Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional Performing Arts Center PROJECT NO: 25310.H DATE: 7/10/08 BY: Brandon D. Bogan This Addendum is issued in accordance with the provisions of “The General Conditions of the Contract for Construction,” Article 1, “Contract Documents” and becomes a part of the Contract Documents as provided therein. This Addendum includes: Addendum Pages: ADD3- 1-9 through ADD3 9-9 Attachments: Specifications 116122 Supplementary Drawings ADD3-A.1 through ADD3-A.6 Drawings TE11-ADD3, TE12-ADD3, A9.16, PL123 PART I – BIDDING REQUIREMENTS 1.1 Notice to Bidders A. Change the Bid Date to “5:00 p.m. EST on or before August 20, 2008” in lieu of July 16, 2008. PART II – Specifications 2.1 Door Schedule A. Doors 366c,d, and e are to have casing D on one side. B. Doors 321c,d, and e are to have a casing similar to D (Refer to interior elevations). 2.2 11 61 22 – Demountable Auditorium Risers A. Issue specification complete. PART III – Drawings 3.1 Drawing A2.01n – Orchestra Low Plan - Notes A. Delete Elevation Marker noted as 28/A5.41 in the Rear Stage/Live Scenery Storage area. B. Enlarged Plan marker noted as 1/A2.65 and 2/A4.65 changed to 14/A2.65 and 14/A2.69. C. Section marker (@ box office) noted as 13/A9.80 changed to 19/A9.80.

Upload: others

Post on 14-Jun-2020

28 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 1 - 1

ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional Performing Arts Center PROJECT NO: 25310.H

DATE: 7/10/08

BY: Brandon D. Bogan

This Addendum is issued in accordance with the provisions of “The General Conditions of the Contract for Construction,” Article 1, “Contract Documents” and becomes a part of the Contract Documents as provided therein. This Addendum includes: Addendum Pages: ADD3- 1-9 through ADD3 9-9

Attachments: Specifications 116122 Supplementary Drawings ADD3-A.1 through ADD3-A.6 Drawings TE11-ADD3, TE12-ADD3, A9.16, PL123

PART I – BIDDING REQUIREMENTS 1.1 Notice to Bidders

A. Change the Bid Date to “5:00 p.m. EST on or before August 20, 2008” in lieu of July 16, 2008.

PART II – Specifications 2.1 Door Schedule

A. Doors 366c,d, and e are to have casing D on one side. B. Doors 321c,d, and e are to have a casing similar to D (Refer to interior elevations).

2.2 11 61 22 – Demountable Auditorium Risers

A. Issue specification complete. PART III – Drawings 3.1 Drawing A2.01n – Orchestra Low Plan - Notes

A. Delete Elevation Marker noted as 28/A5.41 in the Rear Stage/Live Scenery Storage area.

B. Enlarged Plan marker noted as 1/A2.65 and 2/A4.65 changed to 14/A2.65 and 14/A2.69. C. Section marker (@ box office) noted as 13/A9.80 changed to 19/A9.80.

Page 2: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 2 - 2

3.2 Drawing A2.02n – Orchestra High Plan - Notes

A. Enlarged Plan marker (@ south lobby) noted as 14/A2.74 changed to 1/A2.74. B. Enlarged Plan marker (@ sound control rm.) noted as 25/A7.24 changed to 42/A9.29. C. New Enlarged Plan marker (@ lighting control rm.) shall read 28/A9.29. D. Enlarged Plan marker (@ stair #3) noted as 30/A7.12 changed to 23/A7.12.

3.3 Drawing A2.03n – Box Tier Plan - Notes

A. Enlarged Plan marker (@ north end) noted as 21/A2.81 changed to 4/A2.81. B. Enlarged Plan marker (@ n/e clipped corner) noted as 6/A2.77 changed to 20/A2.77.

3.4 Drawing A2.05n – Balcony High Plan - Notes

A. Section marker (@ south lobby bars) noted as 13/A9.80 changed to 25/A9.82. B. Enlarged Plan marker (@ auditorium) noted as 14/A2.64 changed to 1/A2.64.

3.5 Drawing A2.64 – Enlarged Hall Plan – Balcony HIgh

A. Pilaster Section marker noted as 21/A9.61 changed to 20/A9.61. 3.6 Drawing A2.65 – Enlarged West Lobby Plans

A. In detail 7/A2.65, reverse elevation markers 4/A5.15 and 25/A5.15. 3.7 Drawing A2.74 – Enlarged South Lobby Plan – Orchestra High

A. In detail 1/A2.74, change enlarged Plan marker noted as X/AXXX to 1/A9.81. 3.8 Drawing A2.81 – Enlarged B.O.H. Plans – Orchestra Low

A. In detail 1/A2.81, reverse elevation markers noted as 25/A5.40 and 16/A5.40. B. In detail 2/A2.81, change elevation markers noted as 14/A5.40 to 31/A5.41. C. In detail 3/A2.81 reverse elevation markers noted as 42/A5.41 and 41/A5.41 D. In detail 3/A2.81, change enlarged Plan marker noted as 29/A4.32 to 25/A4.32.

3.9 Drawing A3.45 – Wall Sections

A. In details 1 & 4/A3.45, change section markers noted as 7/A9.80 d to 19/A5.35. 3.10 Drawing A5.01 – Auditorium South North Section

A. Change section marker noted as 5/A6.91 to 5/A9.16. 3.11 Drawing A5.05 – Auditorium East West Section

A. Change section marker noted as 17/A9.13 to 7/A9.12. B. Change section marker noted as 18/A9.13 to 28/A9.12.

Page 3: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 3 - 3

3.12 Drawing A5.07 – Auditorium East West Section

A. Change section marker noted as 17/A9.13 to 7/A9.12. B. Change section marker noted as 18/A9.13 to 28/A9.12. C. Change section markers noted as 32/A9.12 & 18/A9.12 to 16/A9.14. D. Change section marker noted as 4/A9.12 to 6/A9.14.

3.13 Drawing A5.08 – Auditorium Downstage Alcove Developed

A. Change section marker noted as 9/A9.25 to 6/A9.25. 3.14 Drawing A5.09 – Auditorium Upstage/Downstage Parapet Fronts

A. In detail 3/A5.09, Box Tier (East/West) rail elevation revised to be similar to Balcony Low (East/West) rail elevation.

3.15 Drawings A5.11 – Interior Elevations East Lobby

A. In details 28 and 7/A5.11, add railing sections in front of the three solid panels at the opening between the two levels matching the railing around the remainder of the opening.

3.16 Drawing A5.13 – Interior Elevations East Stair Lobby

A. In detail 3/A5.13, change section marker noted as 6/A9.33 to 5/A7.22. B. In detail 4/A5.13, change section marker noted as 7/A9.33 to 2/A7.22. C. In detail 35/A5.13, change section marker noted as 19/A9.35 to 16/A7.22.

3.17 Drawing A5.14 – Interior Elevations East Stair Lobby

A. In details 39 & 32/A5.14, remove detail markers noted as 3 & 6/A9.50 and note railings as “Railing System A”.

3.18 Drawing A5.15 – Interior Elevations West Lobby

A. In detail 4/A5.15, change section marker noted as 10/A9.34 to 18/A9.34. 3.19 Drawing A5.16 – Interior Elevations West Lobby & Box Office Vestibule

A. In detail 7/A5.16, delete note 18 from the poster display cases. B. In detail 11/A5.16, add a bracket at the right end of the lower elevation matching the one

at the far left end. 3.20 Drawing A5.20 – Interior Elevations South Lobby

A. In detail 27/A5.20, change section marker missing a reference bubble to 16/A9.30. 3.21 Drawing A5.21 – Interior Elevations South Lobby

Page 4: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 4 - 4

A. In detail 20/A5.21, change section marker noted as 23/A9.31 to 23/A9.29. 3.22 Drawing A5.30 – Interior Elevations Balcony Lobby

A. In detail 7/A5.30, changed section marker noted as X/AXXX to 23/A9.82. 3.23 Drawing A5.39 – Alternate Restroom Elevations - Box Tier

A. In details 21 & 42/A5.39, change section markers referencing sheet. A5.33 to A5.35 B. In detail 21/A5.39, change section marker noted as X/AXXX to 12/A4.05.

3.24 Drawing A5.40 – BOH Interior Elevations and Details

A. In detail16/A5.40, change title to read “108 – Orchestra Changing Room Elevation”. B. In detail 25/A5.40, change Title to read “113 – Orchestra Changing Room Elevation”. C. In detail 25/A5.40, change dimension line to read “Lockers @ 1’-0” (see plan)”.

3.25 Drawing A6.00p – Plenum Level Reflected Ceiling Plan

A. Change Enlarged Plan marker noted as 1/A6.71 to 14/A6.71. 3.26 Drawing A6.03 – Box Tier Reflected Ceiling Plan

A. Change Enlarged Plan marker noted as 1/A6.73 to 14/A6.73. 3.27 Drawing A6.68 – East Lobby Reflected Ceiling – Orchestra Low

A. In detail 1/A6.68, change section marker noted as 28/A9.33 to 17/A9.33. B. In detail 2/A6.68, change section marker noted as 39/A9.33 to 30/A9.33.

3.28 Drawing A7.03 – Elevator #3 Plans and Sections

A. In detail 7/A7.03, delete section marker noted as 26/A7.14 (@ door head).

3.29 Drawing A7.04 – Elevator #4 Plans and Sections

A. In detail 34/A7.04, change section markers noted as 14/A7.04 and 12/A7.04 to 7/A7.04 and 4/A7.04.

3.30 Drawings A7.05 – Elevator Cab Elevations and Details

A. Change all references, note, and keynotes stating MT21 to Polished Brass (#7) Finish

3.31 Drawing A7.10 – Elevator #4 Plans and Sections

A. In detail 7/A7.10, changed section marker noted as 7/A7.10 sim. to 7/A7.14 sim..

Page 5: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 5 - 5

3.32 Drawing A7.12 – Stair #3 Plans and Sections

A. Stair #3 Balcony Low Plan noted as 30/A7.12 changed to 32/A7.12. B. Stair #3 Balcony High Plan noted as 30/A7.12 changed to 25/A7.12. C. Stair #3 Orchestra High Plan noted as 30/A7.12 changed to 23/A7.12. D. Stair #3 Orchestra Low Plan un-noted shall be 9/A7.12.

3.33 Drawing A7.23 – Mid-House Stair Plans and Sections

A. In detail 2/A7.23, delete section marker noted as REF.2/A9.51. B. In detail 19/A7.23, delete section marker noted as 15/A7.15. C. In detail 19/A7.23, change section marker noted as 16/A7.15 to 26/A7.14. D. In detail 7/A7.23, delete section marker noted as 9/A9.50. E. In detail 7/A7.23, change section markers noted as 16/A7.15 and 15/A7.15 to 26/A7.14

and 25/A7.14 respectively. 3.34 Drawing A7.24 – Misc. Stairs and Ramps Plans and Sections

A. In detail 7/A7.24, delete section marker noted as 5/A7.14. B. In detail 7/A7.24, change section markers noted as 12/A7.14 to 7/A7.14 (@ upper rail)

and 6/A7.14 (@ typ. rail). C. In detail 7/A7.24, change section marker noted as 6/A7.14 to 21/A7.14. D. In detail 20/A7.24, delete section markers noted as 5/A7.14 and 7/A7.14. E. In detail 20/A7.24, change section markers noted as 6/A7.14 and 13/A7.14 to 21/A7.14

and 7/A7.14 respectively. F. In detail 27/A7.24, delete section marker noted as 7/A7.14. G. In detail 27/A7.24, change section markers noted as 6/A7.14 and 13/A7.14 to 21/A7.14

and 7/A7.14 respectively. H. In detail 41/A7.24, change section marker noted as 3/A7.14 to 7/A7.14 and move to

intersect handrail. I. In detail 32/A7.24, delete section marker noted as 7/A7.14. J. In detail 32/A7.24, change section markers noted as 6/A7.14 and 13/A7.14 to 21/A7.14

and 7/A7.14 respectively. 3.35 Drawing A7.25 – Misc. Stairs Plans and Sections

A. In detail 2/A7.25, change Title to read “Stair #11 Plenum Plan”. B. In detail 9/A7.25, change Title to read “Stair #11 Orchestra Low Plan”. C. In detail 23/A7.25, change Title to read “Stair #11 Orchestra High Plan”. D. In detail 30/A7.25, change Title to read “Stair #14 Orchestra Low Plan”. E. In detail 4/A7.25, change Title to read “Stair #14 Orchestra High Plan”. F. In detail 11/A7.25, change Title to read “Stair #14 Box Tier Plan”. G. In detail 7/A7.25, change Title to read “Stair #5 Basement Plan”. H. In detail 7/A7.25, change section marker noted as 13/A7.14 to 7/A7.14. I. In detail 14/A7.25, change Title to read “Stair #5 Section”. J. In detail 25/A7.25, change section markers noted as 16/A7.15 and Ref.2/A9.51 to

26/A7.14 and 7/A7.14 respectively. K. In detail 27/A7.25, change Title to read “Stair #11 Section”. L. In detail 27/A7.25, change section markers noted as 16/A7.15 and Ref.2/A9.51 to

26/A7.14 and 7/A7.14 respectively.

Page 6: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 6 - 6

M. In detail 41/A7.25, change Title to read “Stair #25 Section”. N. In detail 41/A7.25, delete section marker noted as Sim. 7/A7.14. O. In detail 41/A7.25, change section markers noted as 6/A7.14 and Sim13/A7.14 to

21/A7.14 and 7/A7.14 respectively. 3.36 Drawinga A8.00 – A8.99

A. In the finish legend, change CN1 to be Sealed Concrete in lieu of Unfinished Concrete.

3.37 Drawing A8.00 – Basement Finish Plan

B. In rooms 018 and 036, delete the notation AW6. C. In room 060, delete the VF1 and VB2 notations at Stair 5. D. In rooms Stair 7, Stair 8, Stair 4 and Stair 2 change VF1 to CN2. E. In room 034, change CN3 to CN2.

3.38 Drawing A8.01p – Plenum Finish Plan

A. In rooms Stair 7 and Stair 8, change VF1 to CN2.

3.39 Drawing A8.01 – Orchestra Low Finish Plan

A. Change Enlarged Plan marker noted as 1/A8.10 to 2/A8.10. B. Modify this plan to depict the base bid floor patterning for rooms 166, 168, 140, and 142.

Reference enlarged plans on sheets A8.10 and A8.11 for enlarged plans depicting correct pattern.

C. Eliminate AW6 notation in rooms 108 and 113. D. In rooms Stair 1, Stair 2, Stair 3, and Stair 4, change VF1 to CN2.

3.40 Drawing A8.01a– Orchestra Low Finish Plan - Alternate

A. Change Enlarged Plan marker noted as 2/A8.11 to 1/A8.11.

3.41 Drawing A8.02– Orchestra High Finish Plan

A. Change Enlarged Plan marker noted as 1/A8.12 to 2/A8.12. B. In rooms Stair 1, Stair 2, Stair 3, and Stair 4, change VF1 to CN2.

3.42 Drawing A8.03– Box Tier Finish Plan

A. Change Enlarged Plan markers noted as 1/A8.13 and 1/A8.14 to 2/A8.13 and 2/A8.14. B. In rooms Stair 1, Stair 2, Stair 3, and Stair 4, change VF1 to CN2.

3.43 Drawing A8.04 – Balcony Low Finish Plan

A. In rooms Stair 1, Stair 2, Stair 3, and Stair 4, change VF1 to CN2.

Page 7: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 7 - 7

3.44 Drawing A8.05 – Balcony High Finish Plan

A. In rooms Stair 1, Stair 2, Stair 3, and Stair 4, change VF1 to CN2.

3.45 Drawing A8.06 – Attic Finish Plan

A. In rooms Stair 1, and Stair 2 change VF1 to CN2.

3.46 Drawing A8.07 – Attic Finish Plan

A. In rooms Stair 1 and Stair 2 change VF1 to CN2.

3.47 Drawing A9.01– Casing Elevations and Details

A. Detail 5/A9.01 (furthest to the right) changed to 4/A9.01. B. In detail 19/A9.01, change section markers noted as 17-A/A9.01 and 17-B/A9.01 to 19-

A/A9.01 and 19-B/A9.01 respectively. C. In detail 26/A9.01, change section marker noted as 6/A9.01 to 5/A9.01.

3.48 Drawing A9.07– Trim Profiles and Details

A. Issue detail complete. Refer to attached supplementary drawing BP5 ADD#3 A.5. 3.49 Drawing A9.12– Auditorium Ceiling Details

B. In detail 28/A9.12, change section marker noted as 28/A9.11 to 5/A9.10. 3.50 Drawing A9.15– Parterre and Balcony Details

A. In details10 & 8/A9.15, change Title noted as “(Alt.)” to (Base). B. In details 3 & 1/A9.15, change Title to read (Alt.).

3.51 Drawing A9.16– Auditorium Choral Balcony Details

A. In detail 32/A9.16, change section marker noted as 31/A9.16 to 34/A9.16. B. Issue details 6 and 7/A9.16 complete. C. Revise detail 1/A9.16 as depicted on reissued sheet.

3.52 Drawing A9.20– Portable Choral Wagon Details

A. Issue detail 3/A9.20 complete. Refer to attached supplementary drawing BP5-ADD3-A.6.

3.53 Drawing A9.29– Misc. Details

A. In detail 5/A9.29, changed section marker noted as X/AXXX to 19/A9.14. 3.54 Drawing A9.30 – South Lobby Orchestra High Details

A. In detail 16/A9.30, delete section marker noted as X/AXXX.

Page 8: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 8 - 8

3.55 Drawing A9.34– Interior Details West Lobby and Box Office Vestibule

A. Re-Issue detail 14/A9.34complete. Refer to attached supplementary drawing BP5 ADD#3 A.1.

B. Issue detail 5/A9.34 complete. Refer to attached supplementary drawing BP5 ADD#3 A.2.

C. Issue detail 11/A9.34 complete. Refer to attached supplementary drawing BP5 ADD#3 A.3.

D. Issue detail 11/A9.34 complete. Refer to attached supplementary drawing BP5 ADD#3 A.4.

3.56 Drawing A9.36 – Operable Wall Details

A. In detail 14/A9.36, add note stating the following: “For illustrative purposes, this detail depicts only the tube frame over the door, however a steel tube is required over the transom as well as depicted in detail 35/A9.36. “

3.57 Drawing A9.50 – Ornamental Railings Details

A. In detail 23/A9.50, note that only the Julius Blum top cap and knell caps are to be bronze and the remainder of the metal on the railing is to be powder coated steel.

B. In detail 2/A9.50, note that the following components are to be bronze: Julius Blum top cap, knell cap, assist rail, assist rail bracket and assist rail stanchion. The remainder of the metal on this railing is to be powder coated steel.

3.58 Drawing A9.62 – Column and Pilaster Details

A. In detail 16/A9.62, change section marker noted as 21/A9.61 to 27/A9.61. 3.59 Drawing A9.63 – Column Details

A. In detail 29/A9.63, changed section marker noted as 23/A9.63 to 30/A9.63 3.60 Drawing A9.81 – Portable Bar Details

A. In detail 1/A9.81, change section marker noted as 13/A9.81 to 15/A9.81. 3.61 Drawing TE12 – Demountable Seating Platforms

A. Issue sheet TE12-ADD3 complete. 3.62 Drawing TE13 – Demountable Seating Platform Details

A. Issue sheet TE13-ADD3 complete. 3.63 Drawing PL123 – Breakout Cable

A. Issue sheet PL123 complete.

Page 9: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

Addendum

Addendum#003 - BP5 Interiors.doc ADD - 9 - 9

PART IV – ADDITIONAL INFORMATION 4.1 Addendum #3 Questions and Answers

B. Issue BP#5 – ADD3 Q&A complete. END ADDENDUM

Page 10: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

1. Question: Stage Lift Concrete Sub Floor – The specification states " lightweight concrete sub-floor. Coordinate with finish floor contractor ". How thick does this need to be as it will have a big impact on the drive?

Answer: Three inches (3”) minimum thickness

2. Question: Please confirm the live load for the stage lift is 75LBS/SF (this is higher than normal)? The typical live load for a stage lift is 50LBS/SF. This 25LBS/SF difference on a lift this big, 591 square feet, will make a difference on the drive required and the bid price.

Answer: As clearly stated in the specification, the both the Platform Extension Lift and House Mix Position Lift have a Moving Live load Capacity of 75 lbs./ft2. This is not higher than “normal”.

3. Question: Stage lift manual back-up: We can include the manual backup as an option. This is one with a power drill and an adaptor to fit on a gear reducer. However, if the lift won’t move when you release the brakes, as specified, the lift can't move with a backup system being used in a no-power situation.

Answer: Please note that the specification says: “The gearmotor shall be inherently self-locking under load conditions. Motor brake holding of load will not satisfy this requirement”, and, “Manual release of motor brake shall not allow load to drop”. Manual release of the brakes should enable the gear reducer to be driven (and the gear reducer should be sized so that a fully-loaded lift does not back-drive the reducer).

The Manual Back-up system presumes that, at some point, the drive motor may fail or need complicated maintenance requiring its removal from the lift machine pit. It is not intended to power the system during performance conditions.

TECs can propose an alternative solution to this requirement.

4. Question: What is the estimated dead load of each of the Canopies including truss and glass panels? The specifications state this information will be provided by the Canopy Contractor however it is required to do pre-engineering for a design takeoff for the hoists, rigging, and control components.

Answer: NOVUM STRUCTURES anticipated a dead load (space frame, glass, glass hangers only) of 28.5 psf. We suggest rounding to 30 psf for initial calculations.

Assuming 30 psf:

• Canopy 1: ~612 SQ FT ~18,360# • Canopy 2: ~558 SQ FT ~16,740# • Canopy 3: ~630 SQ FT ~18,900# • Canopy 4: ~630 SQ FT ~18,900#

5. Question: Is there a maximum individual line load requirement for the Canopy lift lines?

Answer: As per 116100 General Conditions for Theater Equipment: Wire rope safety factor shall be 10:1, unless stated otherwise in individual Specification Sections. Final line load requirement must be calculated during TEC’s engineering/shop drawing process.

(BRANDON: I think they are asking if the ceiling structure has any limitations for individual loading. Because there are so few lines, some of the lines at the outer edges will have greater loading than the center ones. Perhaps the Q should be sent to the structural engineer?)

6. Question: Provide details for the demountable and fixed steps on the chorus wagons that are furnished and installed by Bid Package 5060 – Finish Carpentry.

Answer: Refer to Addendum #3.

Page 11: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

7. Question: Several drawings indicate a millwork type AW-6. What is AW-6? It is not on the keynote legend and points to multiple types of items that lead to some confusion.

Answer: Refer to addendum #3 for clarification.

8. Question: Please provide a specification for the wallcovering frieze to indicate the paper weight, acceptable manufacturers and etc…

Answer: This is provided as part of Addendum #3.

9. Question: Addendum #1, 3.10 A & B, changes the note on 2/A5.40 & 14/A5.40 from "Solid Surface Countertop w/backsplashes" to "Countertop w/backsplash (See Finish Drawings for Material). The Finish Plans refer to elevations for countertop material locations and do not specify the finish. Please clarify.

Answer: Refer to addendum #3.

10. Question: Detail 1/A4.40 shows a window sill but does not state what the material is. Please specify sill material.

Answer: Material is to be painted wood.

11. Question: Is the assist rail and wall rail at the glass rail and monumental stairs to be steel or Bronze?

Answer: The assist rail is to be bronze.

12. Question: Plan note 39a calls for a bronze handrail. In the FOH area this note is used sparingly. Please review each stair and ramp in FOH and indicate if these rails should be steel or bronze. As it now stands the building will get steel in some areas that are probably meant for bronze. Please indicate which stairs or ramps should be 39a or 39b.

Answer: Refer to addendum #3 write up for clarifications of railings.

13. Question: Elevation 2/A5.40, Orchestra Restroom, shows a panel under the vanity top, the section detail in 1/A5.40 shows a cabinet. Please clarify.

Answer: This is to be a panel in lieu of cabinet.

14. Question: Elevation 14/A5.40, 151 Men's Restroom, shows vanity tops but no p'lam panel underneath. Is this correct?

Answer: Detail 14/A5.40 depicts solid surface tops and a plastic laminate panel.

15. Question: Please clarify which portions of the chorus wagons are park of the work scope for Bid Package 5060 – Finish Carpentry.

Answer: In general, Bid Package 5180 – Theater Equipment Package 2 is responsible for the structure of the wagons and accessories and appurtenances as indicated on the drawings to be by TEC. All finishes on the Chorus wagons are by the finish contractors as depicted in each work scope and previous addenda.

16. Question: Is there millwork required in rooms 167 & 170? Please provide details.

Answer: There is no millwork in 167, however refer to sheet A5.40 drawings for elevations of room 170.

17. Question: Casings are shown at doors 366c, d & e on the plan, but not on the door schedule. Please clarify.

Answer: Yes, these are to have casing D.

18. Question: Do all the windows receive a millwork casing? Please provide details or a schedule.

Answer: Refer to interior elevations for window casings. Detail for typical sill has been provided as part of addendum #3.

Page 12: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

19. Question: Are the transoms at doors 104d, e & f and 168d, e & f wood casing or by the frame manufacturer?

Answer: These are a part of the built-up wood storefront system.

20. Question: Is Bid Package 5060 – Finish Carpentry responsible for the hardware in the wood framed storefronts/windows/doors/etc…?

Answer: Yes, refer to specification 01 12 05.

21. Question: There appears to be a bench in Chorus Locker Room # 344, where is the detail showing what this is made of.

Answer: Refer to addendum #3.

22. Question: How do we know if the lockers shown on the plan are metal or solid phenolic?

Answer: All lockers are solid phenolic except the lockers located in the following rooms: 036 Waitstaff lockers and 018 Stage Crew Breakroom which are metal.

23. Question: What Acoustical Plaster is in BP 5010? Does it Replace the drywall? Where is the detail?

Answer: Bid Package 5010 – General Trades is responsible for all acoustical plaster. Depending upon the system utilized, the acoustical plaster does not necessarily replace the gypsum wall board. It is to be assumed that the acoustical plaster will be installed over the gypsum wall board unless the system being supplied does not allow for the gypsum wall board, in which the bidder shall provide all structural backup for the acoustical plaster system. Due to the difference between systems, a typical detail for the acoustical plaster has not been provided. The locations for the acoustical plaster include those listed in the alternate and the oculus shaft.

24. Question: What toilet accessories are necessary for Room 346?

Answer: This restroom shall have the following accessories: T1, T2, T3, T4, T5, T6, and T19.

25. Question: Does the alternate for acoustic plaster in the lobby area replace the drywall or added to the drywall? How thick is the plaster, is there a detail?

Answer: Refer to question 23 in regards to replacing gypsum wall board. In regards to the thickness of the system, refer to specification 09 23 13 for required acoustical criteria which will determine the overall thickness.

26. Question: What corners receive the corner guards and what type is used where?

Answer: The following criteria will set the locations for the corner guards:

Basement level – All outside corners on gypsum wallboard walls are to have surface mounted opaque-plastic corner guards.

Plenum level – No corner guards

Orchestra Low/High – All outside corners in Rm 103 are to have metal corner guards and all outside corners in the following rooms are to have opaque-plastic corner guards: 131, 132, 133, 102, 106, 108, 111, 113, 175, 183,

Box Tier - All outside corners in the following rooms are to have opaque-plastic corner guards: 343, 344, 345

Balcony Low – None

Balcony High – None

Attic - None

Page 13: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

27. Question: Is a wire mesh partition ceiling required on the wire mesh partition walls?

Answer: No.

28. Question: Is any hardware, locks, latches or etc… required at the wire mesh partition doors?

Answer: Refer to specification 10 22 13 for required hardware.

29. Question: Detail 23/A9.29 shows wood wainscot paneling on the operable partition, is this by BP 5060? Is the weight of the wainscot on the partition acceptable to the panel manufacturers?

Answer: Refer to 01 12 05 for work scope breakdown. In regards to the weight of the paneling, the panel manufacturer will be required to provide a panel capable of handling the weight.

30. Question: Spec section 102113 includes Stainless and Painted Metal toilet partitions. The plans do not indicate which type is being used where. Please clarify.

Answer: All panels are painted in Base Bid. Refer to Addendum #3 for clarification of add alternate for stainless steel toilet partitions.

31. Question: Which Bid Package shall furnish and install the 1/4" one way mirror glass and associated wood frame in detail 5/A9.70?

Answer: Bid Package 5060 – Finish Carpentry

32. Question: Is any acoustical plaster base bid for Bid Package 5010 – General Trades? Where, if yes?

Answer: Yes, the acoustical plaster located within the oculus shaft(the skylight at the center of the auditorium) is in the base bid. All other acoustical plaster is part of the alternate.

33. Question: Alternate #15 states to include acoustic plaster in upper coffer area. Does this mean only the flat upper portion of the ceiling, not the side or bottom of the "bulkheads"?

Answer: Yes, this is a correct interpretation.

34. Question: Detail 7/A2.65 shows the back-fold doors, 321a&B, folding back against the wall. Detail 19/A9.36 shows one door leaf folding back on the other and then sliding into the wall. Which is correct? The door casing for these will not allow the door to fold back against the wall and wall type W9 will not allow it to slide back into the wall.

Answer: Detail 19/A9.36 is correct.

35. Question: Detail 35/A9.36 shows a 4x6 steel tube above the transoms for door 320A & B but Sub Frame elevation 14/A9.36 only shows the tube above the door. Which is correct?

Answer: A 4x6 steel tube will be necessary over the transom.

36. Question: Addendum #2 item 3.5 says to change 1-1/2" Baswaphon to 092313.A. There is no such number in the Keynotes. What is this suppose to be?

Answer: This keynote is added.

37. Question: Addendum #2 item 3.16 says the refrigerator is by the GC. There is no GC on this job, is this by Bid Package 5010 – General Trades? If so what is the spec's for this item?

Answer:The item will be owner supplied.

38. Question: Q&A #29 in addendum #2 asks about the steel and wood supports for the stone counter top. The answer states "all stone & wood supports” should this be "all steel & wood supports"?

Answer: Yes.

39. Question: What is the size & type of pipe shown in drawing ADD1-C.001?

Answer: Refer to civil drawings for pipe sizing.

Page 14: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

40. Question: Does the plumbing sump pit already have holes cored into it for the pipe?

Answer: No, Bid Package 5010 – General Trades shall provide core drilling as necessary for this scope of work including all clean-up and removal of cores.

41. Question: Refer to sheet A9.07 wood wainscot details. For painted grade wainscot, please confirm if we can use MDF for moulding and panel to fabricate the stile and rail paneling except for baseboard and the chair rail moulding.

Answer: Refer to specification 06 40 00 for acceptable materials. MDF will not be acceptable for stiles and rails.

42. Question: Refer to sheets series A9. For painted grade standing and running trim, please confirm if we can use the MDF for all moulding shown on drawings?

Answer: No.

43. Question: All trims in the Auditorium are gypsum plaster except wood door casing, wood base, wood chair rail, wood cap and wood wainscot in alternative No.12. Please confirm.

Answer: Refer to drawings and specifications for usage of wood.

44. Question: Is it safe to assume that all of the cast plaster bullnose, crown mould, top of arch "casing" mould, etc. are to be installed by the plaster contractor?

Answer: Yes, all plaster trim shall be by the plaster contractor.

45. Question: On the A8.xx, finish plans, reference is continuously made to "AW2" for millwork/casework. What is "AW2"? There is no such item on the finish legend.

Answer: It was our intent to clarify all AW2 items as paint grade wood.

46. Question: Sheet A5.13, detail 3, shows a detail 6/A9.33. There is no such detail on sheet A9.33

Answer: Refer to addendum #3 write up.

47. Question: Sheet A5.08 arched niche indicates detail 28/A9.18 and section 26/A9.18. None of these show the bracket types below the niche. This is also true for numerous room and lobby elevations around the crown. (As an example sheet A5.11 and its associated details). These are complicated pieces and should be clearly identified on each elevation where they appear both as to applicable detail and if they are cast plaster.

Answer: These brackets are to be bracket type C. As depicted in details, these details are to intended to be wood.

48. Question: On more than 50 interior elevations, including many long runs of wall, there is no identification of the various door and other casings leaving us to scale and guess as to which one(s) belong where. Each casing should be identified or indicated to be typical of all those on a given elevation to eliminate any guessing.

Answer: All casings for doors are identified in the door schedule.

49. Question: Sheet A6.68 reflected ceiling plan #2 references section 39/A9.33. There is no such section. Please clarify.

Answer: Refer to addendum #3 write up.

50. Question: Sheet A6.68 reflected ceiling plan #2. Please provide sections through the "spokes" of the circle so we can see how all the trim works.

Answer: Each of the spoke is similar to the inner hub, but with trim on both sides.

51. Question: Spec section 11 61 23 (orchestra risers) makes reference in parts 1.1, A, 5 and 2.2, A, 1 that the wood flooring planks for the orchestra risers are to be provided by the wood flooring contractor

Page 15: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

for installation by the orchestra risers contractor. In reviewing the scopes, I see no reference to the orchestra wood planks in the wood flooring contractor’s scope.

Answer: BRANDON – what do you think. Do they just provide, or provide, install finish. I am ok with this, we just need to state as such in response to the question: Bid Package 5120 shall furnish the wood flooring planks for the orchestra risers to Bid Package 5190 – Orchestra Risers. Bid Package 5190 – Orchestra Risers shall install and finish the wood flooring.

52. Question: Please clarify if stairs 29 & 30 are also monumental stairs and shall be provided by Bid Package 5030 – Ornamental Steel and Railings.

Answer: Yes, stairs 29 & 30 are monumental stairs and shall be furnished and installed by Bid Package 5030.

53. Question: Checking with the specified vertical lift door frame supplier for the doors in the Donor area it appears that NO standard door or lift assembly of theirs will work without major re-design. Please advise.

Answer: It is assumed that these will require a custom assembly.

54. Question: Specification section 12 61 00 (Fixed Auditorium Seating), item 1.1, A, d, states the fabric for the chorus benches (by Bid Package 5060 – Finish Carpentry) is to be provided by Bid Package 5200 – Fixed Audience Seating and supplied to Bid Package 5060. Please Clarify

Answer: Bid Package 5060 – Finish Carpentry shall furnish and install the fabric at the bench seating in coordination with Bid Package 5200 – Fixed Audience Seating.

55. Question: Please confirm that fabric wrapped wall panels are indicated for stairs 17 & 18.

Answer: Yes, these entire walls of the room enclosing stairs 17 and 18 are to be covered with fabric wrapped panels. Note, all trim and other appurtanences are to be furred out to allow the face of the fabric panels to become the face of the wall (i.e. items are not to be recessed behind the face. )

56. Question: Is the fabric for specifications section 09 84 00 by the Owner or $60.00/yd per the Finish Schedule?

Answer: Per A8.00 finish schedule, yes.

57. Question: The bar fronts were moved from Bid Package 5060 – Finish Carpentry to Bid Package 5070 – Custom Casework. Will the glass shelving at these locations remain in Bid Package 5060?

Answer: Yes

58. Question: Bid Package 5030 – Ornamental Steel and Railings is responsible to remove temporary handrails. It will be difficult if not impossible to accurately submit a hard number price for an undetermined amount of work. Please consider reassigning this responsibility to a different package.

Answer: In lieu of an undetermined amount of removal, Bid Package 5030 – Ornamental Steel and Railings shall include an allowance for the complete removal from site of 6,000LF of wood OSHA compliant handrail as directed by the Construction Manager.

59. Question: Will an alternate to combine Bid Package 5170 – Theater Equipment Package 1, Bid Package 5180 – Theater Equipment Package 2, Bid Package 5190 – Orchestra Risers and Bid Package 5200 – Fixed Audience Seating be allowed?

Answer: Yes, see the write up for Addendum #3.

60. Question: Addendum #2, Q & A #3, clarifies the scope for the ornamental grilles on the Chorus Wagons only as being part of Bid Package 5060 - Finish Carpentry. Who is responsible for the upper grilles?

Page 16: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

Answer: The upper grills shall be by Bid package 5030 – Ornamental Steel and Railings.

61. Question: Addendum #2, Q & A #5, clarifies the finishes of rooms 035 & 064 as p'lam shelves & kv standards. How many rows of shelves, 1, 3. 5?

Answer: 5 rows.

62. Question: Addendum #2, Q & A #35, references sheet A2.62 as having benches by Bid Package 5060 - Finish Carpentry, which section or detail shows the finishes for these benches?

Answer: Refer to addendum #3 write up. In general, the benches at the choral terrace and choral wagons (far north end of the auditorium) are to be provided.

63. Question: Addendum #2, Q & A #40, states that All paint grade woodwork and casework is to be primed by the supplying bid package. It also states that Bid Package 5160 - Paint and Wallcoverings shall include the final prep and paint of all paint grade woodwork as part of their work scope. What about the painting of the paint grade casework? Is this part of Bid Package 5160 - Paint and Wallcovering's work scope? Addendum #2, Q & A #32, states that benches are to be shop finished completed. Addendum #2, Q & A #9, states all paint grade wood products are to be shop primed and field finished. These answers seem to be contradictory. The bid package scope call for all paint grade casework to be shop finished.

Answer: All paint grade casework is to be shop finished.

64. Question: Addendum #2, Q & A #73, clarifies that the lockers are sitting on 5" bases by the same suppliers as the lockers Elevation 11/A5.41, there appears to be something in front of the solid back panel on each side of the column with a section marker. Is this a bench, or locker base?

Answer: In this case, this is a bench. Refer to revised detail in addendum #3.

65. Question: Mention is made of illuminated wood display cases. Is this referencing the poster displays? If not, please clarify with location and detail.

Answer: This is referring to the poster display cases.

66. Question: The door schedule calls out hardware sets that I can’t find in the door hardware specs for the doors at the storefronts in the Finish Carpentry scope. Specifically:

Door opening: 1138 Hardware Set: 091 Door opening: 1140A Hardware Set: 093 Door opening: 1140B Hardware Set: 094 Door opening: 1140C Hardware Set: 095 Door opening: 1141 Hardware Set: 091 Door opening: 1168A Hardware Set: 100 Door opening: 1168B Hardware Set: 101 Door opening: 1168C Hardware Set: 102

Answer: These are provided as part of addendum #3

67. Question: Specification 05 70 05 Paragraph 1.02 A.2 Decorative Glass Is there a specification for this glass?

Answer: Glazing for this specification is included within the 05 70 05 specification. There should not have been a reference to another specification.

68. Question: Specification 05 70 05 Paragraph 1.05 B.5 mentions loads for catwalk. Is there a walk surface being applied to the top of space frame and if so where is this information provided?

Answer: That catwalk has been previously bid as part of Bid Package Number 3.

Page 17: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

PARCEL 7A, REGIONAL PERFORMING ARTS CENTER INTERIOR FINISHES PACKAGE P5 Addendum #3 – Questions and Answers

69. Question: Specification 05 70 05 Paragraph 2.02 C states a frit coating as indicated on the drawings. Is there a frit on this glass and if so can you please advise where to find this glass description and other specific glass information regarding the Acoustic Canopy Space Frame glass.

Answer: No all glass is clear with no frit.

70. Question: Drawing A6.85 acknowledges diagonal space frame cross bracing and drawing A6.84 shows Temporary Rigging Penetrations and requirements at the bottom chord of the spaceframe.

A. We would like to point out the fact that there may be several instances where these two items interfere with one another. Which governs? B. Who is responsible for providing the actual Temporary Rigging Penetration framing materials? C. How temporary are this items? Meaning are they truly temporary and will be removed after some point of assembly of systems or will they actually become part of the finished assembly? D. What are these made of? E. What is the finish of these items?

Answer: A. The temporary rigging lines locations cannot be relocated. The diagonal bracing will need to be designed to accommodate the locations as depicted.

B. The framing materials for these are to be provided as part of the space frame.

C. These are basically sleeves which allow the rigging lines to extend from the attic through the canopy on an as needed basis. In general, the lines will be used on a limited basis depending on the performance, however the sleeves will need to be part of the finished assembly.

D. Steel.

E. They should be finished to match the space frame.

71. Question: Are tapped and treaded holes at the node locations adequate for canopy rigging line attachments?

Answer: NO – attachment hardware must pass through hole in node. We have assumed a load-rated shouldered bolt with washer/nut at underside of node. Nut must be secured. Tapped and threaded holes with screw-in bolt hardware at nodes will be REJECTED as a connection type.

72. Question: Please clarify if the finish of the toilet partitions is changed in this alternate. Elevations are vague; a note TC1 & TC6 point to some doors; is there a schedule noting what these numbers mean?

Answer: Refer to addendum #3 write up.

73. Question: - Do Janitor rooms 348 & 341 get the typical accessories as the other janitor rooms?

Answer: Yes.

74. Question: For the Phenolic lockers, are we to go by the listed sizes or what is shown on the plans & elevations?

Answer:Sizes should be as depicted on the elevations.

75. Question: There is a significant amount of railings located within the auditorium please clarify the materials for these and which package is responsible for these?

Answer: All railings within the auditorium except the rails on the balcony parapets and cap rail at the organ loft are to powder coated steel. The rails at the balcony parapets and cap rail at the organ loft are to bronze. All railing with the auditorium is to be part of Bid Package 5030 – Ornamental Steel and Railings.

Page 18: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

25310 11 61 22 - 1 REGIONAL PERFORMING ARTS CENTER - INTERIOR INTERIOR FINISHES P5

SECTION 11 61 22 – DEMOUNTABLE AUDITORIUM RISERS PART 1 - GENERAL

1.1 SUMMARY

A. Description of System: 1. The Demountable Auditorium Risers shall be a system of interlocking portable platforms

designed to provide a sturdy, multi-level seating platform for patrons in the House Left section Orchestra High (parterre) seating level.

2. Demountable Fixed Auditorium Seats (by Auditorium Seating Contractor) shall be mounted to risers. Contractor of this Section shall coordinate work with ASC.

3. Height of risers shall be fixed to conform to the heights of permanent parterre row elevations.

4. Demountable fixed length legs are inserted into captive receptacles on underside of each riser frame. Leg units shall be bolted to the auditorium floor.

5. Risers, step units, fascia panels, and hardware shall be stored and transported on special transport truck dollies.

6. Base bid flooring shall be plywood subfloor with ½” Medite or Masonite painted to match auditorium floor.

7. Finished wood floor (Alternate) of Demountable Auditorium Riser platforms shall match the finished wood floor of the Concert Hall auditorium (by Others).

8. Finished Auditorium wood floor (Alternate) planks of 1/2” tongue and groove shall be provided to Theater Equipment Contractor (TEC) by Finished Floor Contractor. Tongue and groove planks shall be applied to plywood subfloor.

B. This Work is governed by Section 11 61 00: General Conditions for Theater Equipment and Division 1.

C. The Work of this Section Includes:

1. Demountable Auditorium Riser platforms, panels, and all sub-systems, as indicated on tender drawings, and as described within this specification.

2. Demountable Auditorium Riser legs of sizes as indicated on tender drawings, and as described within this specification.

3. End panels (fascia) to mask the sides of the assembled Demountable Auditorium Riser system as indicated on tender drawings, and as described within this specification.

4. Step units as indicated on tender drawings, and as described within this specification. 5. Storage / transport truck dollies. 6. Four (4) hex key (Allen key) “T-handles” for operation of the Roto-locks. 7. Miscellaneous hardware and tools required to assemble, transport, store, and maintain

the complete system. 8. Coordination of Electrical work with Electrical Contractor and Auditorium Seating

Contractor for Aisle Lights.

D. Related Work by Others:

1. Concert Hall Auditorium finished flooring 2. Concert Hall Auditorium finished wood flooring (Alternate) 3. 12 61 00 Fixed Auditorium Seating. 4. Division 16 Electrical work (Aisle Lights)

Page 19: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

25310 11 61 22 - 2 REGIONAL PERFORMING ARTS CENTER - INTERIOR INTERIOR FINISHES P5

1.2 SUBMITTALS/QUALITY ASSURANCE

A. In accordance with General Conditions, provide sufficient General Arrangement, Shop, and Detail drawings; Cut Sheets; and Calculations for Construction Manager, Architect and Consultant to understand details, dimensions, appearances, methods of fabrication and installation, and operation of the Work.

B. Demountable Auditorium Risers shall be provided by:

1. Mystic Scenic Studios, Inc. 293 Lenox Street Norwood, MA 02062 USA TEL: 781.329.9006 FAX: 781.440.2623 Email: [email protected]

2. R. A. Reed Productions, Inc. 955 N. Columbia Blvd. Bldg A Portland, OR 97217 USA TEL: 503.735.0003 FAX: 503.735.0306 Email: [email protected]

3. Staging Concepts 7008 Northland Drive Suite 150 Brooklyn Park, MN 55428 USA TEL: 763.533.2094 FAX: 763.533.2096 Email: [email protected]

4. StageRight Corporation 495 Pioneer Parkway Clare, MI 48617 USA TEL: 800.438.4499 Website: www.stageright.com

5. Wenger Corporation 555 Park Drive P.O. Box 448 Owatonna, MN 55060-0448 TEL: 800.493.6437 FAX: 507.455.4258 Email: [email protected] Email: [email protected]

C. Candidates who wish to bid on this system shall be governed by the General Conditions, section 1.6: Qualification Requirements for Potential Bidders.

D. General Arrangement, Shop, and Detail drawings: in accordance with the General Conditions.

Page 20: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

25310 11 61 22 - 3 REGIONAL PERFORMING ARTS CENTER - INTERIOR INTERIOR FINISHES P5

E. Cut Sheets; Calculations: in accordance with the General Conditions.

F. Mockups:

1. Two full size, adjacent riser sections using different height legs. 2. Units may be used in final installation if approved or with required corrective work as

noted by CM, Architect, and Consultant.

1.3 PERFORMANCE CRITERIA

A. Platforms shall be capable of sustaining a uniform load of 300-pounds/square foot. Platforms must support combined weight of the demountable auditorium seats and the live load of patrons.

B. All platforms shall be easily moved and secured in position by two (2) technicians.

C. All platforms shall be lifted and stacked atop each other by two (2) technicians.

PART 2 - PRODUCTS AND MATERIALS

2.1 METAL

A. In accordance with the General Conditions.

2.2 WOOD

A. In accordance with the General Conditions, and as below: 1. Flooring finish to match auditorium floor finish (as per Architect). 2. Finished wood flooring planks (Alternate) shall be provided by Finished Floor Contractor. 3. Wood Flooring (Alternate) shall be ½” tongue and groove planks.

2.3 EQUIPMENT

A. In accordance with the General Conditions

B. Frame 1. Frames shall be fabricated to match the shapes and sizes shown on the drawings. 2. Frame shall be constructed of extruded structural aluminum. 3. Interior joists shall be of aluminum, as needed to support finished wood flooring. 4. Frames for platform of a given elevation shall be interlocked by means of a Butt-Joint

Panel Fastener (Roto-locks, or similar). Two (2) fasteners shall be provided on each side. An oversized hexagonal Allen key with integrated handle (“T-handle”) shall be used to engage the fastener.

C. Leg Sockets 1. Frame shall be provided with leg sockets appropriately spaced to carry loads,

permanently attached to the platform frame, to accept detachable legs.

Page 21: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

25310 11 61 22 - 4 REGIONAL PERFORMING ARTS CENTER - INTERIOR INTERIOR FINISHES P5

2. Leg Sockets shall be designed with an integral, single action lever to lock the legs into the sockets.

D. Legs 1. Fixed legs shall be fabricated from structural aluminum. 2. Length of legs shall be in quantities and heights as shown on the drawings and be

interchangeable between platforms, where possible. 3. Each leg shall be provided with a UHMW plastic cap on the foot to prevent damage to the

stage finished floor. 4. Platform heights shown on the contract drawings are finished elevations.

E. Fascia Panels 1. Base Bid Fascia panels shall be fabricated from A/C plywood or Masonite, with finish as

per Architect. 2. Panels shall connect to platform legs with bolt connection as shown on the drawings. 3. Alternate Fascia Panels shall be Maple plywood, with finish as per Architect.

F. Stairs 1. Provide step units as shown on the drawings. 2. Steps platforms shall be covered by fascia panels as per subsection E: Fascia Panels

(above). 3. Frames for platform of a given elevation shall be interlocked by means of a Butt-Joint

Panel Fastener (Roto-locks, or similar). Two (2) fasteners shall be provided on each side. An oversized hexagonal Allen key with integrated handle (“T-handle”) shall be used to engage the fastener.

G. Storage/Transport Truck Dolly 1. Storage/transport truck dolly shall be sized to maximize the number of platforms that may

be manageably moved with a single truck dolly. 2. Storage/transport truck dollies must also be sized to allow them to fit through all required

doorways. 3. Provide storage/transport truck dollies in quantities sufficient to move all of the concert

riser platforms. 4. Casters shall be 8" diameter, ball bearing type. 5. Each unit shall have two (2) swivel casters and two (2) rigid. 6. Each caster shall be rated to support appropriate load.

2.4 FABRICATION

A. Fabrication shall be as described in Section 11 61 00: General Conditions for Theater Equipment, and as below.

B. TEC shall receive finished floor planking from Finished Floor Contractor. After installation of finished floor onto riser frames, Finished Floor Contractor shall complete finish treatment of wood floor.

C. Frames and railings shall be of welded construction. Welds, edges and corners shall be ground smooth and eased so as to eliminate all rough parts, sharp protrusions and irregularities.

D. Exposed wood on underside of risers shall be painted with a flame retardant paint

Page 22: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

25310 11 61 22 - 5 REGIONAL PERFORMING ARTS CENTER - INTERIOR INTERIOR FINISHES P5

PART 3 - EXECUTION

3.1 COORDINATION

A. Provide a complete and working installation of this system, fully coordinated with work of other contractors and trades.

B. Coordination with:

1. Finished Flooring Contractor. 2. Auditorium Seating Contractor

3.2 ENVIRONMENTAL CONDITIONS

A. Protect all Work of this Section as described in Section 11 61 00: General Conditions for Theater Equipment.

B. For shipping, storage, handling, and during installation, protect all materials and components from dust, moisture and physical damage.

C. During installation, provide protection against environmental conditions at all times when not physically working on equipment.

D. Do not deliver any materials or equipment for installation until worksite is dust free and secured.

E. Coordinate proper environmental conditions for storage of materials and equipment on or near site prior to shipment.

3.3 INSTALLATION

A. Installation shall be as described in Section 11 61 00: General Conditions for Theater Equipment, and as below.

3.4 FIELD QUALITY

A. Verify all field dimensions and verify strength and suitability of all work by others before installation of any Work of this Section.

B. Coordinate in shop drawings and verify necessary electrical accommodation required for installation of the Work of this Section.

C. Furnish all items necessary to properly install and secure all work of this Section to existing work provided by others.

D. Make site alterations to equipment and mounting details only as specified in this Section and in Section 11 61 00: General Conditions for Theater Equipment.

3.5 FIELD TESTING

Page 23: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

25310 11 61 22 - 6 REGIONAL PERFORMING ARTS CENTER - INTERIOR INTERIOR FINISHES P5

A. Properly align, test and tune entire installation prior to Final Inspection. Conduct trial versions of all Final Inspection tests prior to CM, Architect, and Consultant’s review. Replace or adjust any system or component that fails any tests, and repeat tests.

B. Upon successful completion of all tests, provide written confirmation to Consultant certifying that all Work of this Section is ready for Final Inspection, as specified in Section 11 61 00: General Conditions for Theater Equipment.

3.6 FINAL INSPECTION

A. This Contractor shall be responsible for all necessary aspects of Final Inspection, demonstration of system, safe and reasonable access to all components of the system during check-out and instructions in operation, per requirements as identified in Section 11 61 00: General Conditions for Theater Equipment.

B. Wagons to be moved from storage to play position and back to storage, to demonstrate ease of, and smooth operation of wagons and machinery.

3.7 INSTRUCTION

A. Provide a minimum of three (3) hours of detailed instruction and demonstration to Owner in the presence of the CM, Architect, and Consultant. Prepare for and provide organized instruction on:

1. Proper installation (set-up) of risers, legs, and other elements. 2. Proper method for breakdown and storage of elements on Storage / Transport dollies. 3. Safety precautions. 4. Maintenance requirements. 5. System trouble-shooting and fault-finding.

B. Coordinate scheduling of instruction session directly with Owner, CM, and the Consultant. Schedule session only after:

1. Seven (7) days past completion and Consultant reviewed Operation and Maintenance Manual / Theater Equipment Manual has been received by Owner and CM,

2. Certificate of substantial completion has been issued, 3. Majority of punch list items have been cleared.

C. Notify the Owner, CM, and Consultant in writing at least seven (7) days prior to desired demonstrations and instructions in operation. The demonstrations shall be carried out to the satisfaction of the Architect prior to final payment request.

3.8 THEATER EQUIPMENT OPERATIONS AND MAINTENANCE MANUAL

A. Supply Theater Equipment Manuals, as identified in Section 11 61 00: General Conditions for Theater Equipment.

3.9 SPARE PARTS

Page 24: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional

25310 11 61 22 - 7 REGIONAL PERFORMING ARTS CENTER - INTERIOR INTERIOR FINISHES P5

A. Provide spare parts labeled and packaged in containers as specified in Section 11 61 00: General Conditions for Theater Equipment.

3.10 FINAL SUBMITTALS

A. Provide Final Submittals as per Section 11 61 00: General Conditions for Theater Equipment.

END OF SECTION

Page 25: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional
Page 26: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional
Page 27: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional
Page 28: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional
Page 29: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional
Page 30: Addendum - W.R. Dunkins/Carmel/CarmelAdd3.pdf · Addendum Addendum#003 - BP5 Interiors.doc ADD - 1 - 1 ADDENDUM NO: 3 BID PACKAGE NO: Interiors Package - P5 PROJECT: Carmel Regional