ADDENDUM NUMBER 1 January 27, 2016 WILLIAMSBURG/JAMES CITY COUNTY PUBLIC SCHOOLS Invitation for Bids # 16-8678 Matthew Whaley Elementary School Auditorium HVAC Replacement ADDENDUM NO. 1 This Addendum provides clarification and answers to questions at Pre-Bid Conference on January 21, 2016 at 4:00 P.M. at Matthew Whaley Elementary School, Pre-Bid Conference Attendance Log and Plan Holders List and includes Revisions and clarification of documents and drawings, bidder questions received by email, modifies, changes, deletes from or additions to the Bid Documents. The above referenced IFB is hereby amended and clarified as follows: The following modifications, additions, or deletions are hereby incorporated into the contract documents. QUESTIONS: 1. Reference General Conditions – 46-A: Paragraph 2 references a hazardous materials survey related to the project. Please provide referenced hazardous materials report. Response: ECS Mid-Atlantic report dated June 17, 2015 attached. If the Contractor discovers or inadvertently disturbs any material that he knows, should have known or has reason to believe, may contain asbestos that has not been previously identified, was overlooked during the removal, was deemed not to be friable or was encapsulated, the Contractor shall stop Work in the area containing or suspected to contain the asbestos, secure the area, and notify the Owner and the Architect/Engineer immediately by telephone or in person with written notice as soon as possible. The Owner will have the suspect material sampled. 2. MD102 – Is it known whether or not the existing condensate drain piping in the storage areas below the stage is installed above the ceiling or below the ceiling? If above the ceiling, is it permissible to cut, cap, and label portion of pipe run horizontal in ceiling and mount new piping in an exposed manner? Response: The existing condensate drain piping is not above a ceiling. As such, all of the piping shall be removed as indicated. New condensate drain piping shall follow the path of the existing and will be exposed near the ceiling.

Upload: others

Post on 02-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • ADDENDUM NUMBER 1 January 27, 2016

    WILLIAMSBURG/JAMES CITY COUNTY PUBLIC SCHOOLS Invitation for Bids # 16-8678

    Matthew Whaley Elementary School Auditorium HVAC Replacement

    ADDENDUM NO. 1 This Addendum provides clarification and answers to questions at Pre-Bid Conference on January 21, 2016 at 4:00 P.M. at Matthew Whaley Elementary School, Pre-Bid Conference Attendance Log and Plan Holders List and includes Revisions and clarification of documents and drawings, bidder questions received by email, modifies, changes, deletes from or additions to the Bid Documents. The above referenced IFB is hereby amended and clarified as follows: The following modifications, additions, or deletions are hereby incorporated into the contract documents. QUESTIONS:

    1. Reference General Conditions – 46-A: Paragraph 2 references a hazardous materials survey related to the project. Please provide referenced hazardous materials report.

    Response: ECS Mid-Atlantic report dated June 17, 2015 attached. If the Contractor discovers or inadvertently disturbs any material that he knows, should have known or has reason to believe, may contain asbestos that has not been previously identified, was overlooked during the removal, was deemed not to be friable or was encapsulated, the Contractor shall stop Work in the area containing or suspected to contain the asbestos, secure the area, and notify the Owner and the Architect/Engineer immediately by telephone or in person with written notice as soon as possible. The Owner will have the suspect material sampled.

    2. MD102 – Is it known whether or not the existing condensate drain piping in the storage areas

    below the stage is installed above the ceiling or below the ceiling? If above the ceiling, is it permissible to cut, cap, and label portion of pipe run horizontal in ceiling and mount new piping in an exposed manner? Response: The existing condensate drain piping is not above a ceiling. As such, all of the piping shall be removed as indicated. New condensate drain piping shall follow the path of the existing and will be exposed near the ceiling.

  • 3. MD103 – Is it possible to have the owner provide model numbers for existing units on stage? Response: Unit type CCDA083L0B

    Basic unit HLA1R11R0AG Primary coils 10CA4B000000 # 1 serial # K80H11819 # 2 serial # K80H11820

    4. M102 – It appears the intent is that any ductwork exposed in the stage area be double wall. Please

    confirm. Further, please clarify whether or not the below stage return ductwork must be double wall or can be single wall with external duct insulation. It may not be possible to provide true double duct below the stage without removal and reinstallation of existing ceilings/structure below the stage area. This would be very expensive and time consuming. Response: It is the intent for the outside air and return air ductwork to be double wall as shown on the drawings. There is no ceiling under the stage, just a cavity between the stage and the floor that the return ductwork is routed through. The floor under the stage is at the same level as the flor just in front of the stage. We believe the double wall duct can be installed there and would like the bids based as such.

    5. M103 – Please provide load rating for existing stage and roof structure such that it may be determined the safest way to remove and install the equipment, ductwork, and piping for the job.

    Response: A mobile lift may not be used. The contractor should plan a scaffolding system along with taking into account that they will need to take appropriate measures to determine the proper measures to take before loading equipment or scaffolding onto the stage.

    6. E102 – Please provide manufacturer and model of existing fire alarm system controller. If there is a service contract for this system, please provide point of contact. Response: Simplex, Model 4020. There is a service contract with Simplex.

    7. Do you want the intake louvers to be cleaned and painted? If so, what color?

    Response: Yes, please include cleaning and painting of the outside air louvers. Color selection shall be selected by the owner during submittals, contractor shall provide color chart.

    8. Has Asbestos inspection been completed on Auditorium?

    Response: WJCC recently conducted the required triennial inspections. All known asbestos has been removed from Matthew Whaley. If the Contractor discovers or inadvertently disturbs any material that he knows, should have known or has reason to believe, may contain asbestos that has not been previously identified, was overlooked during the removal, was deemed not to be friable or was encapsulated, the Contractor shall stop Work in the area containing or suspected to contain the asbestos, secure the area, and notify the Owner and the Architect/Engineer immediately by telephone or in person with written notice as soon as possible. The Owner will have the suspect material sampled.

  • 9. Can you provide a shop drawing of control upgrades?

    Response: Please see attached for the 2014 shop drawings for HVAC Controls. The existing air handlers being replaced have Trane Controls but were not upgraded in 2014. The existing controllers are a legacy product. It is anticipated that it will be less expensive to provide new controls on the air handlers from the factory in comparison to removing/reusing the existing legacy controls.

    ATTACHMENTS:

    1. Pre-Bid Conference Attendance Log 2. Plan Holders List

    This Addendum 1 is incorporated into the Bid Documents and will be made part of the resulting contract. Please acknowledge receipt of this Addendum in the space provided on the bid form section of the Invitation for Bids.

    ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

  • PLAN HOLDERS LIST

    16-8678

    Matthew Whaley Elementary School Auditorium HVAC Replacement

    1. Controlled Conditions Corp. 2. Johnson Controls 3. Atlantic Constructors, Inc. 4. Sycamore Mechanical 5. CDM 6. Conserv Building Services 7. Hitt Electric Corporation 8. Air Conditioning Equipment Sales 9. Survey Data Inc. 10. Deltek 11. Mid Atlantic Controls 12. Comfort Systems of Virginia, Inc. 13. Capitol Boiler Works, Inc. 14. Haley Builders, Inc. 15. Hobbs & Associates 16. Comfort Systems, Inc. 17. Engineered Services, Inc. 18. Chesapeake Controls 19. D.E. Kirby, Inc. 20. The Canada Company 21. Seaboard General Construction 22. JCI

  • 108 Ingram Road, Williamsburg, Virginia 23188 • T: 757-229-6677 • F: 757-229-9978 • www.ecslimited.com

    ECS Carolinas, LLP • ECS Florida, LLC • ECS Midwest, LLC • ECS Mid-Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP

    June 17, 2015

    Mr. Alan T. Robertson Facilities Manager WJCC Public Schools 597 Jolly Pond Road Williamsburg, Virginia 23188

    ECS Project No. 07:12819

    Reference: Asbestos Management Plan Review Matthew Whaley Elementary School

    301 Scotland Street Williamsburg, Virginia 23185

    Dear Mr. Robertson: ECS Mid-Atlantic, LLC (ECS) is pleased to provide WJCC Public Schools with the following findings and conclusions based on the review of the existing asbestos related records for Matthew Whaley Elementary School under US EPA Asbestos Hazard Emergency Response Act (AHERA) under 40 CFR 763. ECS reviewed the existing records maintained by WJCC Public Schools for general compliance with AHERA. Based on the available documentation provided within the asbestos management plan, it appears that all of the previously identified and/or assumed asbestos containing materials (ACMs) within the building(s) have been removed. Therefore, no further re-inspections or periodic surveillance for asbestos containing materials (as specified under AHERA) is required. It should be noted however that this status could change in the future if additional asbestos is discovered concealed within the building and not removed, or if any new building materials are installed for the school as part of any future renovation or new construction projects that are not covered by a signed statement by an architect, project engineer responsible for the construction, or an accredited inspector that no asbestos-containing building material (ACBM) was specified as a building material in any construction document for the building(s), or to the best of his or her knowledge, no ACBM was used as a building material in the building(s). Under 40 CFR 763 (AHERA) this letter will in part serve as a closing document to the school’s asbestos management plan. This letter along with all other existing documentation should be maintained at the school and in the central record keeping office as a record with respect to the status of asbestos in the school and be available for review by parents, teachers, school employees, and outside contractors. Parent, teacher, and employee organizations should be continued to be notified of the availability of the asbestos management plan annually. Note 1: If any renovation or demolition activities are planned within the school property, an asbestos survey is recommended prior to the renovation/demolition in the areas to be impacted in order to identify asbestos containing building materials (if any) not covered by AHERA or any

  • 2

    other building materials not readily accessible or concealed within the school building components. Note 2: In preparation of this letter, ECS relied on accuracy of the studies and reports previously performed/provided for WJCC Public Schools by third party consulting firms other than ECS. ECS did not field verify the findings/conclusions provided by others. Respectfully submitted, ECS MID-ATLANTIC, LLC

    Nemanja Zivadinovic “Z” Chris J. Chapman, CIH Environmental Staff Project Manager Principal/Director of Industrial Hygiene VA Asbestos Inspector License # Asbestos Management Planner License # 3303003965 3304000318

  • TITLE PAGE

    12

    3

    14.0300.6614

    1MATTHEW WHALEY HVAC REPLACEMENT .AXD

    D BACON

    AS-BUILT REVISION 8/21/2014 DB

    SALESPERSON:

    FILE NAME:

    NUM. REVISION DATE: BY:

    DESIGNED BY: CHECKED BY:

    MATTHEW WHALEY HVAC REPLACEMENT

    5/13/2014

    PROJECT:

    757.558.0200

    CHESAPEAKE, VA 23323

    1100 CAVALIER BLVD

    Damuth Trane

    DWG:

    4

    5PROJECT ID:CID: PID:

    THIS DRAWING SET IS THE PROPERTY OF TRANE. DESIGN INFORMATION, DRAWINGS, DETAILS OR SPECIFICATION DATA MAY NOT BE REPRODUCED OR DUPLICATED NOR MAY ANY WORK BE EXECUTED HEREFROM WITHOUT THE WRITTEN AUTHORIZATION OF TRANE.

    AUTOMATIC TEMPERATURE CONTROL SYSTEM FORMATTHEW WHALEY HVAC REPLACEMENT

    301 SCOTLAND STREETWILLIAMSBURG, VIRGINIA 23185

    7/30/14

    AS BUILTA. MILES

  • INDEX PAGE

    12

    3

    14.0300.6614

    2MATTHEW WHALEY HVAC REPLACEMENT .AXD

    D BACON

    SALESPERSON:

    FILE NAME:

    NUM. REVISION DATE: BY:

    DESIGNED BY: CHECKED BY:

    MATTHEW WHALEY HVAC REPLACEMENT

    5/13/2014

    PROJECT:

    757.558.0200

    CHESAPEAKE, VA 23323

    1100 CAVALIER BLVD

    Damuth Trane

    DWG:

    4

    5PROJECT ID:CID: PID:

    DRAWING NUM BER

    DRAWING TITLE REVISION LEVEL REVISION DATE COM M ENTS

    1 TITLE PAGE AS-BUILT REVISION 8/21/2014

    2 INDEX PAGE

    3 LEGEND

    4 COM M UNICATION RISER AS-BUILT REVISION 8/21/2014

    5 BM TX - 1 WIRING DETAIL AS-BUILT REVISION 8/21/2014

    6 CHILLER WIRING DETAIL

    INDEX OF CONTROL SYSTEM DRAWINGS

    7/30/14

    AS BUILTA. MILES

  • Symbol Legend

    AIR FLOW STATION

    AFS

    AIR FLOW STATION, FAN MOUNTED

    AFS

    ALARM, BELL

    ALM

    ALARM, STROBE

    ALM

    ALARM, PIEZIO

    ALM

    BLENDER, AIRBURNER, FUEL-FIRED DIRECT COIL, COAXIAL

    COIL, CHW, DX, HW, STEAM, ETC.

    C

    CCONTROL POINT

    CS - CURRENT SENSOR ~CSR - CURRENT SENSOR W/RELAY

    CS OR CSR

    DAMPER, OPPOSED OR PARALLEL

    D

    TRAQ DAMPER

    D

    ACTUATOR, DAMPER

    DA

    SENSOR, DIFFERENTIAL PRESSURE

    DPS

    AIR DIFFERENTIAL SWITCH OR SENSOR

    DPS, DPT

    DIFFERENTIAL PRESSURE SWITCH OR SENSOR

    DPT, DPSH L EXCHANGER, FUEL FIRE

    HEATEXCHANGER, FLUID HEAT FAN OR PUMP

    FAN, ROOF TOP FILTER, AIR FILTER, AIR BAG FILTER, AIR HEPA

    FILTER, AIR ROLL SWITCH, FLOAT

    FLT

    FIRESTAT

    FS

    SENSOR, FLOW

    FS

    HEATER, ELECTRIC DUCT

    SENSOR, ROOM STATIC PRESSURE

    HDW

    TUBE, STATIC PRESSURE

    HDW

    SENSOR, DUCT HUMIDITY AND TEMPERATURE

    HE, TEH

    SENSOR, HUMIDITY OR TEMPERATURE AND HUMIDITY

    HE, TEH

    SENSOR, INDOOR AIR QUALITY

    IAQ

    SENSOR, INDOOR AIR QUALITY (CO2)

    IRQ

    THERMOSTAT, LOW LIMIT

    LLT

    STARTER, MOTOR

    MS

    SENSOR, OCCUPANCY

    OCC

    TRANSMITTER, PRESSURE

    PT

    RELAY

    R

    RELAY, SOCKET

    R

    SENSOR, OUTDOOR PRESSURE

    RB

    SWITCH, RESET STATION

    RST

    DETECTOR, SMOKE

    SD

    SEQUENCER

    SEQ

    SWITCH

    SWON

    OFFSOLENOID, AIR

    SOL

    SWITCH, BUTTON

    SW

    THERMOSTAT, WALL

    T

    COMPOUND, THERMAL

    TC

    SENSOR, AVERAGING TEMPERATURE

    TE

    SENSOR, STRAP ON TEMPERATURE

    TE

    SWITCH, ROTARY

    SWHEAT COOL

    AUTO

    SENSOR, TEMPERATURE

    TE

    SENSOR, ZONE

    TE

    TIMER, ELECTRONIC WALL

    TMR

    TIMER, WALL

    TMR

    WELL, THERMAL

    TW

    TRANSFORMER

    TX

    LIGHT, ULTRAVIOLET

    UV

    VALVE, 2-WAY COIL

    VAL

    VALVE, 3-WAY COIL

    VAL

    VALVE, DUCT HUMIDIFIER

    VAL

    VARIABLE FREQUENCY DRIVE

    VFD

    FIELD WIRING NOTE:

    121D

    WHT

    BLK

    121D

    WHT

    BLK

    SOLID LINES: NOT WIRED BY FIELD

    DASHED LINES: WIRED BY FIELD

    BLKWHT

    121 3738

    2TB

    WIRED BY FACTORY WIRED BY FIELD

    FIELD MOUNTED CONTROLLER

    FACTORY TERMINAL

    CABLE TAG

    FACTORY MOUNTED DEVICE WITH FIELD MOUNTED CONTROLLE R:

    D

    CABLE MATRIX NOTES:KEEP ALL COMMUNICATION LINK WIRING IN A DAISY CHAIN CONFIGURATION. ALL CABLE WIRING MUST BE TRANE RECOMMENDED WIRING , ESPECIALLY COMMUNICATION CABLES. CONTACT TRANE FOR RECOMMENDED CABLES AND SPECIFICATIONS.

    Cable MatrixCable Matrix

    * When ordering cable specify jacket color. Part numbers are subject to change without notice.

    CT

    052003

    TRANE NUMBER*

    A WHT, BLK

    DESCRIPTION

    18/2 TWIST SHLD PURPLE COMM CABLE

    105500C WHT, BLK22/2 TWIST NON-SHLD BLUE COMM CABLE

    002320D WHT, BLK18/2 TWIST SHLD PLEN WHITE CABLE

    002330E WHT, BLK, RED18/3 TWIST SHLD PLEN WHITE CABLE

    002340F WHT, BLK, RED, GRN18/4 TWIST SHLD PLEN WHITE CABLE

    J WHT, BLK1 PAIR #14 THHN STRANDED IN CONDUIT

    L ETHERNET RG58 THNNET PLEN CABLE

    555619M ETHERNET CAT-5 PLEN CABLE

    002352O WHT, BLK, RED, ORN, YEL, GRN, BLU, BRN18/8 TWIST SHLD PLEN WHITE CABLE

    106502P WHT, BLK22/2 TWIST SHLD PLEN ORANGE COMM CABLE

    WIRE COLORS

    761360Q WHT, BLK16/2 SOLID RED SMOKE DETECTOR CABLE

    5100012C WHT, RED18/2 SOLID PLENUM THERMOSTAT CABLE

    51002-043C WHT, RED, GRN18/3 SOLID PLENUM THERMOSTAT CABLE

    5100045C WHT, RED, GRN, YEL, BLU18/5 SOLID PLENUM THERMOSTAT CABLE

    5100078C WHT, RED GRN, YEL, BLU, ORN, BLK, BRN18/8 SOLID PLENUM THERMOSTAT CABLE

    10C WHT, RED, GRN, YEL, BLU, ORN, BLK, BRN, GRY, PNK18/10 SOLID PLENUM THERMOSTAT CABLE

    12C 18/12 SOLID PLENUM THERMOSTAT CABLE

    B FACTORY PROVIDED CABLE

    WHT, RED, GRN, YEL, BLU, ORN, BLK, BRN, GRY, PNK, PUR, TAN

    CABLE INFORMATION SHAPE (CIS):EACH CABLE CONNECTION HAS A CIS WHICH PROVIDES SOME OR ALL OF THE INFORMATION INDICATED BELOW:

    WIRE COLOR OR POLARITY

    SHIELD CONFIGURATION

    CABLE TYPE FROM CABLE MATRIX

    CABLE NUMBER

    DEVICE TAG AND POINT DESCRIPTION

    END DEVICE DETAIL REFERENCE INSET & PAGE

    121B

    14CSR-3 CONDENSER PUMP STATUS

    DWHT

    BLK TAPE SHLD

    SHIELDING NOTE:

    121D

    WHT

    BLK TAPE SHLD

    121D

    WHT

    BLK

    ATTACH ALL SHIELDS TO COMMON AS SHOWN

    TAPE OFF SHIELD AT DEVICE

    FACTORY PROVIDED AND WIRED DEVICE

    Field, Factory And Existing Device Note:

    EXISTING DEVICE

    FIELD WIRED DEVICE (FIELD OR FACTORY PROVIDED)

    D121

    10FACT

    10DEXST

    10

    RISER 'WIRING BY' NOTE:

    EC - ELECTRICAL CONTRACTORESC - ELECTRICAL SUBCONTRACTOROTHERSTRANEEXIST - EXISTING POWER

    CONTROLLERPAGE

    NUMBER

    CABLE TYPEFROM

    CABLE MATRIX

    DEVICE TAG

    FLOW SHAPE NOTES:

    121D 10

    TE - 1

    CABLE TAG

    480 VACBY EC

    AHU - X

    25

    ADDRESS

    WCI

    AHU - X

    25

    WIRELESSCOMMUNICATION

    INTERFACE DISPLAYING

    GROUP ID (TOP) AND SUBNET ID

    (BOTTOM)

    13

    LEGEND

    12

    3

    14.0300.6614

    3MATTHEW WHALEY HVAC REPLACEMENT .AXD

    D BACON

    SALESPERSON:

    FILE NAME:

    NUM. REVISION DATE: BY:

    DESIGNED BY: CHECKED BY:

    MATTHEW WHALEY HVAC REPLACEMENT

    5/13/2014

    PROJECT:

    757.558.0200

    CHESAPEAKE, VA 23323

    1100 CAVALIER BLVD

    Damuth Trane

    DWG:

    4

    5PROJECT ID:CID: PID:

    Wiring and Project NotesWiring and Project Notes

    1. REFER TO DEVICE INSTALLATION MANUALS FOR SPECIFIC WIRING REQUIREMENTS.

    2. FIELD WIRING MUST BE IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE, STATE AND LOCAL BUILDING CODES, AND DIVISION 16 OF SPECIFICATIONS.

    3. TAG ALL CONTROL WIRING AT EACH END OF THE CABLE OR WIRE PER TAGS SHOWN IN ATTACHED DRAWINGS.

    ELECTRICAL CONTRACTOR FOR TRANE:

    4. AVOID OVER TIGHTENING CABLE TIES AND OTHER FORMS OF CABLE WRAPS. THIS CAN DAMAGE THE WIRES INSIDE THE CABLES.

    5. DO NOT CABLE TIE TO INSULATED WATER, STEAM OR OTHER LINES.

    6. IN OPEN PLENUMS, AVOID RUNNING WIRE NEAR LIGHTING BALLASTS, ESPECIALLY THOSE USING 277 VAC.

    7. ALL PANELS AND FIELD DEVICES LISTED IN THIS DOCUMENT ARE TO BE INSTALLED BY CONTROLS ELECTRICAL SUBCONTRACTOR UNLESS OTHERWISE NOTED ON DRAWINGS.

    8. MOUNT ALL ROOM SENSORS AND SWITCHES AS SHOWN ON THE CONSTRUCTION DOCUMENTS, UNLESS OTHERWISE DIRECTED IN WRITING BY THE OWNER AND/OR ENGINEER.

    9. FLEXIBLE CONDUIT IS NOT TO EXCEED 24” IN LENGTH.

    10. CONTROL PANELS ARE NOT TO BE USED AS JUNCTION BOXES OR RACEWAYS. WIRING THAT DOES NOT TERMINATE IN A CONTROL PANEL IS NOT TO BE RUN WITHIN THE PANEL.

    11. BINARY INPUT LIMITS: 1000 FT (300 M).

    12. 0~10 VDC ANALOG INPUT LIMITS: 300 FT (100 M).

    13. 0~20 MA ANALOG INPUT LIMITS: 1000 FT (300 M).

    14. VARIABLE RESISTANCE ANALOG INPUT LIMITS: 300 FT (100 M).

    15. ANALOG OUTPUT LIMITS: 1000 FT (300 M).

    16. BINARY OUTPUT LIMITS: 1000 FT (300 M).

    17. WIRING POWER FROM THE AC OUT TERMINALS TO POWER ANALOG INPUT DEVICES WILL CAUSE IMMEDIATE CONTROLLER FAILURE IF INPUT DEVICE USES HALF-WAVE RECTIFICATION. WHEN UNSURE, USE A SEPARATE POWER SUPPLY FOR DEVICE.

    18. GENERAL COMMUNICATION GUIDE: DO NOT RUN COMMUNICATION LINK WIRING IN THE SAME CONDUIT OR WIRE BUNDLE WITH AC-POWER WIRES (INCLUDING CONDUCTORS RUNNING FROM TRIAC-TYPE OUTPUTS). KEEP POLARITY CONSISTENT THROUGHOUT THE SITE. MAKE SURE THAT THE 24 VAC POWER SUPPLIES ARE CONSISTENT IN HOW THEY ARE GROUNDED. AVOID SHARING 24 VAC BETWEEN CONTROLLERS. USE ONLY ONE TYPE OF COMMUNICATION CABLE; DO NOT MIX CABLE. IF AN EXISTING JOB USED ALTERNATE CABLE, CONTINUE USING THE SAME CABLE AFTER APPROVAL FROM THE PROJECT MANAGER.

    19. BACNET MS/TP COMMUNICATION CABLE MUST BE SHIELDED TWISTED PAIR, 18 AWG MINIMUM, STRANDED, TINNED COPPER CONDUCTORS. SHIELD MUST BE CONTINUOUS THROUGHOUT, ISOLATED FROM OTHER CONDUCTORS OR GROUND, AND GROUNDED AT THE SYSTEM CONTROLLER ONLY. MAXIMUM CAPACITANCE BETWEEN CONDUCTORS IS 24 PICOFARADS PER FOOT. MAXIMUM DISTANCE IS 4000 FT (1372 M). MAXIMUM OF 60 TRANE DEVICES PER LINK BUT LESS WHEN COMBINED WITH NON-TRANE DEVICES. EXPANSION MODULE LINK LIMIT IS 656 FT (200 M). A TRACER BACNET TERMINATOR IS REQUIRED AT EACH END OF THE COMMUNICATION LINK. TOPOLOGY MUST BE DAISY CHAINED.

    20. LONTALK (COMM 5) COMMUNICATION CABLE MUST BE LEVEL 4 UNSHIELDED, 22 AWG WITH MAXIMUM CAPACITANCE BETWEEN CONDUCTORS OF 17 PICOFARADS PER FOOT. MAXIMUM DISTANCE IS 4500 FT (1400 M). MAXIMUM DEVICES IS 60 DEVICES WITHOUT REPEATER AND 120 WITH REPEATER. ONE REPEATER PER LINK CAN BE USED FOR AN ADDITIONAL 4500 FT (1400 M), 60 DEVICES. EX2 LINK LIMIT IS 1000 FT (300 M). CCP III LINK LIMIT IS 3500 FT (1090 M). 105 OHMS, 1%, ¼ WATT TERMINATION RESISTORS ARE REQUIRED AT EACH END FOR LEVEL 4 WIRE AND 82 OHMS, 1%, ¼ WATT AT EACH END FOR 18 AWG SHIELDED (PURPLE) WIRE. TOPOLOGY MUST BE DAISY CHAINED

    21. COMM 3 AND COMM 4 COMMUNICATION CABLE MUST BE SHIELDED TWISTED PAIR, 18 AWG MINIMUM, STRANDED, TINNED COPPER CONDUCTORS. SHIELD MUST BE CONTINUOUS THROUGHOUT, ISOLATED FROM OTHER CONDUCTORS OR GROUND, AND GROUNDED AT BCU ONLY. MAXIMUM CAPACITANCE BETWEEN CONDUCTORS IS 24 PICOFARADS PER FOOT. MAXIMUM DISTANCE IS 5000 FT (1715 M). UNDER CERTAIN CONDITIONS, TERMINATION RESISTORS ARE REQUIRED ON A COMM 3 COMMUNICATION LINK.

    22. ETHERNET LAN COMMUNICATION CABLE MAXIMUM DISTANCE IS 295 FT (90 M) PLUS 33 FT (10 M) FOR PATCH CABLES.

    1. DAMPERS ARE TO BE INSTALLED BY SHEET METAL CONTRACTOR UNLESS OTHERWISE NOTED.

    MECHANICAL CONTRACTOR:

    2. CONTROL VALVES AND ACCESSORIES INSTALLED DIRECTLY INTO PIPING (SENSOR WELLS, THREADOLETS, ETC.) ARE TO BE INSTALLED BY MECHANICAL CONTRACTOR.

    3. FLOW DIAGRAMS SHALL NOT BE A GUIDE FOR PIPE AND VALVE INSTALLATION. REFER TO THE VALVE MANUFACTURER’S INSTALLATION INSTRUCTIONS FOR INSTALLATION GUIDANCE.

    23. TRANE WCI WIRELESS COMMUNICATION

    SIGNAL RANGE TYPICALLY HAS A RADIUS OF 200 FT (60 M) - POTENTIALLY MORE FOR LINE-OF-SIGHT INSTALLATIONS, AND LESS FOR OBSTRUCTED INSTALLATIONS.

    EACH NETWORK SHALL HAVE 1 WCI NETWORK COORDINATOR AND UP TO 30 WCI NETWORK MEMBERS.

    THE TRACER SC SUPPORTS UP TO 8 NETWORK COORDINATORS AND UP TO 120 WCI NETWORK MEMBERS.

    MAXIMUM IMC WIRING LENGTH BETWEEN A WCI AND A CONTROLLER IS 656 FT (200 M).

    7/30/14

    AS BUILTA. MILES

  • COMMUNICATION RISER

    12

    3

    14.0300.6614

    4MATTHEW WHALEY HVAC REPLACEMENT .AXD

    D BACON

    AS-BUILT REVISION 8/21/2014 DB

    SALESPERSON:

    FILE NAME:

    NUM. REVISION DATE: BY:

    DESIGNED BY: CHECKED BY:

    MATTHEW WHALEY HVAC REPLACEMENT

    5/13/2014

    PROJECT:

    757.558.0200

    CHESAPEAKE, VA 23323

    1100 CAVALIER BLVD

    Damuth Trane

    DWG:

    4

    5PROJECT ID:CID: PID:

    SYSTEM CONTROLLER

    ROOM 213

    120 VACBY ESC

    BMTX - 1

    RE-TERMINATE EXISTING COMM 3 LINKDEMO EXISTING COMM 3 CHILLER (CH-1) ANDREWORK EXISTING COMM 3 LINK. CH-2 TO REMAIN ON EXISTING COMM 3 LINK.

    EX

    IST

    ING

    CO

    MM

    3 L

    INK

    NEW COMM 5 LINK

    (PULL NEW COMM 5 LINK TO NEW DEVICES AS SHOWN)

    CHR - 1

    120 VAC

    OUTLET

    SWITCH

    INSTALL HUB AND OUTLET IN ENCL. A12N126 W/ A12N12P PANEL. MOUNT ADJACENT TO BCU.

    ENCL

    TES - 1TO JCC ES SERVER

    (EXISTING - REMOTE)

    TX

    120 VACEXIST

    REPLACE EXISTING TRACER L.

    7/30/14

    AS BUILTA. MILES

    1

  • TAG QTY VENDOR PART NO DESCRIPTION

    BM TX - 1 1 TRANE BM TX001AAC010 BM TX, 120VAC, DISPLAY

    SFT - 1 1 TRANE 4020-1113 SUM M IT CUSTR UPG PK V10-V16 TO V17

    SFT - 2 1 TRANE X40250125010 TRACER ES ADD LICENSE

    PC - 1 1 DELL DELL LATITUDE E6530

    SWITCH - 1 1 LINKSYS SD205 ETHERNET SWITCH

    BILL OF M ATERIALSTYPICAL FOR 1(SYSTEM CONTROLLER)

    BMTX - 1

    LOCATION:ROOM 213

    SYSTEM CONTROLLER

    SYSTEM CONTROLLED:

    120 VAC

    BY ESCN

    L

    GND

    GND

    CO

    M3

    + -

    GND

    CO

    M4A

    + -

    GND

    CO

    M4B

    + -

    GND

    CO

    M5

    + -

    ROVERCOM5

    MINI-MONITORPORT

    ROVERCOM4B

    ROVERCOM4A

    TB2

    TB3

    TB4

    TB5

    TB6BIP1GNDBIP2

    GND P5

    P4

    P3

    P2

    P1

    BA

    Cnet

    TB

    1

    GND 24VAC

    SEE DRAWING LEGEND PAGE AND / OR BMTX INSTALLATION MANUAL FOR COMM LINK WIRING REQUIREMENTS

    IF SHIELD IS USED AS A SHIELD TERMINATE AT THE COMMON TERMINAL ON THE CONTROLLER AND TAPE BACK. CUT AND TAPE AT THE END DEVICE. WHEN WIRING A BINARY INPUT: CONNECT THE SHIELD WIRE TO A COMMON TERMINAL AT THE TERMINATION BOARD AND TAPE IT BACK AT THE OUTPUT DEVICE.

    INPUT WIRING NOTES:COMM LINK WIRING NOTES:

    1

    2

    INSTALL TERMINATION RESISTOR AT THE BEGINNING AND AT THE END OF THIS LINK.

    1

    TB2

    TB3

    TB4

    TB5

    BIN

    AR

    Y IN

    PU

    TS

    BIP1

    BIP2

    GND

    GND

    TB6

    P1

    BA

    Cnet

    ISO

    CO

    MM

    3

    +

    -GND

    CO

    MM

    4A

    +

    -GND

    CO

    MM

    4B

    +

    -GND

    CO

    MM

    5

    +

    -GND

    COMMA

    RETERMINATE TO EXISTING COMM 3 EQUIPMENT

    WHT

    BLKSHLD

    1C

    NEW COMM LINK TO CONNECT TO NEW DEVICES AS SHOWN ON RISER

    WHT

    BLK105 Ohm

    COMMENET

    BMTX - 1 WIRING DETAIL

    12

    3

    14.0300.6614

    5MATTHEW WHALEY HVAC REPLACEMENT .AXD

    D BACON

    AS-BUILT REVISION 8/21/2014 DB

    SALESPERSON:

    FILE NAME:

    NUM. REVISION DATE: BY:

    DESIGNED BY: CHECKED BY:

    MATTHEW WHALEY HVAC REPLACEMENT

    5/13/2014

    PROJECT:

    757.558.0200

    CHESAPEAKE, VA 23323

    1100 CAVALIER BLVD

    Damuth Trane

    DWG:

    4

    5PROJECT ID:CID: PID:

    120 VAC

    OUTLETSWITCH - 1

    TO JCC ES SERVER

    SFT - 1

    SUMMIT CUSTOMER UPGRADE PACKAGE

    TRACER ES ADD LICENSE

    SFT - 2

    PC - 1

    15"

    NEW WORKSTATION

    7/30/14

    AS BUILTA. MILES

    1

  • TAG QTY VENDOR PART NO DESCRIPTION

    BILL OF M ATERIALSTYPICAL FOR 1(CHILLER)

    64

    J2

    1A25

    2-10 VDC

    CAPACITY OUTPUTGND

    1X587 3

    4J2 CHW PUMP FAULT

    PUMP 2

    1A12

    1X565

    12

    PUMP 1

    43

    21

    J2

    TRACER COMMUNICATIONS

    1A15

    LONTALK

    64

    31

    J2

    1A9

    CHW PUMP 1 S/S

    CHW PUMP 2 S/S

    CHW PUMP RUN SIG

    ACC-1

    CHILLER

    SYSTEM CONTROLLED:

    1X512

    21

    J2 STDEVAP PROOF OF FLOW

    1A17

    349

    COMMC

    FROM BMTX - 1 WHTBLKWHTBLK

    COMMC

    NEXT DEVICE

    JUMPER

    JUMPER

    FACTFLOW SWITCH FACTORY INSTALLED WHTBLK

    BRNBLU

    JMPR

    CHILLER WIRING DETAIL

    12

    3

    14.0300.6614

    6MATTHEW WHALEY HVAC REPLACEMENT .AXD

    D BACON

    SALESPERSON:

    FILE NAME:

    NUM. REVISION DATE: BY:

    DESIGNED BY: CHECKED BY:

    MATTHEW WHALEY HVAC REPLACEMENT

    5/13/2014

    PROJECT:

    757.558.0200

    CHESAPEAKE, VA 23323

    1100 CAVALIER BLVD

    Damuth Trane

    DWG:

    4

    5PROJECT ID:CID: PID:

    NOTES: RECONNECT EXISTING CHILLER INTERLOCKWIRING

    REFER TO UPCM LOCATED IN THE MECHANICAL ROOM FOR POINT INFORMATION.

    EXISTING TRANE UCM PUMP CONTROLLER

    CHILLED WATER SYSTEM PUMPING PACKAGE CONTROL

    THE DDC CONTROL SYSTEM FOR THE CHILLED WATER PUMPS WILL START THE LEAD PUMP

    AND MODULATE ITS SPEED AS REQUIRED BY SYSTEM DEMANDS. THE SYSTEM WILL MAINTAIN

    A MINIMUM DIFFERENTIAL PRESSURE SETPOINT AT TWO REMOTE LOCATIONS. THE LAG PUMP

    WILL BE STARTED SHOULD THE LEAD PUMP NOT BE CAPABLE OF MAINTAINING THE SYSTEM

    DIFFERENTIAL PRESSURE SETPOINT. PUMP START AND STOP FUNCTIONS WILL HAVE ADJUSTABLE

    TIMERS TO PREVENT UNNECESSARY STARTING AND STOPPING OF PUMPS. THE DDC CONTROLLER

    WILL HAVE FIELD PROGRAMMABLE INDEPENDENT SETPOINTS, THE VALUE OF WHICH WILL BE

    THE OPTIMUM DIFFERENTIAL PRESSURE AS DESIGNED FOR EACH REMOTE LOCATION.

    THE DDC CONTROL SYSTEM FOR THE CHILLED WATER SYSTEM WILL MAINTAIN MINIMUM FLOW

    ACROSS THE CHILLER EVAPORATOR BARREL DURING ALL HOURS OF OPERATION. THE CONTROL

    SYSTEM WILL MONITOR FLOW (PRESSURE DROP) ACROSS THE CHILLER BARREL AND CONTROL

    PACKAGED PUMPING SYSTEM.

    THE DDC CONTROLLER WILL CONTINUOUSLY MONITOR ALL CHILLED WATER VALVES AND RESET

    THE SETPOINT OF THE PUMP PACKAGE SO THAT AT LEAST ONE CHILLED WATER VALVE IS AT

    LEAST 95% OPEN.

    THE DDC CONTROLLER WILL PROVIDE A FAILURE ALARM FOR EACH PUMP. UPON A PUMP FAILURE

    ALARM, THE PUMP WILL BE STOPPED AND LOCKED OUT OF SERVICE UNTIL THE ALARM IS MANUALLY

    RESET. THE LAG PUMP WILL BE STARTED TO REPLACE THE FAILED PUMP.

    L1 L2 L3

    PUMP MOTOR STARTER

    TO EXISTING CHILLER CONTROL PANEL

    7/30/14

    AS BUILTA. MILES