8/14/2019 Activity Registry
1/4
Engagement Activity Registry
This is a registry aim to document all activities carried out on client site.
History:
2008-12-18 Entry start from
Complexity
Critical 40
High 30 Low Exposure (20 -60)
Medium 20 Medium Exposure (70 - 150)
Low 10 High Exposure (160 - 320)
2 3 5 7 8
Low Medium High
Likelihood
Legend : Risk Exposure
-
8/14/2019 Activity Registry
2/4
In_work Activities
Printed 02/10/2009 03:15:01 Page 2 of 4
Ref. No. Stakeholder Description/Deliverable Tasks/Comments Complexity Due date / status
IN-WORKACTIVITIES
5 Duncan Medium ON-GOING
6 Steve/Duncan High ON-GOING
7 Duncan Low ON-GOING
8 Kurt Continue to support Kurt on ad-hoc basis Low ON-GOING
Deliverable:Creating the front-end concept for gCCF
2009-01-23: Received gCCF.zip file2009-01-27: Sent Duncan first concept with TiddlyWiki implementation
Deliverable:Revive BizTalk environment to operational and develop a POCintegration between SharePoint-BizTalk-SAP
Start date, effort & component:2009-01-27, 7 days, Revive BizTalk environment from John Viner to anoperational stage2009-02-04, 1 day, Install and configure SharePoint on BizTalkenvironment2009-02-05, 2 days, Integrate SharePoint with BizTalk, develop aPOC.2009-02-09, 3 days, Install or simulate a SAP-like environment2009-02-12, 2 days, Integrate SharePoint-BizTalk-SAP and develop a
POC
2009-02-04: BizTalk environment is now operational with some error on Enterprise SingleSign-One application2009-02-05: The biggest challenge at this point is trying to come up with a SAP-likeenvironment to establish connection to BizTalk
Follow up call and interview for webMethods Administrator role at Western Power
Waiting for call from Sharon on Friday morning
-
8/14/2019 Activity Registry
3/4
-
8/14/2019 Activity Registry
4/4
Completed Activities
Printed 02/10/2009 03:15:02 Page 4 of 4
Ref. No. Stakeholder Description/Deliverable Tasks/Comments Complexity Due date / status
COMPLETED
ACTIVITIES
2 Kurt Medium COMPLETED
3 Conor High COMPLETED
4 Kurt Subversion and Process Runtime test COMPLETED
Deliverables: Developer's Guide, design pattern, cookbook Template provided,Next, working backward to align with John Viner's ESI implementation
New generation gESA Product Description - simplified design andimplementation of gESI-like
Deliverables:1. Logical model, before Christmas2. Conor to review the logical model3. Physical design and implementation, follow agil developmentapproach
2008-12-19: First draft out for discussion2008-12-23: Finalise logical model
2009-01-06: Sent Conor the detailed design