Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 Phone: 254-750-8062 Fax: 254-750-8063 [email protected] CITY OF WACO www.waco-texas.com Date: 08/28/2018 RFB No: 2018-057 Commodity: Cottonwood Creek Water Well Rehab Project Purchasing Agent: Mr. Kasey Gamblin Closing Time: 2:00 P.M. CST, Friday, August 31, 2018 Opening Time: 2:01 P.M. CST, Friday, August 31, 2018 RFB Opening Location: Operations Center, Purchasing Services Office, 1415 N. 4 th St., Waco, TX 76707 ______________________________________________________ Addendum No: 1 The above-mentioned RFB invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address. 1. The following page includes clarifications and amendments to the RFB. Please review and note the changes. This includes using the revised Bid Sheet that is attached. This revised Bid Sheet must be used in your bid proposals. Not using the revised Bid Sheet will be cause to disqualify your bid. Firm:_____________________________________________________________________________________ Address___________________________________________________________________________________ Signature of Person Authorized to Sign Bid:______________________________________________________________________ Signor's Name and Title (print or type):_____________________________________________________________________________ E-mail Address:____________________________________________________________________________ Date:____________________Telephone:___________________________Fax:_________________________ RFB 2018-057 Cottonwood Creek Water Well Rehab. Project 1 of 21

Upload: others

Post on 21-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Purchasing Services Post Office Box 2570

Waco, Texas 76702-2570 Phone: 254-750-8062

Fax: 254-750-8063 [email protected]

CITY OF WACO www.waco-texas.com

Date: 08/28/2018 RFB No: 2018-057 Commodity: Cottonwood Creek Water Well Rehab Project Purchasing Agent: Mr. Kasey Gamblin Closing Time: 2:00 P.M. CST, Friday, August 31, 2018 Opening Time: 2:01 P.M. CST, Friday, August 31, 2018

RFB Opening Location: Operations Center, Purchasing Services Office, 1415 N. 4th St., Waco, TX 76707

______________________________________________________

Addendum No: 1 The above-mentioned RFB invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address.

1. The following page includes clarifications and amendments to the RFB. Please review and note the changes. This includes using the revised Bid Sheet that is attached. This revised Bid Sheet must be used in your bid proposals. Not using the revised Bid Sheet will be cause to disqualify your bid.

Firm:_____________________________________________________________________________________ Address___________________________________________________________________________________ Signature of Person Authorized to Sign Bid:______________________________________________________________________ Signor's Name and Title (print or type):_____________________________________________________________________________ E-mail Address:____________________________________________________________________________ Date:____________________Telephone:___________________________Fax:_________________________

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

1 of 21

Page 2: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Addendum No: 1 CITY OF WACO

OFFICIAL BID SHEET BID INVITATION NO: RFB 2018-057

Cottonwood Creek Water Well Rehab. Project DATE: ________________ BIDDER:_____________________________________________________________________ AUTHORIZED SIGNATURE:____________________________________________________ I. Refer to "Standard Instructions for all Bids" before completing Bid Sheet.

a. Price: Includes all labor, materials, and equipment to complete project. b. Completion time to be 30 calendar days after Notice to Proceed. However, counting of the days

will not begin until 10 calendar days after the Notice to Proceed has been given. c. Retainage shall be withheld in the percentage per the Standard Specifications until final

completion of the project including turf establishment and receipt of as-built plans and other closeout documents.

II. In submitting this bid, I certify: a. Items bid are in exact accordance with specifications, unless noted in bid. b. That prices in this bid have been arrived at independently, without consultation or agreement with

any competitor for the purpose of restricting competition. ---------------------------------------------------------------------------------------------------------------------------- PRICING INFORMATION NOTE: Depending on unit prices, requirements and approved budgeted funds, quantities may be reduced or increased during the contract period.

ITEM No.

DESCRIPTION QUANITY UNITS

(A)

UNIT PRICE

(B)

TOTAL AMOUNT

(C) 1 Mobilization

(not to exceed 5% of total bid price) 1 LS

2 Rehabilitate existing Cottonwood Creek Water Well including new pump, motor, and piping. The bid is to include all accessories, wiring, attachments, and connections to make a complete working water well

1 LS

3

Bail out sediment from well (beginning at a bottom of the well up to a height of ten feet)

10 LF

4

T.V. camera well survey 1 LS

5 Sonar Jet clean well perforations

4 Hr.

TOTAL AMOUNT OF BID $_____________________________________

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

2 of 21

Page 3: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Early Payment Terms:

a) Bidder may offer an early payment discount by filling in the blanks in section b below. City may accept an early payment discount, but in doing so, City does not waive any of its rights under Texas Government Code Section 2251 (Prompt Payment Act).

b) Payment is due thirty (30) DAYS after acceptance of order and receipt of an original invoice, but a ______ percent early payment discount is offered for full payment made within ______(__) DAYS after acceptance of order and receipt of an original invoice.

COMPLETED FORM MUST BE RETURNED WITH BID

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

3 of 21

Page 4: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Addendum No: 1

 General Specifications 

1. All work is to be performed in accordance with the City of Waco’s Manual of Standard

Details and the Standard Specifications for Construction.

2. The contractor is to protect from damage all facilities and equipment at the golf course (work site) location both public and private during this project. Any damaged facilities or equipment will be replaced or repaired, to the Owner’s satisfaction, at the expense of the contractor.

3. The work will be done during the normal business hours of 7:30 a.m. to 5 p.m. Monday

through Friday unless otherwise mutually agreed upon. 4. After construction, the work site is to be cleaned up to the same or better than pre-

construction condition. 5. Delivery of the equipment and supplies are to be coordinated with the golf course manager 6. Installing the pump will include all the wiring and connections needed to make a fully

functional water well system. 7. All of the old piping, pumps, motors, and other materials not used will be removed and

disposed properly and according to relevant local, state, and federal environmental rules, regulations and procedures.

8. The work shall not interfere with the golf course operations, golfers, or golf course

maintenance.

9. Protecting all golf course facilities is to include repairing ruts and laying down plywood or other protective material that will protect the golf course while moving equipment in and out of the work site.

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

4 of 21

Page 5: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Addendum No: 1

 Technical Specifications 

Waco Cottonwood Water Well Replacement Existing Well Information: 10” Casing: 0 to 2,031 Ft Perforations: 1,840 – 1,916 Ft 1,926 – 1,985 Ft 1,998 – 2,010 Ft Total Well Depth – 2,041 Ft Pump to be set at 1,030 FT Contractor is to provide: Goulds 7CLC-9 Stg. submersible pump that produces approximately 340 GPM (gallons per minute)

@ 840’ TDH (total discharge head) Franklin high temperature 8-inch, 100 HP (horsepower), 3-Phase, 460 Volt Motor 1030 linear feet of 5-inch ID Schedule 40 black steel pipe with 8V thread and API collars Two 5-inch ductile iron positive check valves with break-off plugs 1,050 Ft of 4/0 3-conduit (with ground) flat submersible pump cable 2,100 Ft of ¼” poly airline Two (2) complete airline gauge kits ¾” (minimum) stainless steel banding material with stainless steel buckles All miscellaneous tape, splicing material, and any other items not listed, but is needed to make the

well a fully functional and operating ground water well and pump system.

Contractor is to provide the following services: Perform a TV camera well survey to determine the condition of the well screen and casing. Repair

and replace the well parts as needed Sonar jet clean the well perforations Bail out the sediment from the bottom of the well with bailer up to a ten-foot height. Additional

cleaning will be based on the included bid price Assemble pump with motor, install with all the accessories and start-up/test

Contractor is to get the well back in service:

Conduct a minimum one (1) hour pump test upon completion of the well repair, per TCEQ requirements. Adjustments are to be made to ensure test meets and passes TCEQ requirements.

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

5 of 21

Page 6: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Conduct and make sure the well passes bacteria test (Bac-T) to ensure the well/pump, etc. are clean and meets TCEQ requirements for public use.(The City of Waco Water Utilities staff will perform the tests when the contractor has properly prepared the well for testing. The contractor will be charged for any failed bacteria tests after the first round.

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

6 of 21

Page 7: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Addendum No: 1 Questions Raised during the Pre-Bid Meeting:

1. Does the fence around the well have to be replaced?

The City will replace the fence upon final completion of the project.

2. Will the City be replacing he exposed wiring at the well head? Yes. The City will replace the exposed wiring to ensure there are no electrical issues related to the wiring of the well, pump, and motor.

3. Can MSE Submersible Heat Exchanger Motors be used in the bid as an alternate to the Franklin motors? This motor can be submitted as an alternative, per the RFB procedures. Please follow the RFB procedures on how to submit alternative bids. Note, using this motor as an alternative does not guarantee the related bid will win in the bidding process. The City has requested a Franklin motor, and this is a low bid award project.

4. Does the City have any documentation regarding the location of the well perforations? The City does have some documentation on the perforations for the well. See the attached pages.

5. How will the jet cleaning and T.V. surveying be handled for this project? Each of the items will be handled separately. The contractor is to assume the T.V. Camera Survey will be conducted once. It will be done first. Then the Sonar Jet Cleaning will be conducted, only after the camera survey data has been reviewed. It also will be done once or as mutually agreed upon by the City and the contractor. Payment for the cleaning will be done per the Bid Item Description (per hour). The City reserves the right to use another form of well cleaning based on the findings of the camera survey.

6. Is there a scope of work pertaining to the cleaning of the well. I do not see a bid item for this? It shall be understood that the Sonar Jet-Cleaning is to provide a significant cleaning of the well. If the camera survey deems that the well cannot or should not be cleaned by sonar jetting, another form of cleaning maybe used. Payment for the alternative cleaning method will be calculated in conjunction with the removal of the sonar jet cleaning bit item.

7. Will the quote for the Sonar Jet be included in Bid item #2. I do not see a separate line item. The list of bid items have been adjusted to take into account sonar jet cleaning.

8. Will pump manufacturers other than Goulds be acceptable? Other pumps can be submitted as an alternative, per the RFB procedures. Please follow the RFB procedures on how to submit alternative bids. Note, using other pumps as an alternative does not guarantee the related bid will win in the bidding process. The City has requested a Goulds pump, and this is a low bid award project.

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

7 of 21

Page 8: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

9. Page 12, Item I-b show 30 days to complete after Notice to proceed. Lead time on the motor is 4 to 6 weeks minimum. Can completion time be from receipt of equipment? Please note that the counting of the construction days does not start until 10 calendar days after the Notice to Proceed has been given. The new bid sheet reflects this statement. In addition, the time between when the bids are opened and the pre-construction meeting where the Notice to Proceed is given is approximately 5 to 7 weeks, which can be used for ordering parts at the contractor’s discretion. Please bid as stated. Time adjustments cannot be made at this time.

10. Can you clarify, Bail out the sediment from the bottom of the well with bailer up to a two- foot depth. The bid item for bailing had been revised in the addendum. Bailing is the removal of sediment from the bottom of the well up to a proposed height of ten-feet. Payment for this item will be based on the actual depth of sediment removed.

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

8 of 21

Page 9: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

State Well Number 4031805

County McLennan

River Basin Brazos

Groundwater Management Area 8

Regional Water Planning Area G - Brazos G

Groundwater Conservation District

Southern Trinity GCD

Latitude (decimal degrees) 31.503056

Latitude (degrees minutes seconds) 31° 30' 11" N

Longitude (decimal degrees) -97.167778

Longitude (degrees minutes seconds) 097° 10' 04" W

Coordinate Source +/- 1 Second

Aquifer Code 217HSTN - Hosston Formation

Aquifer Trinity

Aquifer Pick Method

Land Surface Elevation (feet above sea level)

525

Land Surface Elevation Method Interpolated From Topo Map

Well Depth (feet below land surface) 2041

Well Depth Source Driller's Log

Drilling Start Date

Drilling End Date 6/0/1990

Drilling Method Mud (Hydraulic) Rotary

Borehole Completion Perforated or Slotted

Well Type Withdrawal of Water

Well Use Irrigation

Water Level Observation None

Water Quality Available Yes

Pump Submersible

Pump Depth (feet below land surface)

Power Type Electric Motor

Annular Seal Method

Surface Completion

Owner Cottonwood Creek Golf Course

Driller J.L. Myers Co.

Other Data Available Drillers Log; Electric Log; Gamma Ray

Well Report Tracking Number

Plugging Report Tracking Number

U.S. Geological Survey Site Number

Texas Commission on Environmental Quality Source Id

Groundwater Conservation District Well Number

Owner Well Number

Other Well Number

Previous State Well Number

Reporting Agency Texas Water Development Board

Created Date 1/15/1992

Last Update Date 1/28/2016

Casing

Diameter (in.) Casing Type Casing Material Schedule Gauge Top Depth (ft.) Bottom Depth (ft.)

24 Blank Steel 0 40

11 Blank Steel 0 1840

11 Screen Steel 1840 1916

11 Blank Steel 1916 1926

11 Screen Steel 1926 1985

11 Blank Steel 1985 1998

11 Screen Steel 1998 2010

11 Blank Steel 2010 2031

Open Hole 2031 2041

Well Tests - No Data

Lithology - No Data

Annular Seal Range - No Data

Well Basic Details

Remarks

Scanned DocumentsGWDB Reports and Downloads

Tuesday, August 28, 2018 Page 1 of 4State Well Number 40-31-805

Texas Water Development Board (TWDB)Groundwater Database (GWDB)

Well Information Report for State Well Number40-31-805

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

9 of 21

Page 10: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Borehole - No Data Plugged Back - No Data

Filter Pack - No Data Packers - No Data

Tuesday, August 28, 2018 Page 2 of 4State Well Number 40-31-805

Texas Water Development Board (TWDB)Groundwater Database (GWDB)

Well Information Report for State Well Number40-31-805

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

10 of 21

Page 11: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

Tuesday, August 28, 2018 Page 3 of 4State Well Number 40-31-805

Texas Water Development Board (TWDB)Groundwater Database (GWDB)

Well Information Report for State Well Number40-31-805

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

11 of 21

Page 12: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

GWDB DISCLAIMER: Except where noted, all of the information provided in the Texas Water Development Board (TWDB) Groundwater Database (http://www.twdb.texas.gov/groundwater/data/gwdbrpt.asp) is believed to be accurate and reliable; however, the TWDB assumes no responsibility for any errors appearing in rules or otherwise. Further, TWDB assumes no responsibility for the use of the information provided. PLEASE NOTE that users of these data are responsible for checking the accuracy, completeness, currency and/or suitability of all information themselves. TWDB makes no guarantees or warranties as to the accuracy, completeness, currency, or suitability of the information provided via the Groundwater Database (GWDB). TWDB specifically disclaims any and all liability for any claims or damages that may result from providing GWDB data or the information it contains. For additional information or answers to questions concerning the TWDB GWDB, contact the Groundwater Data Team at [email protected].

6/16/1990Sample Date:

Parameter Code

Parameter Description Flag Value* Units Plus/Minus

00415 ALKALINITY, PHENOLPHTHALEIN (MG/L) 10 mg/L

00410 ALKALINITY, TOTAL (MG/L AS CACO3) 360 mg/L

00440 BICARBONATE ION, CALCULATED (MG/L AS HCO3) 414.92 mg/L

00910 CALCIUM (MG/L) 3.2 mg/L

00445 CARBONATE ION, CALCULATED (MG/L AS CO3) 12 mg/L

00940 CHLORIDE, TOTAL (MG/L AS CL) 54.7 mg/L

00950 FLUORIDE, DISSOLVED (MG/L AS F) 1 mg/L

00900 HARDNESS, TOTAL, CALCULATED (MG/L AS CACO3) 11 mg/L

00920 MAGNESIUM (MG/L) 0.9 mg/L

71851 NITRATE NITROGEN, DISSOLVED, CALCULATED (MG/L AS NO3) 0 mg/L

00400 PH (STANDARD UNITS), FIELD 8.3 SU

71860 RESIDUAL SODIUM CARBONATE, CALCULATED 6.97

00931 SODIUM ADSORPTION RATIO, CALCULATED (SAR) 31.4

00932 SODIUM, CALCULATED, PERCENT 97 PCT

00929 SODIUM, TOTAL (MG/L AS NA) 246.8 mg/L

00094 SPECIFIC CONDUCTANCE, FIELD (UMHOS/CM AT 25C) 1000 MICR

00945 SULFATE, TOTAL (MG/L AS SO4) 106.7 mg/L

70301 TOTAL DISSOLVED SOLIDS , SUM OF CONSTITUENTS (MG/L) 629 mg/L

Sample Time: 0000

Water Quality Analysis

Collection Remarks: No Data

1Sample Number:

Sampled Aquifer: Hosston Formation

Analyzed Lab: Pope Testing Lab

Collection Entity: Registered Water Well Driller

Reliability:

* Value may not display all significant digits for parameter in results, check Scanned Documents for laboratory paperwork..

Tuesday, August 28, 2018 Page 4 of 4State Well Number 40-31-805

Texas Water Development Board (TWDB)Groundwater Database (GWDB)

Well Information Report for State Well Number40-31-805

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

12 of 21

Page 13: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

13 of 21

Page 14: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

14 of 21

Page 15: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

15 of 21

Page 16: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

16 of 21

Page 17: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

17 of 21

Page 18: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

18 of 21

Page 19: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

19 of 21

Page 20: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

20 of 21

Page 21: Addendum No: 1 · Addendum No: 1 The above-mentioned RFB invitation has b een changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time

RFB 2018-057 Cottonwood Creek Water Well Rehab. Project

21 of 21