Page 1: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Text Box
Add the standard signature block
dsdlaforce
Callout
Revise to Predevelopment Grading and Erosion Control Plan
dsdlaforce
Cloud+
dsdlaforce
Cloud+
Remove since this was not included.
dsdlaforce
Text Box
Add "PCD File No: SP-17-010"
Page 2: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Text Box
Show the Staging Area and Stockpile Area. Provide details.
dsdlaforce
Callout
Idenify as within the City of Colorado Springs boundary
Page 3: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Text Box
Add a map key
dsdlaforce
Text Box
Add drainage arrows
dsdlaforce
Text Box
There are significant drainage areas which does not show any type of BMPs to control overland sheet flows or concentrated flows. Provide and show BMPs, such as a straw bale, as a form of check dam along concentrated flows like the roads. Typical comment for all sheets.
dsdlaforce
Callout
Silt Fence
dsdlaforce
Callout
Extend SF
dsdlaforce
Callout
Show and label the ditch culvert. Provide the sizing calculation in the Preliminary Drainage Report
Page 4: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Callout
Large tributary area to this local low spot. There should be a temporary sediment basin (TSB) or conveyance such as a temp swale directing runoff to a TSB.
Page 5: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Text Box
Provide temporary swale to divert runoff into the sediment pond
dsdlaforce
Text Box
Identify that detention ponds as a temporary sediment basin until the site is stabilized. Show the outfall structure. Provide the sediment basin detail and note the required design (volume, depth, emergency spillway geometry, outlet sizing, etc.)
Page 6: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Text Box
Identify that detention ponds as a temporary sediment basin until the site is stabilized. Provide the sediment basin detail and note the required design (volume, depth, emergency spillway geometry, outlet sizing, etc.)
Page 7: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Callout
Provide Temporary BMPs and direct to a temporary sediment basin.
Page 8: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
Page 9: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet
dsdlaforce
Perimeter Measurement
101 ft
dsdlaforce
Callout
Show and label the ditch culvert. Provide the sizing calculation in the Preliminary Drainage Report
Page 10: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet

GEOTEXTILE (MATERIAL REQUIREMENTS IN APPENDIX B, TABLE MT-3)

“ ”

“ ”

dsdlaforce
Callout
Show the locations of this BMP on the plans
dsdlaforce
Cloud+
dsdlaforce
Cloud+
Move the signature block to the cover sheet
dsdlaforce
Callout
Add as a 3rd paragraph: In accordance with ECM Section 1.12, these construction documents will be valid for construction for a period of 2 years from the date signed by the El Paso County Engineer. If construction has not started within those 2 years, the plans will need to be resubmitted for approval, including payment of review fees at the Planning and Community Development Directors discretion.
dsdlaforce
Callout
Replace with actual information: [Name, Title] [Business Name] [Address]
Page 11: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet

Markup Summary

Subject: Text BoxPage Label: 1Lock: UnlockedAuthor: dsdlaforce

Add "PCD File No: SP-17-010"

dsdlaforce (23)

Subject: Text BoxPage Label: 1Lock: UnlockedAuthor: dsdlaforce

Add the standard signature block

Subject: CalloutPage Label: 1Lock: UnlockedAuthor: dsdlaforce

Revise to Predevelopment Grading and ErosionControl Plan

Subject: Cloud+Page Label: 1Lock: UnlockedAuthor: dsdlaforce

Remove since this was not included.

Subject: Text BoxPage Label: 2Lock: UnlockedAuthor: dsdlaforce

Show the Staging Area and Stockpile Area.Provide details.

Subject: CalloutPage Label: 2Lock: UnlockedAuthor: dsdlaforce

Idenify as within the City of Colorado Springsboundary

Subject: Text BoxPage Label: 3Lock: UnlockedAuthor: dsdlaforce

Add drainage arrows

Subject: Text BoxPage Label: 3Lock: UnlockedAuthor: dsdlaforce

Add a map key

Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforce

Silt Fence

Add "PCD File No: SP-17-010"

Add the standard signature block

Revise toPredevelopmentGrading and ErosionControl Plan

Remove since thiswas not included.

Show the Staging Area and Stockpile Area.Provide details.

Idenify as within theCity of ColoradoSprings boundary

Add drainage arrows

Add a map key

Silt Fence

Page 12: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet

Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforce

Extend SF

Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforce

Show and label the ditch culvert. Provide thesizing calculation in the Preliminary DrainageReport

Subject: Text BoxPage Label: 3Lock: UnlockedAuthor: dsdlaforce

There are significant drainage areas which doesnot show any type of BMPs to control overlandsheet flows or concentrated flows. Provide andshow BMPs, such as a straw bale, as a form ofcheck dam along concentrated flows like theroads.

Typical comment for all sheets.

Subject: CalloutPage Label: 4Lock: UnlockedAuthor: dsdlaforce

Large tributary area to this local low spot. Thereshould be a temporary sediment basin (TSB) orconveyance such as a temp swale directing runoffto a TSB.

Subject: Text BoxPage Label: 5Lock: UnlockedAuthor: dsdlaforce

Identify that detention ponds as a temporarysediment basin until the site is stabilized.Show the outfall structure.Provide the sediment basin detail and note therequired design (volume, depth, emergencyspillway geometry, outlet sizing, etc.)

Subject: Text BoxPage Label: 5Lock: UnlockedAuthor: dsdlaforce

Provide temporary swale to divert runoff into thesediment pond

Subject: Text BoxPage Label: 6Lock: UnlockedAuthor: dsdlaforce

Identify that detention ponds as a temporarysediment basin until the site is stabilized. Provide the sediment basin detail and note therequired design (volume, depth, emergencyspillway geometry, outlet sizing, etc.)

Subject: CalloutPage Label: 7Lock: UnlockedAuthor: dsdlaforce

Provide Temporary BMPs and direct to atemporary sediment basin.

Subject: Perimeter MeasurementPage Label: 9Lock: UnlockedAuthor: dsdlaforce

101 ft

Subject: CalloutPage Label: 9Lock: UnlockedAuthor: dsdlaforce

Show and label the ditch culvert. Provide thesizing calculation in the Preliminary DrainageReport

Extend SF

Show and label theditch culvert. Providethe sizing calculation inthe PreliminaryDrainage Report

There are significant drainage areas which does not showany type of BMPs to control overland sheet flows orconcentrated flows. Provide and show BMPs, such as astraw bale, as a form of check dam along concentratedflows like the roads.

Typical comment for all sheets.

Large tributary area tothis local low spot. There should be atemporary sedimentbasin (TSB) orconveyance such asa temp swaledirecting runoff to aTSB.

Identify that detention ponds as a temporary sedimentbasin until the site is stabilized.Show the outfall structure.Provide the sediment basin detail and note the requireddesign (volume, depth, emergency spillway geometry,outlet sizing, etc.)

Provide temporary swale to divert runoff into thesediment pond

Identify that detention ponds as a temporary sedimentbasin until the site is stabilized. Provide the sediment basin detail and note the requireddesign (volume, depth, emergency spillway geometry,outlet sizing, etc.)

Provide TemporaryBMPs and direct toa temporarysediment basin.

101 ft

Show and label the ditch culvert. Provide the sizing calculation in thePreliminary Drainage Report

Page 13: Add the standard signature blockRevise to Predevelopment ......Lock: Unlocked Author: dsdlaforce Show the locations of this BMP on the plans Move the signature block to the cover sheet

Subject: Cloud+Page Label: 10Lock: UnlockedAuthor: dsdlaforce

Move the signature block to the cover sheet

Subject: CalloutPage Label: 10Lock: UnlockedAuthor: dsdlaforce

Add as a 3rd paragraph:In accordance with ECM Section 1.12, theseconstruction documents will be valid forconstruction for a period of 2 years from the datesigned by the El Paso County Engineer. Ifconstruction has not started within those 2 years,the plans will need to be resubmitted for approval,including payment of review fees at the Planningand Community Development Directors discretion.

Subject: CalloutPage Label: 10Lock: UnlockedAuthor: dsdlaforce

Replace with actual information:[Name, Title][Business Name][Address]

Subject: CalloutPage Label: 10Lock: UnlockedAuthor: dsdlaforce

Show the locations of this BMP on the plans

Move the signatureblock to the cover sheet

Add as a 3rd paragraph:In accordance with ECM Section 1.12, these constructiondocuments will be valid for construction for a period of 2years from the date signed by the El Paso County Engineer. If construction has not started within those 2 years, theplans will need to be resubmitted for approval, includingpayment of review fees at the Planning and CommunityDevelopment Directors discretion.

Replace with actual information:[Name, Title][Business Name][Address]

Show the locations ofthis BMP on the plans