ADDENDUM NUMBER ONE BID S-12-21 To: All Prospective Bidders and all others concerned From: City of Cheyenne, Purchasing Manager, TJ Barttelbort Date: February 1, 2021 Subject: Addendum Number One to Bid S-12-21 for the Dey Avenue Greenway Connector Project The changes, clarifications, omissions, additions, and/or alterations in, on, and to the bid information and specifications shall apply to the Invitation For Bid submitted for and to the project indicated above. Except as modified by this Addendum Number One, all of the terms and provisions of the Invitation for Bid for the above listed project remain in full force and effect. This Addendum Number One supersedes all previous instructions pertaining to the items listed: Clarifications & Updates: C1: The Pre-Bid Meeting notes are included with this Addendum One. C2: Final Completion of everything EXCEPT seeding will be required by August 16, 2021. Seeding shall be completed between September 6, 2021 and September 24, 2021. C3: Remove Section 02900 of the Supplementary Conditions. Contractor will NOT be required to water the dry land seed area(s). Seeding will be done in September of 2021. C4: The City of Cheyenne will cut off the bolts on the drilled shaft at the corner of Dey and Ames. The City will install a gate on this existing drilled shaft sometime in 2021. C5: A revised Itemized Bid Sheet is included with this Addendum One. Bidders shall use the revised Itemized Bid Sheet for their Bid submission. City of Cheyenne - Purchasing 2101 O’Neil Avenue, Room 309 Cheyenne, WY 82001 307-773-1045 [email protected] City of Cheyenne / Bid S-12-21 / Addendum One Page 1 of 10

Upload: others

Post on 12-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

ADDENDUM NUMBER ONE

BID S-12-21

To: All Prospective Bidders and all others concerned

From: City of Cheyenne, Purchasing Manager, TJ Barttelbort

Date: February 1, 2021

Subject: Addendum Number One to Bid S-12-21 for the Dey Avenue Greenway

Connector Project

The changes, clarifications, omissions, additions, and/or alterations in, on, and to the bid

information and specifications shall apply to the Invitation For Bid submitted for and to the project

indicated above. Except as modified by this Addendum Number One, all of the terms and

provisions of the Invitation for Bid for the above listed project remain in full force and effect. This

Addendum Number One supersedes all previous instructions pertaining to the items listed:

Clarifications & Updates:

C1: The Pre-Bid Meeting notes are included with this Addendum One.

C2: Final Completion of everything EXCEPT seeding will be required by August 16, 2021.

Seeding shall be completed between September 6, 2021 and September 24, 2021.

C3: Remove Section 02900 of the Supplementary Conditions. Contractor will NOT be required

to water the dry land seed area(s). Seeding will be done in September of 2021.

C4: The City of Cheyenne will cut off the bolts on the drilled shaft at the corner of Dey and

Ames. The City will install a gate on this existing drilled shaft sometime in 2021.

C5: A revised Itemized Bid Sheet is included with this Addendum One. Bidders shall use the

revised Itemized Bid Sheet for their Bid submission.

City of Cheyenne - Purchasing

2101 O’Neil Avenue, Room 309

Cheyenne, WY 82001

307-773-1045

[email protected]

City of Cheyenne / Bid S-12-21 / Addendum One Page 1 of 10

Page 2: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

Questions & Responses:

Q1: What is the CY of unclassified excavation?

A1: See table on Page 5. Contractor is responsible for his/her own take-offs.

Q2: If there is a need for excavation below subgrade will it be paid by change order?

A2: Yes

Q3: What is the street classification of this section of Dey Ave?

A3: Dey Avenue is classified as a Local Street on the 2015 Update of the Cheyenne Urban

Roadway Functional Classification Map.

Q4: Can the parking stalls across Lincolnway at the Park be used for employee parking?

A4: Yes

Q5: Does the contractor have to provide access to the businesses at all times?

A5: Refer to the notes on Sheet 2 of the plans. Only one intersection (Dey Ave/Lincolnway and

Dey Ave/Ames Ave) may be closed to traffic at one time. All three of these businesses

have access off of Lincolnway. There will be a period of time when access to Little Philly

and The Eagle’s Nest won’t be accessible from Dey Avenue. This time needs to be kept

to a minimum as much as possible, meaning that consideration needs to be given to

maintaining access as much as is reasonable.

ADDENDUM ONE ACKNOWLEDGED:

BY_____________________________ TITLE_____________________________

(Addendum must be signed and returned with bid or receipt of the addendum must be

acknowledged on the Invitation to Bid).

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

City of Cheyenne / Bid S-12-21 / Addendum One Page 2 of 10

Page 3: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

BID SHEET, BASE BIDBID PROPOSALPROJECT BID S-12-21 / DEY AVENUE GREENWAY CONNECTOR

Item No. Description Unit Est. Qty Unit Price (in figures) Total Price

1000.1 LS 1

1020.1 LS 1

1030.1 LS 1

1035.1 $ 26,000 $26,000.00 $26,000.00

1050.1 LS 1

1563.1 LS 1

2050.1 LF 30

2050.2 EA 1

2050.3 EA 1

2075.1 SY 200

2075.2 SY 210

2075.3 LF 303

2075.4 SY 1,430

2210.1 UNCLASSIFIED EXCAVATION (EXPORT/REMOVE FROM SITE) SY 1,993

2231.1 TON 506

TRAFFIC CONTROL

MISCELLANEOUS FORCE ACCOUNT

MOBILIZATION

INSPECTIONS AND TESTING FOR QUALITY CONTROL

REMOVE EXISTING SIGN PANEL ON MAST ARM

REMOVE EXISTING SIGN PANEL ON POST

REMOVE CONCRETE CURB WALL SOUTH OF EAGLES NEST, INCL. SAW CUT

SEDIMENT, EROSION CONTROL, AND STORM WATER MANAGEMENT

ADDENDUM ONE

CRUSHED BASE GRADING 'W'

REMOVAL OF ASPHALT PAVEMENT, INCL. SAW CUT

REMOVAL OF CONCRETE SIDEWALK

REMOVAL OF CONCRETE VALLEY PAN/FILLET/PAVEMENT

CITY OF CHEYENNE ITEMIZED BID SHEET FORM

REMOVAL OF CONCRETE CURB AND GUTTER, INCL. SAW CUT (24" AND 30")

CONTRACT BOND

City of Cheyenne / Bid S-12-21 / Addendum One Page 3 of 10

Page 4: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

2280.1 CY 42

2512.1 SY 490

2515.1 SF 1,529

2805.1 EA 2

2806.1 SF 52

2806.2 EA 2

2900.1 LS 1

3330.1 LF 731

3330.2 LF 94

3340.1 SF 6,726

3340.2 EA 14

3340.3 SY 140

BIDDER: TOTAL BID:

CONCRETE VALLEY PAN/PAVEMENT/FILLETS, 8"

DETECTABLE WARNING PLATES (2.5'x5' PLATES)

CONCRETE GREENWAY/CONCRETE SIDEWALK, 4"

30" WIDE CURB AND GUTTER TYPE 'A'

24" WIDE CURB AND GUTTER TYPE 'A'

PATCHING ASPHALT (3" ASPHALT ON 6" CRUSHED BASE)

PLANT MIX BIT. PVMT, 4" (2 LIFTS)

IMPORT AND PLACEMENT OF TOPSOIL, 4"

HYDROMULCH SEEDING, DRY LAND MIX (280 ± SY IN SWALE)

T-POST, POST AND INSTALLATION

SIGN PANEL, INCL. POST AND INSTALLATION

RELOCATE EXISTING SIGN (COMPLETE INSTALLATION)

City of Cheyenne / Bid S-12-21 / Addendum One Page 4 of 10

Page 5: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

UNCLASSIFIED EXCAVATION ESTIMATENOTES

ASPHALT PATCH IN TEMP. CONST. EASEMENT 615 SF 7 IN 359 CF DEPTH = CUT FOR 3" ASPHALT + 4" BASEASPHALT PATCH 914 SF 5 IN 381 CF DEPTH = CUT FOR 3" ASPHALT ON 6" BASE (4" ALREADY REMOVED)EXIST. SIDEWALK, REMOVE & REPLACE AS 4" THICK 375 SF 4 IN 125 CF DEPTH = CUT FOR PLACEMENT OF 4" BASEEXIST. SIDEWALK, REMOVE & REPLACE AS 6" THICK 205 SF 6 IN 103 CF DEPTH = CUT FOR PLACEMENT OF 4" BASE + 2" THICKER CONCRETEEXIST. CURB & GUTTER/FILLET/VALLEY PAN, REMOVE & REPLACE 829.5 SF 6 IN 415 CF DEPTH=CUT FOR 6" BASEPROPOSED GREENWAY IN EXIST. ASPHALT PVMT. (ASSUME ASPHALT = 4") 5008 SF 4 IN 1670 CF DEPTH = CUT FOR 4" BASEPROPOSED GREENWAY IN EXIST. CONC. PVMT. (ASSUME CONCRETE = 8") 914 SF 0 IN NO UNCL. NEEDED, REMOVING 8" PAVEMENT TO REPLACE WITH 4" ON 4"PROPOSED CONC. PVMT. IN EXIST. CONC. SDWK. 251 SF 16 IN 335 CF DEPTH = CUT FOR 8" CONC. ON 6" BASE + 2" LOWER AFTER REMOVED SDWK.PROPOSED CONC. PVMT. IN EXIST. VALLEY PAN 506 SF 6 IN 253 CF DEPTH = CUT FOR 6" BASE (6" CONCRETE ALREADY REMOVED)PROPOSED 24" CURB & GUTTER IN EXISTING ASPHALT ROADWAY AREA 990 SF 8 IN 660 CF DEPTH = CUT FOR 6" BASE (4" ASPHALT ALREADY REMOVED)PROPOSED 24" CURB & GUTTER IN EXISTING PARKING LOT AREA 182 SF 16 IN 243 CF DEPTH = CUT FOR 6" GUTTER + 6" BASE + 4" CURB HEIGHTPROPOSED 24" CURB & GUTTER IN EXISTING CONCRETE PAVEMENT 42 SF 4 IN 14 CF DEPTH = CUT FOR 4" BASE (8" PAVEMENT ALREADY REMOVED)PROPOSED ASPHALT IN PARKING LOT AREA/SIDEWALK AREA 1365 SF 12 IN 1365 CF DEPTH = CUT FOR 4" ASPHALT ON 8" BASE (4" ALREADY REMOVED, LOWER BY 4")PROPOSED ASPHALT IN PARKING LOT AREA/SIDEWALK AREA 2883 SF 8 IN 1922 CF DEPTH = CUT FOR 8" BASE (4" PVMT ALREADY REMOVED)PROPOSED ASPHALT WHERE EXIST. CURB & GUTTER REMOVED 260 SF 6 IN 130 CF DEPTH = CUT FOR 4" ASPHALT ON 8" BASE (6" GUTTER REMOVED)SWALE 2427 SF 4 IN 809 CF DEPTH = CUT FOR 4" OF IMPORT TOPSOIL

8784 CF

326 CY EXPORT = HAUL OFF SITE

CONTRACTOR IS RESPONSIBLE FOR HIS/HER OWN TAKE‐OFFS. THESE NUMBERS REPRESENT AN ESTIMATE BASED ON ASSUMED PAVEMENT THICKNESSES/CONDITIONS. UNCLASSIFIEDEXCAVATION IS PAID BY THE SQUARE YARD. TOTAL DISTURBED AREA = 17,940 SF = 1,993 SY. CONTRACTOR SHALL NOT DISTURB AREA BEYOND THE LIMITS SHOWN IN THESE PLANS WITHOUT PRIOR APPROVAL.

AREA DEPTH VOLUME

City of Cheyenne / Bid S-12-21 / Addendum One Page 5 of 10

Page 6: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

1

Dey Avenue Greenway Connector

Bid Bo. S-12-21

Pre-Bid Meeting

I. Introductions: a. TJ Barttelbort, City Purchasing Manager b. Jeanie Vetter, Greenway Planner, City Planning & Development Office c. Darci Hendon, Summit Engineering, Project Engineer and Construction Administration

II. Schedule: a. Questions are due in writing, by email, to TJ by 5:00 p.m. on Friday, January 29, 2021. b. Addendum to be issued no later than 5:00 p.m., Tuesday, February 2, 2021. c. Bid Opening: 2:00 p.m., Friday, February 12, 2021, contractors may attend in person. d. If the bids are acceptable then City Council Approval is anticipated on March 8, 2021 and Notice

to Proceed is estimated for March 16, 2021 (pending completion of required paperwork.) e. Substantial Completion: July 16, 2021

i. This will ensure that Dey Avenue is fully open to the public prior to Frontier Days. ii. This project shall be included in the special rules for Cheyenne Frontier Days (see

Supplementary Specifications on Page 52 of 87 in the project manual.) All roadways and pedestrian ways shall be fully open. All equipment, materials, traffic control devises and other construction items shall be removed from the project site prior to 5:00 p.m. on Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.)

f. Final Completion: August 16, 2021 i. ADDENDUM #1 – Final Completion of everything EXCEPT seeding will be required by

August 16, 2021. Seeding shall be completed between September 6, 2021 and September 24, 2021.

ii. ADDENDUM #1 – Remove Section 02900 of the Supplementary Conditions. Contractor will NOT be required to water the dry land seed area(s). Seeding will be done in September of 2021.

III. Swale/Swale a. The purpose of the swale is to provide some water quality before runoff enters Crow Creek. The

Creek has been identified as being impaired by E.coli and excessive sediment. b. Openings in the curb will be built to allow water to get off the pavement and into this swale. c. Because seeding won’t take place until after Final Completion, it is recommended that straw

waddles be placed at the back of curb at the curb openings. BMPs need to stay in place until 80% of the seed is established, at which time the contractor will remove the BMPs. If the seed doesn’t come in during Spring 2022, this will be a warranty item and it will need to be re-seeded prior to June 1, 2022.

d. Waddles, or BMPs will need to be kept in good condition. If the BMP falls apart and ends up filling up the swale, the swale will need to be cleaned out and the BMP replaced.

e. Dry Land Seeding: Contractor will rake dry land seed into swale area and then must either straw crimp or hydro-mulch over seeded area. Hydro-seeding is not permitted. This will be done in two steps: seeding, and then straw or hydro-mulch.

City of Cheyenne / Bid S-12-21 / Addendum One Page 6 of 10

Page 7: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

2

IV. Historic Wall and Pan a. This wall was constructed in the 1930’s and Councilman

Laybourne’s Grandfather helped to construct it. We need to use caution when working around it to prevent damaging it any further. You may not drive equipment on the pan. Please use care when removing the concrete adjacent to the wall.

b. An expansion joint will be placed between the pan and the new concrete so that the concrete isn’t poured onto the pan. Councilman Laybourne is investigating avenues to pay to restore this wall, we need to make sure the wall and the new Greenway are separated. (All expansion joints shall be sealed.)

c. For ~150’ of the length of the proposed Greenway the path won’t be 10’ wide because of the width restrictions inside the ROW and trying to keep this wall fully intact.

V. There is a fair amount of encroachment into the ROW in this area. Areas that appear to be on private property are actually within the ROW.

a. Construction Surveying will be needed, please don’t try and locate curb lines and improvements without a survey.

i. The grading isn’t standard, meaning that you don’t have a “normal/uniform” roadway cross slope.

City of Cheyenne / Bid S-12-21 / Addendum One Page 7 of 10

Page 8: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

3

ii. The proposed curb line on the south side of the Eagle’s Nest is within the ROW, but that area appears to be on Eagle’s Nest property. That curb line needs to be placed exactly where it was designed, there is already a lawyer involved representing the Eagle’s Nest.

b. Construction Easement i. A Temporary Construction Easement has been obtained from the owners of both Little

Philly and The Eagle’s Nest in order to place asphalt pavement at shown on Sheet 3 of the plans. The purpose of this asphalt will be to help with circulation between these lots and access to these businesses during construction. There will be times when you will have to shut Dey Avenue down to traffic to complete the work – this asphalt area will help with deliveries and getting customers to these businesses.

ii. DO NOT PARK EQUIPMENT OR STORE MATERIALS ON THE EAGLE’S NEST PARKING LOT. Doing so would be a violation of the Temporary Construction Easement.

VI. Working with the Adjacent Businesses a. Sheet 2 of the plans outlines requirements for working with the adjacent businesses and

keeping these businesses accessible.

City of Cheyenne / Bid S-12-21 / Addendum One Page 8 of 10

Page 9: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

4

VII. Storing Equipment / Construction Trailer a. The City of Cheyenne will allow the contractor to keep a construction trailer on the east side of

Ames Avenue within the Pump House Wetland area. This area is currently fenced off. If you choose to use this area to store a trailer then you will need to construct a construction fence around your trailer as indicated by the red line. There is an existing gate that you can open while you are working, but we need to keep the public out of the Pump House Wetland area. You will need to install a construction fence around your trailer to connect to the existing fence such that someone walking down the sidewalk along Ames can’t just walk around your trailer and into the Pump House Wetland area.

City of Cheyenne / Bid S-12-21 / Addendum One Page 9 of 10

Page 10: ADDENDUM NUMBER ONE BID S-12-21 · 2021. 2. 1. · Wednesday of the week immediately preceding CFD (Wednesday, July 21, 2021.) f. Final Completion: August 16, 2021 i. ADDENDUM #1

5

b. If additional material or equipment storage areas are needed the contractor will need to discuss those with the adjacent property owners to secure those sites. (Do not ask the Eagle’s Nest.)

VIII. Intersection of Dey and Lincolnway a. Note that there is an ADA ramp on the north side of Lincolnway that will be completely

removed, and the ADA ramps on the south side of Lincolnway will get rebuilt. IX. Intersection of Lincolnway and Missile Drive

a. Note that a new ADA ramp will be constructed on the south side of Lincolnway, east side of Missile Drive.

b. Note that there is an existing land configuration sign on the mast arm of the traffic signal for south-bound Missile Drive that will be removed and replaced with a Yield to Peds sign.

c. Work on Lincolnway will require a traffic control plan that will meet WYDOT standards. We will be working with Wayne Shenefelt, WYDOT Resident Engineer. See note about WYDOT traffic control on Sheet 10 of the plans.

X. Questions?