adam kaczmarek | structural cambria suites hotel ... · center avenue in pittsburgh, pennsylvania....

20

Upload: others

Post on 21-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the
Page 2: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 2

Table of Contents……………………………………………………………………………………………………………2

Executive Summary………………………………………………………………………………………………………..3

Introduction: Cambria Suites Hotel………………………………………………………………………………….4

Existing Structural System………………………………………………………………………………………………5

Foundation…………………………………………………………………………………………………………..5

Superstructure…………………………………………………………………………………………………….7

Lateral System……………………………………………………………………………………………………..9

Load Path…………………………………………………………………………………………………………..10

Problem Statement……………………………………………………………………………………………………….11

Proposed Solution………………………………………………………………………………………………………...12

Solution Method……………………………………………………………………………………………………………13

Breadth Studies…………………………………………………………………………………………………………….14

Breadth Study Ι…………………………………………………………………………………………………..14

Breadth Study ΙΙ…………………………………………………………………………………………………14

Tasks and Tools……………………………………………………………………………………………………………15

Timeline……………………………………………………………………………………………………………………….17

Appendix A: Existing Building Layout…………………………………………………………………………….18

Page 3: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 3

Executive Summary

The following is a proposed study for the redesign of the existing structure of the Cambria

Suites Hotel. Cambria Suites Hotel is approximately 120,000 square foot and is 7 levels

above grade. The superstructure consists primarily of reinforced concrete masonry walls

and precast hollow-core concrete planks, as well as an interior steel frame. Each story

height ranges from 10’ to 14’, topping out at an overall building height of 102’-2”. Typical

10” concrete planks with topping vary in span length from 20’ to 40’. The lateral force

resisting system is comprised of masonry shear walls which are located around the

staircases, elevator shafts, and other exterior building locations. The foundation

incorporates drilled cast-in-place concrete caissons and grade beams to support the load

bearing walls and columns.

After reviewing the existing conditions through the examination of alternate floor systems

and verifying the current lateral system, it was determined the structural system meets all

standards required by code. For the proposed design, the site location will remain the

same as it serves as a popular attraction to visitors of the City of Pittsburgh and the new

CONSOL Energy Center.

This thesis proposal thoroughly outlines the entire process of obtaining an optimized

building design for the Cambria Suites Hotel. For the structural depth, the current concrete

masonry structure will be modified to an all steel frame system which will still incorporate

the use of precast concrete plank as the floor system. The lateral system will consist of

shear walls which surround the staircases and elevator shaft, with the possible use of

braced frames for extra lateral support. The exterior shear walls will be replaced by either

a curtain wall system or a structural panel façade. In addition, the existing foundation will

be checked for the proposed structural design.

Breadth studies will focus on the architectural, cost, and scheduling impact of the proposed

structural design. Due to the steel redesign, an architectural study will be conducted as it

may result in minor architectural layout changes. In addition, a new façade will be chosen

due to the elimination of the exterior masonry walls. A second breadth will cover

construction management issues such as the construction schedule and cost of the building.

To stay organized and to be able to accomplish the proposed design on time, a complete

breakdown of the tasks is provided within the proposal.

Page 4: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 4

Introduction: Cambria Suites Hotel

Cambria Suites Hotel is the newest, upscale, contemporary all-suite hotel located at 1320

Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new

CONSOL Energy Center, home to the Pittsburgh Penguins hockey team, and numerous

concerts and special events. The 142-suite hotel contains a total of 7 levels above grade

and was built on a quite challenging site. The hotel will have a variety of room suites, such

as the double/queen suite, king suite, one bedroom suite, deluxe tower king suite, and

hospitality suite.

The Plaza Floor level will mainly consist of a few bistro-style restaurants which open to an

outdoor terrace which will overlook the city of Pittsburgh and the CONSOL Energy Center.

At the Hotel Floor level, guests will be greeted by an airy two-story lobby where they can

take part in a state-of-the-art fitness center or the relaxing indoor pool and spa. There are

also two meeting rooms and a board room for guest use, as well as, a large kitchen/bar off

of the lobby entrance. At the North end of the Second Floor level, a steel Porte Cochere will

be cantilevered to cover part of the main entrance. In addition, the property will feature an

1800 square foot presidential suite with one of a kind skyline view of downtown Pittsburgh

and a 7th floor concierge lounge that will offer a wet bar and lounge space for guests to use

and enjoy.

The hotel is fully landscaped and will also have an exclusive 143 space onsite parking

garage with access to the CONSOL Energy Center for event patrons staying at the property.

The Hotel Floor level will have a precast concrete pedestrian bridge leading to the top level

of the parking garage. The bridge is supported by the hotel and the garage. The South end

of the bridge will be supported by the garage on slide-bearings to allow for differential

lateral movement between the two structures. The exterior of Cambria Suites Hotel is

mainly brick and cast-stone veneer, architectural decisions made to resemble the

bordering CONSOL Energy Center. A lighter color brick is used from the 2nd-Roof Floor

levels, with the addition of a cast-stone band at Floor levels 2 and 7. The darker color brick

is used from the 2nd Floor level and below, as well as vertical strips to separate window

pairings and to accent building corners.

The thesis proposal will suggest an alternate structural system for the Cambria Suites

Hotel. Detailed comparisons will be provided between both the existing and proposed

system to determine which system is a more efficient and effective solution for the hotel. A

timeline of the tasks performed to complete the proposed solution is provided.

Page 5: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 5

Existing Structural System

Foundation

The geotechnical engineering study for the Cambria Suites Hotel was completed by

GeoMechanics Inc. on December 29, 2008. In the study, the site of Cambria Suites Hotel is

underlain by sedimentary rocks of the Conemaugh group of rocks of Pennsylvania age. The

Conemaugh group is predominantly comprised of clay stones and sandstones interbedded

with thin limestone units and thin coal beds. The soil zone conditions consisted of

materials of three distinct geologic origins: man-made fill, alluvial deposits, and residual

soils. The fill in the hotel test borings was placed in conjunction with the recent demolition

and regarding of St. Francis Hospital in order to build Cambria Suites and CONSOL Energy

Center. Ground water exists locally as a series of perched water tables located throughout

the sol zone and new the upper bedrock surface. Excavations in soils and bedrock can be

expected to encounter perched water. The volume of inflow into excavations should be

relatively minor, should diminish with time and should be able to be removed by standard

pump collection/pumping techniques. The report also states that the most economical

deep foundation solution for Cambria Suites included a system of drilled-in, cast-in-place

concrete caissons with grade beams spanning between adjacent caissons to support the

anticipated column and wall loads of the structure. With varying types of bedrock on site,

the allowable end bearing pressure ranges from 8, 16, and 30 KSF. As for the floor slab,

GeoMechanics Inc. recommended to place a ground floor slab on a minimum six-inch thick

granular base and to provide expansion joints between the ground floor slab and any

foundation walls and/or columns. This is done to permit independent movement of the

two support systems.

As a result of GeoMechanic’s geotechnical study, the foundation of Cambria Suites Hotel

incorporates a drilled cast-in-place concrete caissons and grade beams designed to support

the load bearing walls and columns. The ground floor is comprised of a 4” concrete slab on

grade, as well as, 10” precast concrete plank in the Southern portion of the building. The 4”

concrete slab on grade is reinforced with 6x6-W1.4 welded wire fabric and has 4000 PSI

normal weight concrete. The slab increases to 8” in thickness with #5 @ 16” O.C. in the

South-West corner of the building, and increases to 24” with #5 @ 12” O.C. within the core

shear walls where the elevator shaft is located. For the majority of the slab on grade, the

slab depth is 14’-0” below finish grade.

Page 6: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 6

Typical Caisson & Grade Beam Detail

Figure 1.1

Typical Caisson Cap Detail

Figure 1.2

Typical Grade Beam Reinforcing Detail

Figure 1.3

The drilled cast-in-place caissons extend anywhere

from 20-30 feet deep below grade and are socketed

at least 3’ into sound bedrock. Caisson end bearing

capacity is 30 KSF (15 ton/SF) on Birmingham

Sandstone bedrock. The caissons are designed with

a compressive strength of 4000 PSI, range from

30-42 inches in diameter, and are spaced

approximately between 15’ and 30’ apart (refer to

Appendix A). Typical caissons terminate at the Plaza

level and are tied into a grade beam with #3 ties @

12” O.C. (horizontal reinforcement) and 4-#6 dowels

(vertical reinforcement) embedded at least two feet

into the drilled caisson. Where steel columns are

located, a pier is poured integrally with the grade beam

and reinforced with 8-#8 vertical bars and #3 @ 8” O.C.

horizontal ties. (As shown in Figures 1.1 & 1.2)

The grade beams have a compressive strength of 3000 PSI and range from 30-48 inches in

width and 36-48 inches in depth. Each grade beam is reinforced with top and bottom bars

which vary according to the size of the beam. Grade beams span between drilled cast-in-

place caissons which transfer the loads from bearing walls, shear walls, and columns into

the caissons. From the caissons, the loads are then transferred to bedrock. (As shown in

Figures 1.1 & 1.3)

Page 7: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 7

Superstructure System

The typical floor system of Cambria Suites Hotel consists of 10” precast hollow-core

concrete plank with 1” leveling topping. The precast plank allowed for quicker erection,

longer spans, open interior spaces, and serves as an immediate work deck for other trades.

Concrete compressive strength for precast plank floors is 5000 PSI and uses normal weight

concrete. The typical spans of the plank floors range from 30’-0” to 40’-0”. The floor system

is supported by exterior load bearing concrete masonry walls, as well as, interior steel

beams and columns.

The Plaza level floor system is a combination of 10” precast concrete plank, 8” precast

concrete plank and 4” slab on grade. Since there is no basement in the North-East section

of the hotel due to the fitness center and pool, the site was excavated properly in order to

place the 4” slab on grade and 8” precast concrete plank. The 4” slab on grade will be for

the fitness center where as the 8” concrete plank will surround the pool area. (As shown in

Figure 2.1)

4” Concrete Slab on

Grade

8” Precast Concrete

Plank

Partial Hotel Level Floor Slab

Figure 2.1

Page 8: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 8

Since the masonry bearing walls are typically located on the perimeter of the hotel, steel

beams and columns were needed thru the center of the building to support the precast

concrete plank floors. Steel beam sizes range from W16x26 to W24x94, and steel column

sizes range from W8x58 to W18x175. Each column connects into concrete piers within the

grade beams via base plates which vary in size. Base plates use either a 4-bolt or 8-bolt

connection, typically using 1” A325 anchor bolts which extend 12” or 18” respectively into

the concrete pier. The steel beams vary in length from 13’-0” to 19’-0” and typically span in

the East-West direction. Exterior bearing masonry walls and the steel beams will take a

reaction load from the precast concrete plank flooring, as well as other loads from levels

above, which will then transfer thru steel columns and exterior bearing walls and thus

transferring all loads to the foundation system. (As shown in Figure 2.2)

The roof structural system at both the Second level and main Roof level uses untopped 10”

precast concrete plank. Reinforced concrete masonry extends passed the Roof level to

support a light gauge cornice which wraps the entire building. A high roof is constructed

for hotel identification purposes and uses 10”-16 GA light gauge roof joists @ 16” O.C.,

supported by 8”-20 GA light gauge wall framing below. W8x21 hoist beams support the top

of the elevator shaft which rest on ½”x7”x7” base plates. There are a total of eight drains

located on the roof for the drainage system. (As shown in Appendix A)

Typical Partial Floor Plan

Figure 2.2

Page 9: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 9

Lateral System

The lateral system for the Cambria Suites hotel consists of reinforced concrete masonry

shear walls. The exterior shear walls, as well as the core interior shear walls, are

constructed of 8” concrete masonry, with the exception of a few 12” concrete masonry

walls on the lower floor levels. All shear walls are solid concrete masonry walls which

extend the entire height of the structure without openings for windows or doors. The core

shear walls are located around the staircases and elevator shafts. The exterior shear walls

are scattered around the perimeter of the building. (As shown in Figure 3.1) Shear walls

supporting the Plaza level to the Third Floor level have a compressive strength of 2000 PSI.

All other shear walls support a compressive strength of 1500 PSI. In addition, all concrete

masonry shall be grouted with a minimum compressive strength of 3000 PSI. Typical

reinforcement for all shear walls is comprised with #5 bars at either 8” O.C. or 24” O.C.

Wind and seismic loads, as well as gravity loads, are transferred to the foundation by first

traveling thru the rigid diaphragm; the precast concrete plank floor system. Loads are then

transferred to the concrete masonry shear walls. From there, loads are transferred down

to the preceding floor system and/or transferred the entire way to the grade beam

foundation, finally travelling thru the concrete caissons which are embedded in bedrock.

Lateral Shear Wall System

Figure 3.1

Page 10: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 10

Load Distribution

Load Path

Lateral force resisting systems transfer lateral loads (wind and/or seismic) to the

building’s foundation where the loads dissipate. This load path is assumed to be governed

by the concept of relative stiffness, which states that the most rigid members in a building

draw the most forces to them. In the case of Cambria Suites Hotel, the lateral forces come

in contact with the exterior of the building, are then transmitted through the rigid

diaphragms, to the masonry shear walls, and lastly down into the foundation (grade beams

and caissons). This load path is shown in Figure 7.1. The exterior shear walls with longer

spans resist the majority of the lateral forces because they have minimal assistance from

the slab. The steel frame which extends through the middle of the building only transfers

gravity loads to the foundation.

Lateral

Loads

Shear

Walls

Floor

Slab

Foundation

Load Path Diagram

Figure 7.1

Page 11: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 11

Problem Statement

Upon the completion of analyzing the gravity and lateral force resisting systems present in

the Cambria Suites Hotel, it is clear that the existing structural system chosen by the design

team is currently the most efficient possible. It was also determined that the structural

system meets all architectural, strength, and serviceability requirements governed by code.

The gravity system, consisting of concrete masonry walls and an interior steel frame, were

sufficiently designed to support the precast concrete planks. In addition, the current

concrete shear walls were also efficient in keeping a minimal building deflection and

resisting the torsional affects.

In Technical Assignment 1, the design of all the structural components of Cambria Suites

Hotel were analyzed and determined to exceed the design requirements according to ASCE

7-05. In Technical Assignment 2, three alternate floor systems were compared to the

existing system and ultimately determined that the existing precast concrete plank floor

system proved to be the most efficient and effective. In Technical Assignment 3, an in-

depth analysis of the existing lateral force resisting system was performed. It was

confirmed that the lateral system was sufficient to carry the controlling lateral loads that

were present on the structure. After evaluating all Technical Assignments, it is clear that

the design of the Cambria Suites Hotel meets all code requirements with respect to its

location and zoning. With the excellent performance of the current system, it will be

difficult to find a comparable system which will replace the existing system. Therefore,

when considering an alternative system design, the final design may not prove to be more

efficient and/or effective compared to the existing system. That being said, a redesign of

Cambria Suite’s structural system will be designed in an attempt to find an equally effective

and efficient building system.

In regards of the foundation system, it was verified that the existing design for the building

was sufficient to transfer all loads for the specified soil class. However, the possibility of

increased loads and other effects due to the proposed redesign will require foundation

checks to verify it is sufficient for these changes.

To determine whether a different building system is equally effective or efficient, it will be

compared to the existing system in various categories. These categories will include code

limitations, building performance, cost effectiveness, constructability, construction

schedule, and material availability. The following proposal will explore an alternate system

which may result in a more practical solution to the Cambria Suites existing structural

system.

Page 12: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 12

Proposed Solution

Structural Depth: New Framing System Design

The current site of the Cambria Suites Hotel is located adjacent to the new CONSOL Energy

Center and within walking distance to other attractions in downtown Pittsburgh. This

prime location attracts several visitors on a regular basis due to the CONSOL Energy

Center, home to the Pittsburgh Penguins, and numerous concerts and special events.

Therefore, the hotel will remain in its existing location for the practice of this assignment.

The existing concrete masonry wall structure is a heavier system by nature, whereas steel

could result in a decreased building weight, creating a lower base shear. As a result, a

feasible alternative structural system for the Cambria Suites Hotel would be steel framing.

This change will initially affect the foundation and construction management issues like

cost and schedule, as well as architectural features such as the building façade due to the

removal of exterior masonry walls.

With the modification to a steel framing system, the lateral force and gravity resisting

systems will have to be considered as well. The current floor system comprised of hollow-

core concrete planks will remain, but will be integrated as a girder-slab system using

specially designed D-Beams. This innovative D-Beam girder was designed to allow the

precast slab to set in on its bottom flange concealing its top flange and web. Once the slabs

are set, grout is easily placed flowing around the D-Beam and through its trapezoidal shape

web openings and into the slab cores. This results in the removal of all load-bearing

masonry walls in the building. The lateral force resisting system will be comprised of

concrete shear walls surrounding the elevator shaft and staircases with the possible

addition of braced frames or moment connections.

Figure: D-Beam System

Page 13: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 13

Since the redesign of the structural system uses a different material than the existing

system, the existing beams and columns will be altered. The plank span will remain

unchanged, whereas the column and beam locations for the girder-slab system may change

slightly to line up between rooms. This is done so that the exterior columns do not alter the

existing location of the windows. The redesign will then be thoroughly compared to the

existing design to determine whether the alternative system is a more effective and

efficient design solution.

Solution Method

To determine whether the proposed structural system will be able to handle the loads

imposed on the Cambria Suites Hotel, hand calculations will be performed to establish

preliminary sizes. Hand calculations will be done with the use of ASCE 7-05, ACI 318-08,

the Thirteenth Edition Steel Manual, and information provided by Girder-Slab

Technologies. These sizes will then be placed into computer programs along with the

calculated gravity and lateral loads. The gravity and lateral loads will be defined according

to ASCE 7-05 and will be applied to the overall structure. RAM will be used to determine

preliminary sized for beams and columns, whereas ETABS will be used to analyze the

lateral effects on the building. Column axial loads will be calculated to determine the forces

that will be acting to each auger cast pile in the foundation. An updated building weight

will be calculated once new member sizes are determined. The concrete shear walls will be

designed per ACI 318-08 and the new layout will be compared to the existing shear wall

layout to determine if the modifications increased the shear capacity of the walls. Once the

gravity and lateral systems are analyzed, hand calculations will be performed to verify the

existing foundation is sufficient to withstand bearing, overturning, shear, and torsional

affects.

Page 14: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 14

Breadth Studies

Breadth Study Ι: Architectural Study

Due to the proposed alternate structural design, a study of how this modification will alter

the existing architecture of the building will be conducted. Converting the structural

system from a concrete masonry structure to a steel structure will change the architectural

features of the building, especially the exterior façade design. Research will be performed

on how a new architectural system could possibly create a more flexible layout and

aesthetical look compared to the existing design. With the use of steel along the exterior of

the structure, it could allow for the use of either a curtain wall system to allow more

daylight into the building, structural wall panels, or

non-load bearing masonry walls. Heat loss

calculations will be compared between the existing

and alternate facades, and the more efficient system

will be determined.

Breadth Study ΙΙ: Construction Management

The proposed alternate structural design is primarily made of steel, which creates two

construction management issues due to the change in material. The two issues are project

cost and construction schedule. Both issues will be addressed and compared for the

existing, as well as the proposed alternative building system. Based on the results,

conclusions will be made whether the proposed design is a feasible solution based on cost

and time efficiency.

Page 15: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 15

Tasks and Tools

I. Structural Depth A. Steel Framing

1. Task 1: Determine loads applied to the steel members a. Determine DL and LL in accordance to ASCE7-05 b. Apply loads to each level and determine distribution to each

column using tributary areas c. Perform load take down on all columns

2. Task 2: Build model in RAM to design steel members a. Place column grid into RAM model for gravity analysis b. Add columns for proposed redesign c. Input loads d. Determine steel member sizes

3. Task 3: Perform hand calculations on steel members a. Spot check select members b. Verify new floor system is adequately designed c. Verify hand calculations with computer results

B. Lateral System 1. Task 4: Determine lateral loads applied to the lateral force resisting

system a. Recalculate overall building weight b. Verify wind loads using ASCE 7-05 c. Recalculate seismic forces with new building weights

2. Task 5: Perform Lateral Analysis a. Perform hand calculations to analyze concrete shear walls b. Modify existing ETABS model if necessary c. Create ETABS model for proposed lateral system d. Compare results to determine if modifications provided

sufficient shear resistance C. Foundation

1. Task 6: Verify existing foundation can carry all loads due to proposed

design a. Hand calculate loads applied to foundation due to shear and

torsion b. Determine if overturning moment creates uplift

Page 16: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 16

II. Breadth Study Ι: Architectural Study A. Task 7: Research existing architecture

1. Compare architecture of surrounding buildings

2. Determine if new structural system has impact on building layout

3. Research impact of new facades

B. Task 8: Implement façade change

1. Review existing concrete masonry facade

2. Show proposed facade

C. Task 9: Perform heat loss comparison

1. Calculate heat loss of existing concrete masonry system

2. Calculate heat loss of proposed façade system

3. Conclude on which system if more efficient and aesthetically

appealing

III. Breadth Study ΙΙ: Construction Management D. Task 10: Determine cost and schedule of existing structural system

1. If possible, find actual cost data or scheduling information from GC

2. Determine any cost data not in RS Means

3. Create mock schedule of construction implementing the existing

structural system

E. Task 11: Determine cost and schedule of proposed structural system

1. Determine actual cost data for steel erection and scheduling

information

2. Determine labor and material costs from RS Means

3. Create mock schedule of construction implementing the proposed

structural system

F. Task 12: Compare Existing vs. Proposed Systems

1. Compare cost information of the two lateral systems

2. Compare schedules and total time of construction

3. Conclude which system is a more feasible solution with respect to

constructability

IV. Presentation

G. Task 13: Prepare final presentation

1. 3-slide PowerPoint presentation

2. Final Report

3. Update CPEP web-site

Page 17: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 17

SEN

IOR

TH

ESIS

FIN

AL

PR

OP

OSA

L

12/1

0/20

10

10-J

an-1

017

-Jan

-10

24-J

an-1

031

-Jan

-10

7-Fe

b-1

014

-Fe

b-1

021

-Fe

b-1

028

-Fe

b-1

07-

Mar

-10

14-M

ar-1

021

-Mar

-10

28-M

ar-1

04-

Ap

r-10

11-A

pr-

1018

-Ap

r-10

25-A

pr-

10

De

term

ine

Lo

ad

s

Bu

ild

RA

M M

od

el

Mil

est

on

e:

Mil

est

on

e:

Mil

est

on

e:

Mil

est

on

e:

An

alys

is 4

: Fin

al P

rese

nta

tio

n

An

alys

is 3

: Co

nst

ruct

ion

Man

age

me

nt

An

alys

is 2

: Arc

hit

ect

ura

l Stu

dy

An

alys

is 1

: Str

uct

ura

l Re

de

sign

Pre

pa

re f

or

Pre

sen

tati

on

Final Reports Due Thursday, April 7th 9:00am

Faculty Jury Presenation

Senior Banquet Dinner Friday, April 29th

Re

vise

fo

r P

rese

nta

tio

n

Re

vise

fo

r P

rese

nta

tio

n

Pre

sen

tati

on

Re

vise

fo

r P

rese

nta

tio

n

Cam

bri

a Su

ites

Ho

tel

Ad

am K

aczm

are

k

STR

UC

TUR

AL

Pro

po

sed

Th

esi

s Se

me

ste

r Sc

he

du

le

Jan

uar

y 20

11-A

pri

l 201

1

Dr.

Han

agan

Mar

ch 2

8th

201

0: C

ON

TEN

T C

OM

PLE

TE A

ND

REA

DY

FOR

FO

RM

ATT

ING

CO

MP

LETE

LA

TER

AL

AN

ALY

SIS

Spring Break 2011

Sum

ma

rize

In

form

ati

on

to

Da

te

Re

sea

rch

Arc

hit

ect

ure

Po

we

rpo

int

Jan

uar

y 10

th 2

010:

DET

ERM

INE

LOA

DS

Feb

ruar

y 14

th 2

010:

Mar

ch 7

th 2

010:

CO

MP

LETE

BR

EAD

TH C

OM

PA

RIS

ON

S

De

term

ine

Co

st/S

che

du

le o

f P

rop

ose

d S

yste

m

De

term

ine

Co

st/S

che

du

le o

f Ex

isti

ng

Syst

em

Co

mp

ari

son

of

Exis

tin

g vs

. Pro

po

sed

Sys

tem

s

Pe

rfo

rm H

an

d C

alc

ula

tio

ns

De

term

ind

La

tera

l Lo

ad

s

Pe

rfo

rm L

ate

ral

An

aly

sis

Ve

rify

Exi

stin

g Fo

un

da

tio

n

Pe

rfo

rm H

ea

t Lo

ss C

om

pa

riso

n

Imp

lem

en

t Fa

çad

e C

ha

nge

Timeline

Page 18: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 18

Appendix A: Building Layout

Foundation Plan

Plaza Level Framing Plan

Page 19: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 19

Hotel Level Framing Plan

Second Level Framing Plan

Page 20: Adam Kaczmarek | Structural Cambria Suites Hotel ... · Center Avenue in Pittsburgh, Pennsylvania. This luxury hotel is built adjacent to the new CONSOL Energy Center, home to the

Adam Kaczmarek | Structural Cambria Suites Hotel | Pittsburgh, PA

Professor Linda Hanagan The Pennsylvania State University Thesis Proposal December 10, 2010

Page | 20

Third thru Seventh Level Framing

Roof Framing Plan

High Roof Framing Plan