addendum notice - heart of america chapter documents 2017/nabholz jefferson...bid captain: michael...
TRANSCRIPT
Nabholz Construction
1707 E 123rd Terrace, Olathe, KS 66061
Job No.: 08-18-3056
Project: Jefferson City Second High School for Jefferson City Public School District
315 E Dunklin Street, Jefferson City, MO 65101
Bid Date & Time: November 29, 2017 @ 10:00 AM
Bid Captain: Michael Feamster / Preston Moore
ADDENDUM NOTICE
Addendum Number: 1
Please see attached documentation
Acknowledgement of all addenda is a requirement of the bid process. Please acknowledge this and all addenda on
page 4 of the Form of Proposal.
Should you have any questions concerning this project, please contact the Bid Captain noted above.
Page 1 of 2 Invitation to Bid 002.01
Rev 2 – Fabruary 2017
1707 E 123RD TERRACE, OLATHE, KS 66061
Job No 08-18-3056 Project SECOND HIGH SCHOOL for JEFFERSON CITY PUBLIC SCHOOLS
MISSION DRIVE & HWY 179 Bid Date 29-November-2017 Bid Location District Office Board Room 315 E Dunklin Street, Jefferson City, MO 65101 Bid Captain MICHAEL FEAMSTER / PRESTON MOORE
Nabholz Construction Corporation is accepting Subcontractor and Supplier proposals for the Jefferson City Public Schools Second High School. Nabholz invites you to bid on any Bid Package in which you specialize. All bid proposals received shall be submitted in accordance with the requirements of the Construction Manager’s Manual (the “CM Manual”). Bid Packages will be due at the following times:
10:00 AM Bid Package 31.10.00 Site Clearing, Grubbing, and Temporary Entrances
Plans and bidding documents will be available after November 6, 2017. Plans will be available for viewing or purchase at the following locations.
Building Connected - [email protected] https://app.buildingconnected.com/login
ABC Heart of America Plan Room - 816-994-5990 http://www.abcksmo.org/en-us/businessdevelopment/bidnotificationservice.aspx
The Builder’s Association Plan Room - 816-531.4741 https://www.buildersassociation.com/WCM/Plan_Room/WCM/_PlanRoom/Plan_Room.aspx?hkey=88f4960d-8355-4746-9a12-8c13c7331d9b
Drexel Technologies Plan Room - 913-371-4430 http://planroom.drexeltech.com/View/Default.aspx
A brief description of the Project is as follows: Approximately 250,000 Square, brand new, three-story high school on an undeveloped site. This is a steel and precast structure either on spread footings or helical piers. This brand new facility will have high end finishes, exposed ceilings, and mixed HVAC systems including VRF systems and roof top units.
Note that Project funding requires Subcontractors and Suppliers to comply with the Davis-Bacon Act wage rates.
Page 2 of 2 Invitation to Bid 002.01
Rev 2 – Fabruary 2017
Pre-Bid Meetings: Since this project contains multiple bidding phases, there will be multiple pre-bid meetings for
each bid day, but does may not apply to all bid days. Pre-bid meetings will be confirmed via addendum. Pre-bid meetings are scheduled according to Bid Package and are limited in size to provide more in-depth discussion of specific project requirements, bid instructions, etc. See schedule below. Attendance is not mandatory, but is strongly encouraged and will be considered in final evaluation of bid proposals.
Nabholz will use the standard Master Contract, Project Contract, and any amendments thereto, collectively, (the “Subcontract”), for all Subcontractors. Construction Manager will use standard Purchase Order (“PO”) for all Suppliers.
Copies of these documents are available in electronic or hard copy upon request. We may also require performance and payment bonds for Subcontractors using Consensus Docs 706 and 707 by an acceptable surety company, or require other forms of surety.
All safety regulations, including, federal (OSHA), state, and local, Construction Manager policy, and Subcontract or Purchase Order shall be required of all personnel on the Project including Subcontractors, Suppliers, and second tier Subcontractors and Suppliers. See Section 007 Health and Safety Requirements in CM Manual. In addition, Construction Manager will enforce a NO SUBSTANCE ABUSE policy, and will not permit the use of tobacco on the Project site.
Nabholz is an AA/EOE. All Women Owned Businesses (WBE), Minority Owned Businesses (MBE), and Disadvantaged Business Enterprises (DBE), including women, minority, disabled or veteran-owned business, are encouraged to submit a proposal or bid. Nabholz Construction Services Jamie Lancaster Precon Assistant
RFI Responses Will you be holding a pre-bid meeting for this bid package? No pre-bid meeting will be held. Bidders are encouraged to go walk the site on their own time and submit any questions for differing conditions. What permits are required for this scope of work? Coordination of permits carried by others is included as may be applicable to this scope of work Scope Item B17- Refers to an underground utility system. Not shown on plans and doesn't seem to match our scope. Please clarify. This is not a requirement for this project and is to be removed from this bid package Scope Item B22 - Temporary Parking Lot - Where do you want this? Would this take place after grading, therefore in another package? This requirement is part of this package and should be carried as an allowance for CM to locate at a future time. Scope item C7 - 4" of 1" Clean in all low areas - where exactly does this go?, how do you quantify or identify these areas? Detail C-6 on C0.2 requires this rock as a facing on the flow side of the mulch berms in low areas that are not drainage ditches Scope Item C10 - Please provide Geotech Report Geotechnical Report dated 9/7/17 has been included in this Addendum as well as additional information dated 11/16/17 titled Geotech Addendum 1. Scope item C12 - Curb Cut - Repouring the curb cut will take place long after this scope is completed. Can this be done by others for means of closing out this contract? Yes, repouring of identified curb cuts will be completed by the site concrete package. Care is to be taken to preserve existing curbs not shown to be removed. Will seeding and mulching be required? No, see erosion control notes on sheet C0.2 How do you foresee the transfer of responsibility for the SWPPP and LD permit upon completion of this scope? The SWPPP maintenance required for the Clearing & Grubbing is to be carried as a requirement of this package until the Earthwork package has mobilized and will transfer completely to that package at that time. Assume an Earthwork mobilization date of 2/20/2018 for the transfer timeframe and include a weekly unit price for SWPPP maintenance should this need to be extended. Who will be making the call on the 12” trees to be kept? Some of the trees of that size are good but some are junk. Are we to make that determination to get the owner the best timber down and set aside or will there be a third party making that decision? Coordination with CM superintendent and District staff is to be completed as work progresses, however contractor shall use their own judgement if schedule will be impacted.
009.31.01 Clearing, Grubbing, and Temporary Entrances Exhibit A
Rev 2 – February 2017 Clearing, Grubbing, and Temporary Entrances 009.31.01
As noted below, Subcontractor shall be responsible for the following project-related activities and Scope of Work in accordance with the requirements of the specifications, drawings, and CM Manual. Furnish all labor and supervision required to complete the work of this package. Unless noted otherwise, furnish all equipment, materials, supplies, tools, scaffolding, hoisting, transportation, unloading, and handling necessary for the proper installation and completion of this work.
APPLICABLE SPECIFICATIONS
Include work normally associated with trade whether referenced in these sections or not:
Refer to C0.1 and C0.2
Geotechnical Report by Gredell Engineering Resources, Inc. dated 07 September, 2017
Geotechnical Report – Addendum 01 by Gredell dated 16 November, 2017
SCOPE OF WORK Includes, but is not necessarily limited to:
Section A: Reference Section 009.01 General Scope Requirements
Section B: Trade-Specific Requirements
1. Coordinate the procurement of all paperwork, permits, fees, and bonds necessary for the work covered under this agreement, bearing all cost associated. This must conform to all governmental regulations inclusive of and required by City, County, State, or other jurisdictions having governance.
2. This bid package is intended to be all inclusive of labor, material, and equipment required for clearing, grubbing, and temporary construction entrances as required by the Construction Documents for a complete project.
3. CM to establish benchmarks and control. This package is reponsibile for procuring a professional surveyor to establish and set all elevations associated to clearing, grubbing, swppp, initial earthwork, initial storm piping, and temporary construction entrances under this scope of work. Provide all site layout and engineering required including maintenance of such.
4. Provide as-built site drawings documented by professional surveyor that will in turn be used for topographical survey.
5. Maintain storm water prevention plan in accordance with requirements of the City, County, State, or other jurisdictions having governance.
6. Provide erosion control, maintenance of positive site drainage, and dewatering as it relates to the work.
7. Provide all barricades, excavation protection, traffic control, and flagmen as necessary for the work. 8. Provide, maintain, and remove protection around all trees to be saved using orange safety netting.
Provide any necessary protection for those trees that are to remain for the duration of the project. This package shall only be responsible during this package’s phase of work.
9. Provide all site clearing, grubbing, tree and stump removal, hauling, and dumping. 10. Temporary works shall be included in this package over ruts or areas of disturbed earth due to
clearing and grubbing site. All areas disturbed by construction activities shall be re-graded and backfilled.
11. Remove any existing concrete structures such as existing slabs, foundations, curb and gutter, or other similar existing structures so as to facilitate new construction.
12. Provide watering/water trucks as required to control dust. 13. Damage to existing utilities and utility structures as a result of this package will result in cost
associations to this package. 14. Do not interrupt existing utility serving occupied or operating facilities, except when authorized in
writing by Owner and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and to governing authorities.
15. Clearing limits as set forth within the construction documents
009.31.01 Clearing, Grubbing, and Temporary Entrances Exhibit A
Rev 2 – February 2017 Clearing, Grubbing, and Temporary Entrances 009.31.01
16. Temporary Entrances to be constructed as per drawings including but not limited to 6” Type 1 Base and Min 18” Compacted Shot Rock.
17. Provide complete underground system from utility service main to location at building or as noted. 18. Clean up site and adjoining streets while working onsite. Power wash all paving, drives and walks at
the end of project. Remove and legally dispose off site of all debris associated with this trade package. Do not use dumpsters.
19. Field engineering and site layout required to perform this scope of work. 20. All permits, fees, and right of way bonds required to form this work. 21. Responsible for maintaining and constructing temporary construction roads during this phase of
work. 22. Temporary parking lot to be included in this package with 6” gravel base (1” clean rock) on geotech
fabric for roughly 25,000 SF.
Section C: Project-Specific Requirements
1. All 12” or greater Hardwood Trees are to be felled, limbed, and stacked for future, salvagable use in an area designated by the CM.
2. Shot Rock fill as indicated. 3. All Mulch Berms as indicated. 4. CMP at Construction Entrance as indicated. 5. Rip Rap as indicated. 6. Rock Ditch Checks as indicated . 7. Minimum 4” of 1“ Clean Rock in all Low Areas which are not drainage ditches. 8. Mulch Berms with concentrated flows as indicated. 9. All debris from Timber will be mulched on site for berms unless Note 1 concerning Hardwood Trees
applies. Absolutely NO burning of debris on site. 10. Refer to Geotechnical Report as applicable to this Bid Package. 11. Include submission of existing conditions photos of the site to be disturbed to the CM before any
work begins. Approval from the CM is required before starting work. 12. Curb Cut includes: all saw cutting, demolition, hauling away, permitting process and fees, and
repour.
Section D: Project-Specific Exclusions
1. Sales Tax 2. Permit Costs
Section E: Alternate Pricing
1. None
Section F: Unit Pricing 1. Provide unit prices for the following:
a. Shot Rock Undercut and remove from jobsite existing soils deemed by Soils Engineer to be unsuitable for reuse, measured as in-place yardage.
b. Excavate and remove from jobsite mass rock quantity, measured as in-place yardage. c. Additional Rock Reinforcing (Detail C-7 on C0.2) for mulch berms at concentrated
flows not identified on the drawings d. Weekly SWPPP Maintenance costs for any weeks beyond 2/20/2018
009.31.01 Clearing, Grubbing, and Temporary Entrances Exhibit A
Rev 2 – February 2017 Clearing, Grubbing, and Temporary Entrances 009.31.01
Section G: Procurement/Schedule
1. Contractor shall mobilize within 10 days of Letter of Intent and as coordinated with Construction Manager for start of work
2. Total Duration for all work to be completed is 20 days 3. It is understood that work under this package is driving the completion of the rest of the
design and efforts are to be made to help the design team gain access and coordinate location of work to accelerate those design vairiables.
END OF PACKAGE
DATE
DRAWN
SCALE
APPROVED
PROJECT NAME REVISION
SHEET #FILE NAME
GREDELL Engineering Resources, Inc.ENVIRONMENTAL ENGINEERING LAND - AIR - WATER
1505 East High Street Telephone: (573) 659-9078Jefferson City, Missouri Facsimile: (573) 659-9079
MO CORP. ENGINEERING LICENSE NO. E-2001001669-D
OF
JCPS MISSION DRIVE HIGH SCHOOLTHE ARCHITECTS ALLIANCE
SITE LOCATION MAP 9/2017 MISSION DRIVE HIGH SCHOOL
1
AS NOTED
CP BD APPENDIX 1
USGS JEFFERSON CITY QUADRANGLE (2015)MISSOURI
7.5 MINUTE SERIES
N
0
SCALE: 1" =
20001000
2000'
SITE LOCATION
M:\S
hare
\CAD
DFi
les\
THE
ARCH
ITEC
TS A
LLIA
NCE
\JCP
S M
ISSI
ON
DRI
VE H
S\SI
TE L
OCA
TIO
N M
AP.d
wg,
SIT
E LO
CATI
ON
MAP
, 8/3
1/20
17 2
:40:
42 P
M
UP
UP
UP
UP
1'-0"
610
62
0
6
3
0
6
4
0
6
5
0
66
0
670
6
8
0
6
9
0
7
0
0
6
2
0
6
3
0
6
4
0
6
5
0
6
6
0
6
7
0
6
8
0
6
9
0
7
0
0
6
4
0
6
5
0
660
670
680
6
9
0
7
0
0 7
1
0
6
2
0
6
3
0
640
650
6
6
0
6
7
0
6
8
0
6
9
0
700
7
1
0
7
2
0
7
3
0
710
7
2
0
730
740
610
6
2
0
6
3
0
6
4
0
6
5
0
6
6
0
6
7
0
6
8
0
6
9
0
7
0
0
7
1
0
7
2
0
7
3
0
7
4
0
7
5
0
620
630
640
650
6
6
0
6
7
0
6
8
0
6
9
0
700
710
6
6
0
6
7
0
6
8
0
6
9
0
7
0
0
7
1
0
7
2
0
7
3
0
720
7
3
0
7
4
0
620
6
3
0
6
4
0
65
0
6
6
0
670
6
8
0
6
9
0
7
0
0
6
0
0
6
1
0
690
7
0
0
7
1
0
720
730
740
7
3
0
7
4
0
S
S
S
S
S
TP1
TP2
TP3
TP4
TP5
TP6TP7
TP9
TP10
TP11
TP12
TP13TP14TP15
TP16
TP17
TP18
TP19
TP21
TP22
TP23
TP25
TP26
TP27
TP28
TP29TP30
TP31
TP32
TP33
TP1
TP2
TP3
TP4
TP5
TP6TP7
TP8
TP9
TP10
TP11
TP12
TP13TP14TP15
TP16
TP17
TP18
TP21
TP22
TP23
TP24
TP25
TP26
TP27
TP28
TP29TP30
TP31
TP32
TP33
TP20
TP19
TP20
DATE
DRAWN
SCALE
APPROVED
PROJECT NAME REVISION
SHEET #FILE NAME
GREDELL Engineering Resources, Inc.ENVIRONMENTAL ENGINEERING LAND - AIR - WATER
1505 East High Street Telephone: (573) 659-9078Jefferson City, Missouri Facsimile: (573) 659-9079
MO CORP. ENGINEERING LICENSE NO. E-2001001669-D
OF
JCPS MISSION DRIVE HIGH SCHOOLTHE ARCHITECTS ALLIANCE
EXPLORATION PLAN 9/2017 MISSION DRIVE HIGH SCHOOL
1
AS NOTED
CP BD APPENDIX 1
N
0
SCALE: 1" =
300150
300'NOTE:BASE PLAN PROVIDED BY CENTRAL MISSOURI PROFESSIONAL SERIVES.
M:\Sh
are\C
AD
DFiles\TH
E A
RC
HITEC
TS A
LLIA
NC
E\JC
PS M
ISSIO
N D
RIV
E H
S\SITE LO
CA
TIO
N M
AP
.d
wg
, EX
PLO
RA
TIO
N P
LA
N, 9/7/2017 2:03:42 P
M
10.0'
32
1
1/2
H:1
V
FINISHED FLOOR ELEVATION
NOTES:1. STRIP EXISTING SOIL TO FIRST CONTACT WITH BEDROCK.2. CUT SOIL SLOPE BEYOND TO DRAIN.3. CONSTRUCT CONTROLLED ROCK FILL PER GEOTECHNICAL REPORT
RECOMMENDATIONS.
DATE
DRAWN
SCALE
APPROVED
PROJECT NAME REVISION
SHEET #FILE NAME
GREDELL Engineering Resources, Inc.ENVIRONMENTAL ENGINEERING LAND - AIR - WATER
1505 East High Street Telephone: (573) 659-9078Jefferson City, Missouri Facsimile: (573) 659-9079
MO CORP. ENGINEERING LICENSE NO. E-2001001669-D
OF
CONTROLLED ROCK FILLZONE BENEATH BUILDINGS
FIGURE 1 9/2017 MISSION DRIVE HIGH SCHOOL
1
N.T.S.
CP BD APPENDIX 1M:\S
hare
\CAD
DFi
les\
THE
ARCH
ITEC
TS A
LLIA
NCE
\JCP
S M
ISSI
ON
DRI
VE H
S\G
EOTE
CHN
ICAL
REP
ORT
.dw
g, F
IGU
RE 1
, 9/7
/201
7 11
:07:
22 A
M
Boring Sample Depth (ft)Water
ContentUSCS LL PL PI
TP1 S1 1.5 - 2.4 22
TP1 S2 2.4 - 3.6 40 CH 84 32 52
TP2 S1 0.0 - 1.7 24
TP3 S1 3.5 - 4.2 35
TP4 S1 2.1 - 6.0 11
TP6 S1 3.1 - 3.7 39 CH 114 34 80
TP7 S1 1.3 - 3.0 28 CH 117 38 79
TP11 S1 2.3 - 7.6 17 CL 49 23 26
TP14 S1 1.3 - 2.5 12
TP18 S1 2.9 - 5.6 20
TP19 S1 1.3 - 3.2 11 CL 30 17 13
TP27 S1 2.4 - 5.3 15
TP28 S1 1.5 - 3.0 16
TP29 S1 1.7 - 2.7 23
TP31 S1 3.1 - 4.3 25 MH 85 38 47
Atterberg Limits
Summary of Laboratory Test Results
JCPS Mission Drive High School
The Architects Alliance
Prepared by:
GREDELL Engineering Resources, Inc. September 2017
NE Not EncounteredNA Not ApplicableCFA Continuous Flight AugersHSA Hollow Stem Augers
Notes:
Symbol Description
Silt
Gravelly Clay
Clay
Limestone
Chert
Clayey Gravel
Silty Gravel
Shale
Sandstone
Misc. Symbols
Penetrometer
Torvane
Soil Samplers
Bulk/Grab sample
GREDELL Engineering Resources, Inc.
KEY TO SYMBOLSJCPS Mission Drive High School
0.0
1.5
2.4
2.8
3.63.8
624
622.5
621.6
621.2
620.4620.2
SILT: Dark brown, moist, soft, with roots.
GRAVELLY CLAY: Brown, moist, firm,limestone gravel, trace roots.
CLAY: Brown, moist, firm, with limestonegravel.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 3.8 feet in Limestone dueto practical refusal.
S1
S2
22
4084
GREDELL EngineeringResources, Inc. TEST PIT LOG TP1
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 624.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.8 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
1.01.2
648
647646.8
CLAY: Black, moist, soft, with roots.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 1.2 feet in Limestone dueto practical refusal.
S1
24
GREDELL EngineeringResources, Inc. TEST PIT LOG TP2
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 648.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 1.2 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
2.2
3.53.8
4.24.3
657.5
655.3
654653.7
653.3653.2
CLAY: Brown, moist, firm, some gravel andboulders.
GRAVELLY CLAY: Reddish brown, moist,firm.
CLAY: Reddish brown, moist, firm.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 4.3 feet in Limestone dueto practical refusal.
S135
GREDELL EngineeringResources, Inc. TEST PIT LOG TP3
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 657.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 4.3 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.00.3
2.1
4.0
6.0
8.08.2
742741.7
739.9
738
736
734733.8
SILT: Brown, dry, soft, with roots. - trace roots.
CLAY: moist to dry, hard, trace roots, tracesandstone gravel, friable.
CHERT: Light yellowish gray, moist, hard,weathered, very fractured, consisting of graveland trace cobbles.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 8.2 feet in Limestone dueto practical refusal.
S1
114.5
GREDELL EngineeringResources, Inc. TEST PIT LOG TP4
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 742.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 8.2 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.3
1.1
4.0
5.05.1
739.5
739.2
738.4
735.5
734.5734.4
SILT: Brown, dry, soft, with roots.CLAY: Brown, dry, firm, with gravel, tracecobbles, trace roots, friable.
CHERT: Light yellow to gray, dry, hard,weathered, very fractured, consisting of graveland trace cobbles.
CLAYEY GRAVEL: Reddish brown, moist,hard, with black staining and gray chert gravel,friable.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 5.1 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP5
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 739.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 5.1 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.9
2.52.8
3.1
3.7
4.84.9
739.5
738.6
737736.7
736.4
735.8
734.7734.6
CLAY: Brown, moist, soft, with roots, organic.
CHERT SANDSTONE CONGLOMERATE:Light brown and gray, dry, firm to hard, withfriable clay.
CLAY: Brown, moist, firm, trace gravel, traceblack mottles. - mottles.
CLAYEY GRAVEL: Brown, moist, firm.
LIMESTONE: Light yellow, dry, hard cherty.Test Pit terminated at 4.9 feet in Limestone dueto practical refusal.
S139
114
GREDELL EngineeringResources, Inc. TEST PIT LOG TP6
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 739.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 4.9 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.00.2
1.3
2.6
3.0
3.3
714713.8
712.7
711.4
711
710.7
SILT: Brown, moist, soft, with roots. - trace roots.
CLAY: Brownish red, moist, hard, with gravel.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 3.3 feet in Limestone dueto practical refusal.
S1
28117
4.5
GREDELL EngineeringResources, Inc. TEST PIT LOG TP7
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 714.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.3 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.00.3
4.0
6.3
9.0
746.5746.2
742.5
740.2
737.5
SILT: Brown, dry, soft, with roots. - trace roots.
GRAVELLY CLAY: Reddish brown, moist,firm.
LIMESTONE: Gray, dry, soft, weathered.
Test Pit terminated at 9.0 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP8
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 746.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 9.0 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.5
1.3
2.4
2.8
3.23.4
737.5
737
736.2
735.1
734.7
734.3734.1
CLAY: Brown, moist, soft to firm, with roots.
- trace roots.
GRAVELLY CLAY: Reddish brown, moist,firm, chert gravel.
CLAY: Brown, moist, firm, trace gravel.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 3.4 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP9
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 737.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.4 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.4
2.1
5.3
5.9
733
732.6
730.9
727.7
727.1
SILT: Brown, moist, soft, with roots. - trace roots.
GRAVELLY CLAY: Reddish brown, moist,firm, chert gravel.
LIMESTONE: Light yellow, dry, hard.
Test Pit terminated at 5.9 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP10
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 733.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 5.9 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.00.3
2.3
4.9
7.6
9.19.3
704.5704.2
702.2
699.6
696.9
695.4695.2
SILT: Brown, moist, soft, with roots. - trace roots.
CLAY: Brown, moist, firm, trace gravel.
GRAVELLY CLAY: Brown, moist, firm, chertgravel.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 9.3 feet in Limestone dueto practical refusal.
S1
17
GREDELL EngineeringResources, Inc. TEST PIT LOG TP11
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 704.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 9.3 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.7
2.4
3.8
4.1
656
655.3
653.6
652.2
651.9
SILT: Brown, moist, soft, with roots.
- firm, trace roots, trace gravel.
LIMESTONE: Yellow, dry, soft to hard, highlyweathered.
- hard, slightly weathered.
Test Pit terminated at 4.1 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP12
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 656.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 4.1 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.7
4.6
6.3
6.7
637
636.3
632.4
630.7
630.3
SILT: Brown, moist, soft, with roots.
- soft to firm, trace roots, trace gravel.
GRAVELLY CLAY: Brown, moist, firm, chertgravel.
LIMESTONE: Yellow, dry, hard.
Test Pit terminated at 6.7 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP13
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 637.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 6.7 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.4
1.3
2.5
3.2
681
680.6
679.7
678.5
677.8
SILT: Brown, moist, soft, with roots. - trace roots.
GRAVELLY CLAY: Red, moist, firm, chertgravel.
LIMESTONE: Yellow, dry, hard.
Test Pit terminated at 3.2 feet in Limestone dueto practical refusal.
S1
12
GREDELL EngineeringResources, Inc. TEST PIT LOG TP14
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 681.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.2 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.6
3.7
5.2
5.8
665.5
664.9
661.8
660.3
659.7
SILT: Brown, moist, soft, with roots.
- firm, trace roots.
GRAVELLY CLAY: Brown, moist, firm, chertgravel.
LIMESTONE: Yellow, dry, hard.
Test Pit terminated at 5.8 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP15
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 665.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 5.8 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.4
1.9
3.84.0
672
671.6
670.1
668.2668
SILT: Brown, moist, soft, with roots. - soft to firm, trace roots.
GRAVELLY CLAY: Brown, moist, firm, chertand limestone gravel.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 4.0 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP16
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 672.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 4.0 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.8
3.1
4.14.4
4.74.9
704.5
703.7
701.4
700.4700.1
699.8699.6
SILT: Brown, moist, soft, with roots.
SILTY GRAVEL: Brown, moist, firm, chertgravel.
CLAY: Red, dry to moist, firm, trace gravel.
SHALE: White, dry, soft, laminated, highlyweathered. - white/gray, hard.LIMESTONE: White, dry, hard.Test Pit terminated at 4.9 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP17
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 704.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 4.9 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.00.3
1.1
2.9
5.65.8
715.5715.2
714.4
712.6
709.9709.7
SILT: Brown, moist, soft, with roots. - trace roots.
CLAY: Brown, moist, firm, trace gravel.
GRAVELLY CLAY: Reddish brown, chertgravel.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 5.8 feet in Limestone dueto practical refusal.
S1
20
GREDELL EngineeringResources, Inc. TEST PIT LOG TP18
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 715.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 5.8 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.4
1.3
2.2
3.2
6.06.2
731
730.6
729.7
728.8
727.8
725724.8
SILT: Brown, moist, soft, with roots. - trace roots.
- firm, trace gravel, no roots.
GRAVELLY CLAY: Brown, moist, firm.
LIMESTONE: Light yellowish gray, dry, hard.Test Pit terminated at 6.2 feet in Limestone dueto practical refusal.
S1
114.5
GREDELL EngineeringResources, Inc. TEST PIT LOG TP19
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 731.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 6.2 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.5
2.9
3.4
3.8
5.96.1
696
695.5
693.1
692.6
692.2
690.1689.9
SILT: Brown, moist, soft, with roots.
- trace roots.
CLAY: Brown, moist, firm, trace gravel.
GRAVELLY CLAY: Brown, moist, firm,limestone and chert gravel.
LIMESTONE: Light yellowish gray, dry, hard.Test Pit terminated at 6.1 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP20
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 696.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 6.1 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.00.3
1.2
2.22.4
713.5713.2
712.3
711.3711.1
SILT: Brown, moist, soft, with roots. - trace roots.
CLAY: Brown, moist, firm, trace gravel.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 2.4 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP21
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 713.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 07-31-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 2.4 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.8
1.2
690
689.2
688.8
CLAY: Brown, moist, soft, with limestonegravel, with roots.
LIMESTONE: Light yellow, dry, hard, mediumbedded, dip generally follows topography.Test Pit terminated at 1.2 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP22
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 690.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 1.2 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
1.1
3.2
3.6
704.5
703.4
701.3
700.9
SILT: Brown, moist, soft, with roots.
GRAVELLY CLAY: Red, moist, firm, chertgravel.
LIMESTONE: Yellow, dry, hard.
Test Pit terminated at 3.6 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP23
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 704.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.6 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.4
2.9
4.6
5.4
6.2
701
700.6
698.1
696.4
695.6
694.8
SILT: Brown, moist, soft, with roots. - trace roots.
GRAVELLY CLAY: Red, moist, firm, chert andlimestone gravel.
LIMESTONE: Yellow, dry, soft to hard, highlyweathered.
- hard.
Test Pit terminated at 6.2 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP24
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 701.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 6.2 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.7
2.4
2.7
677.5
676.8
675.1
674.8
SILT: Brown, moist, soft, with roots.
- firm, trace gravel, trace roots.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 2.7 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP25
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 677.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 2.7 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.4
3.6
5.3
652
651.6
648.4
646.7
GRAVELLY CLAY: Black, moist, soft, withroots, chert and limestone gravel. - red, firm, chert gravel.
SANDSTONE: Brown, dry, hard, mediumcoarse grained, poorly lithified.
Test Pit terminated at 5.3 feet in Sandstone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP26
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 652.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 5.3 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.00.2
2.4
3.8
5.3
9.19.3
664663.8
661.6
660.2
658.7
654.9654.7
SILT: Brown, moist, soft, with roots. - trace roots.
CLAY: Red, moist, firm, with gravel.
GRAVELLY CLAY: Red, moist, firm.
LIMESTONE: White, dry, hard.Test Pit terminated at 9.3 feet in Limestone dueto practical refusal.
S1
15
GREDELL EngineeringResources, Inc. TEST PIT LOG TP27
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 664.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 9.3 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.8
1.5
2.3
3.03.2
698
697.2
696.5
695.7
695694.8
SILT: Brown, moist, soft, with roots.
- trace roots.
GRAVELLY CLAY: Red, moist, firm, chertgravel.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 3.2 feet in Limestone dueto practical refusal.
S1
16
GREDELL EngineeringResources, Inc. TEST PIT LOG TP28
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 698.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.2 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.4
1.7
2.7
3.0
715
714.6
713.3
712.3
712
SILT: Brown, moist, soft, with roots. - trace roots.
CLAY: Brownish red, moist, firm, with gravel,trace roots.
LIMESTONE: Light yellow, dry, hard.Test Pit terminated at 3.0 feet in Limestone dueto practical refusal.
S1
23
GREDELL EngineeringResources, Inc. TEST PIT LOG TP29
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 715.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-01-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.0 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.8
1.1
656
655.2
654.9
SILT: Brown, moist, soft, with roots.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 1.1 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP30
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 656.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 1.1 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
1.2
3.1
3.7
4.34.5
672
670.8
668.9
668.3
667.7667.5
SILT: Brown, moist, soft, with roots.
- firm, trace roots.
CLAY: Brown, moist, firm, trace limestonegravel, trace roots.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 4.5 feet in Limestone dueto practical refusal.
S1
2585
GREDELL EngineeringResources, Inc. TEST PIT LOG TP31
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 672.0 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 4.5 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.7
3.1
4.44.6
705.5
704.8
702.4
701.1700.9
SILT: Brown, moist, soft, with roots.
- firm, trace roots, trace chert gravel.
GRAVELLY CLAY: Brown, moist, firm, chertgravel.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 4.6 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP32
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 705.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 4.6 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1
0.0
0.6
2.1
2.83.0
667.5
666.9
665.4
664.7664.5
SILT: Brown, moist, soft, with roots.
- firm, trace roots.
GRAVELLY CLAY: Brown, moist, firm, chertgravel.
LIMESTONE: Yellow, dry, hard.Test Pit terminated at 3.0 feet in Limestone dueto practical refusal.
GREDELL EngineeringResources, Inc. TEST PIT LOG TP33
JCPS Mission Drive High School LOCATION: See Plan of Test Pit LocationsJefferson City, MO ELEVATION: 667.5 ft DATUM: CMPS SurveyCLIENT: The Architects Alliance DATE EXCAVATED: 08-02-17
OPERATOR: Twehous WATER LEVELS: DURING EXCAVATION - FEET
EQUIPMENT: Cat 308E y PIT DRY AT COMPLETION OF EXCAVATION
BUCKET SIZE: 24" AT - FEET AFTER - HOURS
LOGGED BY: KH AT - FEET AFTER - HOURS
BACKFILLED WITH: spoils COMPLETION DEPTH 3.0 FEET
DE
PT
H (
FE
ET
)
EL
EV
AT
ION
WA
TE
R T
AB
LE
GR
AP
HIC
LO
G
SA
MP
LE
TY
PE MATERIAL DESCRIPTION
SA
MP
LE
ID
DR
Y U
NIT
WE
IGH
T (
PC
F)
BL
OW
S P
ER
6 I
NC
HE
SR
QD
= R
OC
K Q
UA
LIT
Y D
ES
.
MO
IST
UR
E C
ON
TE
NT
PE
RC
EN
T B
Y W
EIG
HT
SHEAR STRENGTH, tsf
20 40 60 PL LL
% FINES (PASSING #200 SIEVE)
MOISTURE CONTENT, %
N-VALUE (BLOWS PER LAST FOOT)
1 2 3
Date
Printe
d:
8/3
0/2
017
QU/2 PP SV
STANDARD PENETRATION TEST
TV
Figure Sheet 1
STRATIFICATION LINES ARE
APPROXIMATE SOIL BOUNDARIES
ONLY; ACTUAL CHANGES MAY BE
GRADUAL OR MAY OCCUR BETWEEN
SAMPLES.
of 1