Page 1: Acumen Fuse Feb2010

1

An Introduction toAcumen Fuse™

Dr Dan Patterson PMP, CEO Acumen

February 2010

Page 2: Acumen Fuse Feb2010

Slide 2

Project analytics thought leader– Headquartered in Austin, TX– North America presence, global reseller network– Privately held, strong legacy within PPM space

Specialists in project analytics– Risk workshops: world leader– Project assessments, schedule analysis

Oracle OPN, MS Partner– Oracle accredited trainer

Project analytics tool: Acumen Fuse™

Acumen Introduction

Page 3: Acumen Fuse Feb2010

Slide 3

What is Acumen Fuse™?Metric analysis & visualization toolCost, schedule, quality, risk, performance & EVPatent pending ribbons for visualization Solutions for resolution– Improves scheduling maturity– Provides insight & confidence– Provides control during execution

Page 4: Acumen Fuse Feb2010

Slide 5

Analysis RibbonsMeans of flattening data, retaining sequenceGrouping activities into higher level entitiesEnables metric analysis beyond project levelGreat visual aid for simplifying data

Project Ribbon

Activity Ribbon(e.g. Critical/

non critical)

Path Ribbon

Page 5: Acumen Fuse Feb2010

Slide 6

Path RibbonsDetermines all paths between any two activities– Gives insight into upcoming complexity, cost, effort– Powerful simplification technique – Great for figuring out which paths to accelerate

Page 6: Acumen Fuse Feb2010

Slide 7

Metric Analyzers

Ribbon Analysis

Phase Analysis

Ribbon Analyzer: Analysis by ribbon Phase Analyzer: Analysis by phaseIntersection Analyzer: Pinpointed analysis

Page 7: Acumen Fuse Feb2010

Slide 8

Metric ScorecardsActivity-based reportCombined metric scores into total scoreCustomizable weightingsAuto generate Scorecards from Metric Libraries

Page 8: Acumen Fuse Feb2010

Slide 9

Ribbon View

Page 9: Acumen Fuse Feb2010

Slide 10

Metric Libraries

Over 100 metricsCustomizable tripwiresPowerful metric editor

Page 10: Acumen Fuse Feb2010

Slide 11

DCMA 14 Point AssessmentSupported within Acumen Fuse™True compliance with “Total Task” definitionAdditional schedule metrics included– e.g. Logic density

Merge with other schedule, cost, risk metricsIncludes tripwire metricsFull support for UN/CEFACT XML Schema

Page 11: Acumen Fuse Feb2010

Slide 12

Types of AnalysisSnapshot: single project– Pinpoint specific hotspots by ribbon– Pinpoint periods of concern– Pinpoint driver activities

Comparison: program/portfolio– Compare performance– Project selection decision support

Trending: changes over time– Performance trending– Timephased comparison

Page 12: Acumen Fuse Feb2010

Slide 13

Product Demos14 Point Schedule AssessmentNetwork Path AnalysisRisk AnalysisPerformance AnalysisPortfolio AnalysisEarned Value Analysis

Page 13: Acumen Fuse Feb2010

Slide 14

Case StudyEPC projectThree project locations– Houston – engineering, project management– Calgary - engineering– New Orleans - fabrication

Three competing Engineering biddersObjectives– Select winning bid– Develop achievable detailed schedule– Execute successfully

Page 14: Acumen Fuse Feb2010

Slide 15

Case StudyBid Phase

Opened up EPC contracts for bidExpected three bidders to replyTarget duration of approx. 3 yearsBidder A came back first– Evaluated planned duration– Evaluated quality of schedule

Results– 807 days duration (way less than 3 years), questionable scope– Poor quality schedule: logic, hard constraints, high durations– Major issues early on in the schedule– Calgary location generally was of poor schedule quality

Page 15: Acumen Fuse Feb2010

Slide 16

Bid ComparisonCompared Bidder A, B, C & reviewed:– Total duration– Cost– Quality of schedule

ResultsBidder Schedule Duration Cost Quality Selected

Bidder A MS Project 807 days $33MM Very Poor ✗Bidder B Primavera P6 1216 days $49MM Reasonable ✗Bidder C MS Project 1269 days $36MM Sound ✓

Page 16: Acumen Fuse Feb2010

Slide 17

Detailed Schedule DevelopmentScope further defined, schedule developedRisk Assessment workshop– Validate risk inputs & review outputs/exposure

Create sound Risk-adjusted baseline for execution

ResultsEngineering has highest # of aggressive activitiesAggressive activities fall early onAverage risk range peaks in 2011 with constructionConstruction carrying major schedule risk drivers

Page 17: Acumen Fuse Feb2010

Slide 18

ExecutionTrack schedule performanceTrack cost spendTrack by location

More non-critical work completed than critical, New Orleans – behind scheduleCalgary – significant cost overrun, cost overrun in early 2009

Page 18: Acumen Fuse Feb2010

Slide 19

Portfolio AnalysisCompare projects within a portfolio/programCombine metrics into a single scorecard

Page 19: Acumen Fuse Feb2010

Slide 20

Other Example Use CasesSchedule Critique– Review quality of planning

Ongoing Project Surveillance– Review monthly performance, changes to plan– IBR reviews, DCMA compliance

Portfolio Analysis– Compare performance of projects within a portfolio– Determine overall strategic value of projects

Contractor Performance Tracking– Track against agreed upon baseline– Early warning indicators for project delay/overruns

Risk Exposure Reduction– Identify & eliminate risk hot spots through targeted risk response

Page 20: Acumen Fuse Feb2010

Slide 21

Platform Support

Sources can be schedule, cost, risk, EV, other…Workbooks are platform agnosticUnlimited # of data sources– MS Project 2003/2007– Oracle Primavera P6– Oracle Pertmaster/Risk Analysis– Deltek Open Plan– Deltek Cobra– MS Excel– XML/UNCEFACT

Merging of data sources – Integrate cost & schedule

Page 21: Acumen Fuse Feb2010

Slide 22

Summary & BenefitsOne-stop shop for project analysisAn addition not a replacement for existing scheduling/risk tool investmentsValue for both owners & contractorsMulti platform supportOver 100 metricsHighly customizableIncludes web-based training

Page 22: Acumen Fuse Feb2010

Slide 23

Acumen Clients & References

Page 23: Acumen Fuse Feb2010

Slide 24

Find Out More!

Sign up for trial [email protected]

Receive notification of updates through Twitter@projectacumen

Webwww.projectacumen.com