BID CLARIFICATION #2 November 20, 2018 DUE DATE: December 4, 2018 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 901661 LOCATION: University of Connecticut Capital Projects & Contract Administration 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661: 1) Attached is the Addendum #2 from Christopher Williams Architects dated November 16, 2018:
Item #1: Revised Architectural Drawings • G-003
Added Dust Barrier Information • A-103
Added dimensions for clarity. Corrected minor graphical errors. • A-203
Added Information/Dimensions for clarity. Coordination w/ Plans and Schedules • A-513
Added Framed Assembly Detail. Added additional information to Sections/Details. • A-603
Clarifications to the Finish Product & Materials Schedule • MH-103 (SHEET NOT ISSUED UNDER THIS ADDENDUM)
Change keynote 1 to read: This Contractor shall provide EX-FH-1A & EX-FH-1B. It shall not be owner furnished.
End of Bid Clarification #2
11/16/2018 IPB Fraunhofer ADD 2 Page 1
ADDENDUM #2
VIA EMAIL Date: November 16, 2018 Project: IPB Fraunhofer Tenant Fit-Out Issued by: Christopher Williams Architects LLC
85 Willow Street, Building 54 New Haven, CT 06511 (203) 776-0184
To: Antoaneta Fedeles UCONN [email protected] Brian Gore UCONN [email protected] Jeffery Olsen UCONN [email protected] Cc: John Christofor HF Lenz [email protected] No. of pages: 2
Notice to all Bidders: This Addendum forms a part of and modifies the original documents issued for bidding, dated November 5, 2018 to the extent noted herein. This Addendum supersedes all previous Drawings, General Documents, Specifications, Instructions and Addenda pertaining to these items. Acknowledge receipt of this Addendum on the submitted Bid.
11/16/2018 IPB Fraunhofer ADD 2 Page 2
Item #1: Revised Architectural Drawings
G-003
Added Dust Barrier Information
A-103 Added dimensions for clarity. Corrected minor graphical errors.
A-203
Added Information/Dimensions for clarity. Coordination w/ Plans and Schedules
A-513 Added Framed Assembly Detail. Added additional information to Sections/Details.
A-603
Clarifications to the Finish Product & Materials Schedule
MH-103 (SHEET NOT ISSUED UNDER THIS ADDENDUM) Change keynote 1 to read: This Contractor shall provide EX-FH-1A & EX-FH-1B. It shall not be owner furnished.
END OF ADDENDUM #2
PROJECT CONSULTANTS
PROJECT SITE LOCATIONNOT TO SCALE
Architect:
CHRISTOPHER WILLIAMS ARCHITECTS
85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com
Engineers:
159 DISCOVERY DRIVESTORRS, CT. 06269
FRAUNHOFER C.E.I
FRAUNHOFER
INNOVATION PARTNERSHIP BUILDING
515 Centerpoint Drive Middletown, CT 06457Suite 104814-269-9300
ISSUED FOR BID: 11/05/18
SHEET INDEX
NO. SHEET NAME ISSU
ED F
OR
BID
- 11
/05/
2018
ADD
END
UM
#1
- 11/
12/1
8
ADD
END
UM
#2
- 11/
15/1
8
GENERALA-COVER COVER ●
G-001 GENERAL INFORMATION ABBREVIATIONS & SCHEDULE LIST ●G-002 SITE LOGISTICS PLAN & CODE INFORMATION ●G-003 OVERALL PLAN ● ●G-004 OVERALL LEVEL FOUR PLAN ● ●AE-101 EXISTING FLOOR PLAN ●
ARCHITECTURALA-102 ENLARGED PLAN ●A-103 REFLECTED CEILING PLAN ● ●A-104 FFE PLAN ●A-201 INTERIOR ELEVATIONS ●A-202 INTERIOR ELEVATIONS ●A-203 INTERIOR ELEVATIONS ● ●A-301 SECTIONS ●A-401 INTERIOR VIEWS ●A-402 INTERIOR VIEWS ●A-501 PARTITION TYPES ●A-502 INTERIOR PLAN DETAILS ●A-503 GLASS PARTITION DETAILS ●A-510 SLOTTED CHANNEL GRID PLAN & DETAILS ●A-511 BENCHTOP FUME HOOD DETAILS ●A-512 FLOOR MOUNTED FUME HOOD ●A-513 MISCELLANEOUS LAB DETAILS ● ●A-601 DOOR SCHEDULES AND DETAILS ● ●A-603 EQUIPMENT & FINISH SCHEDULES ● ●
FIRE PROTECTIONFP-001 FIRE PROTECTION SPECS, NOTES AND LEGEND ●FP-101 FIRST FLOOR PLUMBING FIRE PROTECTION - NEW WORK ●
PLUMBINGP-001 PLUMBING LEGEND AND ABBREVIATION ●P-002 PLUMBING NOTES AND SCHEDULES ●P-101 FIRST FLOOR PLUMBING SANITARY - NEW WORK ●P-102 FIRST FLOOR PLUMBING DOMESTIC AND RO-DI WATER WORK ●P-103 FIRST FLOOR PLAUMBING LAB HOUSE GASES - NEW WORK ●P-104 FIRST FLOOR PLUMBING LAB BOTTLED GASES - NEW WORK ●P-501 PLUMBING DETAILS ●
MEPMEP-101 MEP FLOOR PLAN AND DETAILS ●
MECHANICALMH-001 HVAC SYMBOLS ●MH-002 HVAC NOTES ●MH-003 HVAC ABBREVIATIONS ●MH-101 FIRST FLOOR MECHANICAL HVAC DEMO PLAN ●MH-102 FIRST FLOOR MECHANICAL HVAC NEW WORK PLAN ●MH-103 FOURTH FLOOR ROOF MECHANICAL HVAC NEW WORK PLAN ●MH-201 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN ●MH-401 HVAC FLOW DIAGRAM ●MH-501 MECHANICAL DETAILS ●MH-502 MECHANICAL DETAILS ●MH-700 MECHANICAL ATC AND SCHEDULES ●
ELECTRICALE-001 ELECTRICAL SYMBOLS AND NOTES ●E-002 ELECTRICAL ABBREVIATIONS ●E-101 PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN ●E-201 PARTIAL FIRST FLOOR ELECTRICAL CEILING PLAN ●E-202 PARTIAL FIRST FLOOR ELECTRICAL POWER AND SIGNAL PLAN ●E-203 PARTIAL FOURTH FLOOR POWER PLAN NEW WORK ●E-401 PARTIAL ELECTRICAL DIAGRAMS ●E-501 ELECTRICAL SCHEDULES ●E-601 ELECTRICAL DETAILS ●E-602 ELECTRICAL DETAILS ●
TELECOMMUNICATIONST-001 TELECOMMUNICATION SYMBOLS, NOTES, ABBREVIATIONS,
AND DETAILS ●
T-101 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN ●REVISIONS:MARK DATE DESCRIPTION
2 11/14/2018 ADDENDUM # 2
2
J
DEFGHIKLMNOP
3
4
5
6
7
8
9
10
11
12
13
1
3.3
11.7
14
2
J
8' - 0
"21
' - 4"
6' - 8
"14
' - 8"
21' -
4"21
' - 4"
21' -
4"21
' - 4"
21' -
4"21
' - 4"
21' -
4"14
' - 8"
6' - 8
"21
' - 4"
8' - 0
"
A1A-502
23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 23' - 0" 20' - 0" 32' - 0" 32' - 0"
11' -
0"
HOLD
10' -
4"
6' - 10 7/8"3' - 2 1/2"
FEC01 FEC01
FEC01
FEC01
FEC01
FEC01
FEC01
10' -
7"3'
- 8 1/
8"
1' - 1
0"
E1B
E1A
FEC01
11' -
6 1/4"
2' - 0"
EQ EQ
11' - 0" 11' - 0"
13' -
6"
23' - 0" 23' - 0"
OFFICE
1103-B
OFFICE
1103-C
OPENOFFICE
1103-A
61' -
11 1/
2"
OVERHEAD DOOR AVAILABLE FOR DELIVERIES. REFER TO LOGISTICS PLAN FOR SITE ACCESS & USE.
VERIFY LOCATION OF IT/TELECOMM CABLE TRAY ABOVE SUSPENDED CLG REMOVE/REINSTALL CLG TILES FOR ACCESS REPLACE AND DAMAGED TILE W/ MATCHING NEW. CEILING TILE:COORDINATE W/ MEP DWGS.
IT DEMARCATION
PROVIDE ANTI TRACKING PADS @ EACH DOOR
CONSTRUCT DUST PROOF ENCLOSURE -FLOOR TO CLG WITH 2 - GASKETED SOLID SOLID CORE 3'-0" x 7'x0" x 1 3/4" DOORS IN H.M. FRAMES W/ CONST. CORE KEYED LOCKS & CLOSERS.
DUST - PROOF ENCLOSURE:
3 5/8" MTL STUDS W/ 5/8" GYP BD ON BOTH SIDES. PROVIDE 3 1/2" FG INSULATION POLYETHELENE DUST BARRIER ON BOTH SIDES. DO NOT FASTEN TO FLOOR. TEMP FASTEN TO CLG GRID SYSTEM
4' - 0
"
1/4" THICK PROTECTION BD
FASTEN TRACK TO PROTECTION BOARD
3 5/8" GYP. BD. CLG PANELS @ 4'-0" (EVERY 2ND PANEL)
FASTEN TRACK TO TEMP
POLY DUST BARRIER
ACT
CORRIDOR SIDE DUST BARRIER
3 5/8" GYP. BD.
FIBER GLASS INSULATION
PROJECT:
UN
IVE
RSIT
Y O
F CO
NN
ECT
ICU
T A
RCH
ITE
CTU
RAL
& E
NG
INE
ERI
NG
BU
ILD
ING
SE
RVIC
ES
31 L
ED
OY
T RO
AD
UN
IT 3
038
STO
RRS,
CO
NN
ECT
ICU
T 06
269-
3038
TE
LEPH
ON
E:
(860
) 486
-312
7 F
ACS
IMIL
E:
(860
) 486
-317
7
SCALE:DATE:
DRAFTER:
SHEET TITLE:
WORK ORDER NO:FILE NAME:
SHEET:
SHEET: of
CERTIFICATION:
STATUS:
AUTHOR:
CONSULTANT:
CHRISTOPHER WILLIAMS ARCHITECTS
85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com
PROJECT NO:
A
B
C
D
E
A
B
C
D
E
6 5 4 3 2 1
6 5 4 3 2 1
As indicated
11/15/2018 12:12:25 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]
OVERALL PLAN
G-003
09/13/18
901661
INNOVATIONPARTNERSHIPBUILDING
159 Discovery DriveStorrs, CT 06269
ISSUED FORBID
11/05/18
1/16" = 1'-0"A5 FRAUNHOFER CEI OVERALL PLAN - FIRST FLOOR TRUE NORTH
PROJECT NORTH
0' 8' 16' 32' 48'4'
ELECTRICAL ROOM
REVISIONS:MARK DATE DESCRIPTION
2 11/14/2018 ADDENDUM # 2
* CONTRACTORS CAN PROVIDE AN ALTERNATE
3/4" = 1'-0"C6 DUST BARRIER
2
2
2
J
KLM
3
4
5
1
3.3
2
4' - 0
"4'
- 0"
12' - 0"
ACT-1
9' - 0"
ACT-1
9' - 0"
ACT-1
9' - 0"
UNDERSIDE OF UNISTRUT
C5.03
C5.04
C5.07
C5.08
EQ EQ
EQEQ
C6.01
C6.01
C6.01
C6.02
C5.08
C5.09
C6.02
C6.02
C6.03
C6.04
C6.04
C6.04
C5.08
C5.09
B4B4 @ WINDOWS (TYP.)
PROVIDE SPECIFIED WINDOW TREATMENTS-FULL WIDTH OF GLASS, V.I.F PROVIDE SPECIFIED WINDOW TREATMENTS, FULL WIDTH OF GLASS, V.IF
4' - 0
"4'
- 0"
4' - 0
"4'
- 0"
4' - 0
"4'
- 0"
4' - 0
"4'
- 0"
4' - 0
"4'
- 0"
1' - 8" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 1' - 11" +/-
4' - 0
"3'
- 10"
+/-
4' - 6" 4' - 0" 3' - 9"
NEW OR EXISTING CONCRETE FLOOR SLAB
SPLICE
CROSS RUNNER 2-FT O.C.
MIN 12 GA WIRE HANGER AT EACH CROSS OR MAIN HANGER
DETAIL FOR SPACES GREATER THAN 400 SF TWO DIRECTIONS EXCEED 20 FT
45° MAX
45° MAX
45° MAX
45° MAX
MAX2"
DETAIL FOR SPACES GREATER THAN 400 SF ONE DIRECTION EXCEEDS 20 FT
45° MAX
LONG DIMENSION OF ROOM
OR CORRIDOR
45° MAXMAX2"
PROJECT:
UN
IVE
RSIT
Y O
F CO
NN
ECT
ICU
T A
RCH
ITE
CTU
RAL
& E
NG
INE
ERI
NG
BU
ILD
ING
SE
RVIC
ES
31 L
ED
OY
T RO
AD
UN
IT 3
038
STO
RRS,
CO
NN
ECT
ICU
T 06
269-
3038
TE
LEPH
ON
E:
(860
) 486
-312
7 F
ACS
IMIL
E:
(860
) 486
-317
7
SCALE:DATE:
DRAFTER:
SHEET TITLE:
WORK ORDER NO:FILE NAME:
SHEET:
SHEET: of
CERTIFICATION:
STATUS:
AUTHOR:
CONSULTANT:
CHRISTOPHER WILLIAMS ARCHITECTS
85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com
PROJECT NO:
A
B
C
D
E
A
B
C
D
E
6 5 4 3 2 1
6 5 4 3 2 1
KEYNOTES
As indicated
11/15/2018 12:11:16 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]
REFLECTED CEILINGPLAN
A-103
09/17/18
901661
INNOVATIONPARTNERSHIPBUILDING
159 Discovery DriveStorrs, CT 06269
ISSUED FORBID
11/05/18
1/4" = 1'-0"5A REFLECTED CEILING PLAN
0' 8' 16' 32' 48'4'
TRUE NORTH
PROJECT NORTH
Key Value Keynote Text
C5.03 SUSPENDED SLOTTED CHANNEL GRIS SYSTEMC5.04 SLOTTED CHANNEL SUSPENSION SYSTEM. COORDINATE W/ MEP WORK.C5.07 CUT AND PATCH EXISTING 2 HR RATED WALL FOR DUCT & PIPE PENETRATIONS.
COORDINATE WITH MEP & FP. DRAWINGS FOR REMOVALS AND NEW PENETRATIONSC5.08 PAINT UNDERSIDE OF METAL DECK, STEEL FRAMING & DUCTWORK ( INSULATED & NON
INSULATED ), PIPING (BOTH INSULATED AND NON-INSULATED), SPRINKLER PIPING (EXCEPTHEADS & VITOLIC TYPE FITTINGS) & ELECTRICAL CONDUIT & BACK BOXES. ABOVE BUT NOTDIRECTLY ATTACHED TO THE SLOTTED CHANNEL GRID SYSTEM WITH PT-4. THE COLORWILL BE A LIGHT GRAY COLOR SPECIFIED BY THE ARCHITECT.
C5.09 PAINT GYP BD. WALLS ABOVE THE SLOTTED CHANNEL SYSTEM WITH PT-2. THIS COLOR WILLBE A LIGHT GRAY COLOR SELECTED BY THE ARCHITECT AND WILL NOT BE THE SAME ASTHE WALL COLOR BELOW THE SLOTTED CHANNEL SYSTEM.
C6.01 PROVIDE A LAYER OF 4" SOUND ATTENUATION BLANKETS LOOSE-LAID ON THE TOP SIDE OFTHE ACOUSTICAL PANEL CEILING IN ALL 3 SPACES WITH THE SUSPENDED CEILING. THESOUND ATTENUATION BLANKETS ARE SPECIFIED IN SECTION 09-2117, GYPSUM BOARDSYSTEMS. THEY SHALL BE 4" THICK X 24" X 48" BLANKETS. MAINTAIN REQUIREDCLEARANCES AROUND LIGHTING FIXTURES.
C6.02 ALL SPRINKLER HEADS IN THE SUSPENDED CEILING SHALL BE CONCEALED TYPE,CENTERED IN PADS B.W'S.
C6.03 ALL ELECTRICAL, FIRE ALARM & SIMILAR DEVICES SHALL BE PROPERLY MOUNTED TO THESUSPENDED CEILING SYSTEM AND SHALL BE LOCATED IN THE CENTER OF PADS, B.W'S,REGARDLESS IF SHOWN ON THIS DRAING OR NOT, AND REGARDLESS IF SHOWN CENTEREDOR NOT. THE GC SHALL COORDINATE THE LOCATION OF ALL DEVICES WITH THE CEILINGLAYOUT AND SHALL COORDINATE ALL CONDUIT AND PIPING ABOVE ACCORDINGLY.
C6.04 THE SUSPENDED CEILING SYSTEM SHALL BE DESIGNED TO SUPPORT LIGHTING FIXTURESWITHOUT THE LIGHTING FIXTURES REQUIRING ADDITIONL, INDEPENDENT SUPPORT FROMABOVE. FIXTURES SHALL BE CLIPPED TO THE CEILING GRID. REVISIONS:
MARK DATE DESCRIPTION2 11/14/2018 ADDENDUM # 2
3" = 1'-0"6D ACT GRID SEISMIC BRACING DETAIL
3" = 1'-0"6B ACT GRID SEISMIC BRACING DETAIL
0' 4" 8" 1'-0"
0' 4" 8" 1'-0"
2
LEVEL 1644' - 6"
K L M
8' - 0
"
PT-3
PAINT ENTIRE WALL BETWEEN CONTROL JOINTS
GL-2 PT-1
PATCH & MATCH EXIST MTL. BASE @ DOOR REMOVAL
SIGNAGESIGNAGE
9"
PATCH & MATCH EXIST MTL. BASE @ DOOR REMOVAL
5' - 0
"
CARD ACCESS DEVICE
3' - 0
5/8"
WB-01
LEVEL 1644' - 6"
PT-1
RWBLEVEL 1644' - 6"
PT-1
LEVEL 1644' - 6"
PT-1
5' - 0
"
LEVEL 1644' - 6"
PT-1
RWBLEVEL 1644' - 6"
3
PT-1
LEVEL 1644' - 6"
PT-1
5' - 0
"
LEVEL 1644' - 6"
3.3
PT-1
LEVEL 1644' - 6"
LEVEL 1644' - 6"
PT-1
LEVEL 1644' - 6"
LEVEL 1644' - 6"
33.3
RWB
PROJECT:
UN
IVE
RSIT
Y O
F CO
NN
ECT
ICU
T A
RCH
ITE
CTU
RAL
& E
NG
INE
ERI
NG
BU
ILD
ING
SE
RVIC
ES
31 L
ED
OY
T RO
AD
UN
IT 3
038
STO
RRS,
CO
NN
ECT
ICU
T 06
269-
3038
TE
LEPH
ON
E:
(860
) 486
-312
7 F
ACS
IMIL
E:
(860
) 486
-317
7
SCALE:DATE:
DRAFTER:
SHEET TITLE:
WORK ORDER NO:FILE NAME:
SHEET:
SHEET: of
CERTIFICATION:
STATUS:
AUTHOR:
CONSULTANT:
CHRISTOPHER WILLIAMS ARCHITECTS
85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com
PROJECT NO:
A
B
C
D
E
A
B
C
D
E
6 5 4 3 2 1
6 5 4 3 2 1
1/4" = 1'-0"
11/15/2018 12:11:22 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]
INTERIOR ELEVATIONS
A-203
10/16/18
901661
INNOVATIONPARTNERSHIPBUILDING
159 Discovery DriveStorrs, CT 06269
ISSUED FORBID
11/05/18
1/4" = 1'-0"4A CORRIDOR ELEVATION
1/4" = 1'-0"4B OFFICE 1103-B NORTH ELEV 1/4" = 1'-0"3B OFFICE 1103-B EAST ELEV 1/4" = 1'-0"1B OFFICE 1103-B SOUTH ELEV
1/4" = 1'-0"4C 1103-C NORTH ELEV 1/4" = 1'-0"3C 1103-C EAST ELEV
1/4" = 1'-0"1C 1103-C SOUTH ELEV
1/4" = 1'-0"2E OPEN OFFICE 1103-A EAST ELEV
0' 8' 16' 32' 48'4'
0' 8' 16' 32' 48'4'0' 8' 16' 32' 48'4'0' 8' 16' 32' 48'4'
0' 8' 16' 32' 48'4' 0' 8' 16' 32' 48'4' 0' 8' 16' 32' 48'4'
0' 8' 16' 32' 48'4'
REVISIONS:MARK DATE DESCRIPTION
2 11/14/2018 ADDENDUM # 20' 8' 16' 32' 48'4'
1/4" = 1'-0"6A GLASS PARTITION ELEVATION
1/4" = 1'-0"6B OPEN OFFICE PARTIAL NORTH ELEV
1/4" = 1'-0"3E OPEN OFFICE ENTRANCE
0' 8' 16' 32' 48'4'
1/4" = 1'-0"D5 OPEN OFFICE WEST ELEVATION
0' 8' 16' 32' 48'4'
2
LEVEL 1644' - 6"
5
4' - 5
5/8"
2' - 1
0"
2' - 3
3/4"
9 3/4"
11 3/8"
ADA EPOXY SINK
COORDINATE SINK SUPPORT @ PLMBG W/ SINK BASE
INSET STEEL SINK BASE
FAUCETS PER PLUMBING DWGS BY G.C.
1' - 1
0"
1' - 0" 1' - 0" 1' - 0" 1' - 0"
4' - 2"
1' - 6
"1'
- 7"
3' - 1
"
4' - 1 5/8"
LEVEL 1644' - 6"
L
3' - 0
"
4' - 0
"
C3
1' - 9 5/8" 7 3/8"
EPOXY RESIN PEG BD W/ DRAIN TROUGH
EPOXY RESIN COUNTERTOPS. SIDE & BACK SPLASH (CURBS)
PIPE CHASE MOUNT PLMBG ON SUPPORTS (TYP)
PROVIDE SPLIT ST.STL. ESCUTCHEON SEALED AROUND PIPE & TO CABINETS. TYP.
LOCATE VALVES IN CAB BASE
LEVEL 1644' - 6"
L
3' - 0
"
ALUM / GLASS PARTITION
WIREMOLD RACEWAY PER PER MEP DWGS & SPECS
SPLASH
INSET STEEL BASE CABINETS
RWB - APPLY TO TOE KICKS & RETURNS
1' - 10 3/8" 6 5/8"
EPOXY RESIN SILL BOTH SIDES
PIPE CHASE - MOUNT PIPE ON SLOTTED CHANNEL SUPPORTS
547H0296
SHARED REAR FRAME ASSEMBLY 2 FIXTURE STEMS 4 CIRCUITS
SIDE
PLAN
SEE SCHEDULE
FURNITURE VENDOR:PROVIDE 60" LONG STRAIGHT SERVICE LINE ASSEMBLY PRODUCT # 547H0542 FOR NITROGEN AND LV. PROVIDE UNION PITTING @ TOP / FRAME & MALE QUICK CONNECT @ CLG. & AT FRAME.
2 DUPLEX RECEPTACLES IN LOWER RIGHT HAND FRAME UPRIGHT
12' -
0"
PROJECT:
UN
IVE
RSIT
Y O
F CO
NN
ECT
ICU
T A
RCH
ITE
CTU
RAL
& E
NG
INE
ERI
NG
BU
ILD
ING
SE
RVIC
ES
31 L
ED
OY
T RO
AD
UN
IT 3
038
STO
RRS,
CO
NN
ECT
ICU
T 06
269-
3038
TE
LEPH
ON
E:
(860
) 486
-312
7 F
ACS
IMIL
E:
(860
) 486
-317
7
SCALE:DATE:
DRAFTER:
SHEET TITLE:
WORK ORDER NO:FILE NAME:
SHEET:
SHEET: of
CERTIFICATION:
STATUS:
AUTHOR:
CONSULTANT:
CHRISTOPHER WILLIAMS ARCHITECTS
85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com
PROJECT NO:
A
B
C
D
E
A
B
C
D
E
6 5 4 3 2 1
6 5 4 3 2 1
As indicated
11/16/2018 5:32:30 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]
MISCELLANEOUS LABDETAILS
A-513
11/05/18
901661
INNOVATIONPARTNERSHIPBUILDING
159 Discovery DriveStorrs, CT 06269
ISSUED FORBID
11/05/18
REVISIONS:MARK DATE DESCRIPTION
2 11/14/2018 ADDENDUM # 2
1" = 1'-0"A2 ADA SINK BASE SECTION
0' 6" 1' 2' 3'
CYLINDER RACK BASIS OF DESIGN:
UNISTRUT P-1000 SERIES SLOTTED CHANNELS GALVANIZED STEEL WITH ALL GALVANIZED STL. FITTINGS
0' 6" 1' 2' 3'
SLOTTED CHANNEL BRACING @ EACH DIVIDER
P-1000 BOLT TO IN-WALL BLKG
MANIFOLDS AND REGULATORS PER MEP DWGS
ST. STL. CHAIN TANK CONNECT TO ANCHOR, RESTRAINTS / TANK
ST. STL. CHAIN TANK CONNECT TO ANCHOR, RESTRAINTS / TANK
1" = 1'-0"C2 CYLINDER FARM DETAIL
SLOTTED CHANNEL BRACING @ EACH DIVIDERP 1000
P 1000T UNISTRUT
1" = 1'-0"A3 SINK BASE SECTION
0' 6" 1' 2' 3' 1" = 1'-0"A6 COUNTER BASE SECTION
0' 6" 1' 2' 3'
3/4" = 1'-0"C6 TYPICAL SHARED FRAME ASSEMBLY
0' 6" 1' 2' 4'3" 3'
549H0236
549H0238
LAB GAS STEMS 2/ FRAME - LAB VACUUM & HOUSE NITROGEN (BY FURNITURE VENDOR)
FRAME INCLUDES 4 CIRCUITS, @16 AMP EA.
PROVIDE DATA OUTLETS PER PLAN, WIRING AND DEVICES BY G.C. COORDINATE W/ FRAME KNOCK OUTS
PAINTED STEEL FRAME
4'-0" LONG TWIST LOCK CHORD BY FURNITURE VENDOR
4'-0" LONG TWIST LOCK CHORD BY GC PER MEP DWGS
SLOTTED CHANNEL FRAME SYSTEM
FEMALE BULKHEAD FITTING CONNECTION ABOVE FRAME FOR MALE QUICK CONNECTOR (BY GC)
NOTE: ACTUAL QUANITY & ARRANGEMENT OF PIPING REGULATORS MAY VARY
PROVIDE
LAB GAS PIPING PER MEP DWGS
REGULATORS & MANIFOLDS PER MEP DWGS
2
LAB VACUUM & HOUSE NITROGEN TUBING BY FURNITURE VENDOR
PROJECT:
UN
IVE
RSIT
Y O
F CO
NN
ECT
ICU
T A
RCH
ITE
CTU
RAL
& E
NG
INE
ERI
NG
BU
ILD
ING
SE
RVIC
ES
31 L
ED
OY
T RO
AD
UN
IT 3
038
STO
RRS,
CO
NN
ECT
ICU
T 06
269-
3038
TE
LEPH
ON
E:
(860
) 486
-312
7 F
ACS
IMIL
E:
(860
) 486
-317
7
SCALE:DATE:
DRAFTER:
SHEET TITLE:
WORK ORDER NO:FILE NAME:
SHEET:
SHEET: of
CERTIFICATION:
STATUS:
AUTHOR:
CONSULTANT:
CHRISTOPHER WILLIAMS ARCHITECTS
85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com
PROJECT NO:
A
B
C
D
E
A
B
C
D
E
6 5 4 3 2 1
6 5 4 3 2 1
11/16/2018 5:38:59 PMC:\Users\DDancy\Documents\1816 - Fraunhofer [email protected]
EQUIPMENT & FINISHSCHEDULES
A-603
10/05/18
901661
INNOVATIONPARTNERSHIPBUILDING
159 Discovery DriveStorrs, CT 06269
ISSUED FORBID
11/05/18
LABORATORY EQUIPMENT SCHEDULE
IDEN
TIFI
ER N
O.
RO
OM
NO
.
DESCRIPTION MFG. MODEL PHYSICAL ELECTRICAL REQUIREMENTS MECHANICAL PLUMBING LAB GAS BOTTLED GAS CONNECTION
PURC
HASE
RESPONSIBILTY MATRIX
REMARKSIDENTIFIER
NO.
DIMENSIONSINCHESFOOTPRINT
UN
CR
ATE
D W
EIG
HT
STA
TIO
NA
RY/
FIXE
D/C
AST
OR
S
CO
NN
ECTI
ON
TYP
E
NEMAPLUG NO. PH
ASE
VOLT
S
AMPS
HZ
NET
WO
RK
CO
NN
ECTI
ON
VAPOREXHAUST
(LOWVELOCITY)
HIGHVELOCITY
FUMEEXHAUST PR
OC
ESS
CH
ILL
WA
TER
SU
PPLY
PRO
CES
S C
HIL
L W
ATE
R R
ETU
RN
POTA
BLE
DCW
POTA
BLE
DHW
SAN
WAS
TE
DI W
ATER
HOUS
E CO
MPR
ESSE
D AI
R
HOUS
E VA
CUUM
HOUS
E AR
GO
N
HO
USE
NIT
RO
GEN
PUR
IFIE
D N
ITR
OG
EN
OXY
GEN
HEL
IUM
HYDR
OG
EN
CA
RB
ON
DIO
XID
E
MET
HANE
CARB
ON
MO
NOXI
DE
SULF
UR
HEX
AFL
UO
RID
E
REC
EIVE
SET
IN P
LAC
E
INST
ALL
DIS
POSE
OF
PAC
KA
GIN
G M
AT.
COO
RDIN
ATE
CA
LLIB
RA
TIO
N
FIN
AL
CO
NN
ECTI
ON
S
WID
E
DEEP
TALL
LEQ.020 FUME EXTRACTION ARM ALISIDENTSYSTEM
75-9065-3-7-5-PP F GC GC GC GC GC GC GC GC CHEMICALLY RTESISTANT EXTRACTION ARM INWHITE; HOOD #1-7535-7-5, CLEAR
LEQ.020
LEQ.021 FUME EXTRACTION ARM ALSIDENTSYSTEM
75-9065-3-5 F GC GC GC GC GC GC GC GC ALUMINUM EXTRACTION ARM AND HOOD. HOOD #1-7524; BRACKET #2-500-80. SUPPORT FROM SLOTTEDFRAMING RAIL SYSTEM WITH SLOTTED FRAMINGRIGID SUPPORTS.
LEQ.021
LEQ.001 1104 8' PROTECTOR XL LABBENCHTOP FUME HOOD
LABCONCO 111-82-0020 96" 433/4"
59" F JBOX
208 50/60 1 1/2" 1/2" 1-1/2" 1/2" 1/2" 1/2" O GC GC GC GC GC GC GC ADA ACCESSIBLE; ALL CONTROLS SHALL BE MAX.4'-0" AFF. WORK SURFACE: 2'-10" AFF. EPOXY RESINWORK SURFACE WITH LEFT SIDE FRONT CUP SINK
LEQ.001
LEQ.002 1104 8' PROTECTOR XL FLOORMOUNTED FUME HOOD
LABCONCO 1128X7002 96" 433/4"
95" F JBOX
208 5 50/60 1 1/2" 1/2" 1-1/2" 1/2" 1/2" 1/2" O GC GC GC GC GC GC GC LEQ.002
LEQ.003 1104 PILOT FILTRATIONSYSTEM
FRAUNHOFER C O O O O O GC O O LEQ.003
LEQ.004 1104 FILTRATION STATION FRAUNHOFER C LEQ.004LEQ.006 1104 FILTRATION STATION FRAUNHOFER C O O O O O GC O O LEQ.006LEQ.007 1104 FILTRATION STATION FRAUNHOFER C O O O O O GC O O LEQ.007LEQ.008 1104 FILTRATION STATION FRAUNHOFER C O O O O O GC O O LEQ.008LEQ.009 1104 45 GAL. CORROSIVE
SAFETY CABINETEAGLE 15Y999-CRA-4510 43" 18" 65" 330 S GC GC GC GC GC GC AVAILABLE FROM GRAINGER; INCLUDES 2
ADJUSTABLE SHELVES & 3 POLYETHELENE TRAYS; 2DOORS
LEQ.009
LEQ.011 1104 25 GAL. CORROSIVESTORAGE CABINET
JAMCO 36WJ05-CL24BP 23" 18" 65" 204 S GC GC GC GC GC GC AVAILABLE FROM GRAINGER; INCLUDES 3ADJUSTABLE SHELVES & 4 POLYETHELENE TRAYS; 1DOOR
LEQ.011
LEQ.012 1104 LAB GAS STORAGECABINET
F GC GC GC GC GC GC GC GC LEQ.012
LEQ.013 1104 LAB GAS STORAGECABINET
F GC GC GC GC GC GC GC GC LEQ.013
LEQ.014 1104 LAB GAS STORAGECABINET
F GC GC GC GC GC GC GC GC LEQ.014
LEQ.015 1104 LABORATORYREFRIGERATOR
S O O O O O GC FUTURE LEQ.015
LEQ.016 1104 WIRE SHELVES C O O O O O GC LEQ.016LEQ.017 1104 LAB GAS STORAGE
CABINETF O O O O O GC LEQ.017
LEQ.22 1104 MILLI-Q-IQ 7000 TYPE-1WATER PURIFICATIONSYSTEM
MILLIPORE ZIQ7000US F GC GC GC GC GC GC GC PROVIDE WALL MOUNTING BRACKET: CAT#SYSTFIXA1 LEQ.22
LEQ.023 1104 Q-POD DISPENSER WITH2M CONNECTOR
MILLIPORE ZIQPOD020 171/4"
105/8"
311/4"
12.1 S 1 GC GC GC GC GC GC GC POWERED BY THE PRODUCTION UNIT LEQ.023
LEQ.24 1104 TOOL CHEST C O O O O O GC LEQ.24
ROOM FINISH SCHEDULEROOM
FLOOR BASEWALLS
CEILING NOTESNO. NAME NORTH EAST SOUTH WEST1103-B OFFICE CT-1 RWB-1 P-1 PT-1 PT-1 PT-1 ACT-11103-C OFFICE CT-1 RWB-1 PT-1 PT-1 PT-1 PT-1 ACT-11103-A OPEN OFFICE CT-1 RWB-1 PT-2 PT-2 PT-2 PT-2 ACT-11104 LAB 1104 PC-1 RWB-1 PT-2 PT-2 PT-2 PT-2 UNISTRUT / OPEN TO ABOVE
FINISH PRODUCTS & MATERIALSPRODUCT
IDENTIFIERSPEC.
SECTION PRODUCT DESCRIPTION MANUFACTURER
MANUFACTURER'SPRODUCT
IDENTIFIACTIONCOLOR/FINI
SH NOTES
ACT-1 092200 Acoustical Ceiling Panel ARMSTRONG 3261GL-1 1/2 IN. GLAZING AT GLASS PARTITIONGL-2 GLAZING AT TRANSOMGL-3 GLAZING AT FRAMED GLASS DOORPT-1 090913 PAINT ON GWB PPG INTERIOR /
EXTERIOR PRIMERINTERIORLATEX
SEE SPECIFICATION SECTION 090913
PT-2 090913 PAINT AT 12'-0" AND ABOVE PPG 6-500 PUREPERFORMANCE
INTERIORLATEX
SEE SPECIFICATION SECTION 090913
PT-3 090913 PAINT ON HOLLOW METAL DOORS ANDFRAMES
PPG INTERIOR /EXTERIOR PRIMER
INTERIORLATEX
SEE SPECIFICATION SECTION 090913
PT-4 090913 PAINT ON EXPOSED IRON OR STEELINCLUDING METAL DECK
PPG INTERIOR /EXTERIOR PRIMER
INTERIORLATEX
SEE SPECIFICATION SECTION 090913
RWB-1 RUBBER WALL BASE MANNINGTON OPTIMUM EDGEWB-01 METAL WALL BASE MATCH EXISTING WALL BASE. VERIFY IN FIELD
REVISIONS:MARK DATE DESCRIPTION
2 11/14/2018 ADDENDUM # 2