active traffic management: design & operations …...active traffic management: design &...

23
ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES ON THE ILLINOIS TOLLWAY Jim Powell, PE, PTOE CDM Smith Inc. [email protected] IBTTA MAINTENANCE & ROADWAY OPERATIONS WORKSHOP Harrisburg, PA June 25, 2018 1

Upload: others

Post on 18-Apr-2020

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

ACTIVE TRAFFIC MANAGEMENT:DESIGN & OPERATIONS CHALLENGES

ON THE ILLINOIS TOLLWAYJim Powell, PE, PTOE

CDM Smith Inc.

[email protected]

IBTTA MAINTENANCE &ROADWAY OPERATIONS WORKSHOP

Harrisburg, PAJune 25, 2018

1

Page 2: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

PRESENTATION OVERVIEW:

Concept & General Approach Design

• Smart Corridor Elements• Power, Communications & Site Features

Operations• Lane-Use Control (LUC) displays• Response Plans & Scenarios

Future Implementation

2

Page 3: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

3

INITIAL CORRIDOR: I-90

62 MILES TOTAL – 16 WITH ATM INITIALLY

“Flex Lane”

Gantry Lane Control Signs + DMS

Page 4: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

4

• Desire to “do it right” - previously had to rebuild median wall (new structure foundations)

• Already have electronic toll collection & fiber everywhere

• Talked to FHWA, visited Washington State DOT and Virginia DOT

• Lessons learned

½ mile gantry spacing still good & frequent DMS

2 Gantry advance messaging best - any more & drivers ignore

CONCEPT: SMARTROAD FOR THE FUTURE

Page 5: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

5

• Lessons learned (cont.)

Need public & media outreach – variable speed limit fared badly in the press

(Instructional video)

Yellow arrow displays:

GENERAL APPROACH

Page 6: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

6

• Inside shoulder – “Flex Lane” for Pace transit

• ATM gantry foundations built where ATM expected in future: ½ mile spacing for 22 miles

• Increased shoulder DMS - every other gantry

• Intermediate power & communications buildings every 2 miles

DESIGN FOR SMARTROAD

Page 7: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

7

DESIGN: POWER, COM. & SITE FEATURES

• CCTV cameras everywhere

• Power & backbone communications with redundancy

• Median wall fiber & conduit with lateral conduit

• Safe parking near buildings & devices for maintenance

Page 8: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

8

I-90 SMARTROAD – DISPLAY SUMMARY

plus large DMS ~every 5 mi.

Every other gantry

Every other gantry

Shoulder DMS

Page 9: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

9

• ATM gantries: 29

• ATM lane control signs: 354

• CCTV: +35 cameras

• DMS: +8

• Detector stations: +75

I-90 SMARTROAD – ATM SUMMARY

Page 10: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

10

OPERATIONS: RESPONSE PLANS• Concept of Operations looked at nine common scenarios

Clear presentation of response plans Consistent workflow Ability of operators to review & activate

Clear RulesConsistent Messaging

Page 11: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

11

Page 12: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

12

Page 13: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

13

Page 14: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

14

I-90 ATM BEFORE/AFTER STUDY

Page 15: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

15

ATM IN ACTION

Page 16: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

16

ATM IN ACTION

Page 17: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

17

ATM IN ACTION

Page 18: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

18

ATM IN ACTION

Page 19: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

19

DESIGN LESSONS LEARNED

• ATM gantry placement

Must be located before locating static sign gantries

Must be placed in conjunction with striping & lane geometry

Avoid bridges

Page 20: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

20

OPERATIONS LESSONS - “TO BE LEARNED”

• As more incident experience gained:

Stored response plans must be updated, e.g., display lane use instructions further upstream?

More detailed evaluation of ATM performance

Page 21: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

21

FUTURE IMPLEMENTATION

• I-90 a warmup for I-294

PotentialATM Lite on parts of I-294

I-90

I-294

ATM LITE

Page 22: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

Next MUTCD not likely until ~2020!

Reach out to NCUTCD or joinwww.ncutcd.org

Monitor the FHWA website (for NPA)mutcd.fhwa.dot.gov/

Monitor your state DOT web site

22

FHWA MUTCD – THE “LAW”

Page 23: ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS …...ACTIVE TRAFFIC MANAGEMENT: DESIGN & OPERATIONS CHALLENGES. ON THE ILLINOIS TOLLWAY. Jim Powell, PE, PTOE CDM Smith Inc. powelljl@cdmsmith.com

Thanks !