Alabama State Port Authority Addendum to R&P or Specification Booklet Form ENG-FR-031 Addendum R&P-SB Last Revised 3/4/10 Project Name Hurricane Sally Roof Repairs Project 10842 Task 01 ADDENDUM #1 To: Prospective Bidders Date: 12/23/2020 This Addendum contains the following information and becomes a part of the Bid Package. Item Description 1 Pre-Bid Meeting minutes and answers to submitted questions. 2 Pre-Bid Meeting attendance sheet. 3 The Center A Warehouse (Item 3080) roof does not contain any skylights. Any references to the skylights in the Center A Warehouse specifications are deleted. Please indicate your receipt of this addendum by adding the addendum number in the appropriate place in your Requisition & Proposal or Specification Book. Project Manager: 12/23/2020 James J. “Josh” Bell, P.E. Date Facilities Engineer

Upload: others

Post on 18-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Alabama State Port Authority

    Addendum to R&P or Specification Booklet

    Form ENG-FR-031 Addendum R&P-SB Last Revised 3/4/10

    Project Name Hurricane Sally Roof Repairs

    Project 10842 Task 01

    ADDENDUM #1

    To: Prospective Bidders Date: 12/23/2020

    This Addendum contains the following information and becomes a part of the Bid Package.

    Item Description

    1 Pre-Bid Meeting minutes and answers to submitted questions.

    2 Pre-Bid Meeting attendance sheet.

    3 The Center A Warehouse (Item 3080) roof does not contain any skylights. Any references to the skylights in the Center A Warehouse specifications are deleted.

    Please indicate your receipt of this addendum by adding the addendum number in the appropriate place in your Requisition & Proposal or Specification Book.

    Project Manager: 12/23/2020

    James J. “Josh” Bell, P.E. Date Facilities Engineer

  • Alabama State Port Authority

    Pre-Bid Meeting Minutes

    Project Name Hurricane Sally Roof Repairs Project 10842 Task 01

    Form ENG-FR-009 Pre-Bid Mtg Minutes Template Last Revised 2/22/10

    1 | P a g e

    Date 12-17-2020 Time 9:00 AM

    Location ITC Killian Room and Site Locations Attendees are indicated on Pre-Bid Meeting Sign-in Sheet

    General Discussion

    A non-mandatory pre-bid meeting was held with prospective bidders to briefly discuss the project description and to conduct a site visit. The following were the principal points of the discussion:

    1. All questions should be submitted in writing. Any verbal correspondence is non-binding.

    2. The bid opening date and time were reviewed.

    3. The bid packages are available for digital download. A link will be sent to the prospective bidders upon request to the project manager. The engineering administrative assistant is out of the office at this time, thus all requests should be sent to the project manager.

    4. Requirements to bid are listed in the package, but emphasis was placed on the requirement for bidders to possess one of the license classifications listed in the package with the Alabama Licensing Board for General Contractors.

    5. All people working on the project within secured areas will be required to possess a valid TWIC card, Alabama State Port Authority (ASPA) Badge, and ASPA vehicle decal. All buildings are within the secured area of the ASPA facility, except for the International Trade Center and Adams Street Garage. The utilization of TWIC escorts for workers is prohibited. More information can be found on the ASPA website.

    6. All items within Division I of the package must be completed and submitted with each bid.

    7. A brief, but not all inclusive, summary of the scope of work was given. Note was made that the bid package references skylights within the Center A Warehouse; however, the Center A Warehouse does not have any skylights. Also, note was made regarding the Pier A South Cold Storage Warehouse requirements to replace all removed insulation in the same day.

    8. Attention was called to Specifications Division III, SP-03, since some of the work is higher priority.

    9. Man lifts were positioned at buildings without ladder access for use by any prospective bidders attending the meeting from out of town, however no attendees chose to utilize them. Man lifts will also be provided on the dates specified within the bid package for use with an appointment.

    10. A site visit was made after the meeting. Two prospective bidders attended the site visit and visited the following locations at their choosing: Transit Shed – Berths 6, 7, 8; Pier A South Cold Storage; Berth E North Warehouse and Platform Cover; Transit Shed Pier B South; and South C Warehouse.

    Attendees Questions:

    Question 1: Is it permissible to paint the new metal siding on the Adams Street Garage to match the color?

    Answer: Yes, painting the siding is acceptable.

    These minutes are based upon the observation of the writer. Please direct all additions or corrections to these minutes to the Project Manager within three (3) business days of their receipt.

    Prepared by:

    12/23/2020

    James J. “Josh” Bell, P.E. Project Manager

    Date