918.839.6032 ph. 28899 Brookenhill Rd [email protected] Shady Point, OK 74956 Date: February 9, 2015 Addendum #3 Razorback Event Center for Panama Public Schools Project Number: 11-28 Total Pages: Ten (10) This addendum forms a part of the contract documents and modifies the original bidding documents dated 01-16-15. Acknowledgement of this addendum is required in the space provided on the bid form. Failure to do so may subject bidder to disqualification. Item A3-1 (Additional Information): Please note that all sprinkler heads over the court and in the locker rooms shall have wire guards on them. Item A3-2 (Clarification): Please see attached Addendum #3 items from Engineering Elements for misc. hvac and electrical items. Item A3-3 (Clarifications, Sheet C102): Where the new driveway to the south of the new building connects to the existing driveway to the east, there is NOT to be a concrete transition, it is simply asphalt to asphalt. Also, the concrete trickle channel shown in the south parking lot is to be included in the Alternate #6. All concrete driveway entrances, sidewalks around the building, and the concrete handicapped parking areas are to be included in the Base Bid. Item A3-4 (Clarification): Please note that all masons who bid on this project should familiarize themselves with the building sections, as the low block walls where the basketball court meets the bleachers are more visible / easier to understand in the building sections versus the plan. Sheet A206 (as well as others) has a detail showing how the low height block walls are to be constructed under the first few rows of bleacher structure. Item A3-5 (Clarification, Sheet C102): the space between the back of the building, and the back driveway (which is to the southwest of the building) is to have sod. Item A3-6 (Substitution request): Action Flex floor system with maple wood court floor surface is approved as a substitution for the wood court flooring. Additionally, the Contractors should submit an alternate for Action Excel NR Flooring (or equal), which is a slightly thicker. Note that if this thicker wood floor system is used, the slab recess shall be changed from 1 5/8” deep to 2 1/8” deep. This shall be add alternate #8 (see attached, Revised Bid Form). x x x x

Upload: builiem

Post on 15-Mar-2018

232 views

Category:

Documents


3 download

TRANSCRIPT

918.839.6032 ph. 28899 Brookenhill Rd [email protected] Shady Point, OK 74956

Date: February 9, 2015

Addendum #3 Razorback Event Center for Panama Public Schools

Project Number: 11-28

Total Pages: Ten (10)

This addendum forms a part of the contract documents and modifies the original bidding documents

dated 01-16-15. Acknowledgement of this addendum is required in the space provided on the bid form.

Failure to do so may subject bidder to disqualification.

Item A3-1 (Additional Information): Please note that all sprinkler heads over the court and in the locker rooms shall have wire guards on them.

Item A3-2 (Clarification): Please see attached Addendum #3 items from Engineering Elements for misc. hvac and electrical items.

Item A3-3 (Clarifications, Sheet C102): Where the new driveway to the south of the new building connects to the existing driveway to the east, there is NOT to be a concrete transition, it is simply asphalt to asphalt. Also, the concrete trickle channel shown in the south parking lot is to be included in the Alternate #6. All concrete driveway entrances, sidewalks around the building, and the concrete handicapped parking areas are to be included in the Base Bid.

Item A3-4 (Clarification): Please note that all masons who bid on this project should familiarize themselves with the building sections, as the low block walls where the basketball court meets the bleachers are more visible / easier to understand in the building sections versus the plan. Sheet A206 (as well as others) has a detail showing how the low height block walls are to be constructed under the first few rows of bleacher structure.

Item A3-5 (Clarification, Sheet C102): the space between the back of the building, and the back driveway (which is to the southwest of the building) is to have sod.

Item A3-6 (Substitution request): Action Flex floor system with maple wood court floor surface is approved as a substitution for the wood court flooring. Additionally, the Contractors should submit an alternate for Action Excel NR Flooring (or equal), which is a slightly thicker. Note that if this thicker wood floor system is used, the slab recess shall be changed from 1 5/8” deep to 2 1/8” deep. This shall be add alternate #8 (see attached, Revised Bid Form).

x x

x x

918.839.6032 ph. 28899 Brookenhill Rd [email protected] Shady Point, OK 74956

Item A3-7 (Additional Scope): Each of the four trophy cases in Lobby 100 shall have a divider in the center of them, to break up the span of the shelving. The divider shall be 2 layers ¾” plywood screwed together, with 1X2 front edge, from floor to ceiling, with the adjustable shelving to be on both sides of the divider.

Item A3-8 (Change in Spec): the interior wooden doors used on this project shall be prefinished, plain sliced oak, color to be selected during submittal phase.

Item A3-9 (Clarification, Sheets A208 & A212): Stage 107 is to have the furring strips & gyp board all the way up to the bottom side of the roof, while Corridors 109 & 138 are to only have the furring strips & gyp. bd. up to 10’ above finished floor.

Item A3-10 (Clarification): The tectum wall panels used on this project shall be installed in 4’x4’ panels as shown on the drawings.

Item A3-11 (Clarification, Sheets A401): The sections of floating ceiling tile over the bleachers are NOT to have insulation laying on top of them.

Item A3-12 (Clarification): There is not to be any gyp. bd. placed over cmu block walls. Therefore, all conduit, electrical boxes, etc. in block walls shall be recessed in the block.

Item A3-13 (Clarification, Sheets A207): Along column line 3, where metal stud framing is used to frame the metal building endwall over the opening that leads into the lobby, there shall be 5/8” mtl. furring strips used across the studs, at 48”o.c., to give something to more easily fasten the metal wall panels to the structure.

Item A3-14 (Clarification): See attached, Revised Sheets A202 & A203 for clarification of the location of tectum wall panels inside the gym area. Note that all tectum wall panels should have metal stud framing behind.

Item A3-15 (Clarification): See attached, Supplemental Drawing #1 (SD-1) for on site location where all earth that is removed from the site is to be stockpiled by the contractor. Existing dirt is NOT to be hauled off, but simply piled up for the school to use or dispose of on their own.

Item A3-16 (Clarification): The School is currently obtaining and paying for the State Fire Marshal’s building permit, but it is up to the contractor to pay for any/all meter tap fees, as well as any inspection fees, and concrete and earthwork compaction test.

Item A3-17 (Additional Scope): The School would like to incorporate a key fob unlocking system at door numbers 110A, 110B, 113B, 118B,120A, 120B, 125A, 125B, 128B, 131B, 133A, and 133B. The system shall include parts with the following model numbers at these doors: DMP XR550DNL-G Access Control

x x

x x

918.839.6032 ph. 28899 Brookenhill Rd [email protected] Shady Point, OK 74956

Panel; DMP 734 Wiegand Interface Module; DMP PP-6005B Proximity Reader; and DMP 1346 Proximity Fob. The School already has this system set up on some other doors at Panama Public Schools, and the system must be the same for software compatibility. Please contact Bobby Turney at Security Alarms for more information and for pricing (918-683-5600).

Attachments:

Revised Sheet A202 Revised Sheet A203 Supplemental Drawing #1 (SD-1) Revised Bid Form Addendum #3 Items from Engineering Elements, PLLC

x x

x x

Engineering Elements, PLLC 2820 E. Millennium Drive, Suite 2 Fayetteville, Arkansas 72703

Phone (479) 695-1333 Fax: (479) 251-7982

MECHANICAL, & ELECTRICAL ADDENDUM NO. 3

TO: Michael Riley COMPANY: Michael Allen Riley Architecture, PLLC FROM: Ron McClane, Jacob Cersovsky DATE: February 9, 2015 PROJECT: Razorback Event Center PROJECT #: 14-067 SUBJECT: Plumbing, Mechanical, & Electrical Addendum COPY: File The following addendum and any attached drawings, schedules, details and/or specifications shall become a part of the contract documents dated January 16th, 2015 and titled Razorback Event Center for Panama Public Schools, Panama, OK DRAWINGS

1. MECHANICAL

1.1. REFER TO SHEET M300, MECHANICAL DETAILS: 1.1.1. Single row suspension system with internal round hoops is allowed

as an option to the 2-row suspension system. 1.1.2. Revise Fabric Duct General Notes as follows

1.1.2.1. In the second paragraph revise sentence that says “APPROVED FABRIC DUCT MANUFACTURERS ARE THOSE INDICATED IN WRITTEN SPECIFICATIONS.” To “APPROVED MANUFACTURERS ARE KE FIBERTECH, FABRIC AIR, AND DUCT SOX.”

1.1.2.2. Add to second paragraph, “PROVIDE PERMEABLE UL LISTED FABRIC DUCT.”

1.2. REFER TO SHEET M400, MECHANICAL SCHEDULES: 1.2.1. Revise Air Conditioning Unit Schedule as follows.

1.2.1.1. Removed Accessory item C that reads “PROVIDE MOTORIZED OUTSIDE AIR DAMPER FOR AC-1,2,3,4,8 & 9 FOR EMERGENCY OUTSIDE AIR SETTINGS REFER TO SEQUENCE OF OPERATIONS THIS PAGE.” , and replace with “PROVIDE MANUAL OUTSIDE AIR DAMPER FOR AC-1,2,3,4,7,8 &9.”

1.2.1.2. Remove column “EMER. OSA” from the Air Conditioning Unit Schedule.

x x

x x

14067-Addendum No3.docx

2

1.2.1.3. Remove from Remarks’ column “BAROMETRIC RELIEF” for AC-1,2,3,4,8 &9.

1.2.2. Delete Sequence of Operation.

1.2.3. The following manufacturers are approved to bid the project. This list does not constitute the approval of any specific item or equipment. Final approval of any product shall be made during the submittal review phase of construction. All manufacturers listed below will be expected to provide equipment that is equivalent or better than specified in the contract documents. The contractor assumes all risks for not providing equivalent or better products including but not limited to modifications to screen walls, ductwork routing and electrical requirements.

Johnson Controls Units Packaged Air Conditioners Twin City Fans & Blowers Exhaust Fans Krueger Diffusers, Registers & Grilles ACME Manufacturing Roof Curbs United Enertech Louvers, Dampers United Enertech Duct mounted Access Doors Dace Manufacturing Round Manual Dampers Duct Direct Conical & High Eff. Square to Round take-off with damper.

1. ELECTRICAL

1.1. REFER TO SHEET E300, LIGHT FIXTURE SCHEDULE 1.1.1. The following manufacturers are approved to bid the project. This

list does not constitute the approval of any specific item or equipment. Final approval of any product shall be made during the submittal review phase of construction. All manufacturers listed below will be expected to provide equipment that is equivalent or better than specified in the contract documents. The contractor assumes all risks for not providing equivalent or better products.

LSI Light fixtures Vantage Luminaires Light fixtures PMC Lighting Light fixtures Times Square Lighting Light fixtures GE Lighting Systems Light fixtures Mule Lighting Inc Light fixtures

END OF ADDENDUM

x x

x x

BID FORM PAGE 1

SECTION 00150 BID FORM (Revised) Date: February 17, 2015 Razorback Event Center for Panama Public Schools Panama, Oklahoma The undersigned, hereinafter referred to as the "Bidder" declares that before preparing his Bid he visited the site, familiarized himself with all factors affecting the cost of the Work and carefully examined the Drawings and Project Manual for Panama Public Schools, hereinafter referred to as the "Owner" as prepared by Michael Allen Riley Architecture, PLLC. BASE BID Bidder hereby proposes to furnish all necessary labor, materials, tools and equipment, together with all other items of cost including insurance, and supervision, required for the work called for on the Drawings and in the Project Manual. BASE BID sum of: Dollars ($ ) CALENDAR DAYS: Alternate # 1 ‘deduct’ sum of: Dollars ($ ) Alternate # 2 ‘deduct’ sum of: Dollars ($ ) Alternate # 3 ‘deduct’ sum of: Dollars ($ ) Alternate # 4 ‘deduct’ sum of: Dollars ($ )

x x

x x

BID FORM PAGE 2

Alternate # 5 ‘add’ sum of: Dollars ($ ) Alternate # 6 ‘add’ sum of: ____________________________________________Dollars ($ ) Alternate # 7 ‘add’ sum of: ____________________________________________Dollars ($ ) Alternate # 8 ‘add’ sum of: ____________________________________________Dollars ($ ) Unit Price #1: ________ _Dollars per cubic yard of removal of existing soils, and replacement with structural fill material ($ /cubic yard) (This unit price is only to be implemented if poor soils are encountered and additional undercut depth is required. The building area, to a distance of 5’ outside of the building perimeter, it to be undercut and replaced to a depth of 4’, as part of the Base Bid.) ADDENDUM RECEIPT: Bidder acknowledges receipt of the following addenda: ADDENDUM NO. dated Respectfully submitted. Bidder By Title Bidder's Address: Telephone:

x x

x x

Date: 01-16-15

Sheet Number:

Revisions:

Project Number: 11-28

Pa

na

ma

, O

K

Razo

rb

ack E

ven

t C

en

ter

Pan

am

a P

ub

lic S

ch

oo

ls

fo

r

A202

A

B

x x

x x

EXITEXIT

Date: 01-16-15

Sheet Number:

Revisions:

Project Number: 11-28

Pa

na

ma

, O

K

Razo

rb

ack E

ven

t C

en

ter

Pan

am

a P

ub

lic S

ch

oo

ls

fo

r

A203

A

B

x x

x x

A

SD-1Razorback Event Center forPanama Public Schools

x x

x x