  • 8/3/2019 ADL 74 System Analysis and Design V1

    1/7

    Contact solvedhub.com for best and lowest cost solution or email solvedhub.gmail.com

    System Analysis & Design V1

    Assignment A

    1. Briefly explain the procedure and make up of the post-implementation review.Can one perform maintenance on a system without a post-implementation review? Why?

    2. How does normalization reduce data redundancy? Illustrate

    3. What do you mean by system audit? Explain.

    4. How functional dependency is related to database table design?

    5. What are some of the advantages of top-down design? Elaborate.

    Assignment B

    1. Please answer the following:

    a) What are the pros & cons of waterfall model?.

    b) Summarize the advantages and limitations of Interviews and Questionnaires..

    c) Discuss the multifaceted role of the system analyst.

    d) Explain the major activities in conversion. Which activity is the most important? Why?

    e) Discuss the concepts of MIS and DSS. How are they related? How do they differ?

    Case Study

    A problematic conversion to a new software system for managing staff and Shipping operations at Sealine Inc. to a halt, resulting in passengers stranded in cities such as New York, Detroit and Palm Beach, Florida. The system-wide problems forced the Fort Lauderdale, Florida based discount shipping to book all availablehotel rooms in many markets and to institute a nationwide disaster response program. Sealine Inc president and CEO Thomas konchesky said the crisis wasn't touched off by the new system crashing or other technical problem. Instead, the problem were caused by a lack of familiarity with the software on the part of Sealine's employees-situation that snowballed at the Shipping after winter storms affected sea travel in the northeast.

    While the new scheduling system had been run in parallel with the sealine old one from August through the end of the last year, Thomas said users could not nego

    tiate the software fast enough to keep pace after the storms began forcing Shipcancellations. "The people who operated the software were not longer as fast with it, even though they were proficient and they were trained", Thomas said "It's

  • 8/3/2019 ADL 74 System Analysis and Design V1

    2/7

    one of those situations where your fingers are not connected to your brain anymore, and we were not prepared for that". Ships were also booked to capacity because of the crush of holiday travelers, making it more difficult to accommodate stranded passengers after the problems emerged, he said.

    Compounding the situation even further was the fact that Sealines's CIO post isvacant, said Thomas, who held that position until he was promoted to CEO in mid-

    2000. The Shipping began interviewing potential CIO candidates last month but has yet to hire a replacement. A hands-on IT executive might have been able to foresee the impending crisis and steer Sealine's crew staffing department away fromdoing the software conversion at such a busy travel time, Thomas said. "The only way we could have avoided this problem was to have called off the conversion",he said. "But we obviously didn't see the problem coming". Paul harnandez, an analyst at Forrester Research who follows the travel industry, faulted Sealine for its timing. "You never want to do a cutover to a new software system during apeak travel period", he said. Sealine's staffing department wanted the conversion to occur January 1 because the Sealine needs to track Captain and crew Sail hours on a calendar bases in order to ensure that workers don't exceed sailing limits set by the U.S. federal Sail Administration. Making the switch a week or two

    later would have required the initial records for this year to be moved from the old system to the new one. "Up until now, it's been our policy to let individual departments manage their own projects and not involve the IT department", Thomas said. "That's going to change. We need to have our tech people more involved". Paul said such a hang-off IT policy is receipt for danger. "You don't mess around the technology", he said. "It is not kind to the people who don't understand it".

    Thomas said the Sealine will have to spend at least the rest of month trying towin back passengers who were inconvenienced by the problems. Sealine, the largest privately held shiping in the U.S, carried more than 2, 00,000 passengers lastyear. The Sealine will also have to mend its relationship with the New York andthe New Jersey Port authority, which is considering pulling Sealine's docking p

    ermits at the LaGuardia and Newark docks in the back of the ordeal. Port authority spokesman Stewon Coleman said that at one point. New York police were calledto La Guardia to claim an unruly crowd of disgruntled passengers.

    "There were some near fist fights between some of the passengers who'd just hadenough", he said. The crisis also will lead to organizational restructuring at Sealine. Konchesky said, although he added that specific changes haven't been decided on. A week ago, the sealine announced that it had returned to "business-as-usual operation". Thomas said the new software remains in place. "It was a matter of knowing how to use it", he said.

    Questions:1. What major problems in system implementation and conversion practices do yourecognize in this case? What major management problems do you recognize in thiscase?

    2. What should Sealine Shippings have done to avoid its system problems? What steps should they take now?

    Assignment C

    1. How many steps are in the systems development life cycle (SDLC)?A. 4B. 5C. 6

    D. 10

    2. The first step in the systems development life cycle (SDLC) is:

  • 8/3/2019 ADL 74 System Analysis and Design V1

    3/7

    A. Analysis.B. Design.C. Problem/Opportunity Identification.D. Development and Documentation.

    3. Most modern software applications enable you to customize and automate various

    features using small custom-built miniprograms called:A. Macros.B. Code.C. Routines.D. Subroutines.

    4. The organized process or set of steps that needs to be followed to develop aninformation system is known as the:A. Analytical cycle.B. Design cycle.C. Program specification.D. System development life cycle.

    5. How many steps are in the program development life cycle (PDLC)?A. 4B. 5C. 6D. 10

    6. The make-or-buy decision is associated with the ____________ step in the SDLC.A. Problem/Opportunity IdentificationB. DesignC. AnalysisD. Development and Documentation

    7. In the Analysis phase, the development of the ____________ occurs, which is aclearstatement of the goals and objectives of the project.A. documentationB. flowchartC. program specificationD. design

    8. Actual programming of software code is done during the ____________ step in theSDLC.A. Maintenance and EvaluationB. DesignC. AnalysisD. Development and Documentation

    9. Enhancements, upgrades, and bug fixes are done during the ____________ step in the SDLC.A. Maintenance and EvaluationB. Problem/Opportunity IdentificationC. DesignD. Development and Documentation

    10. The ____________ determines whether the project should go forward.

    A. feasibility assessmentB. opportunity identificationC. system evaluation

  • 8/3/2019 ADL 74 System Analysis and Design V1

    4/7

    D. program specification

    11. Technical writers generally provide the ____________ for the new system.A. programsB. networkC. analysisD. documentation

    12. ____________ design and implement database structures.A. ProgrammersB. Project managersC. Technical writersD. Database administrators

    13. ____________ spend most of their time in the beginning stages of the SDLC, talkingwith end-users, gathering information, documenting systems, and proposing solutions.A. Systems analysts

    B. Project managersC. Network engineersD. Database administrators

    14. Which of the following could not be considered an organizational goal?A. Increase company profit margin.B. Expand customer base.C. Provide quality service.D. Complete backups every Friday.

    15. An organizations goal is to improve the communication of events to members.Which of the following strategies would best achieve this aim?A. Reduce labor costs.

    B. Produce a regular newsletter.C. Make sure all membership information is accurate.D. Use a spreadsheet to keep track of finances.

    16. The profile of an audience can include itsA. Employment category, income level and average age.B. Employment category, favorite color and average age.C. Tax file number, income level and years of employment.D. Educational level, Medicare number and name of doctor.

    17. Which of the following is not a component of an information system?A. EquipmentB. End-userC. Organizational goalsD. Procedures

    18. ____________ manage the system development, assign staff, manage the budget and reporting, and ensure that deadlines are met.A. Project managersB. Network engineersC. Graphic designersD. Systems analysts

    19. ____________ is the process of translating a task into a series of commands that a computer will use to perform that task.

    A. Project designB. InstallationC. Systems analysis

  • 8/3/2019 ADL 74 System Analysis and Design V1

    5/7

    D. Programming

    20. Debugging is:A. Creating program code.B. Finding and correcting errors in the program code.C. Identifying the task to be computerized.D. Creating the algorithm.

    21. Translating the problem statement into a series of sequential steps describing what the program must do is known as:A. Coding.B. Debugging.C. Creating the algorithm.D. Writing documentation.

    22. Translating the algorithm into a programming language occurs at the ____________ step of the PDLC.A. DebuggingB. Coding

    C. Testing and DocumentationD. Algorithm Development

    23. The problem statement should include all of the following EXCEPT:A. Input.B. Output.C. Processing.D. Storage.

    24. The problem statement includes the ____________, which lists specific inputnumbers a program would typically expect the user to enter and precise output values that a perfect program would return for those input values.A. Testing plan

    B. error handlerC. IPO cycleD. input-output specification

    25. Which step of SDLC performs cost/benefit analysis?A. Feasibility StudyB. AnalysisC. DesignD. None of the above

    26. System maintenance is necessary because:A. Human never gets it right the first time.B. The deployment may change over time.C. The users needs may change over time.D. All of the above.

    27. A person-machine system and a highly integrated grouping of information-processing functions designed to provide management with a comprehensive picture ofspecific operation is called:A. DSSB. MISC. IISD. All of the above.

    28. Which is the most creative and challenging phase of SDLC?

    A. AnalysisB. DesignC. Implementation

  • 8/3/2019 ADL 74 System Analysis and Design V1

    6/7

    D. Feasibility Study

    29. Costs that are known to exist but whose financial value cannot be accuratelymeasured are referred to asA. IntangibleB. TangibleC. Direct

    D. Indirect

    30. The parts of the organization or computer system depend on one another is called:A. InteractionB. InterdependenceC. IntegrationD. All of the above

    31. Which of the following Normal forms states that a non-key attribute dependson a key attribute or concatenated keyA. First Normal Form

    B. Second Normal FormC. Third Normal FormD. BCNF

    32. _________ means adding, modifying or redeveloping the code to support changein any specifications.A. EnhancementB. MaintenanceC. ImplementationD. All of the above

    33. Which symbol of DFD represents a Data Store?A. Circle

    B. SquareC. Open-ended RectangleD. Triangle

    34. System maintenance is necessary because:A. Human never gets it right the first time.B. The deployment may change over time.C. The users needs may change over time.D. All of the above.

    35. A person-machine system and a highly integrated grouping of information-processing functions designed to provide management with a comprehensive picture ofspecific operation is called:A. DSSB. MISC. IISD. All of the above.

    36. The parts of the organization or computer system depend on one another is called:A. InteractionB. InterdependenceC. IntegrationD. All of the above

    37. What kind of information comes under user staff category of information?a) Policiesb) Authority relationship

  • 8/3/2019 ADL 74 System Analysis and Design V1

    7/7

    c) Objectivesd) Work schedules

    38. Primary external source of information is:a) Financial reportb) Electronic data processc) Government documents

    d) Personal stuff

    39. In which step of feasibility study people resist to change:a) Technical feasibilityb) Behavioural feasibilityc) Economical feasibilityd) None of the above

    40. Evaluation criteria for the best candidate system:a) Performance and costb) Observationc) User feedback

    d) None of the above