GEOTEXTILE (MATERIAL REQUIREMENTS IN APPENDIX B, TABLE MT-3)
“ ”
“ ”
Markup Summary
Subject: Text BoxPage Label: 1Lock: UnlockedAuthor: dsdlaforce
Add "PCD File No: SP-17-010"
dsdlaforce (23)
Subject: Text BoxPage Label: 1Lock: UnlockedAuthor: dsdlaforce
Add the standard signature block
Subject: CalloutPage Label: 1Lock: UnlockedAuthor: dsdlaforce
Revise to Predevelopment Grading and ErosionControl Plan
Subject: Cloud+Page Label: 1Lock: UnlockedAuthor: dsdlaforce
Remove since this was not included.
Subject: Text BoxPage Label: 2Lock: UnlockedAuthor: dsdlaforce
Show the Staging Area and Stockpile Area.Provide details.
Subject: CalloutPage Label: 2Lock: UnlockedAuthor: dsdlaforce
Idenify as within the City of Colorado Springsboundary
Subject: Text BoxPage Label: 3Lock: UnlockedAuthor: dsdlaforce
Add drainage arrows
Subject: Text BoxPage Label: 3Lock: UnlockedAuthor: dsdlaforce
Add a map key
Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforce
Silt Fence
Add "PCD File No: SP-17-010"
Add the standard signature block
Revise toPredevelopmentGrading and ErosionControl Plan
Remove since thiswas not included.
Show the Staging Area and Stockpile Area.Provide details.
Idenify as within theCity of ColoradoSprings boundary
Add drainage arrows
Add a map key
Silt Fence
Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforce
Extend SF
Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforce
Show and label the ditch culvert. Provide thesizing calculation in the Preliminary DrainageReport
Subject: Text BoxPage Label: 3Lock: UnlockedAuthor: dsdlaforce
There are significant drainage areas which doesnot show any type of BMPs to control overlandsheet flows or concentrated flows. Provide andshow BMPs, such as a straw bale, as a form ofcheck dam along concentrated flows like theroads.
Typical comment for all sheets.
Subject: CalloutPage Label: 4Lock: UnlockedAuthor: dsdlaforce
Large tributary area to this local low spot. Thereshould be a temporary sediment basin (TSB) orconveyance such as a temp swale directing runoffto a TSB.
Subject: Text BoxPage Label: 5Lock: UnlockedAuthor: dsdlaforce
Identify that detention ponds as a temporarysediment basin until the site is stabilized.Show the outfall structure.Provide the sediment basin detail and note therequired design (volume, depth, emergencyspillway geometry, outlet sizing, etc.)
Subject: Text BoxPage Label: 5Lock: UnlockedAuthor: dsdlaforce
Provide temporary swale to divert runoff into thesediment pond
Subject: Text BoxPage Label: 6Lock: UnlockedAuthor: dsdlaforce
Identify that detention ponds as a temporarysediment basin until the site is stabilized. Provide the sediment basin detail and note therequired design (volume, depth, emergencyspillway geometry, outlet sizing, etc.)
Subject: CalloutPage Label: 7Lock: UnlockedAuthor: dsdlaforce
Provide Temporary BMPs and direct to atemporary sediment basin.
Subject: Perimeter MeasurementPage Label: 9Lock: UnlockedAuthor: dsdlaforce
101 ft
Subject: CalloutPage Label: 9Lock: UnlockedAuthor: dsdlaforce
Show and label the ditch culvert. Provide thesizing calculation in the Preliminary DrainageReport
Extend SF
Show and label theditch culvert. Providethe sizing calculation inthe PreliminaryDrainage Report
There are significant drainage areas which does not showany type of BMPs to control overland sheet flows orconcentrated flows. Provide and show BMPs, such as astraw bale, as a form of check dam along concentratedflows like the roads.
Typical comment for all sheets.
Large tributary area tothis local low spot. There should be atemporary sedimentbasin (TSB) orconveyance such asa temp swaledirecting runoff to aTSB.
Identify that detention ponds as a temporary sedimentbasin until the site is stabilized.Show the outfall structure.Provide the sediment basin detail and note the requireddesign (volume, depth, emergency spillway geometry,outlet sizing, etc.)
Provide temporary swale to divert runoff into thesediment pond
Identify that detention ponds as a temporary sedimentbasin until the site is stabilized. Provide the sediment basin detail and note the requireddesign (volume, depth, emergency spillway geometry,outlet sizing, etc.)
Provide TemporaryBMPs and direct toa temporarysediment basin.
101 ft
Show and label the ditch culvert. Provide the sizing calculation in thePreliminary Drainage Report
Subject: Cloud+Page Label: 10Lock: UnlockedAuthor: dsdlaforce
Move the signature block to the cover sheet
Subject: CalloutPage Label: 10Lock: UnlockedAuthor: dsdlaforce
Add as a 3rd paragraph:In accordance with ECM Section 1.12, theseconstruction documents will be valid forconstruction for a period of 2 years from the datesigned by the El Paso County Engineer. Ifconstruction has not started within those 2 years,the plans will need to be resubmitted for approval,including payment of review fees at the Planningand Community Development Directors discretion.
Subject: CalloutPage Label: 10Lock: UnlockedAuthor: dsdlaforce
Replace with actual information:[Name, Title][Business Name][Address]
Subject: CalloutPage Label: 10Lock: UnlockedAuthor: dsdlaforce
Show the locations of this BMP on the plans
Move the signatureblock to the cover sheet
Add as a 3rd paragraph:In accordance with ECM Section 1.12, these constructiondocuments will be valid for construction for a period of 2years from the date signed by the El Paso County Engineer. If construction has not started within those 2 years, theplans will need to be resubmitted for approval, includingpayment of review fees at the Planning and CommunityDevelopment Directors discretion.
Replace with actual information:[Name, Title][Business Name][Address]
Show the locations ofthis BMP on the plans