•click to edit master text styles •second level company … · 2011. 2. 28. · •click to...

8
Click to edit Master text styles Second level Third level Fourth level Fifth level Will Barrett February 17, 2011 Company Presentation

Upload: others

Post on 24-Feb-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth levelWill Barrett

February 17, 2011

Company Presentation

Page 2: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth level

• Founders• Jason France

• Mike Rogers

• Dave Packard

• In EV industry since 1993

• Developed 14 generations of EVSEs

• Shipped over 9,000 EVSEs in the US and Europe, including 4,500 shipped since 2009

• Numerous UL listed products, • One of the first companies through

UL1998, UL 2202 and UL 2231

ClipperCreekHistory

ClipperCreek / TS-90

Davis, CA

2009

Page 3: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth level

• EVSE Design and Manufacturing:Electric Vehicle Supply Equipment (EVSE) for BEVs and PHEVs

• UL Listed: Three UL listed products on the market: (CS, TS and PCS)

• Utilities: Currently working with US utilities: (SCE, PG&E, Southern Company, SMUD, Pepco, Northeast Utilities, Progress Energy…)

• Automakers: Currently working with automakers and distributors in NA, Europe and Japan: (BMW, Tesla, Mercedes, Nissan, Ford, Chrysler, GM, Magna E-car, Honda, Toyota …)

Company Position

ClipperCreek / TS-90

CPUC Meeting, San Francisco, CA

2009

Page 4: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth level

Current Infrastructure Product

• CS Line Public infrastructure

product• UL Listed

• 208 V / 240 V

• 20 to 80 Amps

• Upgrades

• LibertyPlugIn synchronous

code

• Access Control

• Revenue Collection

• Cale digital pay station

code generation

• Smart Grid/WiFi/Cellular data

collection

• Local web portal

• Cloud based data

collection

Page 5: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth level

• 20 mA CCID

• CCID self test

• Reclosure

• Load management

• Earth ground monitor

• Cold load pickup

• External control input

• External fault notification

• NEMA 4 enclosure

• 110 V to 240 V

• Models rated from 16 Amp to

100 Amp branch circuits

Current Product Specifications

ClipperCreek / TS-90

Dixon, CA

2009

Page 6: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth level

• Delphi partnership to

provide EVSEs to

Automakers

• Silver Spring Networks partnership to provide

smart grid integrated EVSE

to Silver Spring customers

• CE Certified EVSE

• On GSA Schedule GS07F0127V

News

NorthEast Utilities

Hartford, CT

2010

Page 7: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth level

• California Energy Commission

ClipperCreek, Inc. was chosen to replace existing infrastructure throughout the state.

Funded through

CEC AB 118

PON-09-006 Alternative and Renewable Fuel Infrastructure

• EVSE Deployment Program

ClipperCreek is partnering with the Bay Area AQMD

Big News

evchargermaps.com

Page 8: •Click to edit Master text styles •Second level Company … · 2011. 2. 28. · •Click to edit Master text styles •Second level •Third level •Fourth level •Fifth level

• Click to edit Master text styles

• Second level

• Third level

• Fourth level

• Fifth level

Thank YouWill Barrett

11805 Kemper RoadAuburn, CA 95603

[email protected] P530-887-8527 F

GSA Contract Number #

GS07F0127V