ADDENDUM NO. 3 The Architect/ Engineer issues this addendum, applicable to the above named project, to all known Contractors before receipt of proposal. This addendum includes Item Number 3-1 thru 3-8. This addendum item shall be fully incorporated into the Bidding/Contract Documents and have the same force and effect as though originally included. The Bidder shall acknowledge receipt of this Addendum No. 3 on the Bid Proposal Form in the place provided.
GENERAL
Bidder Questions:
Item 3-1: Question: One of the trees marked for removal is growing into the existing fence which is noted to remain. How should this be handled? Answer: The tree shall be removed, it is a hazard, but there will need to be coordination with the Owner of the property to the north. This coordination has not taken place yet.
Item 3-2: Question: There is a tree growing along the wooden fence that is leaning. The tree is not currently noted to be removed, should this tree be removed? Answer: This tree is not located on the District Office’s property and it will not be removed as part of this project.
Drawings
Item 3-3: Sheet G0.00 – Index of Drawings
Civil Engineer Stamp & Sheet C1.01 added to the index.
CIVIL
Item 3-4: Sheet C1.01 – Sanitary Sewer Plan
Issued new sheet in its entirety.
MECHANICAL
Drawings
Item 3-5: Sheet M6.01 Mechanical Schedules
Referencing the condensing unit schedule, note 8 shall be omitted from the documents. CU-3 & 4 will not be twinned together. All remaining remarks apply to each of the condensing units.
LCMS NE District Office 05/25/18
Seward, Nebraska
TCEP No.: 119-001-17
ADDENDUM NO. 3 ADD3-2
Item 3-6: Sheet M6.01 Mechanical Schedules
Referencing the split system schedule, note 5 shall be omitted from the document. In addition, the interior blower coil shall have a nominal 12,000 BTU capacity. The blower coil model number indicates a 1.5 ton coil this shall be corrected to a 1.0 ton.
Item 3-7: Sheet M6.01 Mechanical Schedules
Referencing the fan schedule, note 6 shall only apply to EF-5 & 6. Division 23 contractor to coordinate with Division 26 contractor wiring the provided switch to EF-5 & 6 per note 3.
ELECTRICAL
Drawings
Item 3-8: Sheet E1.10 – Lower Level & First Floor Lighting Plan
In looking at the Lower Level Lighting Plan, the door to Warming Kitchen 007 has been changed so that it now swings out into the corridor, conflicting with the emergency wall pack fixture located on the north wall of Corridor 005. Move this north emergency fixture to the north end of the west wall of Corridor 005, locating it near the corner.
END OF ADDENDUM NO. 3
MATERIAL SYMBOLS
ELEVATION INDICATIONS
PARTITION INDICATIONS
FINISHES
INSULATION
GLASS
WOOD
METAL
STONE
MASONRY
CONCRETE
EARTHWORKS
CONCRETE/PLASTER
SHINGLES/SIDINGGLASS
BRICK
WOOD STUD
SHEET METAL
CERAMIC TILE
METAL STUD
CONCRETE MASONRY UNIT
GRAVEL/POROUS
ACOUSTICALTILE
FILLBATT/LOOSE
GLASS
CARPET ANDPAD
CERAMIC TILE
RIGID
STRUCTURAL
SPRAY/FOAM
GLASS BLOCK
ALUMINUM
FINISH
BLUESTONE/SLATE/SOAPSTONE/FLAGGING
STEELBRASS/BRONZE
ROUGH SHIM
RUBBLE LIMESTONE
BLOCKCONCRETE
CONCRETE
NON COMPACTEDEARTH
COMMON/FACEBRICK
PLASTERSAND/MORTAR/
FIRE BRICK
EARTH/COMPACTFILL FILL
WALLBOARDGYPSUM
PLYWOOD
FACING TILESTRUCTURAL
PRECAST CONCRETE
CONCRETE MASONRYCAST-IN-PLACE CONCRETE
SCALE:
VIEW NAME1/8" = 1'-0"1
1
1i
A1011
SIM
REFERENCE SYMBOLS
100'-0"FIN. FLR.
REVISION TAG & CLOUD INDICATOR
DEMOLITION INDICATOR
MATCH LINE
WALL TYPE REFERENCE
ELEVATION REFERENCE
GRID LINE
WINDOW/OPENING IDENTIFIER
DOOR/OPENING IDENTIFIER
ROOM IDENTIFIER
CROSS SECTION REFERENCE
ELEVATION REFERENCE
DETAIL REFERENCE
DETAIL REFERENCE NUMBER
SHEET ON WHICH IT IS FOUNDDETAIL OR SECTION NUMBER
SECTION REFERENCE1A101
SIM
1A101
SIM
CLASSROOM101
101
0
KEY NOTE
A1011
SIM
1t
STANDARD ABBREVIATIONS
DEIONIZED WATERDOUBLE JOIST
DEAD LOAD
DAMPPROOFING
DISHWASHER
DOUBLE HUNGDOOR FRAME
DRINKING FOUNTAIN
DEPARTMENTDOUBLE GLAZING
COLD WATER
CABLE TELEVISIONCERAMIC TILE
COUNTERSUNK
COLD ROLLED STEELCIRCUMFERENCE
COMPRESSIBLECOVER PLATE
COORDINATECONTRACTOR
CONSTRUCTIONCONNECTIONCONFERENCE
CONCRETE
CONCRETE MASONRY UNIT
CONTRACT LIMIT LINE
CEILING DIFFUSERCEILING HEIGHT
CENTER LINECONTROL JOINT
CAST IN PLACE
CHALKBOARD
COUNTER FLASHINGCERAMIC TILE
CEMENT PLASTER
CLOSED CIRCUIT TELEVISIONCATCH BASIN
CURB AND GUTTERCENTER TO CENTER
BUILT-UP ROOF
BEARING PLATE
BRIDGING JOIST
BASE PLATE
BELOW FINISH FLOORBACKFLOW PREVENTER
BOTH FACES
BOTTOM OF CURBBULLETIN BOARD
BALLED AND BURLAPPED
AUDIO VISUALASYMMETRICAL
ABOVE SUSPENDED CEILING
ARCHITECT (URAL)
ACCESS PANEL
ANNUNCIATOR
AIR HANDLING UNIT
ABOVE FINISHED SLABABOVE FINISHED GRADEABOVE FINISHED FLOOR
ACCESS FLOOR
ADJUSTABLE
AUTOMATIC DOOR CLOSERAREA DRAIN
ACOUSTICAL TILE
ACOUSTICAL INSULATION
ACOUSTICAL PLASTERACOUSTICAL PANEL
ACID-RESISTANTAIR CONDITIONING
ABBREVIATE
ARCHITECT/ENGINEER
DOOR CLOSURE
DVTL
DWGDW
DRCLSR
DST
DUPL
DS
DT
DMPFDNDODR
DISTDIVDIWDJDL
DIM
DFRDH
DF
CUR
DETDEPTDBL GLZCW
CUBCTV
CSWKCT
CRCMF
CSMTCSKCSGCRS
CPRSCOV PL
COORDCONTR
CONC FL
CONSTRCONNCONF
CONCCOMPL
COLCO
CLSR
CNTRCNRCMUCMPST
CLRCLOSCLLCLG HT
CIR
CLGCLG DIFF
CLCJ
CIP
CHKCHFR
CI
CEM PLASCER
CHANCH BD
CFLGCER TILE
CEMCCTVCB
C/C
CAVCABC&G
BUR
BSMTBTM
BW
BRDG JST
BRK
BRZBRSBRKT
BS
BRGBRG PL
BRDG
BLKHD
BRCG
BLST
BP
BM
BLKGBLKBLDGBL
BFBFF
BJTBITUMBFP
BEVBDBCBB
AV
BALBAFB&B
AVE
ASYMASPHASC
ARCH
ANN
APPX
ANTANOD
AP
AMTAMPLAMB
ALT
AGGR
ALM
AHUAHR
ALUM
AFSAFGAFFAF
ACOUS TILE
ACOUS INSUL
ACOUS PLASACOUS PNL
ADC
ADJCADJADDMADDL
AD
ABV
ACOUSACID RESAC
ABBR
A/E
DOVETAIL
DRAWING
DOWNSPOUTDOOR STOPDRAIN TILEDUPLICATE
DITTODOOR
DOWN
LTGLVLLVR
LONG
LT WT
LRGLSLT
LKR RMLLLNTLLOC
LIGHTINGLEVEL
LOUVER
LOCKER ROOMLIVE LOAD
LONGITUDINAL
LIGHTWEIGHT
LARGELUMP SUM
LIGHT
LINTELLOCATION
STAG
STDSTIR
SQINSQYDSSKSS
ST
SPKRSPRTSQFTSQ
LIGHTWEIGHT CONCRETE MASONRY UNIT
HEATING, VENTILATION, AIR CONDITIONING
DISTANCEDIVIDER
DIMENSION
CURRENT
DETAIL
CUBICLE
CASEWORK
LHLHR
LINLIQLKR
LD BRGLDGLFLG
LAB
LCMU
LAVLBLBR
KWYL
KPLKOP
CASEMENT
CASING
CONCRETE FLOOR
COMPLETE
COLUMNCLEANOUT
JC
KOKBJTJST
INV ELJAN
INVINTR
IF
INSULINSTL
INCANDINL
HVAC
HYDHW
HTG
LOAD BEARING
LINEAR FOOT
LEFT HANDLEFT HAND REVERSE
LINOLEUMLIQUID
LOCKER
LANDING
LENGTH
LABORATORYLAVATORY
KICK PLATEKNOCKOUT PANEL
POUNDLUMBER
KEYWAYLEFT
SMLS
SPKLR
SPSPCLSPEC
SK
SLP
SLVSM
SHRSHTHGSHVLSIMSJ
SCRNSDSECT
SGL
KNEE BRACE
JANITOR'S CLOSET
INVERT ELEVATION
KNOCKOUT
JOINTJOIST
JANITOR
INVERTINTERIOR
INSULATIONINSTALLATION
INCANDESCENTINSIDE FACE
HOT WATER
INLET
HYDRANT
HEATING
SALVSBSCSCHSCMU
SRVSRV
RO
RFM
RNDRHRRHRFG
RESILREQDREMREINF
SPEAKERSUPPORT
SQUARE FOOT
SQUARE INCHSQUARE YARDSERVICE SINK
STAINLESS STEEL
STAGGERED
STANDARDSTIRRUP
STREET
SQUARE
STORM DRAIN
SHEATHING
SLIP JOINT
SHEET METALSEAMLESS
SPECIFICATIONSPRINKLER
SPACINGSPECIAL
SINK
SLOPE
SLEEVE
SHOWER
SHELVESSIMILAR
SCREEN
SECTION
SINGLE
SALVAGESPLASH BLOCK
SOLID CORESCHEDULE
SOLID CONCRETE MASONRY UNIT
REVERSEROOF VENT
ROUGH OPENING
RIGHT HAND REVERSERIGHT HAND
RESILIENTREQUIRED
REMOVABLEREINFORCEMENT
RECESSED FLOOR MAT
SOUTH
ROUND
ROOFING
OWNER FURNISHED-OWNER INSTALLED
OWNER FURNISHED/CONTRACTOR INSTALLHOLLOW CONCRETE MASONRY UNIT
GLAZED CONCRETE MASONRY UNIT
GROUND FAULT INTERRUPTERGENERAL CONTRACTOR
CLOSURE
COUNTERCORNER
COMPOSITE
CLEARCLOSET
CIRCLE
CEILING
CAST IRONCHECK
CHAMFER
HOHORIZ
HSBHSHR
HNDRLHMFHMDHM
HDJT
HDWD
HDBD
HGT
HDR
HCMUHD
HC
HB
CERAMIC
CHANNEL
CEMENT
CAVITYCABINET
BOTH WAYS
BASEMENTBOTTOM
GRTG
GYP PLAS
H&CWH
GYP
GR BMGPDW
GR
GND
GENL CONTR
GL BLK
GLZ CMU
GLU LAMGLZ
GL
GDRL
GFI
GENL
HIGH STRENGTH BOLTHIGH STRENGTH
HORIZONTALHOLD-OPEN
HAND RAILHOLLOW METAL FRAMEHOLLOW METAL DOOR
HOLLOW METAL
HOUR
HARDWOOD
HARDBOARDHEAD JOINT
HEAVY DUTY
HOLLOW CORE
HOSE BIBB
HEIGHT
HEADER
REC
REFRECTRECPTRECD
RDRCPRCRBR
QT
RADRQUALQTY
PWRPVMTPVGPVC
HOT AND COLD WATER
GYPSUM PLASTER
GRADE BEAMGYPSUM DRY WALL
GRATING
HIGH
GYPSUM
GRADE
GROUND
GLUE LAMINATEDGLASS BLOCK
GUARD RAIL
GLAZING
GLASS
GENERAL
PRELIM
PTN
PT
PROJPRKG
PREFABPRPOS
PLBGPLYWD
POLYISOPOLYPOL
PLATPLASPLAM
PL
FIRE EXTINGUISHER CABINET
BRICK
BOTH SIDESBRONZE
BRASSBRACKET
BEARINGBRIDGING
BULKHEAD
BRACING
BALLASTBEAM
BLOCKINGBLOCK
BUILDINGBASE LINE
FURR
GALVGB
FXTRFUT
FSTNRFTG
FSPFS
FOS
FRNTFRMFPRFFPL
FLUORFLT GL
FOMFOC
BED JOINTBITUMINOUS
BEVELBOARD
BALANCEBAFFLE
AVENUE
ASPHALT
FLG
FLR FINFLR PLFLR SKFLR
FLDG
FIN FL
FLFIN
FD
FIN GRFGL
FECFDN
F BRK
FBDF/F
EXTN
GRAB BARGALVANIZED
FIRE STANDPIPE
FURRING
FIXTUREFUTURE
FOOTINGFASTENER
FULL SIZE
FIREPROOFINGFIREPLACE
FACE OF STUDFACE OF MASONRY
FACE OF CONCRETEFLUORESCENT
FLOAT GLASS
FRONTFRAME
PERIM
PHPGBD
PERPPERM
PERFPEDPCPPC
OXY
PBDPBPARGPAR
OVHD
ORIGOPT
FLOOR FINISHFLOOR PLATE
FLOOR SINK
FINISH FLOOR
FLANGEFLOOR
FOLDING
FLASHINGFINISH
FINISH GRADEFIBERGLASS
FOUNDATIONFLOOR DRAIN
FIBERBOARDFACE TO FACE
FIRE BRICKEXTENSION
OFCI
OPPOPNG
OFOIOFF
OF
ODOCOA
NO
O/ONTSNSNOM
NICNFNEGN/A
X SECTWWMWTRPRFWTRWTWSCTWSWRWLDWLWHSE
REFERENCERECTANGULAR
RECEPTACLERECEIVED
RECESSEDROOF DRAIN
REINFORCED CONCRETE PIPEREINFORCED CONCRETE
QUANTITYQUARRY TILE
PAVEMENT
POLYVINYL CHLORIDE
RUBBER
RADIUSRISER
QUALITY
POWER
PAVING
PARTITION
PROJECT
PRELIMINARYPREFABRICATED
POLYSTYRENEPOLISHEDPLYWOODPLUMBINGPLATFORM
PLASTERPLASTIC LAMINATE
POLYISOCYANURATE
PAINT
PARKING
PAIRPOSITIVE
PLATE
CROSS SECTIONWELDED WIRE MESH
WATERPROOFING
WAINSCOTWEATHERSTRIPPING
WATER RESISTANTWELDED
WIND LOADWAREHOUSE
WATERWEIGHT
WHWGL
WFWDW
WD
WC
W/OW/WW/VWCVTVRVOLVNRVIBVESTVERT
VCTVB
VAVVAC
UTILURUPSUNOUNFINUNEXULT
UGUFD
TYPTV
TSTRNBKL
PEGBOARD
PERPENDICULARPERMANENTPERIMETER
PERFORATEDPEDESTAL
PORTLAND CEMENT PLASTERPORTLAND CEMENT
PARTICLE BOARDPANIC BAR
PARALLEL
OVERHEAD
ORIGINALOPTIONAL
PHASE
W
OXYGEN
PARGING
OPPOSITE
OUTSIDE FACE
OUTSIDE DIAMETERON CENTER
OVERALLOUT TO OUT
NOT TO SCALENEAR SIDE
NOT IN CONTRACTNEAR FACE
NEGATIVENOT APPLICABLE
OPENING
OFFICE
V
NUMBERNOMINAL
VINYL WALL COVERING
WALL HUNGWIRE GLASS
WIDE FLANGE
WATER CLOSET
WITHOUTWALL TO WALL
WOOD
WINDOW
WEST
VINYL TILEVAPOR RETARDER
VOLUMEVENEER
VIBRATIONVESTIBULE
VERTICAL
WITH
VINYL COMPOSITION TILE
VARIABLE AIR VOLUME
UNINTERRUPTIBLE POWER SUPPLYUNLESS NOTED OTHERWISE
VINYL BASE
VACUUMVOLT
UTILITYURINAL
UNFINISHEDUNEXCAVATED
ULTIMATE
UNDERGROUNDUNDER FLOOR DUCT
TYPICALTELEVISION
TENSILE STRENGTHTURNBUCKLE
EXPANDED POLYSTYRENE
APPENDIX
ANTENNAANODIZED
AMOUNTAMPLIFIER
AMBIENT
ALTERNATE
AGGREGATE
ALARM
ALUMINUM
ANCHOR
EXH FN
EXST GR
EXSP
EXT
EXP
EXH HD
EXCEWEST
EQUIP
ESCALERECTEQUIV
ESMT
EQL SP
EP
EQ
EPS
ADJACENT
ADDENDUMADDITIONAL
ABOVE
ACOUSTICAL
ENAM
ENGR
EOENTR
ENCL
EMER SHREMER
ELECEL
DWTR
EJ
EXG
EF
E
DWRDWL
EXISTING GRADE
EXPANSIONEXHAUST FAN
EXHAUST HOOD
EXCAVATE
EXTERIOR
EXPOSED
EACH WAYESTIMATE
ESCALATOR
EQUIVALENTEQUIPMENT
EQUALLY SPACED
ELECTRICAL PANEL
EASEMENT
ERECTION
EQUAL
MTR
NMVBLMULTMULL
MTG
MTDMODMO
MISC
MLWKMLDGMLC
MK
MIR
MH
MFGMFR
ELECTRICAL OUTLET
ENCLOSURE
EMERGENCY SHOWEREMERGENCY
ELECTRICALELEVATION
ENAMEL
ENTRANCEENGINEER
EXPANSION JOINT
EACH FACE
DUMBWAITER
EXISTING
EAST
DRAWERDOWEL
MECH
MEZZMEMBMED
MDO
MC
MBR
MAXMATLMASMARBMAINT
STRUCT STL
TOWTOTTOSTOL
TNL
TMPDTMPD GL
TKBD
TOJ
THRUTHRESTHK
TOFFTOF
TERTEMPTECH
TDTCTB-xx
T>&B
SYMMSYM
SUSPSUSP CLG
SURFSUPPL
MOVABLEMULTIPLE
MOUNTED
MASONRY OPENINGMILLWORK
MOLDINGMETAL LABORATORY CASEWORK
MISCELLANEOUS
MANHOLE
MANUFACTURINGMANUFACTURER
MORTAR
NORTH
MULLION
MEETING
MODULE
MARK
MIRROR
MEZZANINEMEMBRANE
MECHANICAL
MOMENT CONNECTION
MATERIALMASONRY
MAINTENANCE
MEDIUM DENSITY OVERLOAD
MEDIUM
MEMBER
MAXIMUM
MARBLE
TOP OF FINISH FLOOR
TOP OF WALL
TOP OF STEELTOLERANCE
TEMPERED
TOP OF JOIST
TOP OF FLANGE
TOTAL
TUNNELTEMPERED GLASS
TACKBOARDTHROUGH
THRESHOLD
TERRAZZOTEMPORARY
TECHNICAL
TRENCH DRAIN
THICK
TEST BORING-xx(E.G. TB-1)
TONGUE AND GROOVE
TOP OF CURB
TOP AND BOTTOM
SYMMETERICALSYMBOL
SUSPENDEDSUSPENDED CEILING
SURFACE
STRUCTURAL STEELSUPPLEMENT
M
LW PLASLWC
STL JSTSTL PLSTL
STORSTRUCT
LIGHTWEIGHT PLASTERLIGHTWEIGHT CONCRETE
METER
STEEL JOISTSTEEL PLATE
STORAGESTRUCTURAL
STEEL
ANCHOR BOLTAB
ACTUALACT
ALD ALUMINUM DOOR
ACOUSTICAL PANEL CEILINGAPC
ASBESTOSASB
AWC ACOUSTICAL WALL COVERINGAWP ACOUSTICAL WALL PANEL
BO BOTTOM OFBOC BACK OF CURBBOW BOTTOM OF WALL
CORNER GUARDCG
COMM COMMERCIAL
CORRIDORCORR
CARPETCPT
DRAPERY FABRICDF
DIAMETERDIA
DRAPERY LINERDL
DR DRAIN
EA EACH
ELEV ELEVATOR
EPOXY FLOOREPX
EXST EXISTING
EIFS EXTERIOR INSULATION FINISH SYSTEM
FC FIRE COATED
FACTORY FINISHFFFINISH FLOOR ELEVATIONFFE
FL FLOWLINE
GUT GUTTER
HC HANDICAP
HLB HORIZONTAL LOUVER BLINDS
ID INSIDE DIAMETER
LIN LINEAR
MB MARKERBOARD
MC METAL CLAD
MDF MEDIUM DENSITY FIBERBOARD
ME MATCH EXISTINGME MISCELLANEOUS EQUIPMENT
MIL MILLIMETERMIN MINIMUM
ML MATCH LINEML METAL LATH
MTL METAL
OD OVERFLOW DRAIN
OVERHEAD DOOROHDOPERABLEOPER
OTA OPEN TO ABOVEOTFA OPEN TO FLOOR ABOVEOTS OPEN TO STRUCTURE
OZ OUNCEP/C PRECAST
PF PANEL FABRICPFP PRE-FINISHED PANEL
PL PLASTIC LAMINATE
PS PROJECTION SCREEN
PCT PORCELAIN TILE
RB RUBBER BASE
RST RUBBER STAIR TREADRT RUBBER TILE
S SEATING
SF SYSTEMS FURNITURE
SLA SLATE
SLS SUB-FLOOR LEVELING SYSTEM
SSM SOLID SURFACING MATERIALST STAIN
STC SOUND TRANSMISSION CLASS
STN STONE
SVB SHEET VINYL BASESVF SHEET VINYL FLOOR
SYST SYSTEM
T TABLETB TACKBOARD
TE TRANSITION EDGE
TLT TOILET
TO TOP OF
TS TUBE STEEL
UF UPHOLSTERY FABRIC
UL UNDERWRITERS LABORATORY
VB VAPOR BARRIER
VDB VISUAL DISPLAY BOARD
WC WALL COVERINGWCPT WALL CARPET
WDD WOOD DOOR
WF WOOD FLOORING
WH WATER HEATER
GENERAL NOTES1.
2.
3.
ALL DISCIPLINES SHALL BE RESPONSIBLE FOR THEIR SCOPE OF WORK. THIS WORK IS TO BE SCHEDULED AND COMPLETED WITH THE GENERAL CONTRACTOR'S FULL KNOWLEDGE.
ALL DIMENSIONS LOCATING PLUMBING FIXTURES ARE FROM FINISH MATERIAL NOT FROM GPDW SHEATHING.
FINAL CLEANING - REMOVE OR REPAIR DAMAGED OR SOILED SPOTS ON NEWLY PAINTED WALLS AND ON ALL NEWLY INSTALLED WORK. REMOVE DUST AND DEBRIS FROM ALL NEW WORK.
A101 1SI
M
A101 1
001A
REVISION TAG INFORMATION:
BOTTOM indicates consecutive number assigned to instrument type.
TOP indicates the instrument type.ABDFGILPR
= Addendum= Bid Package= Construction Change Directive or Change Directive= Field Order= Guaranteed Maximum Price= Architects Supplemental Instructions or Architects Supplemental Information= Limited Permit= Proposal Request, Proposal Request Order or Change Proposal Request= Request For Information
DETAIL SECTION REFERENCE1/A101
SIM
FS FLAT SCREENFS FAR SIDE
UDRLMNT UNDERLAYMENTUDR UNDER
CONT CONTINUOUS
# SHEET HISTORY:?
? - #
Lincoln, Nebraska1010 Lincoln Mall, Suite 200Lincoln, NE 68508-2883402 477.9291 Fax 402 477.6542
Kansas City, MissouriFairway, Kansas
Landscape Architecture
www.clarkenersen.com
Architecture
EngineeringInteriors
Plot
Tim
e St
amp:
File
Loca
tion/
Nam
e:
ISSUED
5/24
/201
8 4:
25:1
5 PM
C:\
(1) R
evit
Proj
ects
\201
7\11
9001
-A-1
7_tim
.roge
rs@
clar
kene
rsen
.com
.rvt
Title Sheet & DrawingIndex
G0.00
TCEP No.: 119-001-17
152 S Columbia Rd.Seward, NE
LCMS NE District Office
May 7, 2018
05/07/18 AS PER CONSTRUCTION DOCS
A0.00 Wall Type Schedule & DetailsA0.10 Demolition PlansA1.10 Lower Level Floor PlanA1.11 First Level Floor PlanA2.10 Exterior Elevations & Reflected Ceiling PlansA3.10 Stair Sections, Door Schedule, Door Types, & Frame TypesA4.10 Interior Elevations & Restroom Schedule
GENERALLCMS Nebraska District Office Remodel
152 S Columbia Rd, Seward NE 68434119-001-17May 7, 2018
LANDSCAPE ARCHITECTURAL
ARCHITECTURAL
INTERIOR FINISHES
MECHANICAL
ELECTRICAL
G0.00 Title Sheet & Drawing IndexG0.10 Code Compliance Plans
L1.01 Site Conditions/SiteDemolition Plan
L2.01 Site Materials PlanL2.02 Site Layout PlanL3.01 Site Grading PlanL4.01 Site Planting PlanL5.01 Site Irrigation PlanL6.01 Site Details
F1.10 Lower Level Finishes Plan and Finish Materials ScheduleF1.11 First Floor Finishes PlanF2.10 Signage Plans, Details & Schedule
M0.00 Mechanical Abbreviations, Symbols & NotesM0.01 Lower Level Mechanical Demolition PlanM0.02 First Floor Mechanical Demolition PlanM0.03 Mechanical Roof Demolition PlanM1.01 Lower Level HVAC PlanM1.02 First Floor HVAC PlanM1.03 Mechanical Roof PlanM2.01 Underfloor Lower Level Piping PlansM2.02 Lower Level Pipnig PlanM2.03 First Floor Piping PlanM3.01 Piping Riser DiagramsM4.01 Mechanical Room PlansM5.01 Mechanical DetailsM6.01 Mechanical Schedules
E0.00 Electrical Abbreviations, Symbols Legend & General NotesE0.01 Electrical Site Utilities PlanE0.02 Lower Level & First Floor Electrical Demolition PlanE1.10 Lower Level & First Floor Lighting PlanE2.10 Lower Level, First Floor & Roof Power & Auxiliary Systems PlanE3.01 Electrical One Line Diagram, Details & SchedulesE4.01 Electrical Schedules
ELECTRICAL ENGINEERMECHANICAL ENGINEERLANDSCAPE ARCHITECTARCHITECT(COORDINATING PROFESSIONAL)
A - 001 05/15/2018 ADDENDUM 001A - 003 05/25/2018 ADDENDUM 003
CIVIL ENGINEER
003A
C1.01 Sanitary Sewer PlanCIVIL
003A