied portfolio.

Further details of these and other projects together with the services we provide can be obtained by visiting our website: www.quantity-surveyors.co.uk

‘Do N

ot Scale’

All Saints Church of England Primary School

HMB were delighted to have been appointed as Quantity Surveyors and CDM Coordinator’s for the construction of a new Primary School in Peterborough. The Project was phased to enable the continued occupation and expansion of the school.

Despite the difficulties of a restricted site, a narrow access and the challenging economic environment, thanks to a good team approach by the Design Team and the Contractors the project was successfully completed on budget and the finished school certainly is impressive.

Client: The Diocese of Peterborough/Peterborough City CouncilLead Consultant: Grayling Thomas ArchitectsStructural Engineers: Ian Harban Consulting Engineers

M & E Consultants: Vector DesignMain Contractor: Jeakins WeirContract Value: £4,200,000

Page 2: ‘Do Not Scale’ - Hadland Manning Bullock Chartered Quantity ...€¦ · HMB continued their relationship with Bupa and provided Quantity Surveyor Services on a number of Dental

Malvern College New Science Department

HMB were delighted to be Quantity Surveyors and CDM Coordinators on the magnificent new Science Department at Malvern College. Significant difficulties including buried asbestos were overcome to produce a ‘state of the art’ facility including a new Lecture Theatre and stunning Science Laboratories

Client: Malvern College

Lead Consultant:: Squires and Brown

Structural Engineer: Shire Consulting

M&E Consultants: Preston Lee Chambers

Contract Value: £4,400,000

Re-roofing, Beam Hall, Corpus Christi College

HMB were pleased to be appointed as Quantity Surveyors for the re-roofing and repair to windows and elevations at Beam Hall, a Grade II listed building.

The project programme was very tight with the College requiring occupation for the start of the new academic year.

This was achieved by a very efficient procurement and appointment procedure whilst still obtaining competitive tenders using a full Bills of Quantities and fully designed details.

On site a collaborative approach ensured that all participants worked to ensure the successful completion of the project on time.

Client: Corpus Christi College, Oxford Lead Consultant: Gray Baynes ShewMain Contractor: Kingerlee Contract Value: £240,000

Toby Carvery, Braintree

HMB were pleased to be appointed as Cost Consultants and CDM Coordinators for the construction of the Toby Carvery Restaurant; including hard and soft landscaping.

Client: Gifto Properties (Notley Cross) Limited

Lead Consultant: John Hallam Associates

Structural Engineers: Gemma Design Ltd

M & E Consultants: Helix Services Consultancy

Main Contractor: Ashe Construction Ltd

Contract Value: £660,000

Page 3: ‘Do Not Scale’ - Hadland Manning Bullock Chartered Quantity ...€¦ · HMB continued their relationship with Bupa and provided Quantity Surveyor Services on a number of Dental

Glyn Hopkin, St Albans, Infiniti

HMB were pleased to continue our association with Glyn Hopkin Ltd as Quantity Surveyors and CDM Coordinators for their exclusive new Infiniti Showroom, incorporating high quality finishes and hi-tech customer interface.

Client: Glyn HopkinLead Consultant: Scaramanga Design LtdStructural Engineers: SA Consulting (Midlands) Ltd

Contractor: Davlyn Construction LtdContract Value: £600,000

Glyn Hopkin, Bedford

HMB were pleased to be appointed by Glyn Hopkin as Quantity Surveyors and CDM Coordinators for their new Nissan Showroom which was completed and handed over in June of this year.

Client: Glyn Hopkin

Lead Consultant: Scaramanga Design Ltd

Structural Engineers: SA Consulting (Midlands) Ltd

Contractor:

Davlyn Construction Ltd

Contract Value: £765,000

Page 4: ‘Do Not Scale’ - Hadland Manning Bullock Chartered Quantity ...€¦ · HMB continued their relationship with Bupa and provided Quantity Surveyor Services on a number of Dental

Apollo Park, Wroxton Banbury, Oxfordshire, OX15 6AYt. 01295 731844 f. 01295 731845 e. [email protected] w. www.quantity-surveyors.co.uk

Current and Breaking news...

HMB have been appointed as Quantity Surveyors and CDM Coordinators for the multi million pound relocation of local engineering company.

HMB providing QS & CDMC services for Glyn Hopkin Multi Franchise sites in East London and Cambridge.

£2.5m Private dwelling in Berkshire nears completion – HMB are providing QS duties.

HMB continue to provide Cost Consultancy Services to Cherwell District Council to for their Housing/Regeneration Programme.

We are providing Contract Administrators & CDMC services to Bishop Stopford School for their Science Department Extension Project.

HMB are providing QS & CDMC services to Robins & Day for Peugeot Glasgow

CdM news

During 2014 we have been appointed to provide CDM Co-ordinator services on 16 projects for both Private Clients ranging in value from £150,000.00 to £7,000,000.00

Bupa Dental Project

HMB continued their relationship with Bupa and provided Quantity Surveyor Services on a number of Dental Surgeries including Mortimer Street (London), Bristol and Waltham Abbey.

Robins & Day, Chelmsford

We were delighted to have provided Quantity Surveying and CDM Coordinator Services for the refurbishment of Robins & Day’s Chelmsford Dealership to the New Peugeot Corporate Specification.

Client: Robins & Day

Lead Consultant: Scaramanga Design Ltd

Structural Engineers: Robert Smith Associates

Contractor: Davlyn Construction Ltd

Contract Value: £400,000

william Law school, Peterborough

HMB were happy to continue our close relationship with the Diocese of Peterborough and Grayling Thomas Architects. This project successfully delivered two new modern classroom spaces for the school, with the addition of an external timber decked stage to the existing playground. No disruption was caused to the running of the primary school.

Client: The Diocese of Peterborough

Lead Consultant: Grayling Thomas Architects

Structural Engineers: Ian Harban Consulting Engineers

Main Contractor: Lindum Group LtdContract Value: £165,000