    Engagement Activity Registry

    This is a registry aim to document all activities carried out on client site.

    History:

    2008-12-18 Entry start from

    Complexity

    Critical 40

    High 30 Low Exposure (20 -60)

    Medium 20 Medium Exposure (70 - 150)

    Low 10 High Exposure (160 - 320)

    2 3 5 7 8

    Low Medium High

    Likelihood

    Legend : Risk Exposure

  • 8/14/2019 Activity Registry

    2/4

    In_work Activities

    Printed 02/10/2009 03:15:01 Page 2 of 4

    Ref. No. Stakeholder Description/Deliverable Tasks/Comments Complexity Due date / status

    IN-WORKACTIVITIES

    5 Duncan Medium ON-GOING

    6 Steve/Duncan High ON-GOING

    7 Duncan Low ON-GOING

    8 Kurt Continue to support Kurt on ad-hoc basis Low ON-GOING

    Deliverable:Creating the front-end concept for gCCF

    2009-01-23: Received gCCF.zip file2009-01-27: Sent Duncan first concept with TiddlyWiki implementation

    Deliverable:Revive BizTalk environment to operational and develop a POCintegration between SharePoint-BizTalk-SAP

    Start date, effort & component:2009-01-27, 7 days, Revive BizTalk environment from John Viner to anoperational stage2009-02-04, 1 day, Install and configure SharePoint on BizTalkenvironment2009-02-05, 2 days, Integrate SharePoint with BizTalk, develop aPOC.2009-02-09, 3 days, Install or simulate a SAP-like environment2009-02-12, 2 days, Integrate SharePoint-BizTalk-SAP and develop a

    POC

    2009-02-04: BizTalk environment is now operational with some error on Enterprise SingleSign-One application2009-02-05: The biggest challenge at this point is trying to come up with a SAP-likeenvironment to establish connection to BizTalk

    Follow up call and interview for webMethods Administrator role at Western Power

    Waiting for call from Sharon on Friday morning

  • 8/14/2019 Activity Registry

    3/4

  • 8/14/2019 Activity Registry

    4/4

    Completed Activities

    Printed 02/10/2009 03:15:02 Page 4 of 4

    Ref. No. Stakeholder Description/Deliverable Tasks/Comments Complexity Due date / status

    COMPLETED

    ACTIVITIES

    2 Kurt Medium COMPLETED

    3 Conor High COMPLETED

    4 Kurt Subversion and Process Runtime test COMPLETED

    Deliverables: Developer's Guide, design pattern, cookbook Template provided,Next, working backward to align with John Viner's ESI implementation

    New generation gESA Product Description - simplified design andimplementation of gESI-like

    Deliverables:1. Logical model, before Christmas2. Conor to review the logical model3. Physical design and implementation, follow agil developmentapproach

    2008-12-19: First draft out for discussion2008-12-23: Finalise logical model

    2009-01-06: Sent Conor the detailed design