adnan khan cv updated
TRANSCRIPT
Khalid bin Waleed Street,Riyadh.
0590100764, [email protected]
Adnan KhanElectrical Engineer
Objectives
Seek to work in a competitive environment to utilize my potential and abilities for achieving excellence. Looking forward to apply, all that I have learnt to attain a challenging position in a prestigious organization.
Excellent work ethic Good analytical and reasoning skills Ability to write and speak clearly and effectively Outstanding interpersonal skills with peers,
colleagues, and clients Experience on engineering design teams
ExperienceTendering Engineer December 2016- till dateAL ETACK EST.
AL-ETACK EST. was established in Riyadh in the year 1408 H (= 1987 G ). It's active in the field of general contracting for construction of buildings.In addition to buildings construction, we performed a variety of other civil projects such as water works and drainage, electro-mechanical works, roads.
Al Etack Est is part of a group and our sister companies are :
Al Falwa Est ( Trading section and factories of marble and tiles ) The United Co. ( Concrete blocks section and marble and granite quarries and factories )Projects Trading & Contracting Co. / Aleesco ( Ready mix concrete )
Education
BS Electrical EngineeringHITEC University, Taxila, Pakistan.
SkillsProfessionalWindows Operating SystemsMS OfficeAutocadProteusMATLABMS Visual C++EMU 8086XilinxHFSS
PersonalAdaptableAnalyticalDependableDeterminedInnovativeOrganizedTeam Oriented
Hilton hotel project :Job description:
Study/Review of tender documents, scope of work, drawings, BOQ, specifications, client’s requirement and etc. from the tender documents for proper estimating works.
Preparing technical queries for ambiguities in drawings, specifications and BOQ.
Co-ordination with quantity surveyors and material take off when required.
Prioritize RFQ’s that require more time to get quotation and major cost items.
Prepare & send RFQ for all the items to all the approved/ approved equal suppliers/ sub-contractor to obtain required quotations.
Follow up with the supplier/sub-contractor to obtain quotation in time, clarify to all their queries and meetings with the supplier/ sub-contractor when required.
Technical Evaluation of supplier/sub-contractor quotations as per tender requirements.
Pricing material and labor cost of each BOQ item in the price comparison sheets, by using the quotations and a pre–determined manpower production rates.
Preparing Price comparison sheet for each system and final cost summary.
Preparing BOQ unit prices as per tender BOQ format and filling. Check all the addendums and
communications received from the client, ensuring that all items are being clarified and considered in the pricing.
Preparing Qualifications, Assumptions and Exclusions if any.
Preparing tender adjustment schedule with unit prices, when applicable.
Preparing price analysis, proposed vendor list, data sheet and qualifications as applicable.
Prepare value engineering, when required Attend Pre tender meetings and site visits. Assist to estimator and quantity surveyors. Attend meetings, trainings as scheduled or
organized by management.Responsible for implementing and maintaining the Quality management system for Estimation work.
Experience
Shapoorji Pallonji & Co. Ltd KSA
Site engineer January 2016 to December 2016Marriott hotel Project RiyadhJob description:• Study of drawing and execute the work• To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.• To provide the entire electrical solutions as per requirement.• Design for illumination of different area and lux calculation.• To check the entire work as according to approved drawings.• Handling of electrical load as per requirement.• Cable size calculation cable scheduling &its route selection, over head or underground.• Review Inspection and Test Plans in order to perform all required inspections and witnessing all required tests and add witness and hold points for the Client’s Inspection.• Review inspection reports and records of Quality Control carried out on completed and running Project activities.• Review Client’s Inspectors deliverables, analyses and resolve issues and problems emerging during the Quality Control activities. Ensure that all inspection and tests witnessed by clients • Drawing submission and get Approval from consultants• Site issues highlighting and send to consultant• Site Additional work Preparation and send the Quotation• Check and Plan the EOT Date & schedule of the Project• Every two week once attend the site technical coordination meeting• Monthly once attend the site safety coordination meeting • Detail engineering with safety factor in the design.• Updating the Drawing depends on site condition• Mock up unit Preparation and execution• Checking the Workmanship and material Quality as per approved make and standard work for the Right quality and standard work• Daily & Weekly work Progress Report Preparation and Keep the Record• Preparing the Monthly work Progress Report for Claim with Measurements• Monthly LEW Tools inspection check list Preparation and checking• Daily I conduct and maintain the tools box meeting and checking the Height work Permit (above 2m)• Preparation of Project Report for correct and Timely information for the Progress of work
• Responsible to do surveys including site measurements• Responsible for Highlighting foreseen Problem & Delays in advance Escalating to the PM• Client communication and correspondence• Quality Assurance• Coordination with workers• Manpower Controlling and solve the Problem• Updating of material stock• Weekly Material Requirement to be send by email to office• Final Documentation & Billing Works
ExperienceSite EngineerFrontier Works Organization. February 2015 – January 2016Company Profile:Frontier Works Organization (FWO), today’s most versatile and vibrant construction firm, was established on 31 October 1966 to wrought a miracle and carve out a modern highway, the Karakoram Highway, across crags and crevices of the highest mountain ranges of the world. It was towards the completion stage of KKH that the Government analyzed the tremendous potential of FWO in carrying out civil engineering projects in difficult and inhospitable areas and decided not only to keep FWO in existence, but also to expand its tentacles throughout the country.
ISLAMABAD INTERNATIONAL AIRPORT PROJECT
Job Description:
Load calculations HT cable Termination LT Cable Termination Cable trays Commissioning test Elevator installation Electrical power Distribution Making inspection requests All electrical services in slab
InterneeHeavy Industries Taxila. 6 Weeks Internship Program
Company Profile:
The Heavy Industries Taxila (reporting name: HIT), is a
major defence, military contractor, engineering conglomerate, and military corporation located in Taxila, Punjab, Pakistan.
The HIT is noted as being one of the largest defense contractor and has grown into a military industrial complex since its foundation 1971. The HIT promotes, markets, engineers, develops, and undertakes heavy engineering works for Pakistan's military and for the civilian law enforcement agencies
Job Description
Project of Wiring Trainer at HITEC University Project of Toll-Tax Collection Program in MATLAB at
HITEC University Project of Online Banking System in Microsoft Visual
C++ at HITEC University Digital Logic Designing for a 3-bit K-map solver 6 weeks internship at HIT Factory Taxila Cant Image encryption and decryption program in MATLAB
Personal Details:Religion: IslamLanguage: English ,Urdu, ArabicDriving License: Valid SaudiIqama Status: TransferableNationality: Pakistani
Reference:Can be provided if required.