BID CLARIFICATION #2 November 20, 2018 DUE DATE: December 4, 2018 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 901661 LOCATION: University of Connecticut Capital Projects & Contract Administration 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661: 1) Attached is the Addendum #2 from Christopher Williams Architects dated November 16, 2018: Item #1: Revised Architectural Drawings G-003 Added Dust Barrier Information A-103 Added dimensions for clarity. Corrected minor graphical errors. A-203 Added Information/Dimensions for clarity. Coordination w/ Plans and Schedules A-513 Added Framed Assembly Detail. Added additional information to Sections/Details. A-603 Clarifications to the Finish Product & Materials Schedule MH-103 (SHEET NOT ISSUED UNDER THIS ADDENDUM) Change keynote 1 to read: This Contractor shall provide EX-FH-1A & EX-FH-1B. It shall not be owner furnished. End of Bid Clarification #2

Upload: others

Post on 20-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

BID CLARIFICATION #2 November 20, 2018 DUE DATE: December 4, 2018 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 901661 LOCATION: University of Connecticut Capital Projects & Contract Administration 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661: 1) Attached is the Addendum #2 from Christopher Williams Architects dated November 16, 2018:

Item #1: Revised Architectural Drawings • G-003

Added Dust Barrier Information • A-103

Added dimensions for clarity. Corrected minor graphical errors. • A-203

Added Information/Dimensions for clarity. Coordination w/ Plans and Schedules • A-513

Added Framed Assembly Detail. Added additional information to Sections/Details. • A-603

Clarifications to the Finish Product & Materials Schedule • MH-103 (SHEET NOT ISSUED UNDER THIS ADDENDUM)

Change keynote 1 to read: This Contractor shall provide EX-FH-1A & EX-FH-1B. It shall not be owner furnished.

End of Bid Clarification #2

Page 2: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

11/16/2018 IPB Fraunhofer ADD 2 Page 1

ADDENDUM #2

VIA EMAIL Date: November 16, 2018 Project: IPB Fraunhofer Tenant Fit-Out Issued by: Christopher Williams Architects LLC

85 Willow Street, Building 54 New Haven, CT 06511 (203) 776-0184

To: Antoaneta Fedeles UCONN [email protected] Brian Gore UCONN [email protected] Jeffery Olsen UCONN [email protected] Cc: John Christofor HF Lenz [email protected] No. of pages: 2

Notice to all Bidders: This Addendum forms a part of and modifies the original documents issued for bidding, dated November 5, 2018 to the extent noted herein. This Addendum supersedes all previous Drawings, General Documents, Specifications, Instructions and Addenda pertaining to these items. Acknowledge receipt of this Addendum on the submitted Bid.

Page 3: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

11/16/2018 IPB Fraunhofer ADD 2 Page 2

Item #1: Revised Architectural Drawings

G-003

Added Dust Barrier Information

A-103 Added dimensions for clarity. Corrected minor graphical errors.

A-203

Added Information/Dimensions for clarity. Coordination w/ Plans and Schedules

A-513 Added Framed Assembly Detail. Added additional information to Sections/Details.

A-603

Clarifications to the Finish Product & Materials Schedule

MH-103 (SHEET NOT ISSUED UNDER THIS ADDENDUM) Change keynote 1 to read: This Contractor shall provide EX-FH-1A & EX-FH-1B. It shall not be owner furnished.

END OF ADDENDUM #2

Page 4: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

PROJECT CONSULTANTS

PROJECT SITE LOCATIONNOT TO SCALE

Architect:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

Engineers:

159 DISCOVERY DRIVESTORRS, CT. 06269

FRAUNHOFER C.E.I

FRAUNHOFER

INNOVATION PARTNERSHIP BUILDING

515 Centerpoint Drive Middletown, CT 06457Suite 104814-269-9300

ISSUED FOR BID: 11/05/18

SHEET INDEX

NO. SHEET NAME ISSU

ED F

OR

BID

- 11

/05/

2018

ADD

END

UM

#1

- 11/

12/1

8

ADD

END

UM

#2

- 11/

15/1

8

GENERALA-COVER COVER ●

G-001 GENERAL INFORMATION ABBREVIATIONS & SCHEDULE LIST ●G-002 SITE LOGISTICS PLAN & CODE INFORMATION ●G-003 OVERALL PLAN ● ●G-004 OVERALL LEVEL FOUR PLAN ● ●AE-101 EXISTING FLOOR PLAN ●

ARCHITECTURALA-102 ENLARGED PLAN ●A-103 REFLECTED CEILING PLAN ● ●A-104 FFE PLAN ●A-201 INTERIOR ELEVATIONS ●A-202 INTERIOR ELEVATIONS ●A-203 INTERIOR ELEVATIONS ● ●A-301 SECTIONS ●A-401 INTERIOR VIEWS ●A-402 INTERIOR VIEWS ●A-501 PARTITION TYPES ●A-502 INTERIOR PLAN DETAILS ●A-503 GLASS PARTITION DETAILS ●A-510 SLOTTED CHANNEL GRID PLAN & DETAILS ●A-511 BENCHTOP FUME HOOD DETAILS ●A-512 FLOOR MOUNTED FUME HOOD ●A-513 MISCELLANEOUS LAB DETAILS ● ●A-601 DOOR SCHEDULES AND DETAILS ● ●A-603 EQUIPMENT & FINISH SCHEDULES ● ●

FIRE PROTECTIONFP-001 FIRE PROTECTION SPECS, NOTES AND LEGEND ●FP-101 FIRST FLOOR PLUMBING FIRE PROTECTION - NEW WORK ●

PLUMBINGP-001 PLUMBING LEGEND AND ABBREVIATION ●P-002 PLUMBING NOTES AND SCHEDULES ●P-101 FIRST FLOOR PLUMBING SANITARY - NEW WORK ●P-102 FIRST FLOOR PLUMBING DOMESTIC AND RO-DI WATER WORK ●P-103 FIRST FLOOR PLAUMBING LAB HOUSE GASES - NEW WORK ●P-104 FIRST FLOOR PLUMBING LAB BOTTLED GASES - NEW WORK ●P-501 PLUMBING DETAILS ●

MEPMEP-101 MEP FLOOR PLAN AND DETAILS ●

MECHANICALMH-001 HVAC SYMBOLS ●MH-002 HVAC NOTES ●MH-003 HVAC ABBREVIATIONS ●MH-101 FIRST FLOOR MECHANICAL HVAC DEMO PLAN ●MH-102 FIRST FLOOR MECHANICAL HVAC NEW WORK PLAN ●MH-103 FOURTH FLOOR ROOF MECHANICAL HVAC NEW WORK PLAN ●MH-201 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN ●MH-401 HVAC FLOW DIAGRAM ●MH-501 MECHANICAL DETAILS ●MH-502 MECHANICAL DETAILS ●MH-700 MECHANICAL ATC AND SCHEDULES ●

ELECTRICALE-001 ELECTRICAL SYMBOLS AND NOTES ●E-002 ELECTRICAL ABBREVIATIONS ●E-101 PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN ●E-201 PARTIAL FIRST FLOOR ELECTRICAL CEILING PLAN ●E-202 PARTIAL FIRST FLOOR ELECTRICAL POWER AND SIGNAL PLAN ●E-203 PARTIAL FOURTH FLOOR POWER PLAN NEW WORK ●E-401 PARTIAL ELECTRICAL DIAGRAMS ●E-501 ELECTRICAL SCHEDULES ●E-601 ELECTRICAL DETAILS ●E-602 ELECTRICAL DETAILS ●

TELECOMMUNICATIONST-001 TELECOMMUNICATION SYMBOLS, NOTES, ABBREVIATIONS,

AND DETAILS ●

T-101 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN ●REVISIONS:MARK DATE DESCRIPTION

2 11/14/2018 ADDENDUM # 2

2

Page 5: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

J

DEFGHIKLMNOP

3

4

5

6

7

8

9

10

11

12

13

1

3.3

11.7

14

2

J

8' - 0

"21

' - 4"

6' - 8

"14

' - 8"

21' -

4"21

' - 4"

21' -

4"21

' - 4"

21' -

4"21

' - 4"

21' -

4"14

' - 8"

6' - 8

"21

' - 4"

8' - 0

"

A1A-502

23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 20' - 0" 32' - 0" 32' - 0"

11' -

0"

HOLD

10' -

4"

6' - 10 7/8"3' - 2 1/2"

FEC01 FEC01

FEC01

FEC01

FEC01

FEC01

FEC01

10' -

7"3'

- 8 1/

8"

1' - 1

0"

E1B

E1A

FEC01

11' -

6 1/4"

2' - 0"

EQ EQ

11' - 0" 11' - 0"

13' -

6"

23' - 0" 23' - 0"

OFFICE

1103-B

OFFICE

1103-C

OPENOFFICE

1103-A

61' -

11 1/

2"

OVERHEAD DOOR AVAILABLE FOR DELIVERIES. REFER TO LOGISTICS PLAN FOR SITE ACCESS & USE.

VERIFY LOCATION OF IT/TELECOMM CABLE TRAY ABOVE SUSPENDED CLG REMOVE/REINSTALL CLG TILES FOR ACCESS REPLACE AND DAMAGED TILE W/ MATCHING NEW. CEILING TILE:COORDINATE W/ MEP DWGS.

IT DEMARCATION

PROVIDE ANTI TRACKING PADS @ EACH DOOR

CONSTRUCT DUST PROOF ENCLOSURE -FLOOR TO CLG WITH 2 - GASKETED SOLID SOLID CORE 3'-0" x 7'x0" x 1 3/4" DOORS IN H.M. FRAMES W/ CONST. CORE KEYED LOCKS & CLOSERS.

DUST - PROOF ENCLOSURE:

3 5/8" MTL STUDS W/ 5/8" GYP BD ON BOTH SIDES. PROVIDE 3 1/2" FG INSULATION POLYETHELENE DUST BARRIER ON BOTH SIDES. DO NOT FASTEN TO FLOOR. TEMP FASTEN TO CLG GRID SYSTEM

4' - 0

"

1/4" THICK PROTECTION BD

FASTEN TRACK TO PROTECTION BOARD

3 5/8" GYP. BD. CLG PANELS @ 4'-0" (EVERY 2ND PANEL)

FASTEN TRACK TO TEMP

POLY DUST BARRIER

ACT

CORRIDOR SIDE DUST BARRIER

3 5/8" GYP. BD.

FIBER GLASS INSULATION

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

As indicated

11/15/2018 12:12:25 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]

OVERALL PLAN

G-003

09/13/18

901661

INNOVATIONPARTNERSHIPBUILDING

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

11/05/18

1/16" = 1'-0"A5 FRAUNHOFER CEI OVERALL PLAN - FIRST FLOOR TRUE NORTH

PROJECT NORTH

0' 8' 16' 32' 48'4'

ELECTRICAL ROOM

REVISIONS:MARK DATE DESCRIPTION

2 11/14/2018 ADDENDUM # 2

* CONTRACTORS CAN PROVIDE AN ALTERNATE

3/4" = 1'-0"C6 DUST BARRIER

2

2

2

Page 6: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

J

KLM

3

4

5

1

3.3

2

4' - 0

"4'

- 0"

12' - 0"

ACT-1

9' - 0"

ACT-1

9' - 0"

ACT-1

9' - 0"

UNDERSIDE OF UNISTRUT

C5.03

C5.04

C5.07

C5.08

EQ EQ

EQEQ

C6.01

C6.01

C6.01

C6.02

C5.08

C5.09

C6.02

C6.02

C6.03

C6.04

C6.04

C6.04

C5.08

C5.09

B4B4 @ WINDOWS (TYP.)

PROVIDE SPECIFIED WINDOW TREATMENTS-FULL WIDTH OF GLASS, V.I.F PROVIDE SPECIFIED WINDOW TREATMENTS, FULL WIDTH OF GLASS, V.IF

4' - 0

"4'

- 0"

4' - 0

"4'

- 0"

4' - 0

"4'

- 0"

4' - 0

"4'

- 0"

4' - 0

"4'

- 0"

1' - 8" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 1' - 11" +/-

4' - 0

"3'

- 10"

+/-

4' - 6" 4' - 0" 3' - 9"

NEW OR EXISTING CONCRETE FLOOR SLAB

SPLICE

CROSS RUNNER 2-FT O.C.

MIN 12 GA WIRE HANGER AT EACH CROSS OR MAIN HANGER

DETAIL FOR SPACES GREATER THAN 400 SF TWO DIRECTIONS EXCEED 20 FT

45° MAX

45° MAX

45° MAX

45° MAX

MAX2"

DETAIL FOR SPACES GREATER THAN 400 SF ONE DIRECTION EXCEEDS 20 FT

45° MAX

LONG DIMENSION OF ROOM

OR CORRIDOR

45° MAXMAX2"

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

KEYNOTES

As indicated

11/15/2018 12:11:16 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]

REFLECTED CEILINGPLAN

A-103

09/17/18

901661

INNOVATIONPARTNERSHIPBUILDING

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

11/05/18

1/4" = 1'-0"5A REFLECTED CEILING PLAN

0' 8' 16' 32' 48'4'

TRUE NORTH

PROJECT NORTH

Key Value Keynote Text

C5.03 SUSPENDED SLOTTED CHANNEL GRIS SYSTEMC5.04 SLOTTED CHANNEL SUSPENSION SYSTEM. COORDINATE W/ MEP WORK.C5.07 CUT AND PATCH EXISTING 2 HR RATED WALL FOR DUCT & PIPE PENETRATIONS.

COORDINATE WITH MEP & FP. DRAWINGS FOR REMOVALS AND NEW PENETRATIONSC5.08 PAINT UNDERSIDE OF METAL DECK, STEEL FRAMING & DUCTWORK ( INSULATED & NON

INSULATED ), PIPING (BOTH INSULATED AND NON-INSULATED), SPRINKLER PIPING (EXCEPTHEADS & VITOLIC TYPE FITTINGS) & ELECTRICAL CONDUIT & BACK BOXES. ABOVE BUT NOTDIRECTLY ATTACHED TO THE SLOTTED CHANNEL GRID SYSTEM WITH PT-4. THE COLORWILL BE A LIGHT GRAY COLOR SPECIFIED BY THE ARCHITECT.

C5.09 PAINT GYP BD. WALLS ABOVE THE SLOTTED CHANNEL SYSTEM WITH PT-2. THIS COLOR WILLBE A LIGHT GRAY COLOR SELECTED BY THE ARCHITECT AND WILL NOT BE THE SAME ASTHE WALL COLOR BELOW THE SLOTTED CHANNEL SYSTEM.

C6.01 PROVIDE A LAYER OF 4" SOUND ATTENUATION BLANKETS LOOSE-LAID ON THE TOP SIDE OFTHE ACOUSTICAL PANEL CEILING IN ALL 3 SPACES WITH THE SUSPENDED CEILING. THESOUND ATTENUATION BLANKETS ARE SPECIFIED IN SECTION 09-2117, GYPSUM BOARDSYSTEMS. THEY SHALL BE 4" THICK X 24" X 48" BLANKETS. MAINTAIN REQUIREDCLEARANCES AROUND LIGHTING FIXTURES.

C6.02 ALL SPRINKLER HEADS IN THE SUSPENDED CEILING SHALL BE CONCEALED TYPE,CENTERED IN PADS B.W'S.

C6.03 ALL ELECTRICAL, FIRE ALARM & SIMILAR DEVICES SHALL BE PROPERLY MOUNTED TO THESUSPENDED CEILING SYSTEM AND SHALL BE LOCATED IN THE CENTER OF PADS, B.W'S,REGARDLESS IF SHOWN ON THIS DRAING OR NOT, AND REGARDLESS IF SHOWN CENTEREDOR NOT. THE GC SHALL COORDINATE THE LOCATION OF ALL DEVICES WITH THE CEILINGLAYOUT AND SHALL COORDINATE ALL CONDUIT AND PIPING ABOVE ACCORDINGLY.

C6.04 THE SUSPENDED CEILING SYSTEM SHALL BE DESIGNED TO SUPPORT LIGHTING FIXTURESWITHOUT THE LIGHTING FIXTURES REQUIRING ADDITIONL, INDEPENDENT SUPPORT FROMABOVE. FIXTURES SHALL BE CLIPPED TO THE CEILING GRID. REVISIONS:

MARK DATE DESCRIPTION2 11/14/2018 ADDENDUM # 2

3" = 1'-0"6D ACT GRID SEISMIC BRACING DETAIL

3" = 1'-0"6B ACT GRID SEISMIC BRACING DETAIL

0' 4" 8" 1'-0"

0' 4" 8" 1'-0"

2

Page 7: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

LEVEL 1644' - 6"

K L M

8' - 0

"

PT-3

PAINT ENTIRE WALL BETWEEN CONTROL JOINTS

GL-2 PT-1

PATCH & MATCH EXIST MTL. BASE @ DOOR REMOVAL

SIGNAGESIGNAGE

9"

PATCH & MATCH EXIST MTL. BASE @ DOOR REMOVAL

5' - 0

"

CARD ACCESS DEVICE

3' - 0

5/8"

WB-01

LEVEL 1644' - 6"

PT-1

RWBLEVEL 1644' - 6"

PT-1

LEVEL 1644' - 6"

PT-1

5' - 0

"

LEVEL 1644' - 6"

PT-1

RWBLEVEL 1644' - 6"

3

PT-1

LEVEL 1644' - 6"

PT-1

5' - 0

"

LEVEL 1644' - 6"

3.3

PT-1

LEVEL 1644' - 6"

LEVEL 1644' - 6"

PT-1

LEVEL 1644' - 6"

LEVEL 1644' - 6"

33.3

RWB

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

1/4" = 1'-0"

11/15/2018 12:11:22 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]

INTERIOR ELEVATIONS

A-203

10/16/18

901661

INNOVATIONPARTNERSHIPBUILDING

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

11/05/18

1/4" = 1'-0"4A CORRIDOR ELEVATION

1/4" = 1'-0"4B OFFICE 1103-B NORTH ELEV 1/4" = 1'-0"3B OFFICE 1103-B EAST ELEV 1/4" = 1'-0"1B OFFICE 1103-B SOUTH ELEV

1/4" = 1'-0"4C 1103-C NORTH ELEV 1/4" = 1'-0"3C 1103-C EAST ELEV

1/4" = 1'-0"1C 1103-C SOUTH ELEV

1/4" = 1'-0"2E OPEN OFFICE 1103-A EAST ELEV

0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4'0' 8' 16' 32' 48'4'0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4' 0' 8' 16' 32' 48'4' 0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4'

REVISIONS:MARK DATE DESCRIPTION

2 11/14/2018 ADDENDUM # 20' 8' 16' 32' 48'4'

1/4" = 1'-0"6A GLASS PARTITION ELEVATION

1/4" = 1'-0"6B OPEN OFFICE PARTIAL NORTH ELEV

1/4" = 1'-0"3E OPEN OFFICE ENTRANCE

0' 8' 16' 32' 48'4'

1/4" = 1'-0"D5 OPEN OFFICE WEST ELEVATION

0' 8' 16' 32' 48'4'

2

Page 8: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

LEVEL 1644' - 6"

5

4' - 5

5/8"

2' - 1

0"

2' - 3

3/4"

9 3/4"

11 3/8"

ADA EPOXY SINK

COORDINATE SINK SUPPORT @ PLMBG W/ SINK BASE

INSET STEEL SINK BASE

FAUCETS PER PLUMBING DWGS BY G.C.

1' - 1

0"

1' - 0" 1' - 0" 1' - 0" 1' - 0"

4' - 2"

1' - 6

"1'

- 7"

3' - 1

"

4' - 1 5/8"

LEVEL 1644' - 6"

L

3' - 0

"

4' - 0

"

C3

1' - 9 5/8" 7 3/8"

EPOXY RESIN PEG BD W/ DRAIN TROUGH

EPOXY RESIN COUNTERTOPS. SIDE & BACK SPLASH (CURBS)

PIPE CHASE MOUNT PLMBG ON SUPPORTS (TYP)

PROVIDE SPLIT ST.STL. ESCUTCHEON SEALED AROUND PIPE & TO CABINETS. TYP.

LOCATE VALVES IN CAB BASE

LEVEL 1644' - 6"

L

3' - 0

"

ALUM / GLASS PARTITION

WIREMOLD RACEWAY PER PER MEP DWGS & SPECS

SPLASH

INSET STEEL BASE CABINETS

RWB - APPLY TO TOE KICKS & RETURNS

1' - 10 3/8" 6 5/8"

EPOXY RESIN SILL BOTH SIDES

PIPE CHASE - MOUNT PIPE ON SLOTTED CHANNEL SUPPORTS

547H0296

SHARED REAR FRAME ASSEMBLY 2 FIXTURE STEMS 4 CIRCUITS

SIDE

PLAN

SEE SCHEDULE

FURNITURE VENDOR:PROVIDE 60" LONG STRAIGHT SERVICE LINE ASSEMBLY PRODUCT # 547H0542 FOR NITROGEN AND LV. PROVIDE UNION PITTING @ TOP / FRAME & MALE QUICK CONNECT @ CLG. & AT FRAME.

2 DUPLEX RECEPTACLES IN LOWER RIGHT HAND FRAME UPRIGHT

12' -

0"

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

As indicated

11/16/2018 5:32:30 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]

MISCELLANEOUS LABDETAILS

A-513

11/05/18

901661

INNOVATIONPARTNERSHIPBUILDING

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

11/05/18

REVISIONS:MARK DATE DESCRIPTION

2 11/14/2018 ADDENDUM # 2

1" = 1'-0"A2 ADA SINK BASE SECTION

0' 6" 1' 2' 3'

CYLINDER RACK BASIS OF DESIGN:

UNISTRUT P-1000 SERIES SLOTTED CHANNELS GALVANIZED STEEL WITH ALL GALVANIZED STL. FITTINGS

0' 6" 1' 2' 3'

SLOTTED CHANNEL BRACING @ EACH DIVIDER

P-1000 BOLT TO IN-WALL BLKG

MANIFOLDS AND REGULATORS PER MEP DWGS

ST. STL. CHAIN TANK CONNECT TO ANCHOR, RESTRAINTS / TANK

ST. STL. CHAIN TANK CONNECT TO ANCHOR, RESTRAINTS / TANK

1" = 1'-0"C2 CYLINDER FARM DETAIL

SLOTTED CHANNEL BRACING @ EACH DIVIDERP 1000

P 1000T UNISTRUT

1" = 1'-0"A3 SINK BASE SECTION

0' 6" 1' 2' 3' 1" = 1'-0"A6 COUNTER BASE SECTION

0' 6" 1' 2' 3'

3/4" = 1'-0"C6 TYPICAL SHARED FRAME ASSEMBLY

0' 6" 1' 2' 4'3" 3'

549H0236

549H0238

LAB GAS STEMS 2/ FRAME - LAB VACUUM & HOUSE NITROGEN (BY FURNITURE VENDOR)

FRAME INCLUDES 4 CIRCUITS, @16 AMP EA.

PROVIDE DATA OUTLETS PER PLAN, WIRING AND DEVICES BY G.C. COORDINATE W/ FRAME KNOCK OUTS

PAINTED STEEL FRAME

4'-0" LONG TWIST LOCK CHORD BY FURNITURE VENDOR

4'-0" LONG TWIST LOCK CHORD BY GC PER MEP DWGS

SLOTTED CHANNEL FRAME SYSTEM

FEMALE BULKHEAD FITTING CONNECTION ABOVE FRAME FOR MALE QUICK CONNECTOR (BY GC)

NOTE: ACTUAL QUANITY & ARRANGEMENT OF PIPING REGULATORS MAY VARY

PROVIDE

LAB GAS PIPING PER MEP DWGS

REGULATORS & MANIFOLDS PER MEP DWGS

2

LAB VACUUM & HOUSE NITROGEN TUBING BY FURNITURE VENDOR

Page 9: ADDENDUM #2 DOCUMENTS/90166… · e-101 partial first floor electrical demolition plan e-201 partial first floor electrical ceiling plan e-202 partial first floor electrical power

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

11/16/2018 5:38:59 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]

EQUIPMENT & FINISHSCHEDULES

A-603

10/05/18

901661

INNOVATIONPARTNERSHIPBUILDING

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

11/05/18

LABORATORY EQUIPMENT SCHEDULE

IDEN

TIFI

ER N

O.

RO

OM

NO

.

DESCRIPTION MFG. MODEL PHYSICAL ELECTRICAL REQUIREMENTS MECHANICAL PLUMBING LAB GAS BOTTLED GAS CONNECTION

PURC

HASE

RESPONSIBILTY MATRIX

REMARKSIDENTIFIER

NO.

DIMENSIONSINCHESFOOTPRINT

UN

CR

ATE

D W

EIG

HT

STA

TIO

NA

RY/

FIXE

D/C

AST

OR

S

CO

NN

ECTI

ON

TYP

E

NEMAPLUG NO. PH

ASE

VOLT

S

AMPS

HZ

NET

WO

RK

CO

NN

ECTI

ON

VAPOREXHAUST

(LOWVELOCITY)

HIGHVELOCITY

FUMEEXHAUST PR

OC

ESS

CH

ILL

WA

TER

SU

PPLY

PRO

CES

S C

HIL

L W

ATE

R R

ETU

RN

POTA

BLE

DCW

POTA

BLE

DHW

SAN

WAS

TE

DI W

ATER

HOUS

E CO

MPR

ESSE

D AI

R

HOUS

E VA

CUUM

HOUS

E AR

GO

N

HO

USE

NIT

RO

GEN

PUR

IFIE

D N

ITR

OG

EN

OXY

GEN

HEL

IUM

HYDR

OG

EN

CA

RB

ON

DIO

XID

E

MET

HANE

CARB

ON

MO

NOXI

DE

SULF

UR

HEX

AFL

UO

RID

E

REC

EIVE

SET

IN P

LAC

E

INST

ALL

DIS

POSE

OF

PAC

KA

GIN

G M

AT.

COO

RDIN

ATE

CA

LLIB

RA

TIO

N

FIN

AL

CO

NN

ECTI

ON

S

WID

E

DEEP

TALL

LEQ.020 FUME EXTRACTION ARM ALISIDENTSYSTEM

75-9065-3-7-5-PP F GC GC GC GC GC GC GC GC CHEMICALLY RTESISTANT EXTRACTION ARM INWHITE; HOOD #1-7535-7-5, CLEAR

LEQ.020

LEQ.021 FUME EXTRACTION ARM ALSIDENTSYSTEM

75-9065-3-5 F GC GC GC GC GC GC GC GC ALUMINUM EXTRACTION ARM AND HOOD. HOOD #1-7524; BRACKET #2-500-80. SUPPORT FROM SLOTTEDFRAMING RAIL SYSTEM WITH SLOTTED FRAMINGRIGID SUPPORTS.

LEQ.021

LEQ.001 1104 8' PROTECTOR XL LABBENCHTOP FUME HOOD

LABCONCO 111-82-0020 96" 433/4"

59" F JBOX

208 50/60 1 1/2" 1/2" 1-1/2" 1/2" 1/2" 1/2" O GC GC GC GC GC GC GC ADA ACCESSIBLE; ALL CONTROLS SHALL BE MAX.4'-0" AFF. WORK SURFACE: 2'-10" AFF. EPOXY RESINWORK SURFACE WITH LEFT SIDE FRONT CUP SINK

LEQ.001

LEQ.002 1104 8' PROTECTOR XL FLOORMOUNTED FUME HOOD

LABCONCO 1128X7002 96" 433/4"

95" F JBOX

208 5 50/60 1 1/2" 1/2" 1-1/2" 1/2" 1/2" 1/2" O GC GC GC GC GC GC GC LEQ.002

LEQ.003 1104 PILOT FILTRATIONSYSTEM

FRAUNHOFER C O O O O O GC O O LEQ.003

LEQ.004 1104 FILTRATION STATION FRAUNHOFER C LEQ.004LEQ.006 1104 FILTRATION STATION FRAUNHOFER C O O O O O GC O O LEQ.006LEQ.007 1104 FILTRATION STATION FRAUNHOFER C O O O O O GC O O LEQ.007LEQ.008 1104 FILTRATION STATION FRAUNHOFER C O O O O O GC O O LEQ.008LEQ.009 1104 45 GAL. CORROSIVE

SAFETY CABINETEAGLE 15Y999-CRA-4510 43" 18" 65" 330 S GC GC GC GC GC GC AVAILABLE FROM GRAINGER; INCLUDES 2

ADJUSTABLE SHELVES & 3 POLYETHELENE TRAYS; 2DOORS

LEQ.009

LEQ.011 1104 25 GAL. CORROSIVESTORAGE CABINET

JAMCO 36WJ05-CL24BP 23" 18" 65" 204 S GC GC GC GC GC GC AVAILABLE FROM GRAINGER; INCLUDES 3ADJUSTABLE SHELVES & 4 POLYETHELENE TRAYS; 1DOOR

LEQ.011

LEQ.012 1104 LAB GAS STORAGECABINET

F GC GC GC GC GC GC GC GC LEQ.012

LEQ.013 1104 LAB GAS STORAGECABINET

F GC GC GC GC GC GC GC GC LEQ.013

LEQ.014 1104 LAB GAS STORAGECABINET

F GC GC GC GC GC GC GC GC LEQ.014

LEQ.015 1104 LABORATORYREFRIGERATOR

S O O O O O GC FUTURE LEQ.015

LEQ.016 1104 WIRE SHELVES C O O O O O GC LEQ.016LEQ.017 1104 LAB GAS STORAGE

CABINETF O O O O O GC LEQ.017

LEQ.22 1104 MILLI-Q-IQ 7000 TYPE-1WATER PURIFICATIONSYSTEM

MILLIPORE ZIQ7000US F GC GC GC GC GC GC GC PROVIDE WALL MOUNTING BRACKET: CAT#SYSTFIXA1 LEQ.22

LEQ.023 1104 Q-POD DISPENSER WITH2M CONNECTOR

MILLIPORE ZIQPOD020 171/4"

105/8"

311/4"

12.1 S 1 GC GC GC GC GC GC GC POWERED BY THE PRODUCTION UNIT LEQ.023

LEQ.24 1104 TOOL CHEST C O O O O O GC LEQ.24

ROOM FINISH SCHEDULEROOM

FLOOR BASEWALLS

CEILING NOTESNO. NAME NORTH EAST SOUTH WEST1103-B OFFICE CT-1 RWB-1 P-1 PT-1 PT-1 PT-1 ACT-11103-C OFFICE CT-1 RWB-1 PT-1 PT-1 PT-1 PT-1 ACT-11103-A OPEN OFFICE CT-1 RWB-1 PT-2 PT-2 PT-2 PT-2 ACT-11104 LAB 1104 PC-1 RWB-1 PT-2 PT-2 PT-2 PT-2 UNISTRUT / OPEN TO ABOVE

FINISH PRODUCTS & MATERIALSPRODUCT

IDENTIFIERSPEC.

SECTION PRODUCT DESCRIPTION MANUFACTURER

MANUFACTURER'SPRODUCT

IDENTIFIACTIONCOLOR/FINI

SH NOTES

ACT-1 092200 Acoustical Ceiling Panel ARMSTRONG 3261GL-1 1/2 IN. GLAZING AT GLASS PARTITIONGL-2 GLAZING AT TRANSOMGL-3 GLAZING AT FRAMED GLASS DOORPT-1 090913 PAINT ON GWB PPG INTERIOR /

EXTERIOR PRIMERINTERIORLATEX

SEE SPECIFICATION SECTION 090913

PT-2 090913 PAINT AT 12'-0" AND ABOVE PPG 6-500 PUREPERFORMANCE

INTERIORLATEX

SEE SPECIFICATION SECTION 090913

PT-3 090913 PAINT ON HOLLOW METAL DOORS ANDFRAMES

PPG INTERIOR /EXTERIOR PRIMER

INTERIORLATEX

SEE SPECIFICATION SECTION 090913

PT-4 090913 PAINT ON EXPOSED IRON OR STEELINCLUDING METAL DECK

PPG INTERIOR /EXTERIOR PRIMER

INTERIORLATEX

SEE SPECIFICATION SECTION 090913

RWB-1 RUBBER WALL BASE MANNINGTON OPTIMUM EDGEWB-01 METAL WALL BASE MATCH EXISTING WALL BASE. VERIFY IN FIELD

REVISIONS:MARK DATE DESCRIPTION

2 11/14/2018 ADDENDUM # 2

2

2