Adam Airbase Package 2 Facts Project Description Construction of parallel taxiway, apron, substation, airfield lighting, sunshade for typhoon City/Country Client Ministry of Defence, Muscat Contract Value € 52,08 Mio. Construction Period 11/2014 - 05/2016 (18 Months) .

Upload: others

Post on 16-Feb-2021

12 views

Category:

Documents


0 download

TRANSCRIPT

  • Adam Airbase Package 2

    Facts Project DescriptionConstruction of parallel taxiway, apron, substation, airfield lighting, sunshade for typhoon

    City/Country

    Client

    Ministry of Defence, Muscat

    Contract Value

    € 52,08 Mio.

    Construction Period

    11/2014 - 05/2016 (18 Months)

    .