ad-qaqc

4
ASHOK DUBEY Cell +91 987111 6812 E-Mail: [email protected] Looking for career enrichment opportunities in MEP Project Management Quality assurance-Quality Control Management with a frontline organization of repute. CAREER SUMMARY A Mechanical Engineer with 16 Years of Extensive experience in HVAC System Design - Engineering, Commissioning, Quality Assurance, Quality Control, TAB of system and Techno-commercial aspects. Deft in swiftly ramping projects with cross functional skills. Experience on Mega Projects, worked with persons of different Cultural and Educational background. Possess excellent interpersonal skill with a Flexible & detail oriented attitude. I have obtained Internal Auditor Certification on QMS ISO 9001:2008 from TUV India and completed MBA from Sikkim Manipal - Project Management. Experience of Mega Projects like Delhi Airport Metro Line, Burj Tower, Ras Laffan CCWP.. CORE COMPETENCIES Quality Assurance & Quality Control - Preparation of Project Quality Plan -PQP, Inspection & Test Plan - ITP for the project inline to the contract specification. - Preparation of specific Work Procedure/Method Statement & supporting check list for MEP activity. Implementation of the same at project. - Carrying out Factory Acceptance test (FAT) for Equipments and Major items prior to despatch, Inspection for Incoming material as per the approved ITP . - Inspection of MEP works & Installation. Co-ordination with consultant/authority for final approval. - Preparation of Functional test procedure for MEP system; Co- ordination for PAT/FAT and its documentation. - As-Built drawing recheck, Punch list generation, Preparation & compilation of Project Dossier. - Root Cause Analysis and closure of NCR/SOR . - Preparation of Operation & Maintenance Manual for MEP system. - Co-ordination for Operational Training to end users and Ensure successful hand over of project to end users. - Carry out Vendor and Contractor evaluation. Managing and approving 3rd TPIs and its inspectors . CV OF ASHOK DUBEY 1

Upload: ashok-dubey

Post on 17-Jan-2017

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AD-QAQC

ASHOK DUBEY Cell +91 987111 6812 E-Mail: [email protected]

Looking for career enrichment opportunities in MEP Project Management Quality assurance-Quality Control Management with a frontline organization of repute.

CAREER SUMMARY

A Mechanical Engineer with 16 Years of Extensive experience in HVAC System Design - Engineering, Commissioning, Quality Assurance, Quality Control, TAB of system and Techno-commercial aspects. Deft in swiftly ramping projects with cross functional skills. Experience on Mega Projects, worked with persons of different Cultural and Educational background. Possess excellent interpersonal skill with a Flexible & detail oriented attitude. I have obtained Internal Auditor Certification on QMS ISO 9001:2008 from TUV India and completed MBA from Sikkim Manipal - Project Management. Experience of Mega Projects like Delhi Airport Metro Line, Burj Tower, Ras Laffan CCWP..

CORE COMPETENCIES

Quality Assurance & Quality Control

- Preparation of Project Quality Plan -PQP, Inspection & Test Plan -ITP for the project inline to the contract specification.

- Preparation of specific Work Procedure/Method Statement & supporting check list for MEP activity. Implementation of the same at project.

- Carrying out Factory Acceptance test (FAT) for Equipments and Major items prior to despatch, Inspection for Incoming material as per the approved ITP .

- Inspection of MEP works & Installation. Co-ordination with consultant/authority for final approval.

- Preparation of Functional test procedure for MEP system; Co-ordination for PAT/FAT and its documentation.

- As-Built drawing recheck, Punch list generation, Preparation & compilation of Project Dossier.

- Root Cause Analysis and closure of NCR/SOR . - Preparation of Operation & Maintenance Manual for MEP system.- Co-ordination for Operational Training to end users and Ensure successful

hand over of project to end users. - Carry out Vendor and Contractor evaluation. Managing and approving 3rd TPIs

and its inspectors.- Maintaining Records for all inspection and quality control documents as per ISO

norms.

Techno-commercial/ Contract Management

- Interpretation of contractual obligations & rights. Evaluation of Technical / Financial problems.

- Progressive Billing instruction to Finance team as per contracts, ensuring steady cash flow for the project. Final documentation for close out of Project as per contracts.

ORGANIZATIONAL DETAILSIsolux corsan

CV OF ASHOK DUBEY 1

Page 2: AD-QAQC

Since OCT 2014 - till Date Manager - QA/QC

Running Project and Job Profile 1. Delhi Metro Rail Project CE 10 & 11 Lot 4 Line 8Client: DMRC Rs 190 Crore Project

Air conditioning & Tunnel ventilation work with SCADA BMS system of 5 underground stations from IGD Terminal 1 to Janakpuri. My role & responsibilities

FAT of Major Equipments like Chiller, Pump, AHU. Inspection of Inward materials as per approved Datasheet.

Company MR for all Quality activity & External Audits. Co-ordination with DMRC Personnel for inspections, audit & approval. Preparation of Method Statement for work. Preparation of Quality Matrix and Implementation to ensure work Quality. Follow-ups & Closure of Non Conformance Report. Preparation of O&M Manual for VAC, TVS & BMS System.

Blue Star Limited, Infrastructure Projects Division - Gurgaon Since May 2010 - till Sept. 14 Manager - QA/QC

Major Projects Handled and Job Profile 1. Delhi Airport Metro Express Line ProjectClient: Reliance Infrastructure Rs 250 Crore Project

Fastest Metro project of the country, Complete BEMS work is carried out by Blue Star including Track Side work & SMS (Automation). My role & responsibilities

Preparation of Quality Matrix and Implementation to ensure work Quality. Follow-ups & Closure of Non Conformance Report. Preparation of O&M Manual for HVAC, Plumbing & Fire Fighting System. Operational Training to the end users in collaboration with equipment manufacturer. Testing & Commissioning of E C S, Plumbing & Fire Fighting System.

ACPD Projects : Mall of India- Noida, DLF-Capital Green Project , Bosch, JCB ..

- Preparation of detail method statement, field checklist day to day coordination with L&T TURNER engineering/QC team

- Work Inspection Request - WIR co-ordination for inspection & Closure with " First Time Right Job Approach"

- Review of Vendor’s technical submittals and its approval. - Periodic Audit of Projects as per calender & circulation of Reports to Management- MIS- Formulation of strategies, monitoring & Tracking of Engineering Process. - NCR Closure & field training

Dodsal Engineering & Construction Pte Ltd, Qatar October 2007- Oct 2009: Sr. Engineer –HVACProject: Ras Laffan Common Cooling Sea water Project -IIClient: QATAR PETROLEUM US $ 1.5 Billion Project

Common Cooling Seawater project comprises set of Sea water pumps located in the pump house near intake bay which supplies cooling water to the industries as once through cooling system. These pumps are powered through 33KV switchgear system and controlled with VSDS stations. DODSAL carried out the entire work on EPIC basis. HVAC was provided for all switchgear buildings, VSDS station, Local loop control building, Main Control building, & operation building. My role & responsibilities

Responsible for HVAC engineering deliverables, Monitoring and control of HVAC Design Process

Package Incharge for HVAC works Responsible for Timely & Quality work completion. Co-ordination with Client on various technical issues & approvals of Drawing &

Documents.

EVH, ETA Voltas Hitachi–JV Dubai - UAECV OF ASHOK DUBEY 2

Page 3: AD-QAQC

March 2006 to September 2007: Project Engineer -HVAC

Project: Burj Tower DubaiClient: Emmar / SAMSUNG Construction MEP – QA/QC SECTION

Preparation of work Procedure, Inspection & Test Plan, Check list & its approval. Inspection of all inward materials inline to approved submittal & TC. Day to day co-ordination with Consultant & Samsung for Work & Material Inspection. NCR root cause analysis, field training & NCR closure.

VOLTAS LIMITED – AC&RBG FEB 2003 to Jan 2006 Engineer HVAC - ProjectsIndia’s leading company in HVAC sector, Worked at Kolkata Branch. Responsibilities to control and monitor complete chain of Project Management. Major activities includes

Defining Milestone of Project & Preparation of Project Bar Chart. Assigning subcontracts to vendors and close monitoring of their activity Meeting & co-ordination with Client and Consultants. Pro-rata billing instruction to maintain positive cash flow for the Project. Commissioning & Successful handing over of the plant to the end user’s satisfaction.

TRAC FUJICO AIR SYSTEM LIMITED 1996 to DEC 2002 Engineer - HVAC Started career with TRAC FUJICO, Chennai as Trainee Engineer. Major activities includes

HVAC load calculation, Engineering Documentation, Preparation of Technical Submittals, co-ordination with Client for approval Preparation of Material Takeoff list from approved HVAC Layout drawing co- ordination with Client representative & other agency for smooth run of the project

ACADEMIC OVERVIEW2011 TO 2013 : MBA in Project Management Sikkim Manipal University2004: Degree in Mechanical EngineeringInstitution of Mechanical Engineers (I)1996: Diploma in Mechanical Engineering Institution of Mechanical Engineers (I)

Schooling at Jharkhand.

Conversant with Latest Heat Load Package Carrier HAP V 4.2,TRANE Psychrometric Chart, Working Knowledge of Auto CAD, Familiar with Industry Code & Standards like ASHRAE, SMACNA, DW 144, NFPA 90A.

PERSONAL DETAILS

Date of Birth : 18th December, 1972Nationality : IndianPassport No : MO 177137Marital Status : MarriedLanguages : English, HindiHobbies : Books & Music

REFERENCES & DOCUMENTS AVAILABLE ON REQUEST

CV OF ASHOK DUBEY 3