AGREEMENT NUMBER AGENCY PROJECT TITLE START DATE END DATE GCB 3001 Alaska Department of Transportation & Public Facilities, Statewide Design & Engineering Evaluation of W-Beam Guardrail Terminal Post in Sleeve 06/26/2018 12/31/2019 GCB 2092 Attorney General’s Office Perform geotechnical engineering work on the SR530 Oso landslide. 7/6/2015 project completion GCB 2376 Bainbridge Island Metropolitan Park & Recreation District Bainbridge Island Trail Agreement 4/19/2016 3/31/2036 GCB 1333 Benton County Government Agreement for Aid 9/27/2012 9/27/2017 GCB 2139 Benton-Franklin Council of Governments Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 10/2/2015 perpetual GCB 2550 Benton-Franklin Council of Governments Benton-Franklin TMA, MPO, and RTPO 07/01/2017 06/30/2019 GCA 3602 Central Puget Sound Regional Transit Authority Design, Implementation, Operation and Maintenance Fare Coordination System 04/29/2003 12/31/2016 GCB 2382 Central Puget Sound Regional Transit Authority SR 520 Grand Opening 3/31/2016 4/2/2016 GCA 2941 Central Puget Sound Regional Transit Authority (Sound Transit) Downtown Redmond Link Extension 01/01/2017 12/31/2019 T 5228 Central Washington University I-90 Snoqualmie Pass East Low-Mobility Wildlife Monitoring 07/01/2016 12/31/2019 GCA 5228 Central Washington University Master Agreement 7/5/2007 6/30/2023 Page 1 of 42

Upload: others

Post on 24-Dec-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

AGREEMENT NUMBER

AGENCY PROJECT TITLE START DATE END DATE

GCB 3001 Alaska Department of Transportation & Public Facilities, Statewide Design & Engineering Evaluation of W-Beam Guardrail Terminal Post in Sleeve 06/26/2018 12/31/2019

GCB 2092 Attorney General’s Office Perform geotechnical engineering work on the SR530 Oso landslide. 7/6/2015 project completion

GCB 2376 Bainbridge Island Metropolitan Park & Recreation District Bainbridge Island Trail Agreement 4/19/2016 3/31/2036

GCB 1333 Benton County Government Agreement for Aid 9/27/2012 9/27/2017

GCB 2139 Benton-Franklin Council of Governments Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 10/2/2015 perpetual

GCB 2550 Benton-Franklin Council of Governments Benton-Franklin TMA, MPO, and RTPO 07/01/2017 06/30/2019

GCA 3602 Central Puget Sound Regional Transit Authority Design, Implementation, Operation and Maintenance Fare Coordination System 04/29/2003 12/31/2016

GCB 2382 Central Puget Sound Regional Transit Authority SR 520 Grand Opening 3/31/2016 4/2/2016

GCA 2941 Central Puget Sound Regional Transit Authority (Sound Transit) Downtown Redmond Link Extension 01/01/2017 12/31/2019

T 5228 Central Washington University I-90 Snoqualmie Pass East Low-Mobility Wildlife Monitoring 07/01/2016 12/31/2019

GCA 5228 Central Washington University Master Agreement 7/5/2007 6/30/2023

Page 1 of 42

Page 2: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 3149 Chehalis Tribe I-5 Northbound Ramp / 93rd Avenue Intersection Improvements In Process

GCB 1181 Chelan County Public Works US 2 / US 97A West of Wenatchee Paving and I/S Improvements 4/17/2012 project completion

GCB 1520 Chelan County Public Works Burch Mountain Road Maintenance 6/4/2013 6/4/2033

GCB 1819 Chelan County Public Works Agreement for Equipment Rental 6/13/2014 12/31/2015

GCB 1360 Chelan Douglas Transportation Council Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 7/11/2016 perpetual

GCB 3052 Chelan Douglas Transportation Council US 2 Upper Wenatchee Valley Transportation Study 08/01/2018 06/30/2019

GCB 1975 Chelan-Douglas Transportation Council Governance Agreement between WSDOT, Chelan County, Douglas County and several other governmental entities 2/19/2015 2/18/2025

GCB 2355 City of Aberdeen SR 520 Bridge Replacement and HOV Program 10/18/2016 03/31/2017

GMB 1032 -Perpetual City of Arlington SR9 / SR 531 Roundabout Maintenance 9/18/2013 Perpetual

GCB 2572 City of Auburn SR 164 / SR 18 to 17th St SE Paving & ADA Compliance 9/14/2017 project completion

GCB 2892 City of Auburn SR 18, WB West Valley Highway So. Vic. to SE St. Paving & ADA Compliance 01/23/2018 12/31/2019

GCB 3246 City of Auburn SR 164th North Sidewalk Improvements In Process

Page 2 of 42

Page 3: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2504 City of Auburn Public Works SR 164 - Muckleshoot to Dogwood 2/16/2017 project completion

GCB 1911 City of Bainbridge Island SR 305 Shoulder Widening 8/14/2014 project completion

GCB 2374 City of Bainbridge Island SR305 Sound to Olympics Trail 5/13/2016 project completion

GCB 3059 City of Bainbridge Island Non-Motorized Improvement and Water Main Replacement Project 08/08/2018 08/14/2020

GCB 3162 City of Battle Ground Battle Ground Land Use Management Plan and Transportation System Plan Update 04/04/2019 06/30/2019

GCA 4998 -Perpetual City of Bellevue Kelsey Creek Wetland Mitigation 11/22/2006 N/A

GCB 2345 City of Bellevue SR 520 Wayfinding Signs In Process

GCB 2477 City of Bellevue I-405, Renton to Bellevue Express Toll Lanes 09/30/2019 06/30/2024

GCB 2505 City of Bellevue I-405, Renton to Bellevue Express Toll Lanes Program 09/30/2019 06/30/2024

GCB 2817 City of Bellevue I-405, Renton to Bellevue Widening and Express Toll Lanes 06/27/2018 12/31/2020

GCB 3053 City of Bellevue 2018 Overlay Program (Lakemont Blvd) 08/07/2018 project completion

GCB 1792 City of Bellingham Vactor Waste Facility Use In Process

Page 3 of 42

Page 4: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2907 City of Bingen Grade Separation Agreement 06/01/2018 project completion

GCB 2509 City of Bonney Lake SR410 / 204th In Process

GCB 3175 City of Bonney Lake SR 410 / Traffic Ave Interchange Improvements 04/30/2019 05/23/2022

GCB 1881 City of Bothell North Creek Trail Improvements 5/21/2014 project completion

GCB 3026 City of Bothell SR 522 Stage 3 Improvements 07/30/2018 project completion

GCA 6458 City of Bremerton SR 303/Manette Bridge Bremerton Vicinity - Bridge Replacement 2/23/2010 project completion

GCB 2246 City of Bremerton SR 303 ADA Ramps 10/29/2015 6/30/2017

GCB 2573 City of Bremerton SR 303/SR 304 to WM E Sutton Rd NE - Paving 07/11/2017 12/31/2017

GCB 2931 City of Bremerton SR 304 E of Jct to SR 310 to SR 303 Paving and ADA Compliance 03/20/2018 12/30/2019

GCB 2932 City of Bremerton SR 304 E of Jct to SR 310 to SR 303 Paving and ADA Compliance 03/20/2018 12/31/2019

GCB 2931 City of Bremerton-Public Works Engineering Department SR 304 E of Jct to SR 310 to SR 303 Paving and ADA Compliance 03/20/2018 12/30/2019

GCB 2379 City of Buckley SR410 / SR165 / Ryan Road / 112th Street E. Realignment Project Phase 2 3/29/2016 12/31/2017

Page 4 of 42

Page 5: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GMB 1035 City of Burlington Signal Maintenance In Process

GCB 2126 City of Castle Rock Exit 49 Pedestrian Improvements SR504 Dougherty Drive to 300’ SW of Salmon Creek Lane NE 06/05/2018 12/31/2023

GCB 1989 City of Centralia Regional Decant facility 6/30/2017 06/30/2045

GCB 2490 City of Chelan SR 150 No See-Um Road Intersection Improvements 11/23/2016 12/31/2018

GCB 3023 City of Cle Elum First Street and Peoh Avenue Intersection Improvements 09/01/2018 05/01/2019

GCB 3184 City of Cle Elum First Street Stormwater and Billings Avenue Intersection Improvements 05/20/2019 12/31/2019

GCB 2992 City of Colfax Engineering analysis of Colfax Bridges In Process

GCB 2961 City of Colville Main Street Pedestrian Actuated Crossings 03/14/2018 06/30/2019

GCB 3200 City of Connell 2019 Street Improvements 08/01/2019 12/31/2019

GCB 2350 City of Darrington Darrington 2016 Safety Improvements-Seeman Street In Process

GCB 2959 City of Des Moines Barnes Creek Fish Passage 04/25/2018 04/25/2023

GCB 1579 City of Duvall SR 203 Coe Clemons Creek - Chronic Environmental Deficiency 8/4/2014 project completion

Page 5 of 42

Page 6: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2529 City of Eatonville Center Street Signal Project In Process

GCB 1986 City of Edmonds 228th St Corridor Improvements and 76th Ave West Illumination 2/11/2015 project completion

GCB 2038 City of Enumclaw SR 410 Corridor Improvements 6/3/2015 project completion

GCB 2378 City of Federal Way Pacific Highway South HOV (Phase 5) 5/25/2016 project completion

GCB 3289 City of Federal Way South Dash Point Road Gap In Process

GCB 3289 City of Federal Way South Dash Point Road Gap In Process

GCB 2196 City of Ferndale I-5 NB Nooksack River Bridge to Blaine Paving 10/27/2015 project completion

GCB 1029 City of Fife I-5 Portland Avenue to Port of Tacoma Road - NB HOV 1/28/2013 project completion

GCB 1762 City of Fife I-5 Portland Avenue to Port of Tacoma Road - Northbound HOV 9/15/2014 6/30/2017

GCB 2930 City of Fife SR 99 Stormwater and Pedestrian Improvements In Process

GCB 2942 City of Fife Port of Tacoma Road Interchange In Process

GCB 3123 City of Fife North segment of SR 167 Completion Project 04/03/2019 06/30/2026

Page 6 of 42

Page 7: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 3141 City of Fife Tacoma to Puyallup Regional Trail Connection Route Analysis Study 05/20/2019 12/31/2019

GCB 3120 City of Hoquiam US 101 / 5th St to South H St - Paving and ADA Compliance 01/17/2019 12/31/2019

GCB 3156 City of Hoquiam US 101 / 5th St to South H St - Paving and ADA Compliance 04/08/2019 12/31/2020

GCB 3157 City of Hoquiam US 101 / 5th St to South H St - Paving and ADA Compliance 03/25/2019 12/31/2019

GMB 1014 -Perpetual City of Issaquah I- 90, Issaquah Highlands Parcel 2 Storm Outfall - City Project 10/25/2011 Perpetual

GCB 2015 City of Kenmore SR 522 Kenmore West 3/23/2015 project completion

GCB 2273 City of Kennewick US 12 ET AL Tri -Cities Vicinity Paving and ADA Compliance 1/25/2016 10/30/2016

GCB 1927 City of Kent Construction of trail In Process

GCB 2393 City of Kent 224th Bridge In Process

GCB 3093 City of Kent City of Kent Public Works Department for the SR 509 Completion Project Stage 1b 11/05/2019 12/31/2025

GCB 3093 City of Kent Public Works Department Interlocal Funding Agreement Between WSDOT and the City of Kent Public Works Department for the SR 509 Completion Project Stage 1b 11/05/2019 12/31/2025

GCB 1869 City of Kirkland SR 405 NE 124th Overlay In Process

Page 7 of 42

Page 8: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2348 City of Kirkland NE 124th ITS 3/29/2016 project completion

GCB 1928 City of Lacey Golf Club Road 10/27/2014 project completion

GCB 2885 City of Lacey I-5/SR 510 Interchange - Reconstruct Interchange 02/02/2018 10/31/2021

GCB 2940 City of Lacey I-5 SR 510 Interchange Reconstruct Interchange 06/04/2018 12/31/2021

GCB 2257 City of Lakewood S Tacoma Way SR 512 Roadway Improvements 11/17/2015 project completion

GCB 2263 City of Lakewood I5 Bridgeport Way Signal Improvement 9/22/2015 project completion

GCB 2998 City of Liberty Lake Harvard Road Bridge widening and I-90 ramp Improvements 09/12/2018 06/30/2019

GCB 1165 City of Longview Aerial Orthophotos 3/11/2014 project completion

GCB 2487 City of Mabton Safe Routes to School Improvements 10/28/2016 10/01/2017

GCB 2580 City of Marysville HAWK Signal Installation In Process

GCB 3054 City of Montesano Intersection Control Improvement at Main Street/US 12 Westbound Off-Ramp 08/02/2018 08/28/2020

GCB 3081 City of Moses Lake SR17/Stratford Road Traffic Study and Improvement Feasibility Analysis 10/10/2018 06/30/2019

Page 8 of 42

Page 9: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 3201 City of Mount Vernon SR 536 Skagit River to I-5 paving and ADA compliance 06/07/2019 12/31/2019

GMB 1967 -Perpetual City of Mount Vernon Beautification of I-5/Kincaid Interchange retaining wall 3/31/2015 Perpetual

GCB 2053 City of Moxee Morrier Lane Intersection In Process

GCB 2538 City of Moxee SR 24 / Morrier Lane Intersection and Improvements 04/24/2017 12/31/2018

GMB 1111 City of Mukilteo and Central Puget Sound Regional Transit Authority

Ownership, Operation and Maintenance Agreement for Stormwater Facilities Constructed as Part of the Mukilteo Multimodal Transportation Center Between City of Mukilteo, Washington State Department of Transportation and Central Puget Sound Regional Transit Authority In Process Perpetual

GCB 2127 City of Normandy Park SR 509/S Normandy Rd Vic to 174th Intersection - Paving and ADA Compliance - Police Services Contract 8/3/2015 10/31/2015

GMB 1065 City of Oakesdale Roadway Maintenance 9/26/2016 12/31/2017

GCB 2347 City of Olympia 3D modeling/visualization, video production and/or commercial photography services 2/26/2016 2/25/2021

GCB 2428 City of Orting Washington Avenue Two Way Left Turn Lane Improvements In Process

GCB 1049 City of Pacific Stewart Rd. / Thornton Ave. Improvements 5/5/2014 project completion

GMB 1135 City of Pullman Repairs to Potholes 07/16/2019 07/16/2024

GCB 3152 City of Puyallup Tacoma to Puyallup Regional Trail Connection Route Analysis Study 06/06/2019 12/31/2019

Page 9 of 42

Page 10: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2936 City of Raymond US 101/Heath Street to Duryea Street - Replace Enclosed Drainage System 02/14/2018 12/31/2019

GCB 1870 City of Redmond NE 40th Pedestrian Improvements 8/27/2014 project completion

GCB 3215 City of Redmond Public Works - MS: 1NPW NE 51st Street Improvements In Process

GCA 4894 -Perpetual City of Renton Springbrook Creek Wetland & Habitat Mitigation Bank 8/15/2006 Perpetual

GCB 1376 City of Renton SR 900 Highlands to Landing Pedestrian Connection Project 4/30/2014 10/29/2015

GCB 2197 City of Renton I-405, SR 167 Interchange Direct Connector 06/26/2017 12/31/2019

GCB 2274 City of Renton I-405, SR 167 Interchange Direct Connector 06/26/2017 12/31/2019

GCB 2433 City of Renton I-405, Renton to Bellevue Express Toll Lanes 3/11/2019 project completion

GCB 2890 City of Renton I-405 Renton to Bellevue Widening and Express Toll Lanes 06/01/2018 06/30/2019

GCB 3066 City of Renton I 405 Renton to Bellevue Corridor Widening and Express Toll Lane 4/22/2019 project completion

GCA 6136 City of Richland Land Acquisition, Relocation and Related Services 5/19/2009 5/19/2017

GCB 2464 City of Richland SR 240 Paving 01/23/2017 12/01/2018

Page 10 of 42

Page 11: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2204 City of Richland Public Works I-182/SR 240 Wellsian Way I/C - Paving 12/29/2016 12/01/2018

GCB 2909 City of Richland Public Works Department I-182 and US 395/ Tri Cities Vic - Paving, ADA and Joint Repair, I-182 Bridge I-182/12 Jadwin Ave 02/05/2018 09/02/2019

GCB 2944 City of Roslyn Pennsylvania Avenue Pedestrian Improvements 03/16/2018 06/30/2018

GCB 3025 City of SeaTac 2018 Street Overlay - Military Road S 08/16/2018 project completion

GCB 3068 City of SeaTac Interlocal Agreement for the Construction of the Gateway Project 11/27/2018 12/31/2021

GCA 6624 City of Seattle Alaskan Way Viaduct and Seawall Replacement Program 11/23/2011 6/30/2019

GCB 1576 City of Seattle SR 520, I-5 to Medina Bridge Replacement Arboretum Waterfront Trail 11/25/2013 project completion

GCB 1707 City of Seattle NRHP Multiple Property Documentation for Olmsted-designed Park and Boulevard System and nomination forms for Lake Washington Boulevard 11/1/2014 12/31/2016

GCB 1715 City of Seattle Alaskan Way Viaduct & Seawall Traffic Control Assistance Program 9/1/2014 12/31/2020

GCB 1798 City of Seattle SR 520, I-5 to Medina: Bridge Replacement and HOV Project 3/31/2014 project completion

GCB 1871 City of Seattle Duwamish Trail In Process

GCB 1895 City of Seattle SR 520, I-5 to Medina: Bridge Replacement and HOV Project 1/16/2015 project completion

Page 11 of 42

Page 12: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1977 City of Seattle Elliott Bay Seawall Project at Seattle Ferry Terminal 1/1/2013 12/31/2017

GCB 2124 City of Seattle SR 522 (Lake City Way) Channelization Improvements Vic. 24th Ave NE In Process

GCB 2388 City of Seattle Seattle Ferry Terminal Direction Signage In Process

GCB 2903 City of Seattle SR 99 Roy Street to N 145th St -DOT to install Plastic Traffic Letters within Seattle City limits 04/15/2018 12/31/2021

GMB 1094 City of Seattle SR 520, City of Seattle Maintenance Agreement 05/17/2019 Perpetual

GCB 1217 City of Seattle Utility Cost Share for SCL Work Elements associated with the Battery Street Tunnel 05/29/2018 09/30/2020

GCB 2814 City of Seattle Seattle Ferry Terminal and Fire Station 5 11/01/2017 06/30/2019

GCA 5739 City of Seattle Department of Transportation Project Services Agreement-Alaskan Way Viaduct and Seawall Replacement Program 09/05/2008 06/30/2018

UT0 1476 City of Seattle - Seattle City Light SR99 Alaska Way Viaduct Replacement 02/21/2013 12/31/2021

UT0 1474 City of Seattle - Seattle Public Utilities SR99 Alaska Way Viaduct Replacement 05/23/2011 12/31/2021

GCB 2762 City of Seattle Department of Finance Traffic Signal Modifications Adjacent to Seattle Ferry Terminal 11/07/2017 12/31/2019

GCA 6486 City of Seattle Department of Transportation SR 99 Alaskan Way Viaduct Property, Environmental Remediation, Design Review, Permitting and Construction Coordination 10/11/2011 12/31/2020

Page 12 of 42

Page 13: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2469 City of Seattle Department of Transportation SR 520 I-5 to Medina: Bridge Replacement and HOV Project Neighborhood Traffic Calming 11/09/2017 03/31/2022

GCB 1308 City of Seattle Department of Transportation Alaskan Way Surface Street Reconstruction-Schematic Design and Environmental Documentation 04/11/2013 03/31/2019

GCB 2583 City of Seattle Department of Transportation Property Activation Services 5/8/2017 12/31/2019

GCB 1217 City of Seattle

AWVRP SR 99/AWV Demolition Decommissioning and Surface Streets Battery Street Tunnel - 01/01/2020 12/31/2019

GCB 2437 City of Snohomish City of Snohomish 30th Street Project Road Widening In Process

GCB 2973 City of Spokane I-90 & SR 195 Connection study 2/26/2019 12/31/2021

GCB 3086 City of Spokane Master agreement for work preformed for the North Spokane Corridor (NSC) 01/31/2019 06/30/2029

GCB 3086 City of Spokane US 395 North Spokane Corridor 11/04/2019 06/30/2020

GCB 3090 City of Spokane Maple Street Gateway improvements 03/21/2019 11/30/2020

UTB 1343 City of Spokane I-90 Medical Lake IC to Geiger Field IC Reconstruction 03/29/2019 12/31/2021

GCB 1358 City of Spokane Valley Regional Decant Facility 2/14/2013 6/30/2043

GCB 1862 City of Spokane Valley SR 290 /Sullivan Rd to Idaho State Line 11/13/2014 12/31/2015

Page 13 of 42

Page 14: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1865 City of Spokane Valley SE Yardley Stormwater Upgrade In Process

GCB 2937 City of Spokane Valley ITS Fiber Project- Phase 1 01/31/2018 6/30/2019

GCB 2995 City of Spokane Valley Barker interchange north ramp terminal with intersection improvements 01/17/2019 06/30/2020

GCB 3182 City of Spokane Valley SR290 Barker Rd BNSF Grade Separation at Trent Avenue Right of Way Acquisition and Transfer 09/19/2019 12/31/2023

GCB 3086 City of Spokane

US 395 North Spokane Corridor 11/04/2019 06/30/2020

GCB 2457 -perpetual

City of Spokane, Spokane County, Spokane Transit Authority, City of Spokane Valley, Spokane Regional Transportation Council

Interlocal Agreement regarding the creation, operations, and management of the Spokane Regional Transportation Management Center 11/23/2016 perpetual

GCB 2956 City of Stanwood Stanwood Station Facility Shelter Maintenance 07/09/2018 12/31/2020

GCB 3244 City of Stanwood SR 532 Corridor Pre-Scoping Analysis 09/20/2019 03/30/2020

GMB 1047 -Perpetual City of Stanwood Stanwood Entrance Monument Sign 5/14/2014 Perpetual

GCB 1034 City of Tacoma I-5 Portland Avenue to Port of Tacoma Road – HOV 9/10/2012 8/30/2018

GCB 1085 City of Tacoma I-5/M St to Portland Ave - HOV 2/3/2014 6/30/2018

GCB 1389 City of Tacoma I-5/M St to Portland Ave - HOV 12/12/2013 7/31/2019

Page 14 of 42

Page 15: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2499 City of Tacoma I-5 / SR 16 Interchange Construction HOV Connections 07/12/2017 10/30/2020

GCB 2889 City of Tacoma I-5 Portland Avenue to Port of Tacoma Road - Southbound HOV 01/08/2019 09/30/2022

GCB 3151 City of Tacoma Tacoma to Puyallup Regional Trail Connection Route Analysis Study 07/31/2019 12/31/2019

GCB 3206 City of Tacoma Homeless Encampments Safety and Public Health on WSDOT Property 10/10/2019 6/30/2021

GMB 1003 -Perpetual City of Tacoma I-5/SR 16 Eastbound Nalley Valley - HOV 3/6/2012 Perpetual

GMB 1015 -Perpetual City of Tacoma A Street City Maintenance 10/2/2012 Perpetual

GMB 1024 City of Tacoma, Tacoma Rail Bridge 5-405W Maintenance Work 3/14/2012 project completion

GCB 1876 City of Tukwila I-5, Klickitat Drive - Unstable Slope - Boardwalk Replacement 7/29/2014 project completion

GCB 2373 City of Tumwater South bound on and off ramp widening, ADA and Signal Modification 3/23/2016 project completion

GCB 2473 City of Walla Walla SR 10 et al 2017 SCR Region Wide - Chip Seal 11/14/2016 05/01/2018

GCB 2799 City of Washougal SR 14 Access Improvements 01/18/2019 12/31/2020

GCB 2658 City of Wenatchee SR 285 Wenatchee Area Paving 03/01/2018 12/31/2018

Page 15 of 42

Page 16: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2947 City of Wenatchee Department of Public Works SR285 Connecting Washington North Wenatchee 01/01/2018 project completion

GCB 1667 City of Yakima 3D modeling/visualization, video production and/or commercial photography services In Process

GCB 2921 Clark County Public Works Dept. SR503/Rock Creek Rd Vic to Williams Rd Vic - Paving 02/01/2018 06/30/2019

GCB 2902 Colorado Department of Transportation Participation in TPF-5(343), Roadside Safety for MASH Implementation 05/29/2018 05/29/2021

GCB 1673 Columbia County Public Works Lyons Ferry Road Project 03/03/2015 10/01/2017

UTB 1335 Columbia Rural Electric Association US 12 Nine Mile to Frenchtown Vicinity Relocation of Electrical Facilities 04/03/2019 12/01/2024

GCB 2153 Community Transit Striping to accommodate new SWIFT Bus Station In Process

GCB 2674 Community Transit Community Transit Swift BRT II-128th St Greenline In Process

GCB 3126 Confederated Tribes Colville Flashing light at crosswalk 05/01/2019 05/31/2020

GCA 5587 Confederated Tribes of the Umatilla Indian Reservation Cultural Resource Services 09/01/2017 03/20/2019

GCB 2305 Cowlitz Tribal Gaming Authority Reconstruction of I-5/NW 319th St/NW La Center Road Interchange 6/30/2016 8/31/2017

GCB 1361 Cowlitz-Wahkiakum Council of Governments Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 2/2/2018 perpetual

Page 16 of 42

Page 17: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2655 C-TRAN Transit Bus on Shoulder Pilot 8/1/2017 6/30/2019

GCB 3196 C-TRAN Southbound I-5 Bus on Shoulder 07/11/2019 12/31/2020

GCB 2574 Department of Archaeology and Historic Preservation Cultural Resource Training Instructor 05/01/2017 06/30/2021

GCB 1342 Department of Corrections Highway Sign Refurbish Project 10/1/2012 6/30/2017

GCB 2330 Department of Corrections Master Class IV Work Crew Agreement 1/1/2016 12/31/2020

T 2912 Department of Corrections Chehalis Engineering - All Routes within Chehalis/Centralia Area 03/25/2019 03/24/2020

GCB 2537 Department of Corrections Interagency Agreement Between the Washington State Department of Corrections and the Washington State Department of Transportation Ferries Division 03/09/2017 04/30/2017

GCA 6437 Department of Ecology SR502 Interchange Environmental Mitigation 4/1/2010 6/30/2019

GCB 1411 Department of Ecology On-Call Environmental Services 7/1/2013 06/30/2020

GCB 1998 Department of Ecology Testing of water quality 9/14/2015 6/30/2019

GCB 3292 Department of Ecology Laboratory services 11/15/2019 10/31/2022

GCB 3292 Department of Ecology Laboratory services 11/15/2019 10/31/2022

Page 17 of 42

Page 18: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 3282 Department of Enterprise Richland PEO Expansion 10/07/2019 06/30/2020

GCB 2669 Department of Enterprise Services Geotechnical Work SR 20 Spur Shoulder Instability and Groundwater 07/24/2017 09/30/2017

GCB 2974 Department of Enterprise Services Project Management Essentials Training 06/15/2018 03/31/2019

GCB 2986 Department of Enterprise Services (DES) Div of Real Estate Svc New Lease space for Tacoma Project Engineer (PE) Office 03/26/2017 12/31/2019

GCB 3282 Department of Enterprise-Real Estate Services Richland PEO Expansion 10/07/2019 06/30/2020

GCB 1412 Department of Fish & Wildlife On-Call Agreement for Environmental Services 6/1/2013 07/01/2020

GCB 1789 Department of Fish & Wildlife Government Agreement for Aid 1/29/2014 1/12/2019

GCB 1795 Department of Fish & Wildlife WSDOT cultural resources monitoring for WDFW 8/26/2014 6/30/2016

GCB 2533 Department of Fish and Wildlife Cultural Resources Training Instructor 05/01/2017 06/30/2021

GCB 3210 Department of Fish and Wildlife Fish Passage Assessment, Inventory and Project Support 07/01/2019 06/30/2021

GCB 2699 Department of Health Prepare and conduct a student travel survey, prepare and analyze data, complete secondary analyses 7/1/2017 6/30/2019

GCB 3159 Department of Health (DOH Contract# GVS24170 )

Complete Streets - increase physical activities by friendly routes to everyday destinations thru revision of ordinances in WA state 07/15/2019 09/29/2019

Page 18 of 42

Page 19: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCA 6474 Department of Natural Resources Fire Suppression Resources Availability Agreement 6/25/2010 6/30/2020

GCA 6654 Department of Natural Resources SR 520, I-5 to Medina: Bridge Replacement and HOV Project 10/9/2013 12/31/2023

GCB 1760 Department of Natural Resources DNR Trout Lake NAP (Lonesome Pine Holding Trust Ownership) 1/15/2014 11/25/2018

GCB 1956 Department of Natural Resources Drilling geotechnical bore holes near SR 530 landslide area 11/1/2014 6/30/2015

GCB 2434 Department of Natural Resources Space in WSF HQ Building 9/1/2016 8/31/2020

GCB 2449 Department of Natural Resources WSDOT to provide Kris as a public information officer 08/28/2016 12/31/2016

GCB 2647 Department of Natural Resources WSDOT to provide a public information officer 02/24/2017 12/31/2018

GCB 3167 Department of Natural Resources Rock Slope Training 05/01/2019 06/30/2019

GCB 3144 Department of Natural Resources-Wildfire Division WSDOT to provide a public information officer 02/01/2019 12/31/2022

GCB 3094 DES Div of Real Estate Services 15700 Dayton Ave N. Shoreline 08/30/2018 06/30/2019

GCB 2965 Drainage and Irrigation Improvement District #17 I-5/Maddox Creek- Fish Passage Barrier (ID #991725) 06/11/2018 01/31/2019

GCB 1426 Eastern Washington University On-Call Cultural Resources Services 1/15/2014 05/01/2019

Page 19 of 42

Page 20: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2506 Eastern Washington University SR 395, North Spokane Corridor 10/01/2016 12/31/2023

GCB 3203 Federal Aviation Administration SR 531: 43rd Avenue NE to 67th Ave NE Widening Project 08/20/2019 project completion

GCB 1909 FHWA HFST Vender Demonstration 7/23/2014 7/23/2015

GCB 1733 Florida's Turnpike Enterprise Tolling Expert Review Panel 12/4/2013 12/31/2017

GCB 2075 Freight Mobility Strategic Investment Board Agreement for WSDOT Services 7/1/2015 6/30/2017

GCB 2587 Freight Mobility Strategic Investment Board (FMSIB) FMSIB Reimbursable Agreement for WSDOT Services 07/01/2017 06/30/2019

GCB 3199 Freight Mobility Strategic Investment Board (FMSIB FMSIB Reimbursable Agreement for WSDOT Services 07/01/2019 06/30/2021

GCB 2211 Green River College Assistance to firms actively participating or trying to work with WSDOT in the highway construction and consulting industries 11/15/2015 10/15/2016

GCB 2919 Idaho Transportation Department District One SH-41 Burlington Northern RR BR Bonner county 11/06/2017 01/23/2020

GCB 2488 Island County SR 20 Design 03/26/2019 09/13/2023

GCB 2465 Island County Public Works Freeland Trail Segment-1 In Process

GCB 3256 Island County Sheriff’s Office Agreement No. GCB 3256 Re: Traffic Control Services at Clinton Ferry Terminal 09/09/2019 09/30/2024

Page 20 of 42

Page 21: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2254 Island Enterprises SR 108 / Salish Cliffs 9/17/2015 project completion

GCB 1485 Island Transit SR 20/Morris Road to Jacobs Road - Safety Improvement 11/15/2013 12/15/2020

GCB 2668 Jamestown S’Kallam Tribe Chicken Coop/Zaccardo Realignment In Process

GCB 1837 Jefferson County SR19 / West Valley Road SRTS 3/16/2015 project completion

GCB 2021 Jefferson County Public Works Olympic Discovery Trail 1/30/2017 project completion

GCB 3096 Jefferson Transit Authority Peninsula RTPO 07/01/2019 06/30/2021

GCB 2445 Key Peninsula Fire Department / Pierce County Fire Protection District #16 SR 302/1.15 Miles S of E Victor Road – Major Drainage 7/25/2016 12/31/2016

GCB 1323 King County Barton Street Pump Station Upgrade Project 10/26/2012 6/30/2032

GCB 2527 King County Lake to Sound Trail Funding Agreement Segment C 11/27/2018 06/30/2021

GCB 2695 King County SR 99/Roy Street to North 145th Street - Paving 11/01/2017 12/31/2019

GCB 3300 King County Cambridge 11/07/2019 11/07/2024

GCB 2539 King County Department of Transportation Mini-MACC Cost Reimbursement For New Passenger-Only Terminal at Seattle Multimodal Terminal 05/02/2017 06/30/2018

Page 21 of 42

Page 22: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1951 King County Ferry District New Passenger-Only Ferry Terminal at Seattle Multimodal Terminal 12/23/2014 1/31/2018

GCB 1934 King County Marine Division Reimbursement Agreement for Certain Pre-Construction Work For New Passenger-Only Ferry Terminal at Seattle Multimodal Terminal 7/1/2011 7/7/2014

GCB 2694 King County Metro SR 99/Roy Street to North 145th Street - Paving and ADA 10/4/2017 10/31/2019

GCB 3030 Kitsap County SR 104 Realignment 08/31/2018 project completion

GMB 1029 -Perpetual Kitsap County SR 104, Kingston Sidewalk Maintenance 4/5/2013 Perpetual

GCB 3286 Kitsap County Public Works Washington Boulevard Improvements 11/01/2019 11/01/2022

GCB 3286 Kitsap County Public Works Washington Boulevard Improvements 11/01/2019 11/01/2022

GCB 3286 Kitsap County Public Works

Washington Boulevard Improvements 11/01/2019 11/01/2022

GCB 1377 Kitsap Transit On-Call Vessel Charter Agreement No. 12/1/2012 11/30/2015

GCB 1959 Kitsap Transit SR 305 Suquamish Way Intersection Improvement 2/5/2015 6/30/2017

GCB 3119 Kitsap Transit Public Transportation Options During Alaskan Way Viaduct Closure 01/01/2019 06/30/2019

GCB 1365 Lewis-Clark Valley MPO Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 1/3/2017 perpetual

Page 22 of 42

Page 23: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2145 Lewis-Clark Valley MPO (LCVMPO) Lewis-Clark Valley MPO (LCVMPO) 10/01/2019 06/30/2021

GCB 2384 Lower Elwha / Klallam Tribe US101 / Dry Creek Road Intersection Improvements 5/10/2016 project completion

GCB 2664 Lower Elwha Klallam Tribe Lower Elwha Klallam Tribe Health Clinic Access Improvements In Process

GCB 2480 Mason County SR 3 Belfair Area Widening & Safety 01/24/2018 12/31/2018

GCB 3177 Mason Transit Authority Pear Orchard Park and Ride Development 04/16/2019 04/19/2022

GCB 3293 Mason Transit Authority Log Yard Road Roundabout Intersection 11/19/2019 11/19/2022

GCB 3293 Mason Transit Authority Log Yard Road Roundabout Intersection 11/19/2019 11/19/2022

GCB 3155 Metro Parks Tacoma Tacoma to Puyallup Regional Trail Connection Rout Analysis Study 06/12/2019 12/31/2019

GCB 3192 Microsoft Corporation Construct Bridge across SR 520 07/18/2019 06/30/2024

GCB 2850 Mid Columbia Fisheries Enhancement Group US 97 Swauk Creek Campground 12/01/2017 12/31/2019

GCB 2588 Minnesota Department of Transportation Impact Performance Evaluation of Modified Minnesota Swing-Away Mailbox Support to MASH 10/18/2017 06/30/2019

UCB 1362 Minnesota Department of Transportation Roadside Safety Research Program 3/10/2016 3/31/2017

Page 23 of 42

Page 24: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 3010 Minnesota DOT Partnership between Minnesota DOT and Washington DOT Pooled Fund Participation - NW Passage - TPF-5(376) 07/23/2018 06/30/2023

GCA 6737 Montana State University Master Agreement for Research 6/9/2011 6/30/2022

T 6737 Montana State University WSRTC Meeting Coordination, Western States Forum Travel Support and Website Maintenance (Task Order 12) 03/01/2019 03/31/2020

GCA 6722 Muckleshoot Indian Tribe SR 520, I-5 to Medina: Bridge Replacement and HOV Project 12/13/2011 project completion

GCB 1347 Muckleshoot Indian Tribe SR 520, I-5 to Medina: Bridge Replacement and HOV Project / Foster Island Cultural Event Agreement 4/24/2014

project completion

GCB 1731 Muckleshoot Indian Tribe SR 520, I-5 to Medina: Bridge Replacement and HOV Project 08/20/2015 07/31/2019

GCB 2014 Muckleshoot Indian Tribe Memorandum of Agreement for the Seattle Multimodal Terminal at Colman Dock Project 10/06/2016 12/31/2025

GCB 3187

Multi organization agreement. A list of participating agencies is maintained at Office of Emergency Management (OEM)

(Emergency Proclamation) Public Works Emergency Response Assistance Mutual Aid Agreement 08/19/2019 6/30/2023

GCB 1162 Multnomah County Drainage District No. 1 Columbia River Crossing Project 3/21/2013 12/31/2021

GCB 2997 Nez Perce Tribe Buford Creek Barrier Fish Passage 04/05/2019 01/02/2021

GCB 2333 Nisqually Tribe SR510 Improvements and Frontage Rd. 1/4/2016 project completion

GCB 3265 North Carolina State University Preparing for Traffic Signal Operations in a Multi-Modal Connected & Autonomous Vehicle Environment 08/17/2019 12/31/2019

Page 24 of 42

Page 25: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2989 North Olympic Salmon Coalition Kilisut Harbor Restoration Project 03/28/2019 06/30/2021

GCA 6904 Office of Administrative Hearings Toll Violation Adjudication 10/1/2013 6/30/2019

GCB 1708 Office of Financial Management Results Washington 10/8/2013 project completion

GCB 1722 Office of Minority and Women’s Business Enterprises DBE, SBE Certification 7/1/2013 6/30/2015

GCB 2119 Office of Minority and Women’s Business Enterprises

Implement the Certification portion of the USDOT DBE Program/Small Business Enterprise Program Participation Plan 7/1/2015 6/30/2017

GCB 2978 Office of Secretary of State Interagency Library Agreement 07/01/2018 06/30/2019

GCB 3257 Office of Secretary of State Interagency Library Agreement 07/01/2019 06/30/2021

GCB 1686 Office of Superintendent of Public Instruction Safe Routes to School Bicycle & Pedestrian Safety Education Program 8/1/2013 6/30/2015

GCB 2677 Office of the Attorney General Puget Sound Transportation Projects 07/01/2017 06/30/2019

GCB 3218 Office of the Attorney General Puget Sound Transportation Projects 07/01/2019 06/30/2021

GCB 1391 Okanogan County Armory Junction Road Improvements 2/15/2013 project completion

GCB 1479 Oregon Department of Transportation Western Road Usage Charging Consortium Project 6/10/2013 6/30/2017

Page 25 of 42

Page 26: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1985 Oregon Department of Transportation Pacific Northwest Rail Corridor Management 1/1/2013 9/30/2017

GCB 2470 Oregon Department of Transportation Oregon’s participation in TPF-5(343) 06/30/2016 06/30/2017

GCB 2693 Oregon Department of Transportation US197 Columbia River (The Dalles) Bridge Deck and Rail Replacement 08/30/2018 08/30/2025

GCB 2703 Oregon Department of Transportation SR 433/Lewis and Clark Bridge - Replace Navigation Lights 07/27/2018 07/27/2025

GCB 3072 Oregon Department of Transportation Oregon’s Participation in TPF-5(241) 09/05/2018 03/31/2020

GCB 3020 Oregon Department of Transportation

Ultra High-Speed Ground Transportation Study 10/12/2018 06/30/2019

GCB 1703 Parks and Recreation Commission Rocky Reach Trail Phase 1 10/15/2013 12/31/2014

GCB 1882 Parks and Recreation Commission Bottle Beach Wetland Monitoring 7/1/2014 6/30/2019

GCB 1917 Parks and Recreation Commission Land Acquisition, Relocation and Related Services 9/18/2014 9/18/2019

GCB 2229 Parks and Recreation Commission On Call Tree Service 10/14/2015 6/30/2020

GMB 1036 -Perpetual Parks and Recreation Commission Shoreline of Spokane River Maintenance 9/4/2013 Perpetual

GCB 3153 Pierce County Parks and Recreation Tacoma to Puyallup Regional Trail Connection Route Analysis Study 05/20/2019 12/31/2019

Page 26 of 42

Page 27: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2095 Pierce County Public Works Hiyu On Call Vessel Charter In Process

GCB 2951 Pierce County Public Works I-5 Steilacoom-DuPont to Thorne Lane Corridor Improvements 06/01/2018 06/30/2018

GCB 1952 Pierce County Public Works and Utilities Canyon Road East - 84th-72nd St. E.; CRP 5736 10/24/2014 02/14/2016

GCB 2652 Port of Everett Interagency Agreement Between the State of Washington Department of Transportation and Port of Everett 09/26/2005 12/31/2020

GCB 2730 Port of Ridgefield Port of Ridgefield Overpass 10/01/2017 04/01/2019

GCB 2334 Port of Seattle SR 518, Haul Road Restoration In Process

GCB 2700 Port of Seattle WSDOT Statewide Aviation-Based DBE Program Disparity Study 01/19/2018 08/31/2019

GCB 3006 Port of Seattle SR 518 Corridor Study - Port of Seattle Contribution 06/06/2018 06/30/2019

GCB 3121 Port of Seattle License For Temporary Use 01/01/2019 12/31/2023

GM0 1533 Port of Walla Walla SR 124 Interchange - Burbank Vicinity 4/9/2013 4/9/2025

GCB 2258 Portland State University Research Tasks 12/17/2015 6/30/2019

GCA 6473 Puget Sound Clean Air Agency Purchasing Diesel Engine Power Assemblies 3/25/2010 project completion

Page 27 of 42

Page 28: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1362 Puget Sound Regional Council Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 5/31/2016 perpetual

GCB 3154 Puyallup Tribe of Indians-Land Use and Planning Tacoma to Puyallup Regional Trail Connection Route Analysis Study 05/17/2019 12/31/2019

GCA 6658 -Perpetual Quinault Indian Nation SR 520 Pontoon Construction Project 12/8/2010 N/A

GCB 3105 Quinault Tribe Hogan’s Corner Development SR 109 Improvements 11/15/2018 1/29/2021

GCB 1719 Readiness Response Center Educational Services 10/1/2013 6/30/2015

GCB 1916 Recreation & Conservation Office Cultural Resources Services for WSRCO 10/1/2014 6/30/2017

GCB 3212 Recreation & Conservation Office Cultural Resources Support 07/01/2019 06/30/2021

GCB 3198 Recreation & Conservation Office Cultural Resources Services for WSRCO In Process

GCB 2311 Saint Martin’s University Master Agreement 8/14/2017 6/30/2023

T 2311

Saint Martin’s University

Methane Electricity Generation Project 11/01/2019 06/30/2020

GCB 2690 Samish Nation SR 20/Campbell Lake Road Intersection Improvement Feasibility Study partnership 11/28/2017 12/31/2018

GCB 2136 San Juan County Orcas Island Building Space 2/1/2016 1/31/2021

Page 28 of 42

Page 29: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2485 San Juan County Orcas Island Modular Wall Extension Agreement 10/26/2016 5/31/2017

GCB 1368 San Juan County Public Works San Juan County Regional Transportation Planning 7/1/2016 perpetual

GCB 2530 San Juan County Public Works Department Lease For Orcas Island Park and Ride Lot In Process

GCB 1757 Seattle Parks and Recreation SR 520, I-5 to Medina: Bridge Replacement and HOV Project 8/5/2014 10/30/2014

GCB 1275 Secretary of State’s Office Combined Fund Drive 04/11/2018 06/30/2022

GCB 1363 Skagit Council of Governments Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 6/29/2017 perpetual

GMB 1132 Skagit County

Skagit County Large Woody Debris removal from County bridges by WSDOT 12/18/2018 12/18/2023

GCB 2985 Skagit County Drainage and Irrigation Improvement District #17 I-5/Maddox Creek- Fish Passage barrier 11/07/2018 04/20/2020

GMB 1114 Skagit County Parks SR 20/SR9 to Hansen Creek & SR 9/ SR 20 to Park Cottage P1-Paving & ADA 11/09/2017 N/A

GCB 1574 Skagit River System Cooperative Tree planting services performed by the Skagit River System Cooperative 11/24/2014 12/31/2018

GCB 2395 Skokomish Tribe of Indians US101 Crosswalk and Turn Lane 5/27/2016 project completion

GCB 2121 Snohomish County SR 530 Removal of Bus Turnaround In Process

Page 29 of 42

Page 30: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2276 Snohomish County Adaptive signal System, SR 527/96, 228th St SE to SR 96, & SR 96, 128th St. SW/Airport Road from Seattle Hill Rd In Process

GCB 2475 Snohomish County SR 96 Seattle Hill Road 35th Ave SE to 132nd St SE In Process

GCB 3263 Snohomish County SR 99 and 148th Paver In Process

GCB 3169 South Puget Sound Community College Olympic Region off-site leadership 05/01/2019 06/30/2020

GCA 5145 South Whidbey Fire & EMS Clinton Ferry Terminal Fire Protection 1/1/2011 12/31/2015

GCB 1935 Southwest Washington Regional Transportation Council Planning Area Governance Agreement 11/6/2014 perpetual

GCB 2146 Spokane County US 395 Hawthorne Road Intersection 3/30/2016 12/31/2017

GCB 2970 Spokane County SR 2 - SR 206 to Day Mount Spokane Study 09/11/2018 project completion

GCB 3099 Spokane County I-90 Medical Lake IC to Geiger Field IC Reconstruction 01/16/2019 06/30/2019

GCB 2570 Spokane County Sheriff’s Office SR 90 License Plate Reader Cameras 04/02/2019 12/31/2020

GMB 1063 -Perpetual Spokane International Airport SR 2 Airport Interchange snow removal 2/26/2015 Perpetual

GCB 1864 Spokane Public Facilities District Spokane Convention Center 8/1/2014 project completion

Page 30 of 42

Page 31: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2008 Spokane Regional Transportation Council Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process in the Spokane Metropolitan Planning Area 01/15/2013 perpetual

GCB 3133 Spokane Regional Transportation Council Division Street Corridor Study 03/21/2019 12/31/2022

GCB 2484 Spokane Transit Authority Eastern Region wide ADA Project-Pedestrian Access Upgrades 01/04/2017 12/31/2018

GCB 2492 Spokane Transit Authority Eastern Region wide ADA Project-Pedestrian Access 02/08/2017 12/31/2018

GCB 2979 Spokane Transit Authority SR 291 Francis Ave and Alberta Street 08/13/2018 06/30/2019

GCB 3134 Spokane Transit Authority I 90 Medical Lake I/C to Geiger I/C Reconstruction 03/04/2019 12/30/2021

GCB 2310 Spokane Tribe of Indians SR2, Roundabout 8/23/2017 12/31/2018

GCB 1713 State of Illinois Multi-State NGEC Locomotive Procurement 8/8/2013 9/30/2017

GCB 3084 State of Connecticut DOT MASH Full Scale Crash Testing and Evaluation of the Merritt Parkway Guiderail 10/01/2018 09/30/2019

GCB 3083 State of Connecticut DOT MASH Full Testing 09/01/2018 06/30/2019

GCB 2125 State of Oregon Columbia River Bridge EB - Truss Deck Replacement Bridge 82/280S 7/1/2015 project completion

GCB 2272 State of Oregon I-5/NB Interstate Bridge - South Tower Trunnion Replacement 10/15/2015 10/15/2022

Page 31 of 42

Page 32: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2964 Stevens County Compact Roundabout SR 291 03/16/2018 06/30/2019

GCB 2898 Stevens County Department of Public Works Mill Creek breech repair 12/14/2017 09/30/2018

GCA 5765 Stillaguamish Tribe SR 532 - Corridor Improvements - Wetland Mitigation 9/17/2008 7/31/2020

GCB 1087 Stillaguamish Tribe of Indians SR 9 Corridor Improvements - Buffer Mitigation 6/28/2012 12/31/2018

GCB 1484 Stillaguamish Tribe of Indians SR 5, 236th St NE/13th Ave N Improvements 6/17/2013 project completion

GCB 3166 Stillaguamish Tribe of Indians SR 20 Wildlife Crossing planning level cost estimate 05/13/2019 12/31/2019

GCB 1756 Suquamish Indian Tribe Mukilteo Multimodal Project 3/28/2014 Life of facility

GCB 2009 Suquamish Indian Tribe Vashon Trestle Seismic Bracing Project 4/1/2015 Life of facility

GCB 1202 Suquamish Tribe SR 520, I-5 to Medina: Bridge Replacement and HOV Project 6/28/2012 project completion

GCB 2486 Suquamish Tribe Memorandum of Agreement for the Seattle Multimodal Terminal at Colman Dock 01/10/2017 12/31/2025

GCB 1734 Swinomish Indian Tribal Community Mukilteo Multimodal Project Replacement of the Mukilteo Ferry Dock 3/27/2014 Life of facility

T 4541 Texas A&M Transportation Institute Testing, Evaluation, and Tech Support; Engineering Support Services and Recommendations for Roadside Safety Issues/Problems 03/01/2019 11/30/2020

Page 32 of 42

Page 33: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCA 4541 Texas A&M University System Master Agreement for Roadside Safety 4/1/2013 6/30/2021

T 4541 Texas Transportation Institute

2020 Administrative Support 01/02/2020 12/31/2020

T 4541 Texas Transportation Institute

Design and Testing of a Thrie-beam Guardrail System at a Fixed Object 12/16/2019 12/15/2020

T 4541

Texas Transportation Institute TAMU Office of Sponsored Research

A Study of Acceptable Sidewalk Heights and Widths 12/16/2019 03/15/2021

GCB 1425 The Evergreen State College Habitat Connectivity Research Internship 7/1/2013 06/30/2019

GCB 3131 The Evergreen State College Collaboration Project 03/01/2019 06/01/2019

GCB 3171 The Evergreen State College On-Call TESC Internship Program - Master Agreement 07/01/2019 06/30/2023

GCB 2525 The Suquamish Tribe Planning Meetings with Suquamish Tribe for Cultural Design Element at Mukilteo Multimodal Terminal 03/22/2017 03/01/2018

GCB 2503 The Tulalip Tribes Tulalip Tribes Cultural Design Elements for Mukilteo Multimodal Terminal 11/08/2019 6/30/2021

GCB 2503 The Tulalip Tribes Tulalip Tribes Cultural Design Elements for Mukilteo Multimodal Terminal 11/08/2019 06/30/2021

GCB 2524 The Tulalip Tribes Planning Meetings with Tulalip Tribes for Cultural Design Elements at Mukilteo Multimodal Terminal 02/23/2017 03/01/2018

GCB 1367 Thurston Regional Planning Council Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 3/4/2016 perpetual

Page 33 of 42

Page 34: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1931 Thurston Regional Planning Council 3D Modeling 9/25/2014 9/25/2015

GCB 3015 Town of Wilkeson Foothills Trail Extension 11/15/2018 1/29/2021

GCB 1966 Traffic Safety Commission WTSC Intersection Data Enhancements 11/14/2014 9/30/2015

GCB 1690 Transportation Commission WSDOT Project Management Assistance 8/12/2013 6/30/2017

GCB 2249 Transportation Commission Assistance for Road Usage Charge Study 10/6/2015 6/30/2016

GCB 3202 Transportation Commission WSTC Ferry Tariff Online Engagement 05/22/2019 06/30/2019

GCB 1096 Tulalip Tribes Elevation Monuments Project 12/1/2011 project completion

GCB 1529 Tulalip Tribes I-5 Improvements at 116th Street NE 2/7/2014 6/30/2019

GCB 1735 Tulalip Tribes Mukilteo Multimodal Project Ferry dock replacement 1/1/2013 Life of facility

GCB 2389 Tulalip Tribes of Washington 116th Street NE Interchange 09/28/2017 12/30/2017

GCB 3179 University of Idaho Site Calibrated Bedload Equation Implementation in Python 06/01/2019 12/31/2020

GCB 2665 University of Maryland Master Agreement 02/12/2018 06/30/2021

Page 34 of 42

Page 35: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCA 4908 University of Washington Curation of artifacts from Hood Canal Bridge reconstruction 4/5/2011 4/5/2021

GCA 5612 University of Washington Commute Trip Reduction Survey Processing Data Capturing and Reporting 7/1/2007 6/30/2017

GCA 6662 University of Washington SR 520 I-5 to Medina Project - Montlake Triangle Project 6/21/2012 12/31/2016

GCB 1112 University of Washington SR 520, I-5 to Medina Natural Area Mitigation Agreement 4/29/2014 4/28/2026

GCB 1291 University of Washington SR 520, I-5 to Medina 3-Party Real Estate Transaction Agreement 12/23/2013 project completion

GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1461 University of Washington UW Master Agreement 8/7/2013 6/30/2022

GCB 1721 University of Washington Sponsored Research Agreement 10/1/2014 9/18/2018

GCB 1723 University of Washington Puget Sound Water Quality Monitoring Equipment 11/19/2013 6/30/2015

GCB 1802 University of Washington Sponsored Research Agreement 12/15/2013 6/30/2015

GCB 1968 University of Washington Capital Projects Office will provide General Contractor / Construction Manager 10/1/2014 10/31/2017

GCB 1976 University of Washington UBNA - West Approach Wetland Mitigation 4/30/2015 project completion

Page 35 of 42

Page 36: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2911 University of Washington Maintenance Support at UBNA 07/03/2018 09/30/2021

T 1461 University of Washington Digital Science for Social Good and Intern Programs 02/01/2019 06/30/2021

T 1461 University of Washington Real-Time Truck Parking Information Integration, Visualization and Prediction 12/16/2019 03/15/2020

T 1462 University of Washington TRAC and Various Programs 03/01/2019 06/30/2021

T 1461 University of Washington

Provide Training Services Addressing WSDOT’s Workforce Development Needs 12/16/2019 12/16/2020

GCB 1307 US Army Corps of Engineers Columbia River Crossing 11/16/2012 6/30/2022

GCA 6514 US Department of Agriculture Master Cooperative Service Agreement 08/11/2010 06/30/2016

GCB 1988 US Department of Agriculture Wildlife Management & Monitoring Statewide On-Call Services 11/12/2015 6/30/2020

GCB 3254 US Dept. of Agriculture Forest Service South Baldy 08/08/2019 12/31/2048

GCB 1099 -Perpetual US Dept. of Federal Highway Administration Toll Facilities for AWV/SR99 8/23/2011 N/A

GCB 1519 US Forest Service Interstate 90 Snoqualmie Pass East Project 7/1/2013 6/30/2019

GCB 1548 US Forest Service Snoqualmie Pass East, forest restoration and mitigation 6/10/2014 12/31/2024

Page 36 of 42

Page 37: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2523 US Forest Service Wildcat Creek Bridge - Replace Bridge 01/29/2018 11/30/2019

GCB 3195 USDA Forest Service Interstate 90 Snoqualmie Pass East Project 07/01/2019 06/30/2024

GCB 2815 USDA Forest Service Okanogan-Wenatchee National Forest US97 Swauk Creek Campground - Fish Passage Retrofit 12/01/2017 12/31/2022

GCB 3185 USGS - U.S Geological Survey Installation of Stream Gage on Glacier Creek 06/01/2019 09/30/2019

GCB 3194 USGS - U.S Geological Survey-California Water Science Center Glacier Creek monitoring equipment installation 05/28/2019 03/31/2022

GCB 2962 Utah Department of Transportation Utah’s Participation in TPF-5(343) 06/13/2018 09/30/2018

GCB 2891 Utah State University New Master Agreement 04/12/2018 12/31/2022

GCB 3213 Utilities and Transportation Commission Agreement for Assignment of Grade Crossing Inspection Duties in RCW 47.32.140 08/26/2019 06/30/2029

GCB 1973 Virginia Tech Illumination Safety Research Using SHRP2 Naturalistic Safety Data Collected in Washington State 1/1/2015 1/31/2018

GCB 3219 WA State Dept. of Fish & Wildlife Fish Passage at Tidal Crossings 07/01/2019 12/31/2021

GCB 1371 Walla Walla Valley MPO Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process 6/15/2016 perpetual

GCB 1373 Walla Walla Valley MPO This agreement establishes the WWVMPO 3/25/2013 perpetual

Page 37 of 42

Page 38: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1932 Washington Military Department 3D Modeling/visualization 10/27/2014 10/26/2015

GCB 2582 Washington State Association of Counties Washington State Association of Counties Services Project 7/1/2017 6/30/2019

GCB 2678 Washington State Convention Center I-5/WSCC & Freeway Park Tunnels - Lighting Controls Upgrade 09/11/2017 12/31/2017

GCB 3290 Washington State Department of Corrections Interagency Agreement between WSDOT Ferries Division / Washington State Ferries (WSF)and the Washington State Department of Corrections 11/15/2019 06/30/2020

GCB 3290 Washington State Department of Corrections Washington State Ferries (WSF)and the Washington State Department of Corrections 11/15/2019 06/30/2020

GCB 2877 Washington State Department of Enterprise Services

Interagency Agreement Between the Department of Enterprise Services and WSDOT Ferries Division, operating as Washington State Ferries 10/02/2017 12/31/2020

GCB 2988 Washington State Parks Bottle Beach State Park Weed Control 2018 04/20/2018 10/30/2018

GMB 1089 Washington State Parks and Recreation Commission Steptoe Butte Roadway Repairs 08/22/2016 12/31/2017

GCB 1481 Washington State Parks Department Master Tree work Agreement (Statewide) 7/2/2013 6/30/2018

GCB 2252 Washington State Parks Department Cultural Resource Training Instructor/Support Staff In Process

GCB 3273 Washington State Parks Department

On-call Tree Services Agreement 09/17/2019 06/30/2023

GCA 5080 Washington State Patrol Traffic Support 07/01/2019 07/25/2020

Page 38 of 42

Page 39: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCA 5080 -Perpetual Washington State Patrol Various Locations for traffic control assistance 2/22/2007 N/A

GCA 5711 Washington State Patrol High Occupancy Toll Lanes 4/26/2008 6/30/2015

GCB 1101 Washington State Patrol Out Of State License Plate Review 2/19/2013 12/31/2014

GCB 1445 (GCA 2230) Washington State Patrol Naselle Maintenance Facility Maintenance Operations and Ownership 7/1/2013 12/19/2020

GCB 1999 Washington State Patrol Training 9/1/2015 8/31/2020

GCB 2018 Washington State Patrol I-405 Toll Lane Enforcement 8/5/2015 8/4/2019

GCB 2343 Washington State Patrol Wire Theft Sting Operations 1/15/2016 10/31/2016

GCB 2377 Washington State Patrol I-5 / Ridgefield Port of Entry - Scale House Reconstruction 6/23/2016 12/31/2017

GCB 2767 Washington State Patrol High Occupancy Toll Lane (“HOT Lane”) enforcement 10/1/2017 6/30/2019

GCB 3067 Washington State Patrol Gunn Street Improvements 08/10/2018 09/15/2018

GCB 3248 Washington State Patrol SR 24 Vernita Weigh Station - Preservation 08/22/2019 09/01/2020

GMB 1083 Washington State Patrol Haden Road Grading 07/06/2016 07/05/2021

Page 39 of 42

Page 40: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

OPB 1014 Washington State Patrol Kalama Communication Site 7/1/2013 6/30/2028

OPB 1020 Washington State Patrol Roosevelt Communication Site 7/1/2013 6/30/2023

OPB 1041 Washington State Patrol Devils Mountain Site Lease 12/19/2013 6/30/2018

GMB 1088 Washington State Patrol Steptoe Butte Roadway 08/22/2016 12/31/2017

GCB 1591 (GM0 1348) Washington State Patrol ACE Building Operations 7/1/2001 7/1/2020

GCA 4120 Washington State University Concrete Performance Using Low Degradation Rock 12/31/2005 6/30/2017

GCB 1462 Washington State University WSU Master Agreement 8/23/2013 06/30/2021

GCB 2967 Washington State University & University of Washington TRAC Operating Agreement 06/28/2018 06/30/2022

GCB 1460 Washington State University and University of Washington TRAC Operating Agreement 9/23/2013 6/30/2018

GCB 2987 Washington Tree Fruit Research Commission & Washington State Department of Agriculture Apple Maggot Quarantine Signs 06/07/2018 06/30/2023

GCB 1993 Whatcom Council of Governments MPO Agreement regarding responsibilities 5/28/2015 perpetual

GCB 1880 Whatcom County I-5 Slater Road Intersection Enhancements 8/6/2014 project completion

Page 40 of 42

Page 41: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 2250 Whatcom County Exit 270 Birch Bay- Lynden Rd Crossroad Paving 12/17/2015 project completion

GCB 2391 Whatcom County Exit 270 Birch Bay- Lynden Rd Crossroad Paving 12/17/2015 project completion

GCA 6437 WS Ecology, Dept. of Washington Conservation Corps Southwest Region Regionwide Mitigation Site Establishment 11/19/2012 06/30/2021

GCA 6437

WS Ecology, Dept. of Washington Conservation Corps

Southwest Region Regionwide Mitigation Site Establishment 11/11/2019 06/30/2021

GCA 6437

WS Ecology, Dept. of Washington Conservation Corps

SR 506 / Lacamas Creek Bridge Replacement (Lacamas Creek Mitigation Site) 01/05/2020 03/14/2020

GCB 3183 WSCC Public Facilities District WSCC Expansion Permit 4 - Cranes In Process

GCB 2735 Yakama Nation Beaver Creek CED 10/01/2017 12/31/2019

GCB 2938 Yakama Nation Yakama Nation Master Agreement 07/01/2019 07/30/2039

GCB 2044 Yakima County Fort Road Intersection 6/9/2015 12/31/2018

GCB 2466 Yakima County Public Services Naches Rail to Trail 08/30/2016 10/31/2016

GCB 1164 Yakima County Public Works. Fort Road Improvements 5/1/2012 6/30/2015

GCB 2938 Yakima Nation SR 241 Mabton Vicinity Bridges Structural Rehabilitation Project 10/09/2019 03/01/2020

Page 41 of 42

Page 42: Active Interlocal Agreements...10/1/2012 6/30/2017 GCB 1343 University of Washington SR 520, I-5 to Medina Overall Property Needs and Mitigation Agreement 12/23/2013 project completion

GCB 1370 Yakima Valley Conference of Governments Memorandum of Agreement relating to mutual responsibilities in carrying out the Metropolitan Transportation Planning Process In Process

GCB 2232 Yakima Valley Conference of Governments 3D modeling/visualization, video production and/or commercial photography services 1/1/2016 12/31/2021

UCB 1537 Zeco Systems, Ins dba Greenlots I-82 - 51 Firing Center Road Charging Station 04/17/2019 01/02/2020