adaptive managment adaptive management the past reengineering the corporation

65

Upload: garry-jeffery-stone

Post on 16-Jan-2016

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION
Page 2: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

Adaptive Managment

Adaptive Management

Page 3: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

THE PASTTHE PAST

REENGINEERINGTHE

CORPORATION

Page 4: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

DE-DE-ENGINEERINGENGINEERING THE CORPORATIONTHE CORPORATION• A LOOK AT MANAGEMENT IN THEA LOOK AT MANAGEMENT IN THE

TECHNOLOGICALLY COMPLEX NEW TECHNOLOGICALLY COMPLEX NEW MILLENNIUMMILLENNIUM

• AN OPPORTUNITY TO LEAD THE FUTUREAN OPPORTUNITY TO LEAD THE FUTURE OF MANAGEMENTOF MANAGEMENT

Page 5: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

THREE MAJOR THREE MAJOR THRUST AREASTHRUST AREAS

• USING NEW MANAGEMENT USING NEW MANAGEMENT APPROACHESAPPROACHES TO HARNESS THE POWER OF TO HARNESS THE POWER OF TECHNOLOGYTECHNOLOGY

– ADAPTIVE MANAGEMENTADAPTIVE MANAGEMENT• PRECISION DEFINITION OF TASK VALUEPRECISION DEFINITION OF TASK VALUE– VALUATED STATE SPACE/ KPIVALUATED STATE SPACE/ KPI

( 2nd level metrics ) ( 2nd level metrics )

• EVOLUTIONARY STRATEGIESEVOLUTIONARY STRATEGIES–EVOLVING SOLUTIONS VICE ENGINEERINGEVOLVING SOLUTIONS VICE ENGINEERING

Page 6: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

ADAPTIVE ADAPTIVE MANAGEMENTMANAGEMENT

• EVOLVED FROM THE SCIENCE OF COMPLEXITYEVOLVED FROM THE SCIENCE OF COMPLEXITY

– OBSERVATIONS OF NATURE APPLIED TO OBSERVATIONS OF NATURE APPLIED TO SOLVING COMPLEX PROBLEMS.SOLVING COMPLEX PROBLEMS.

Page 7: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

PRESIDENT

COMPTROLLERCOMPTROLLER

UNIVERSITYUNIVERSITY

Page 8: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

BASEBASE

COMPTROLLERCOMPTROLLER

CO

Page 9: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

LET’S LOOK AT ….LET’S LOOK AT ….

HOWHOW

NATURAL SYSTEMS EVOLVENATURAL SYSTEMS EVOLVE

Page 10: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

“It’s not the strongest or the most intelligent of the species that survive, it’s the most adaptable.”

Charles Darwin,

Page 11: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

FITNESS LANDSCAPESFITNESS LANDSCAPES

Page 12: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

PRE-CAMBRIANPRE-CAMBRIAN

SINGLE CELL LIFESINGLE CELL LIFE

=

NO INTERACTION...NO INTERACTION......SIMPLE REPLICATION...SIMPLE REPLICATION

NO MEDIUMNO MEDIUM

POST-CAMBRIANPOST-CAMBRIAN

MULTI CELL LIFEMULTI CELL LIFE

INTERACTION=MUTATION,INTERACTION=MUTATION,EVOLUTIONEVOLUTION

FLUID MEDIUMFLUID MEDIUM

Page 13: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

THE EVOLUTION OF INFORMATIONTHE EVOLUTION OF INFORMATION

GOODS AND GOODS AND WANTSWANTS

SERF/FEUDALSERF/FEUDAL

1ST WAVE1ST WAVEAGRICULTUREAGRICULTURE

-- SMALL VILLAGES SMALL VILLAGES-- FARMING FARMING-- LITTLE LITTLE INTERACTIONINTERACTION

• FOOT AND ANIMALFOOT AND ANIMAL

•ECONOMIES OFECONOMIES OF COOPERATIONCOOPERATION

• LITTLE GROWTHLITTLE GROWTH

LABOR /LABOR / MANAGEMENTMANAGEMENT

- - MOVE TO CITYMOVE TO CITY-- MORE MORE INTERACTIONINTERACTION-- MASS PROD MASS PROD

• TELEPHONES / TELEPHONES / TELEGRAPHS /TELEGRAPHS /• MASS MEDIA MASS MEDIA •ECONOMIES OFECONOMIES OF SCALE SCALE • MORE GROWTHMORE GROWTH

2ND WAVE2ND WAVEINDUSTRIALINDUSTRIAL

-- INFORMATION ISINFORMATION IS CENTER OFCENTER OF PRODUCTIVITYPRODUCTIVITY- - TRENDSTRENDS INFO IS POWERINFO IS POWER

• COMPUTER-COMPUTER- CENTRICCENTRIC•ECONOMIES OF ECONOMIES OF PRECISIONPRECISION• NON LINEARNON LINEAR GROWTHGROWTH

TQLTQL

3RD WAVE3RD WAVE

INFORMATIONINFORMATION

NEXT NEXT WAVEWAVEIDEA AGEIDEA AGE

-- NETWORK IS NETWORK IS CENTER OF CENTER OF PRODUCTIVITYPRODUCTIVITY-- COMPLEX COMPLEX ADAPTIVE SYS.ADAPTIVE SYS.

• NETWORK-NETWORK- CENTRICCENTRIC•ECONOMIES OFECONOMIES OF INTEGRATIONINTEGRATION

• EXPONENTIAL EXPONENTIAL GROWTHGROWTH

ADAPTIVEADAPTIVE MANAGEMENTMANAGEMENT

IDEAS AND WANTSIDEAS AND WANTS

Page 14: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

99 9699

9593

2534

2439

3

0

20

40

60

80

100

1991

1998

HIGHER TECHNOLOGYHIGHER TECHNOLOGYPercentage of Inc. 500 CEOs using a Percentage of Inc. 500 CEOs using a particularparticular technology in 1998 compared with 1991:technology in 1998 compared with 1991:

LaptopsLaptops NetworkedNetworkedPCsPCs

CellularCellularPhonesPhones

The InternetThe InternetPagersPagers

Page 15: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

THE TRAIL OF INFORMATION MEDIUMSTHE TRAIL OF INFORMATION MEDIUMS

• POST CAMBRIAN - FLUIDPOST CAMBRIAN - FLUID

• FIRST WAVE - FOOT AND FIRST WAVE - FOOT AND ANIMALANIMAL

• SECOND WAVE - TELEPHONES / SECOND WAVE - TELEPHONES / TELEGRAPHS / TELEGRAPHS / MASS MEDIAMASS MEDIA

• 3RD WAVE - COMPUTER3RD WAVE - COMPUTER

• 4TH WAVE - NETWORK4TH WAVE - NETWORK

Page 16: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

Profound Phase Changes in Business

Industrial Revolution The Quality Revolution Overnight Packages: Fed Ex, UPS E-commerce (KOZMO.COM)

Page 17: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT

( TQM )( TQM )

APPLYING QUANTITATIVE METHODSAPPLYING QUANTITATIVE METHODSAND PEOPLE’S KNOWLEDGE TO ASSESSAND PEOPLE’S KNOWLEDGE TO ASSESSAND IMPROVE THE ORGANIZATIONAND IMPROVE THE ORGANIZATION

Page 18: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

TQM NORMALIZES SPIKES TQM NORMALIZES SPIKES AND STABILIZES PROCESSESAND STABILIZES PROCESSES

COMPLEXITY & CHAOSCOMPLEXITY & CHAOSBOUNDARY LAYER BETWEENBOUNDARY LAYER BETWEEN

Page 19: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

TQMTQMTOOLSTOOLS

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

0

10

20

30

40

50

60

70

80

5 5 . 5 6 6 . 5 7

0

0 . 5

1

1 . 5

2

2 . 5

3

3 . 5

4

2nd Qtr 3rd Qtr

0

20

40

60

80

100

PARETOPARETO HISTOGRAMHISTOGRAM SCATTERGRAMSCATTERGRAM

Page 20: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

HITTING THE RIGHT WALLM

OD

EM

ED

IAN

ME

AN

LIMITS TO OPTIMIZATION

Page 21: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

PRACTICAL EXAMPLESHRS

4

3

1900 NOW

MALE VS. FEMALE MARATHON TIMES

Page 22: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

WHY ARE THERE NO MORE .400 HITTERS?AVG

.400

.300

1890 NOW

GAMES OF RELATIVE PLAY ARE SIMILAR TO BUSINESS

.260

.200

Page 23: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

WHY ARE THERE NO MORE .400 HITTERS?

1990

1890

VARIATON OF BEST TO WORST BATTER

.25 .40 .50

GENERAL PLAY IS BETTER

Page 24: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

EFFECTS OF DECREASED VARIATION

INF

OR

MA

TIO

N V

AR

IAT

ION

1900 NOW

PEERS

US

REDUCED OSSORTUNITYS

Page 25: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

The double edge sword

We need increased levels of information to get better.

As we get better, so does the competition What happens when we hit the right wall? Phase state change; Chaos! How do we organize to take advantage?

Page 26: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

Break time!

Page 27: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

TIME

SY

ST

EM

ST

AT

ENON

EQUILIBRIUM

MORE COMPLEX

GREATER / BETTER INFO

HIGHER ORGANIZATION LEVELS

DYNAM ICSTABILITY

BIFURCATION

NEW DYNAMICSTABILITY

CRITICALINSTABILITY

INTRODUCTIONOF PERTURBATION

EQUILIBRIUM

Page 28: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

HOW DO WE HOW DO WE MANAGEMANAGE

THE TRANSITION....THE TRANSITION....• FROMFROM managing stabilized processes managing stabilized processes

• TO TO managing dynamic complex systemsmanaging dynamic complex systems

BasesBases Stock MarketStock MarketShipsShips CombatCombatBusinessBusiness

Page 29: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

ADAPTIVE MANAGEMENTADAPTIVE MANAGEMENT

LET’S LOOK AT SOME . . .LET’S LOOK AT SOME . . .

• • BACKGROUNDBACKGROUND • • THEORYTHEORY • • EXAMPLESEXAMPLES

Page 30: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

C H A O S

• CHAOS - MINOR PERTURBENCESCHAOS - MINOR PERTURBENCES CAUSE CATASTROPHICCAUSE CATASTROPHIC CONSEQUENCESCONSEQUENCES

- EDWARD LORENTZ - MIT- EDWARD LORENTZ - MIT

CHAOS EXISTS BECAUSE WE CANNOTCHAOS EXISTS BECAUSE WE CANNOTPRECISELY CALCULATE THE INITIALPRECISELY CALCULATE THE INITIALSTATE OF ANY SYSTEM.STATE OF ANY SYSTEM.

– TRAVELING SALESMANTRAVELING SALESMAN

Page 31: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

THETHE TRAVELING TRAVELING SALESMANSALESMAN

5 CITIES = 12 POSSIBILITIES5 CITIES = 12 POSSIBILITIES10 CITIES = 181,440 POSSIBILITIES10 CITIES = 181,440 POSSIBILITIES24 CITIES = A COMPUTER THAT EVALUATES 1 MILLION24 CITIES = A COMPUTER THAT EVALUATES 1 MILLION POSSIBILITIES PER SECOND WOULD TAKE 9.8POSSIBILITIES PER SECOND WOULD TAKE 9.8 BILLION YEARS OR 2/3 THE AGE OF THE UNIVERSEBILLION YEARS OR 2/3 THE AGE OF THE UNIVERSE

CityCity AA

CityCity BB

CityCity CC

CitCityy DD

Page 32: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

COMPLEXITYCOMPLEXITY

• OPPORTUNITY TO LOOK AT GLOBALOPPORTUNITY TO LOOK AT GLOBAL IMPLICATIONS OF FUNDAMENTAL UNITIMPLICATIONS OF FUNDAMENTAL UNIT INTERACTIONS.INTERACTIONS. - ATOMS- ATOMS

- GENES ( DNA )- GENES ( DNA )

Page 33: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

COMPLEXITYCOMPLEXITY

. . . . TO CREATE A SYNTHESIS THAT. . . . TO CREATE A SYNTHESIS THAT CROSSES THE BORDERS OFCROSSES THE BORDERS OF STOVEPIPED DISCIPLINES TO SEE . . .STOVEPIPED DISCIPLINES TO SEE . . .

“ “ THE MACRO VIEW” THE MACRO VIEW”

““

Page 34: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

EXAMPLES OF EXAMPLES OF COMPLEXITY IN BUSINESSCOMPLEXITY IN BUSINESS

“ EVOLVING SOLUTIONS VICE ENGINEERING THEM ”

• GENERAL MOTORS SAVES 1.5 MILLIONGENERAL MOTORS SAVES 1.5 MILLION PER YEAR IN PAINT COSTS ALONE.PER YEAR IN PAINT COSTS ALONE.

• SCIENTISTS USE COMPLEXITY TO SCIENTISTS USE COMPLEXITY TO CALCULATE DRY TIME OF CALCULATE DRY TIME OF CONCRETE.CONCRETE. - CALIFORNIA EARTHQUAKE - CALIFORNIA EARTHQUAKE 1993 1993

• JOHN DEEREJOHN DEERE - WORK SCHEDULES- WORK SCHEDULES

Page 35: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

AN ANALOGYAN ANALOGY

• THE NEW YORK TAXI CABTHE NEW YORK TAXI CAB– HOW WOULD YOU SIMULATE ITHOW WOULD YOU SIMULATE IT IF YOU WERE FROM MARS?IF YOU WERE FROM MARS?

° BIG DISPATCHER THEORYBIG DISPATCHER THEORY

• COMPLEX ADAPTIVE SYSTEMCOMPLEX ADAPTIVE SYSTEM

– SIMPLE RULESSIMPLE RULES

° STOP FOR ANYTHING THAT WAVESSTOP FOR ANYTHING THAT WAVES° GO WHERE IT SAYSGO WHERE IT SAYS° GET PAID !GET PAID !

Page 36: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

• RANDOMNESS LEADS TO EVOLUTION AND SOLVING OF RANDOMNESS LEADS TO EVOLUTION AND SOLVING OF DIFFICULT PROBLEMSDIFFICULT PROBLEMS• EVOLUTIONARY STRATAGIESEVOLUTIONARY STRATAGIES

COMPLE

COMPLE

XX

ADAPTIVEADAPTIVESYSTEM

S

SYSTEMSLL

II

NN

EE

AARR

RR

AAEE

NNIILL

NNOO

NN

CCHHAAOOSS

MM

CCOO

PPLLEEXXIITTYY

Page 37: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

TWO QUALITIES OF TWO QUALITIES OF COMPLEX ADAPTIVE COMPLEX ADAPTIVE

SYSTEMSSYSTEMS

• SELF ORGANIZING SELF ORGANIZING • EMERGENT BEHAVIOREMERGENT BEHAVIOR - - ANTSANTS

- - AIRPORT LAVATORY AIRPORT LAVATORY

-- AIRLINE SEATING-- AIRLINE SEATING

_ Audience Participation_ Audience Participation

Page 38: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

TWOTWO REQUIREMENTS REQUIREMENTS FOR COMPLEX FOR COMPLEX

ADAPTIVE SYSTEMSADAPTIVE SYSTEMS

• NON - LINEARITY NON - LINEARITY

• FEEDBACKFEEDBACK

Page 39: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

• USING REFINED METRICS TO ENHANCE THEUSING REFINED METRICS TO ENHANCE THE MACRO VIEWMACRO VIEW

FEEDBACK - VALUATED STATE SPACEFEEDBACK - VALUATED STATE SPACE

NON-LINEARITY - NON-LINEARITY - EVOLUTIONARY STRATEGIESEVOLUTIONARY STRATEGIES

• BIOLOGICAL APPROACH TOBIOLOGICAL APPROACH TO INFORMATION MANAGEMENTINFORMATION MANAGEMENT

Page 40: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

• QUANTIFYING TO DISCRETE LEVELS WHATQUANTIFYING TO DISCRETE LEVELS WHAT EACH TASK IS WORTH AS IT RELATES TOEACH TASK IS WORTH AS IT RELATES TO MISSION.MISSION.

VALUATED STATE SPACEVALUATED STATE SPACE

– DOES 16 MINS HAVE VALUE ?DOES 16 MINS HAVE VALUE ?

– IN A BINARY SYSTEM, ANYTHINGIN A BINARY SYSTEM, ANYTHING GREATER THAN 16 HAS NO VALUE. GREATER THAN 16 HAS NO VALUE.

( SECOND LEVEL METRICS )

EXAMPLE:EXAMPLE: FUEL TO A / C WITHIN 15 MINS. FUEL TO A / C WITHIN 15 MINS.

Page 41: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

EXAMPLEEXAMPLEFUEL TO AIRCRAFTFUEL TO AIRCRAFT

MINUTES VALUEMINUTES VALUE 2020 95 95 1919 96 96 1818 97 97 1717 98 98 1616 99 99

15 15 100 100 1414 101101 1313 102102 1212 103103 1111 104104 1010 105105

GOAL GOAL STATSTATEE

MINSMINS --------------- --------------- VALUE STATEVALUE STATE

Page 42: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

DIGITAL DARWINISMDIGITAL DARWINISMEVOLUTIONARY STRATEGIESEVOLUTIONARY STRATEGIES

INITIAL STATEINITIAL STATE IDEASIDEASPOSSIBILITIESPOSSIBILITIESMEASURESMEASURESMETRICSMETRICS

ASSESS THE FITNESS OFASSESS THE FITNESS OFEACH SOLUTION ON THEEACH SOLUTION ON THELANDSCAPELANDSCAPE

KILL POOR PERFORMERSKILL POOR PERFORMERS

RANDOM MUTATIONRANDOM MUTATION STOPSTOPWHEN ONE WHEN ONE SOLUTION SOLUTION ACHIEVES ACHIEVES PREDETERMINEDPREDETERMINEDFITNESSFITNESS

OR A GOALOR A GOALVALUATED STATE SPACEVALUATED STATE SPACE.

Page 43: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

FITNESS LANDSCAPESFITNESS LANDSCAPES

Page 44: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

S 0 . . . . .S 0 . . . . .

• MANAGEMENT IN A CHANGING LANDSCAPEMANAGEMENT IN A CHANGING LANDSCAPE MUST BE MORE ADAPTIVEMUST BE MORE ADAPTIVE

• THE THE NETWORK NETWORK WILL BECOME THE WILL BECOME THE CONTROL TOOL FOR MANAGERSCONTROL TOOL FOR MANAGERS

TWO ASPECTS OF NETWORKSTWO ASPECTS OF NETWORKS - - COGNITIVECOGNITIVE - PHYSICAL- PHYSICAL

• THE MANAGEMENT STRUCTURE MUST BETHE MANAGEMENT STRUCTURE MUST BE

- SELF-ORGANIZING- SELF-ORGANIZING - ADAPTIVE- ADAPTIVE

Page 45: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

Changes in organizational structures equal changes in speed

of adaptation. Sears- top down structure, offices in one of

the tallest buildings in the world. Information flow followed structure

Wal-Mart- Same old flat building, information flow moves via network, business moves and adapts at the speed of light. Second only to DOD in the use of supercomputers.

Page 46: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

DataData DataData

KnowledgeKnowledge DecisionDecision

DataData

DataData

ExecutionExecution

KNOWLEDGEDECISION EXECUTION

Page 47: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

Norman AuginstineCEO, BOEING

“Layer upon layer of bureaucracy will not leave the demise of the organization to chance”.

Page 48: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

S O M E D E M O S . . . .S O M E D E M O S . . . .

Page 49: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

ADAPTIVE MANAGEMENTADAPTIVE MANAGEMENT SOFTWARESOFTWARE

Page 50: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

ADAPTIVE MANAGEMENTADAPTIVE MANAGEMENT- SIMPLE RULES GOVERN COMPLEX SYSTEMS- SIMPLE RULES GOVERN COMPLEX SYSTEMS

DEMANDDEMAND RESPONSERESPONSE

TASK 1TASK 1

MAGICMAGICNUMBERNUMBER

VALUATED STATE SPACEVALUATED STATE SPACE

STOPSTOP

RESOURCERESOURCESS

PEOPLEPEOPLETIMETIME$$$$$$EQUIPMENTEQUIPMENT

TRNGTRNGMANNINGMANNINGQUALIFICATIONQUALIFICATION

Page 51: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0102030405060708090

100

Your Org

Your Org.com (AGGGREGATE)Your Org.com (AGGGREGATE)

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

Page 52: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0102030405060708090

100

Your Org

Your Org.com(AGGREGATE)Your Org.com(AGGREGATE)

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

Page 53: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0102030405060708090

100

SUPPLY OPS AIMD

DEPARTMENTDEPARTMENT

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

Page 54: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0

10

20

30

40

50

60

70

80

90

100

SUPPLYSUPPLY

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

IS CBQ FUELS ASD GALLEY

Page 55: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0

20

40

60

80

100

Demand Response

ASDASD

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

Rotable Pool Effectiveness

Page 56: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

SUPPLSUPPLY Y A S DA S D

ROTABLE ROTABLE POOLPOOL

AIMD EXREPAIMD EXREP

Page 57: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0102030405060708090

100

EXREPS BENCHES GSE

AIMDAIMD

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

Page 58: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0102030405060708090

100

100 Div 200 Div 400 Div 600 Div

AIMDAIMD

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

Page 59: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

0102030405060708090

100

BENCH 1 BENCH 2 BENCH 3

DIVISION 600DIVISION 600

PERCENT PERCENT VALUATEDVALUATEDSTATE SPACESTATE SPACE

Page 60: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

SO . . SO . . ..

WHAT DOES ADAPTIVE MANAGEMENTWHAT DOES ADAPTIVE MANAGEMENTMEAN TO MEMEAN TO ME

HELPS YOU TO UNDERSTAND THE HELPS YOU TO UNDERSTAND THE LANDSCAPELANDSCAPE

DE-ENGINEERS YOUR BUSINESS SPACEDE-ENGINEERS YOUR BUSINESS SPACE IDENTIFIES “ THE SIMPLE RULES “IDENTIFIES “ THE SIMPLE RULES “ DEVELOPS A VALUATED STATE SPACE DEVELOPS A VALUATED STATE SPACE

FOR EACH MISSION/COMMODITYFOR EACH MISSION/COMMODITY

Page 61: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

WHAT LIES AHEAD?WHAT LIES AHEAD?

THE SPEED OF BUSINESS WILL INCREASE THE SPEED OF BUSINESS WILL INCREASE INNOVATION WILL DISPLACE QUALITYINNOVATION WILL DISPLACE QUALITY““ADAPTIVE” IS ANOTHER WORD FOR ADAPTIVE” IS ANOTHER WORD FOR

INNOVATIONINNOVATION

Page 62: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

SUMMARSUMMARYY

DEVELOP TOOLS TO MANAGE IN A DEVELOP TOOLS TO MANAGE IN A DYNAMIC ENVIRONMENTDYNAMIC ENVIRONMENT

$$$ SAVINGS$$$ SAVINGS OUTPACE THE COMPETION

THROUGH INNOVATION

OVERALL OBJECTIVESOVERALL OBJECTIVES

Page 63: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

INNOVATION

THE DEFINING MEASURE OF SUCCESS IN BUSINESS IN THE

FUTURE

“INCREMENTALISM IS THE WORST ENEMY OF INOVATION”

Page 64: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

Reading List

Complexity- Roger Llewen

At Home in the Universe- Stuart Kaufman

Page 65: Adaptive Managment Adaptive Management THE PAST REENGINEERING THE CORPORATION

QUESTIONS ?QUESTIONS ?

QUESTIONS ?QUESTIONS ?QUESTIONS ?QUESTIONS ?

QUESTIONS ?QUESTIONS ?QUESTIONS ?QUESTIONS ?

QUESTIONS ?QUESTIONS ?