Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA I.Project Background II.Scope of Work III.Structural Depth Study i.Gravity System ii.Lateral Force Resisting System iii.Impact on Foundation IV.Architectural/Façade Breadth V.Construction Management Breadth VI.Summary of Conclusions VII.Acknowledgments PRESENTATION OUTLINE Project Background Location: 1320 Centre Avenue, Pittsburgh, PA Building Statistics: 120,000 SF 7 stories above grade Overall height of 102’-2” Project Statistics: $25 Million Design-Bid-Build delivery method Nov – Dec. 2010

TRANSCRIPT

Page 1: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PACambria Suites Hotel

Pittsburgh, PA

Adam Kaczmarek | Structural OptionDr. Linda Hanagan

Page 2: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PACambria Suites Hotel

Pittsburgh, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

Adam Kaczmarek | Structural OptionDr. Linda Hanagan

Page 3: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Project BackgroundLocation:•1320 Centre Avenue, Pittsburgh, PA

Building Statistics:•120,000 SF•7 stories above grade•Overall height of 102’-2”

Project Statistics:•$25 Million•Design-Bid-Build delivery method•Nov. 2009 – Dec. 2010

Page 4: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Project BackgroundExisting Structural System

Foundation:

•4” slab on grade

•Cast in Place Concrete Caissons• 30”, 36”, & 42” diameters

• Spaced 15’-0” to 30’-0” apart

• 4000 PSI concrete

• End bearing capacity of 15 ton/SF

•Grade Beams:• 30”-48” in width

• 36”-48” in depth

• 3000 PSI concrete

Page 5: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Project BackgroundExisting Structural System

Gravity System:•10” precast hollow-core concrete plank

•Exterior CMU load bearing walls

•Interior steel frame

Lateral Force Resisting System:•Reinforced concrete masonry shear walls

• Typically 8” or 12” thick CMU walls

Page 6: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Scope of WorkProblem Statement:•Existing structural system currently the most efficient and economical

•Design equally effective and efficient building system

•High overall building weight

Problem Solution:•Design lighter structural system

• Girder-Slab Composite Steel and Precast System

• Specially designed D-Beams

• Concentrically Braced Frames

Page 7: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Scope of WorkProject Goals

Structural Depth Study:•Reduce overall building weight•Optimize gravity and lateral systems•Impact on foundation

Architectural/Façade Breadth Study:•Research façade options for building redesign•Address thermal effects of exterior facades

Construction Management Breadth Study:•Impact on construction schedule and cost

Page 8: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Structural Depth Study

Girder-Slab System

•Composite Steel and Precast System

•Mid to High-Rise Residential Structures

•Light Weight

•Offers Rapid Construction

•Reduces Building Height

•Requires Minimum Fireproofing

•Meets Required Sound (STC) Ratings

www.girder-slab.com

Page 9: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Structural Depth StudyFraming Plan

•D-Beams limited in availability•Typical bay is 18’-0” x 27’-6”•Columns aligned with room partition walls•Precast planks span East/West•D-Beams span North/South

Page 10: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Structural Depth Study

Page 11: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

D-Beam Design

•Initial Load – Precomposite• MDL = 62.37 k-ft. < 84 ft-k = Mall

•Total Load – Composite• Mtot = 151.5 ft-k• Sreq = 60.6 in3 < 68.6 in3 = St

• ΔSUP = 0.5 in. < 0.6 in. = ΔLL

•Check Compressive Stress on Concrete• Fc = 2.25 ksi > 2.16 ksi = fc

•Check Bottom Flange Tension Stress• Fb = 45 ksi > 28 ksi = fb

•Check Shear• Fv = 20 ksi > 15.6 ksi = fv

DB 9x46 PropertiesSteel Section:•Is = 195 in4

•St = 33.7 in3

•Sb = 50.8 in3

•Mall = 84 ft-k•tw = 0.375 in.

Transformed Section:•It = 356 in4

•St = 68.6 in3

•Sb = 80.6 in3

•B = 5.75 in.

Structural Depth Study

Page 12: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Column Design

• Comply with LRFD methods and AISC Steel Construction Manual

• Optimal members designed by RAM

• Resist gravity loads only

• Spliced above 2nd and 5th floor levels

• Sizes range from W10x33 to W12x87

Structural Depth Study

Page 13: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Lateral Force Resisting System

General Assumptions and Considerations:• Only lateral members were modeled• Floor diaphragms modeled as rigid area elements• Gravity loads applied as additional area masses• Accidental and inherent torsion considered

Braced Frame Assumptions and Considerations:• Columns pinned at base• Columns in braced frames were fixed• Beams and braces pinned• P-Delta effects taken into account

Structural Depth Study

Page 14: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Controlling Load Combinations (ASCE 7-05)• Wind - North/South direction

• 1.2D + 1.6 WY + 1.0L + 0.5Lr

• Seismic – East/West direction

• 0.9D + 1.0EX

Structural Depth Study

Design Wind and Seismic Loads• Design wind and seismic load cases were

calculated

• Loads manually applied to ETABS model

Story Point Load FX FY FZ MX MY MZSummartion 0,0,Base Case 1X -139.20 0.00 0.00 0.00 -7377.10 7034.70Summartion 0,0,Base Case 1Y 0.00 -479.50 0.00 25364.80 0.00 -52504.20Summartion 0,0,Base Case 2X -104.39 0.00 0.00 0.00 -5532.30 3726.84Summartion 0,0,Base Case 2Y 0.00 -359.62 0.00 19023.74 0.00 -51228.20Summartion 0,0,Base Case 3 -104.39 -359.62 0.00 19023.74 -5532.30 -34102.52Summartion 0,0,Base Case 4 -78.36 -269.97 0.00 14281.11 -4153.11 -35659.47Summartion 0,0,Base Case EX -225.89 0.00 0.00 0.00 -14408.67 11764.63Summartion 0,0,Base Case EY 0.00 -225.89 0.00 14408.67 0.00 -25392.93

Design Wind Load Cases: Controlling Base Shears and Overturning Moments

Page 15: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Structural Depth Study

Frame 2

Page 16: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Structural Depth StudyRelative Story Stiffness

Frame C: 49.25% Frame 2: 58.7%Frame O: 40.8% Frame 8: 41.3%Frame M & M.2: 9.95%

C

2

M M.2

O

8

Frame C Frame M Frame M.2 Frame O0.507 0.034 0.044 0.4150.506 0.035 0.045 0.4140.504 0.036 0.047 0.4130.501 0.038 0.050 0.4110.498 0.040 0.053 0.4090.492 0.043 0.058 0.4060.481 0.048 0.067 0.4040.452 0.066 0.088 0.394

Relative Story Stiffness, Ri

Riy = Kiy/Kiy,total

Frame 2 Frame 80.605 0.3950.602 0.3980.598 0.4020.593 0.4070.588 0.4120.581 0.4190.573 0.4270.553 0.447

Relative Story Stiffness, Ri

Rix = Kix/Kix,total

Page 17: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Drift and Displacement

Wind Seismic

Structural Depth Study

LevelHeight Above Ground, h (ft)

Allowable Drift Δallowable = h/400

Total Drift (ETABS)

Adequate?

Roof 86.833 2.60 1.37 OK7 76.833 2.30 1.17 OK6 66.833 2.00 0.99 OK5 56.833 1.70 0.82 OK4 46.833 1.40 0.64 OK3 36.833 1.10 0.47 OK2 26.833 0.80 0.32 OK

Plaza 14.833 0.44 0.14 OK

Controlling Wind Drift (X-Direction)

LevelHeight Above Ground, h (ft)

Allowable Drift Δallowable = h/400

Total Drift (ETABS)

Adequate?

Roof 86.833 2.60 1.91 OK7 76.833 2.30 1.56 OK6 66.833 2.00 1.36 OK5 56.833 1.70 1.1 OK4 46.833 1.40 0.86 OK3 36.833 1.10 0.62 OK2 26.833 0.80 0.48 OK

Plaza 14.833 0.44 0.06 OK

Controlling Wind Drift (Y-Direction)

LevelHeight of

Story, hsx (ft)Allowable Story Drift

Δallowable = 0.02hsx

Total Drift (ETABS)

Adequate?

Roof 10 0.20 0.005 OK7 10 0.20 0.005 OK6 10 0.20 0.004 OK5 10 0.20 0.004 OK4 10 0.20 0.004 OK3 10 0.20 0.003 OK2 12 0.24 0.002 OK

Plaza 14.83 0.30 0.001 OK

Controlling Seismic Drift (X-Direction)

LevelHeight of

Story, hsx (ft)Allowable Story Drift

Δallowable = 0.02hsx

Total Drift (ETABS)

Adequate?

Roof 10 0.20 0.015 OK7 10 0.20 0.014 OK6 10 0.20 0.013 OK5 10 0.20 0.012 OK4 10 0.20 0.01 OK3 10 0.20 0.007 OK2 12 0.24 0.007 OK

Plaza 14.83 0.30 0.002 OK

Controlling Seismic Drift (Y-Direction)

Page 18: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Impact of Lateral Loads

Structural Depth Study

Existing Building Design New Building DesignBuilding Weight 20,223 kips 14,260 kips

Base Shear 508.03 kips 228.16 kipsTotal Moment 29,463 ft-k 13,468 ft-k

Page 19: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Structural Depth Study

Impact on Foundation

Stress Due to E/W Seismic Loads

• 1.6% of the Dead Load

Stress Due to N/S Lateral Loads

• 1.5% of Dead Load

Concrete Caissons•Lighter building weight

•Reduced loads to foundation

•Foundation expected to reduce amount of concrete and reinforcement

Structural System No. of Caissons

Existing CMU System 74

Redesigned Steel System

76

Number of Caissons

Page 20: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Architectural/Façade Breadth

• Analyze thermal effects of alternative facades

• Compare construction cost and time

• ASHRAE Fundamentals Handbook

• R-values

• Tx = Toutdoor + (Tindoor – Toutdoor)(ΣRo-x/ Σ Ro-i)

• Façade alterations on North façade only

Page 21: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Thermal Gradients

Architectural/Façade Breadth

Between Material

ΣRo-x

(°F-ft2-h/BTU)

Temperature (°F)

0-1 0.17 21-2 0.81 5.752-3 1.79 10.33-4 12.06 57.94-5 13.09 62.75-6 13.55 64.96-i 14.01 66.98

Total 14.66 70

Existing CMU/Masonry System

U-Value = 0.0682 (BTU/°F-ft2-h)

Between Material

ΣRo-x

(°F-ft2-h/BTU)

Temperature (°F)

0-1 0.17 21-2 0.81 5.622-3 1.79 103-4 1.91 10.544-5 14.1 65.085-i 14.56 67.14

Total 15.2 70

Brick Vaneer System

U-Value = 0.0658 (BTU/°F-ft2-h)

Between Material

ΣRo-x

(°F-ft2-h/BTU)

Temperature (°F)

0-1 0.17 21-2 2.045 27.622-3 0.98 38.953-i 2.045 62.6

Total 0.64 70

Curtain Wall System

U-Value = 0.17 (BTU/°F-ft2-h)

Page 22: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Architectural/Façade Breadth

Wall System S.F. Crew Size Material Cost/SF Labor Cost/SF Total Cost Daily OutputConstruction

Time

CMU/Brick System 19,0163 Bricklayers, 3 Bricklayer

Helpers$9.40 $21.00 $578,096 159 120 days

Wall System S.F. Crew Size Material Cost Labor Cost Total Cost Daily OutputConstruction

Time

Curtain Wall System

19,0162 Glaziers, 2

Structural Steel Workers

$33.50 $7.05 $771,099 205 93 days

Brick Veneer System/Metal Stud Backup

19,0163 Bricklayers, 2 Bricklayer

Helpers$6.95 $15.55 $427,860 230 83 days

Façade of Existing System

Façade Systems for Redesigned System

Cost/Time Comparison

Page 23: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Construction Management Breadth

Construction Schedule

•Existing Structural System• Start Date – January 6, 2010• Finish Date – August 10, 2010

• Redesigned Structural System• Start Date – January 6, 2010• Finish Date – May 31, 2010

Existing Construction Schedule

Redesigned Construction Schedule

Page 24: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Cost of Structural Systems

•Costs unaccounted for:• Foundation• Steel Connections

Construction Management Breadth

Steel Amount UnitMaterial

Cost/UnitLabor

Cost/UnitEquipment Cost/Unit

Total Cost/Unit

Total Cost w/ O&P

Total Cost

Columns 4986 LF 84 2.7 1.65 88.35 99 493614.00Baseplates 119.2 SF 46 0 0 46 0 5483.20

Beams 9435 LF 62 3.99 1.8 55.29 63.5 599122.50Braces 2368 LF 47.14 3.79 2.32 53.25 n/a 126096.00

Fireproofing 95400 SF 1.31 0.29 0.04 1.64 1.95 186030.00

Concrete Amount UnitMaterial

Cost/UnitLabor

Cost/UnitEquipment Cost/Unit

Total Cost/Unit

Total Cost w/ O&P

Total Cost

8" P.C. Plank 120000 SF 7.2 1.07 0.6 8.87 10.45 1254000.00

2664345.70

Cost Estimate of Redesigned System

Total Cost of Redesigned System:

Shearwalls Amount UnitMaterial

Cost/UnitLabor

Cost/UnitEquipment Cost/Unit

Total Cost/Unit

Total Cost w/ O&P

Total Cost

8" CMU, reinforced 59904 SF 2.62 4.03 0 6.65 9.35 560102.4012" CMU, reinforced 12339 SF 3.65 6.25 0 9.9 14 172746.00

Steel Amount UnitMaterial

Cost/UnitLabor

Cost/UnitEquipment Cost/Unit

Total Cost/Unit

Total Cost w/ O&P

Total Cost

Columns 1224 LF 84 2.7 1.65 88.35 99 121176.00Baseplates 52.2 SF 46 0 0 46 0 2401.20

Beams 2888 LF 68 3.45 1.56 73.01 83 239704.00Fireproofing 27180 SF 1.31 0.29 0.04 1.64 1.95 53001.00

Concrete Amount UnitMaterial

Cost/UnitLabor

Cost/UnitEquipment Cost/Unit

Total Cost/Unit

Total Cost w/ O&P

Total Cost

10" P.C. Plank 120000 SF 7.5 0.95 0.53 8.98 10.55 1266000.00

2415130.60

Cost Estimate of Existing System

Total Cost of Existing System:

Cost Comparison

Component Existing System Redesigned System Additional Cost

CMU Walls $732,848.40 $0.00 -$732,848.4Steel Bracing $0.00 $126,096.00 $126,096

Steel Framing $416,282.20 $1,284,249.70 $994,063.5Pre-Cast Plank $1,266,000 $1,254,000 -$12,000

Total $2,415,130.60 $2,664,345.70 $249,215.1

Page 25: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE

Gravity System Redesign• Girder-Slab Composite Steel and Precast System

• Sufficiently designed for strength and serviceability requirements

• Reduced overall building weight

• Framing plan conformed easily to existing floor layout

• Maintained floor-to-ceiling height

Lateral Force Resisting System Redesign• Concentrically Braced Frames

• Lighter weight• Fast construction• Economical• Limit drift and displacement

Impact on Foundation• Reduced overturning moment•Reduced base shear •Reduce size of foundation

Architectural/Façade Breadth• Brick veneer system is most efficient

Construction Management Breadth• Reduced schedule•Minimal increase in cost

If a minimal cost increase and minor architectural layout changes were not a concern, the redesigned structural system could be implemented as an alternative design.

Summary of Conclusions

Page 26: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE AcknowledgementsAtlantic Engineering Services

• Chris Kim• Andy Verrengia• Tim Jones

Horizon Properties Group, LLC• J.P. Morgan

DLA + Architecture & Interior Design• Joe Sepcic

Snavely Development Company• Greg Osborne

The Pennsylvania State University• Dr. Linda Hanagan• Prof. Robert Holland• Prof. Kevin Parfitt• The entire AE faculty and staff

All my friends, family, and classmates for their unconditional support and encouragement

Page 27: Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam

Ada

m K

aczm

arek

St

ruct

ural

Opt

ion

Spri

ng 2

011,

Han

agan Ca

mbr

ia S

uite

s H

otel

@ C

ON

SOL

Ener

gy C

ente

rPi

ttsb

urgh

, PA

I. Project Background

II. Scope of Work

III. Structural Depth Study

i. Gravity System

ii. Lateral Force Resisting System

iii. Impact on Foundation

IV. Architectural/Façade Breadth

V. Construction Management Breadth

VI. Summary of Conclusions

VII. Acknowledgments

PRESENTATION OUTLINE Cambria Suites Hotel

Questions & Comments