Service Partners’ Training on Safety We, at ACME, are committed to serve our customers through our continuous endeavors to build a right environment that promotes trust, transparency, business excellence, best utilization of resources, cost optimization, energy ef�iciency and best practices adhered towards Environment, Health and Safety.
Regional Safety cum Technical Training for Safety Champions “Train the Trainer”
ACME has completed 2nd batch of “Train the Trainer” Safety cum Technical Training which was held at Kolkata and at Head Of�ice in Gurugram.
The training covered everything from EHS aspects to technical Know-how of the Products, and robust EFSR Process to educate the technicians on RAS, FQB and Tab Usage.
ACME launches Safety App as a Safety and Growth Enabler
Features:Real-time MonitoringAutomated mail to concerned Safety Champion & EHS Head on Submission as well as on ClosureFree Text-bookPicture UploadOf�line ApplicabilityDirect submission to higher AuthorityAutomated Reactive Monitoring Dashboard with Score Cards (Circle Wise)
ACME has developed a user-friendly Mobile App for their employees & EHS Personnels. The App contains four modules.
1. Safety Audit 2. Incident Monitoring 3. Help 4. Feedback
ACME conducted Safety Training with Service Partners to make our workplace more safer.
Hazard Identi�cation & Risk Assessment (HIRA)
New order for AMC of Air Conditioners
Document - ACSPL/EHS-SOP/01
Rating (R) Severity (S) Date -: April 2017
1 No Injury / First Aid Next Review on -: Sept. 2017
2 Minor Injury ( No man days loss) Revision -: 00
3 Major Injury (LTI) Page -: 01 to 05
4 Fatal
P S RR P S RR
Collision with another Vehicle
4 4 16
Use of Safety Helmet Use Of Safety Belt
Speed Control, Avoid Over taking , No mobile use while driving , No drink &
drive
2 3 6Safe Distance to be followed ,
Expect the unexpected and be more caution while driving
Animal Coming in front of vehicle
4 4 16Use of Safety Helmet
Use Of Safety Belt Speed Control
2 4 8Safe Distance to be followed ,
Expect the unexpected and be more caution while driving
Public Coming in front of vehicle
4 4 16Use of Safety Helmet
Use Of Safety Belt Speed Control
2 4 8 Reduce speed in public area
Collision with heavy vehicle running with metal /roads etc.
3 4 12
Use of Safety Helmet Use Of Safety Belt
Speed Control No night Movement
2 4 8 Safe Distance to be followed
Adverse Weather Condition
Road accident due to Adverse WeatherConditions
2 4 8Use of Safety Helmet
Use Of Safety Belt Speed Control
1 4 4 Avoid driving during Rainy season
Load/equipmentsloads and equipment are carried improper
2 4 8Use of Safety Helmet
Use Of Safety Belt Speed Control
1 4 4All loads and equipment are carried safely, don’t place material in front
of tank
Additional Control Measures Control Measure
Probability (P)
Very Unlikely
Unlikely
ACME CLEANTECH SOLUTIONS
HAZARD IDENTIFICATION, RISK ASSESSMENT & ITS CONTROL REGISTER
1-3 Low risk (L)
Likely
Certain
Activity
Pre Mitigation Level (Base Risk)S. No
Hazard Associated with Activity
Consequence
NOTE -:
P -Probability S - SeverityRR - Risk Rating
Acceptable Risk Rating is 6 or below
Road Travel
Risk Rating (RR)
RISK MATRIX
1
Road Accident
16 Extreme High risk (EH)
6-12 High risk (H)
3-6 Medium risk (M)
Post Mitigation Risk Level (Residual Risk)
ACME has done 3 brainstorming sessions on HIRA with AMC, EMS & NMS and Projects Team.
What is HIRA: HIRA is a process that consists of a number of sequential steps such as hazard identi�ication, consequences & frequency assessment, risk estimation based on the existing controls and recommendations to reduce those risks which are not under acceptable limits.
Objective of HIRA: To carryout a systematic, critical appraisal of all potential hazards involving personnel, services and operation method; to identify the existing safeguards available to control the risks due to the hazards and; to suggest additional control measures to reduce the risk to acceptable level.
ACME has bagged new order for AC AMC from ICICI Prudential Life Insurance for East Zone. Agreement has already been signed with the customer and the work is in progress.
ACME Solar Cooling Unit
ACME Solar Cooling Unit
ACME Solar Cooling Unit has proven its ef�iciency across geography maintaining 7 Degree Delta Temperature. It is saving huge amount of money & energy for Operators.
Glimpses of Customer Training in Delhi Circle
At the onset of FY 2017-18 Circle Zonal Managers were invited to HO for AOP 2017-18 Cascading Session.Team was also enriched with Training on transition from Service to Sales preparing them for Rooftop Solar business.
Last Year Hits & Miss were discussed, Session ended with awarding of Winners for their contribution to business.
ACME celebrated World Environment Day on
5th June 2017.
ACME Safety Compliance EHS Training
Results:
AIM-: The AIM of conducting such kind of training program is to robust EHS Management System, Continual Improvement & Sustainability in EHS Management in entire circles of ACME.
Earlier we have done such kind of programs in Delhi, Rajasthan, Gujarat & UP East Circle. During such kind of training programs, circle team also give training of technicians about new initiative of organizations & importance of RAS, FQB, Tab Utilization.
We have observed Sustainability in EHS Performance since last 4 months.There is an increase in the number of Safety Training & Audit. We have observed improvement in knowledge of our engineers in terms of EHS. There is a fall in the Safety Violations in the Circles.After training, we have also observed that Safety Champions are more responsive than earlier. They started participating in Safety Con-call & report any near-misses, accidents & unsafe activities.
AOP Cascading Session
World Environment Day
PARAMETER BEFORE AFTER
EHS Dashboard Score RAJ - 20%GUJ - 50%UPE - 40%
RAJ - 70%, 100%GUJ - 100%UPE - 100%
Safety Trainings Only 45-50% Training sessions
90%+ Training sessions since last 4 months
Use of Safety App Only 65 - 70% Audit
90%+ Audit since last 4 months
Safety Violation 7 Nos. Violation in Jan
2 Nos. violation since last 4 months
Engineers Exam Report (UPE ) 52% 79%
Sustainability In EHS Dashboard 90%+ since last 4 months
100%Safety Dashboard
Score Ever(March 2017)
DIGEST
APPRECIATION
From:To:For:
Indus TowersRavi Kant, Punjab Circle
From:To:For:
Indus TowersAbhishek Pathak, Punjab Circle
From:To:For:
Indus TowersAbhishek Pathak, Punjab Circle
100% NMS communication.
From:To:For:
Bharti Infratel LimitedAnkit Mangla, Haryana Circle
Providing great support to close sites on time during BIL corporate team visit and maintainingNo. 1 Position in PAN India for all verticals.
Harish Kumar/ Devendra Singh Bisht, Himachal CircleFor:
From:To:
Bharti Infratel Limited
Attending to the complaints timely and proper PM to reduce BD calls.
Timely doing PM on hub sites and quickly resolving the fault.
100% Proper PM to reduce BD calls. Zero BD calls for respective FSE.
From:To:For:
Indus TowersAnil Verma, Punjab Circle
From:To:For:
Bharti Infratel LimitedJaypal Singh/ Devendra Singh Bisht, Haryana Circle
Supporting Operations Team in closing all PIU issues on priority.
From:To:For:
Indus TowersDevendra Singh Bisht, Punjab Circle
Supporting Operations Team in closing all PIU issues on priority.
Providing great support to close sites timely during corporate team visit.
WALLOF
APPRECIATION
TOP EFSR - APRIL 2017
Vinay Kumar M.Karnataka
P. SatyanarayanaTelangana
G. Ravi
Rajiv KumarChandigarh
PIU/PMS -FIELD SERVICE REPORT-Maintenance check list
Customer Name: Indus Towers Limited
Site ID: IN-1138993 (INCS00011857753)
Name: Gulagalale
Type: Non-Strategic
Site Address: INDIA
FAULT DESCRIPTION: ACME Auto Indus TT Upload
FSR No.: 169526 Date: 14-04-2017
Call Type: BD
Engineer Name: VINAY KUMAR.M
TT No.: ACME/06/04/2017/1389
Attend Date: 04-14-2017 Time: 01:07 PM
Close Date: 04-14-2017 Time: 02:41 PM
Circle Name: KARNATAKA Cluster: HASSAN
Call Status: Complete
INPUT PARAMETERS:V(R-Y): 394V V(Y-B): 396 V(B-R): 392 V(N-E): 0V
I ( R ): 11 I ( Y ): 10 I ( B ): 0 I ( N ): 0
OUTPUT PARAMETERS:V(R-N): 222 V(Y-N): 0 V(B-N): 0 V(N-E): 0
LCU-1 O/PCurrent: 19 LCU-2
O/P Current: 0 LCU-3O/P Current: 0 PIU display
O/P Current: 19
AUTOMATION: OK NOT OK
DG Automation Cable : OK
DG Battery Charger : OK
DG Relay Box / Start Stop Switch : OK
PIU DETAILS: Indoor Outdoor
PIU Type: Normal Range
Sr.No.: PIU12/E/014684/08 Rating: 25
PIU Model/Version: SPPRTUV1.5A
LCU Rating: 12.5 Qty: 1
LCU Type: 12.5 LCU Batch No: NA
PIU Installation Date: 14-12-2008
SPD Make & Model: ODU
SPD Type: ODU
SPD Working Status: No
LCU bypassed underEnergy Project :
No
CPU Type: ASA10N0002-ASSY PCB(EPCB-SPP-T-SD)PIU
ALARM TEST: (Please tick if OK,cross if not OK)
Mains Fail: OK SOB:OK Rectifier Fail: OK Low Batt: HRT: OK Fire & Smoke: OK LLOP: OKDG Major Fault: OK DG On Load: OK DC Fuse fail: OK Door Open: OK HCT/HWT/LWL/V-Belt: OK Fire detector LED Condition: OK Fire Detector Position ( Roof Top): OK
PIU/PMS -FIELD SERVICE REPORT-Maintenance check list
Customer Name: Indus Towers Limited
Site ID: IN-1057858 (CRQN00001005619)
Name: Tanda Infill
Type: Non-Strategic
Site Address: INDIA
FAULT DESCRIPTION: ACME Auto Indus TT Upload
FSR No.: 163670 Date: 03-04-2017
Call Type: PM
Engineer Name: RAJIV KUMAR
TT No.: ACME/03/04/2017/0598
Attend Date: 04-03-2017 Time: 09:25 AM
Close Date: 04-03-2017 Time: 10:22 AM
Circle Name: CHANDIGARH Cluster: Hosiyarpur
Call Status: Complete
INPUT PARAMETERS:V(R-Y): 441V V(Y-B): 0 V(B-R): 0 V(N-E): 0V
I ( R ): 32 I ( Y ): 32 I ( B ): 0 I ( N ): 0
OUTPUT PARAMETERS:V(R-N): 214 V(Y-N): 212 V(B-N): 0 V(N-E): 0
LCU-1 O/PCurrent: 27 LCU-2
O/P Current: 33 LCU-3O/P Current: 0 PIU display
O/P Current: 60
AUTOMATION: OK NOT OK
DG Automation Cable : OK
DG Battery Charger : OK
DG Relay Box / Start Stop Switch : OK
PIU DETAILS: Indoor Outdoor
PIU Type: Normal Range
Sr.No.: ATP/12.5?2/04092881 Rating: 25
PIU Model/Version: SPPRTUV 1.4
LCU Rating: 12.5 Qty: 2
LCU Type: 12.5 LCU Batch No: NA
PIU Installation Date: 26-12-2005
SPD Make & Model: DEHN
SPD Type: DEHN
SPD Working Status: OK
LCU bypassed underEnergy Project :
No
CPU Type: ASA10N0002-ASSY PCB(EPCB-SPP-T-SD)PIU
PIU/PMS -FIELD SERVICE REPORT-Maintenance check list
Customer Name: Indus Towers Limited
Site ID: IN-1071765 (CRQN00001015961)
Name: Apat Colony
Type: Non-Strategic
Site Address: INDIA
FAULT DESCRIPTION: ACME Auto Indus TT Upload
FSR No.: 167236 Date: 10-04-2017
Call Type: PM
Engineer Name: P. SATYANARAYANA
TT No.: ACME/06/04/2017/0103
Attend Date: 04-10-2017 Time: 09:10 AM
Close Date: 04-10-2017 Time: 10:10 AM
Circle Name: TELANGANA Cluster: HYDERABAD
Call Status: Complete
INPUT PARAMETERS:V(R-Y): 410V V(Y-B): 415 V(B-R): 416 V(N-E): 0V
I ( R ): 15 I ( Y ): 15 I ( B ): 0 I ( N ): 0
OUTPUT PARAMETERS:V(R-N): 223 V(Y-N): 225 V(B-N): 0 V(N-E): 0
LCU-1 O/PCurrent: 15 LCU-2
O/P Current: 15 LCU-3O/P Current: 0 PIU display
O/P Current: 30
AUTOMATION: OK NOT OK
DG Automation Cable : OK
DG Battery Charger : OK
DG Relay Box / Start Stop Switch : OK
PIU DETAILS: Indoor Outdoor
PIU Type: Normal Range
Sr.No.: no Rating: 15
PIU Model/Version: piu 15kva
LCU Rating: 7.5 Qty: 2
LCU Type: 7.5 LCU Batch No: lcu75kva
PIU Installation Date: 10-3-2008
SPD Make & Model: DEHN
SPD Type: DEHN
SPD Working Status: OK
LCU bypassed underEnergy Project :
No
CPU Type: ASA10N0002-ASSY PCB(EPCB-SPP-T-SD)PIU
ALARM TEST: (Please tick if OK,cross if not OK)
Mains Fail: OK SOB:OK Rectifier Fail: OK Low Batt: HRT: OK Fire & Smoke: OK LLOP: OKDG Major Fault: OK DG On Load: OK DC Fuse fail: OK Door Open: OK HCT/HWT/LWL/V-Belt: OK Fire detector LED Condition: OK Fire Detector Position ( Roof Top): OK
Employees of the Month – April 2017
On-the-Spot Awardees – April 2017
PM within SLA : 100%Month Productivity : 1.1
R. Jagadeesh BabuAndhra Pradesh
Contact No. - 9010200153
Pradeep Kumar ShuklaGujarat
Contact No. – 8128105039
Rajesh KumarHaryana
Contact No. – 9812546685
Sarath R. MenonKerala
Contact No. – 9072584906
S.K. BasiruddinAssam
Contact No. - 8974462646
Vijyendra KumarChandigarh
Contact No. – 8054381010
Bhim SenHimachal Pradesh
Contact No. – 9805919181
Khaminder PaulJammu & Kashmir
Contact No. – 9906188978
Santosh Kumar N.Karnataka
Contact No. – 9611344375
Yastish Kumar SahuMadhya Pradesh
Contact No. – 7898760491
Mangesh DamodharSuryawanshi
Rahul Singh Pawan Pandey Arif Husain Rajesh Kumar
Shailender Singh
PM within SLA : 100%Month Productivity :2.8
PM within SLA : 100%Month Productivity : 3.7
PM withinSLA : 100%Month Productivity : 1.0
PM withinSLA : 97%Month Productivity : 2.2
PM within SLA : 100%Month Productivity : 1.7
PM within SLA : 100%Month Productivity : 2.3
PM within SLA : 100%Month Productivity : 1.1
PM within SLA : 96%Month Productivity : 2.0
PM within SLA : 100%Month Productivity : 1.7
PM within SLA : 100%Month Productivity : 1.2
PM within SLA : 100%Month Productivity : 1.7
PM within SLA : 90%Month Productivity : 2.2
PM within SLA : 100%Month Productivity : 1.8
PM within SLA : 84%Month Productivity : 2.2
He has achieved 100% compliance on call logging and response to customer. He is providing training to new agents about the process. He is maintaining daily MIS reports for review and ensuring call closure within TAT.
Best Average Reach At Site: 8:30AM – 9:30AM
April 2017
Safety Compliance Dashboardfor
Circles Scoring 100% Achievement
Andhra Pradesh Delhi Gujarat Haryana, Punjab &Himachal Pradesh Jammu & Kashmir KarnatakaMadhya Pradesh
Tamil NaduOdisha Bihar KeralaUttar Pradesh EastWest BengalNorth East & Assam
MaharashtraContact No. – 9673337978
RajasthanContact No. – 8233994339
UP EastContact No. – 9936843129
UP WestContact No. – 9808601018
DelhiContact No. – 9971428596
GEMCContact No. – 9560117293
BalveerYadavGEMCContact No. – 9694303296
He has achieved 100% PM on IBM Calls and has received Appreciation from Client. He ensures IBM the calls are being closed within TAT.
P. Pragatheeswaran Biswanath Sahoo Anand Kumar Tiwari S.K. Riazuddin Anand Singh Taragi
PM within SLA : 100%Month Productivity : 1.8
PM within SLA : 96%Month Productivity : 1.4
PM within SLA : 93%Month Productivity : 2.0
PM within SLA : 95%Month Productivity : 2.8
He has achieved highest productivity PAN India in repairing category and stands at 1st position as per the TRC productivity dashboard.
Tamil NaduContact No. – 7845464215
KolkataContact No. – 9800508507
BiharContact No. – 9771419722
OdishaContact No. – 9777963325
TRC (Rajasthan)Contact No. – 9828179412
Varun ChadiwalGEMCContact No. – 9416977889
He has achieved 100% PM compliance for HPH every month. He ensures that the calls are being closed within TAT. He has provided a major contribution in maintaining Tab usability in HPH circle.
Parkash ChanderSati
Working as office boy at Circle office, he has contributed in making timely dispatches & worked on RAMCO to support circle operations.
HPHContact No. – 9914555440
Subhash ChandraRudrapur PlantContact No. – 9758036434
He has provided a major contribution for different types of battery assembly, pack in (57-AH, 40-AH, 30-AH, 80-AH) on production line. He has repaired rejected batteries & used on production line and has given multi-skilled work performance in LIB production. Excellent team work & adherence to quality system.
Bidhan Kr. NathNESAContact No. – 9859239500
He has provided outstanding support in Tinsukia cluster (No AC Manpower) for closing AC PM/BD calls in the month of April'17. A total no. of 20 TT were closed by him in Tinsukia cluster.
Head Office: Plot No. 152, Sector 44, Gurugram - 122 002 (Haryana) IndiaPhone: +91-124-7117000 • Fax: +91-124-7117001 • Email: [email protected] • Website: www.acme.in
ACME Cleantech Solutions Private Limited