achievement report under nedp projectudpamizoram.nic.in/documents/others/final nedp... · sl. no....

137
1 | Page ACHIEVEMENT REPORT UNDER NEDP PROJECT 2016-17 & 2017-2018 Government of Mizoram Urban Development & Poverty Alleviation Department Aizawl, Mizoram

Upload: vophuc

Post on 08-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

1 | P a g e

ACHIEVEMENT REPORT

UNDER

NEDP PROJECT

2016-17

&

2017-2018

Government of Mizoram

Urban Development & Poverty Alleviation Department

Aizawl, Mizoram

2 | P a g e

FOREWARD

Urban Development and Poverty Alleviation Department is rendering its

effort towards sustainable development and growth of urban city and towns in

Mizoram through various National Schemes and missions and had achieved

remarkable outcome in the state for the welfare of urban societies especially the

weaker sections. Urban development is a big challenge for every city and state

as it invites many challenges and issues, although the state has undertaken

various kinds of actions to improve urban infrastructure and economy of urban

areas in Mizoram, no state owned specific plan, initiatives and action was

recognized in the state before the New Economic Development Policy that was

launched in 30th September 2016.

India has a total population of 1,210.2 million and out of this, 68.84% is

the population of rural areas and the urban areas comprises of 31.16%. As for

the state of Mizoram, rural population is 48.49% to the total population of the

state and the urban population is 51.51% to the total population. Mizoram’s

urban population percentage is very high as compared to the urban population

percentage of India, however; increase in urbanization is a healthy mark of the

State as the contribution of urban economy is highly crucial for the development

of the state economy as well. NEDP addresses the problem of transitional gap

that arise due to urbanization and its effect, such as transition from traditional

farming method into contemporary livelihood method, lack of infrastructure in

rural and urban areas, competition among entrepreneurs etc, all these affect the

state economy and live- ability in the state.

Keeping in mind the above mentioned issues in urban administration, The

department has taken its initiatives to have smart, clean and flourishing city and

urban towns, The Urban Development and Poverty Alleviation Department

plays an active role and is driving all urban development initiatives in Mizoram,

among which NEDP is one of the most important and effective programmes

being implemented by the department.

3 | P a g e

NEDP ALLOCATION 2016 -2017

Sl.No. Name of Scheme Amount

Rs(In lakhs)

1. Composite Infrastructure Development for

Urban Areas/ Localities schemes 1500.00

2

Urban Development:

(i) Operation and maintenance of existing

infrastructure/ equipments;

(ii) (ii) Provision of e-services/ e-offices

340.51

3 Aizawl Road junction improvement 650.00

(i) Improvement & Widening of Venghlui to

Republic Road – Pangi Junction; 95.74

(ii) Improvement of road junction atBawngkawn 283.63

(iii) Improvement of vaivakawn to Hunthar

Junction 142.20

4 Climate Change Mitigation – Sanitation and

Cleanliness Drive Component 25.00

TOTAL 2515.51

Physical and financial progress is 98%.

4 | P a g e

NEDP ALLOCATION 2017-2018

Sl.

No. Name of Schemes

Budget Estimate

Amount

Rs(In lakhs)

1 Improvement of Urban Infrastructure in the City/Towns

(UD&PA Components) 7500.00

2 Aizawl City Infrastructure Development 1500.00

3 Operation & Maintenance (Service Level) 500.00

4 Construction of Zodin Multilevel Car Parking 2500.00

5 Improvement of ATI Junction at New Secretariat 140.00

6 Climate Change Mitigation Initiatives 200.00

7 Construction of Mizoram State Convention Centre 5000.00

8 Aizawl City GIS Based Street Zoning and Signage 300.00

9. Additional fund for improvement of various connectivity in

Aizawl city 236.37

TOTAL 17876.37

5 | P a g e

Approved annual Action Plan for 2017-2018 NEDP

1) Improvement of Urban Infrastructure in the City/Towns -Rs. 7500lakh

(UD&PA Components)

Sl. No. Name of proposal Amount

(in lakh)

1

Composite urban infrastructure within Aizawl:

1) Internal roads

2) Pedestrian footpath

3) Drainage

4) Retaining wall

5) RCC Steps

6) Solid Waste Management

7) Culvert / Bridge

8) Parking

9) Other urban amenities

10) Etc.

2200.00

2

Composite urban infrastructure in city and census

towns:

1) Internal roads

2) Pedestrian footpath

3) Drainage

4) Retaining wall

5) RCC Steps

6) Solid Waste Management

7) Culvert / Bridge

8) Parking

9) Other urban amenities

10) Etc.

1510.00

3 Continuation of Pavilion & Gallery at Rajiv Gandhi

Stadium atMualpui, Aizawl 2350.00

4 Zero Waste Projects at Selected Institutions (PUC,

HATIM, ATC, and AICS) 60.00

5 Providing and laying of Artificial Turf (including

approach road atMeisatla) Siaha 650.00

6 Purchase of Garbage dumping trucks (4 nos.) 72.00

7 Completion of Directorate Office building UD&PA

Department 600.00

8 Completion of Linkages of Road from Ramhlun

South YMA Hall to main road atRamhlun South,

Aizawl

30.00

9 Construction of Road atKhatla South Vengthar

(approach road to Thlanmual via Khatla South

Vengthar Presbyterian Church)

28.00

TOTAL 7500.00

6 | P a g e

2) AizawlCity Infrastructure Development- Rs. 1500 lakh

Sl. No. Name of proposal Amount

(in lakh)

1

Junctions Improvement 50,000,000.00

i) Dinthar Junction atDawrpuiVengthar 127,87,350.00

ii) Improvement of industry pengatRamhlun North 63,38,000.00

iii) Improvement of Venghlui to Republic road on

upper Republic at Pi Pangi junction 94,05,000.00

iv) Improvement of 3rd

Bn MAP junction atATI veng

and Salem veng border 44,28,200.00

v) Improvement of Armed Veng to Chhingaveng

Junction 42,57,000.00

vi) Improvement of Kawipui junction at Republic

Veng 61,92,450.00

vii) Improvement of Magazine kawn to Armed

Veng South Hall at Armed Veng South, Aizawl 65,92,000.00

2

Construction of elevated road from

HangiLunglentlang connecting to DurtlangLeitan

(Consultancy Works)

138.14

Supply and Installation of Synthetic Athletic Track

atSerchhip Stadium 334.80

Rajiv Gandhi Stadium GST 177.06

3 Re-construction of car parking near Power House at

Electric Veng. 100.00

4 Multi level car parking at College Veng 150.00

5 Improvement & widening of roads and improvement

of traffic island at various locations of the city. 82.00

6. Construction of Pedestrian side walk with Hand

railing along the main road at Bara Bazar, Dawrpui 18

TOTAL 1500.00

7 | P a g e

3) Operation & Maintenance (Service Level) - Rs. 500lakh

Sl.No Name of proposal Amount

(in lakh)

1 Construction of Public Service Centre for EWS Housing

Complex atDurtlangLeitan 50.00

2 Repairing and maintenance of housing phase II complex at

New Secretariat Complex 30.00

3

Fencing of BSUP Housing Complex

1. Lawipu

2. Edenthar

3. Durtlang

4. Rangvamual

80.00

4 Operation and maintenance of Crematorium atSairang 20.00

5 Acoustic treatment & lighting of Community Hall atSaitual 5.00

6 Construction of Departmental Quarters with fencing

atRamthar, Lunglei 40.00

7 Construction of Departmental quarters with fencing

atKhuangpuilam, Kolasib 40.00

8 Development of Site for Proposed Re-creation Centre

atThenzawl 65.00

9 Fencing of RAY project Site at Falkland 10.00

10 Providing external water connection and external power

connection for Sports Stadium atSerchhip and Champhai 15.00

11 Construction of DUDO office atSerchhip (60 lakhs) and

Mamit (40 lakhs) 100.00

12 Repair and Renovation of Dumping grounds 45.00

TOTAL 500.00

8 | P a g e

4) Construction of Zodin Multi Level Car Parking - Rs. 2500 lakh

5) Improvement of ATI Junction at New Secretariat Complex -Rs. 140lakh

6) Climate Change Mitigation Initiatives – Sanitation and -Rs. 200lakh

Cleanliness Drive Component

7) Construction of Mizoram State Convention Centre -Rs. 5000lakh

8) Aizawl City GIS Based Street Zoning and Signage -Rs. 300lakh

9) Link Road Armed veng S to Bethlehem VT -Rs 107.43

10) LC Road at armed Veng S -Rs 9.68

11) Approach road to Chaltlang road Lily Vengcemetary -Rs 35.00

12) Reno. & black Topping of Roads between NH 54 and BSNL land at durtlang N –

Rs 39.25

13) Approach Road to SairangSaronveng road - Rs 50.00

14) Enhancement of Armed VengCom.Centre -Rs40.01

9 | P a g e

ACHIEVEMENT REPORT OF NEDP 2016 – 2017

1. Composite Infrastructure Development for Urban Areas/ Localities schemes

= Rs 1500 lakh.

The Scheme covered Aizawl city and five other District towns

LungleiChamphai, Serchhip,Kolasib and Mamit

Urban infrastructure Components mainly includes:

- Public Amenities and Utilities

- Drainage System improvement

- Improvement of Internal Roads

- RCC Culvert/Bridge

- Protection work(retaining wall)

- Vertical linkage(Masonry/RCC steps)

- Masonry/Cement Concrete Flooring.

The above said infrastructures were constructed based on the needs and

proposals from local authorities and fund was allocated among various localities in

urban areas. Mizoram, being a steep and hilly terrain, there needs to be construction

of various protection works to avoid landslide and possible disaster; moreover,

connectivity and drains in urban areas are also improved with fund received from

composite Infrastructure development fund under NEDP

Following are various works implemented under Composite Infrastructure

development for Urban area / Localities Schemes under NEDP 2016-2017 :

1. Name of Work : Construction of Link Drain near Saithanchhunga’s

house atChanmari West

2. Amount : Rs. 1,00,000.00

3. Location : Chanmari West, Aizawl

4. Status : Completed

10 | P a g e

1. Name of Work : Laying of chequered tile Near PuH.Lalmuana’s house

atChanmari West.

2. Amount : Rs. 1,00,000.00

3. Location : Chanmari West

4. Status : Completed

1. Name of Work : Laying of Chequered tile near Pu.RunaMualatChanmari

West, Aizawl

2. Amount : Rs. 1,0,000.00

3. Location : Chanmari West

4. Status : Completed

11 | P a g e

1. Name of Work : RCC Slab Culvert on DamdiaiLuihnaratEdenthar,

Aizawl.

2. Amount : Rs. 1,50,000.00

3. Location : Edenthar

4. Status : Completed

1. Name of Work : Construction of Crash barrier near Chakma House

atHunthar, Aizawl

2. Amount : Rs. 1,00,000.00

3. Location : Hunthar

4. Status : Completed

12 | P a g e

1. Name of Work : Construction of step with chequered tile near

PuR.Pakunga to Central road T-section atChanmari

West, Aizawl

2. Amount : Rs. 1,50,000.00

3. Location : Chanmari West, Aizawl

4. Status : Completed

1. Name of Work : Construction of drain near Rochungnunga’s house at,

Chanmari

2. Amount : Rs. 1,00,000.00

3. Location : Chanmari, Aizawl

4. Status : Completed

13 | P a g e

1. Name of Work : Construction of drain near Singhmuaka’s house

atChanmari, Aizawl.

2. Amount : Rs. 1,25,000.00

3. Location : Chanmari

4. Status : Completed

1. Name of Work : Construction of Drain between EdentharTuikhur to

PuHrangliana house atEdenthar

2. Amount : Rs. 1,50,000.00

3. Location : Hunthar

4. Status : Completed

14 | P a g e

1. Name Of Work : Construction of S/M Step Near PuHrangliantawna

(L) House AtZuangtui

2. Amount : Rs. 1,20,000 /-

3. Location : Zuangtui

4. Status : Completed

1. Name Of Work : Construction of Public Step atZuangtuiVengthar

2. Amount : Rs. 1,50,000 /-

3. Location : Zuangtui

4. Status : Completed

15 | P a g e

1. Name of Work : Construction of Public TuikhuratZuangtuiVengthar

2. Amount : Rs. 1,00,000 /-

3. Location : Zuangtui

4. Status : Completed

1. Name of Work : Construction of S/M step with railing near

PuLalchungnunga's house atZemabawk North

2. Amount : Rs. 1,50,000 /-

3. Location : Zemabawk North

4. Status : Completed

16 | P a g e

1. Name of Work : Construction of s/m step with railing near

PuRemliana's house atZemabawkNorth

2. Amount : Rs. 1,50,000 /-

3. Location : Zemabawk North

4. Status : Completed

1. Name of Work : Laying of chequered tile near PuLalrema'sColney

house atZemabawk North - diverted

2. Amount : Rs. 60,000 /-

3. Location : Zemabawk North

4. Status : Completed

17 | P a g e

1. Name of Work : Construction of S/M step with railing near

PuRodinga's houseatZemabawk North

2. Amount : Rs. 1,50,000 /-

3. Location : Zemabawk North

4. Status : Completed

1. Name of Work : Construction of R/Wall below Zemabawk Cemetery

2. Amount : Rs.2,00,000 /-

3. Location : Zemabawk

4. Status : Completed

18 | P a g e

1. Name of Work : Construction of S/M R/Wall on parallel road to

Bethel Veng, Zemabawk

2. Amount : Rs.1,00,000 /-

3. Location : Zemabawk

4. Status : Completed

1. Name of Work : Construction of Minor RCC slab Culvert between

Thlanmual& Middle School Mual(Approach to

Supply peng)

2. Amount : Rs.95,000 /-

3. Location : Zemabawk

4. Status : Completed

19 | P a g e

1. Name of Work : Construction of minor RCC slab culvert near

PuLalrinfela's house at Middle School Veng,

Zemabawk(Approach to Supply peng)

2. Amount : Rs.1,08,000 /-

3. Location : Zemabawk

4. Status : Completed

1. Name of Work : Construction of link drain near Primary School at

Bung Bangla

2. Amount : Rs.1,50,000 /-

3. Location : Zemabawk

4. Status : Completed

20 | P a g e

1. Name of Work : Construction of Culvert near Upper Primary School

atZemabawkBerawLui

2. Amount : Rs.1,50,000 /-

3. Location : Zemabawk

4. Status : Completed

1. Name of Work : Construction of link drain on approach to RC road

near A.Ralmana house atDurtlangLeitanDIVERTED

2. Amount : Rs.150,000 /-

3. Location : DurtlangLeitan

4. Status : Completed

21 | P a g e

1. Name of Work : Construction of step near PuThanchhunga house

atDurtlangRamthar

2. Amount : Rs.1,30,000 /-

3. Location : DurtlangLeitan

4. Status : Completed

1. Name of Work : Construction Of Slab Culvert Below Pu

Hmangaihzuala House AtDurtlangRamthar

2. Amount : Rs.2,00,000 /-

3. Location : DurtlangLeitan

4. Status : Completed

22 | P a g e

1. Name of Work : Construction of RCC Step Cover Drain at Shalom

Veng.

2. Amount : Rs.5,00,000/-

3. Location : Bawngkawn

4. Status : Completed

1. Name of Work : Construction of S/M Step atBawngkawn

Thlanmual

2. Amount : Rs.1,50,000 /-

3. Location : Bawngkawn

4. Status : Completed

23 | P a g e

1. Name of Work : Construction of PCC Flooring with Turning Point

at Salvation Army Church Road atThuampui

West, Aizawl

2. Amount : Rs.2,50,000/-

3. Location : Thuampui

4. Status : Completed

24 | P a g e

1. Name of Work : Construction Of Retaining Wall Near KT

Lalrikhuma'sHouse atThuampui

2. Amount : Rs.2,00,000 /-

3. Location : Thuampui

4. Status : Completed

25 | P a g e

1. Name of Work : Construction of Culvert Near Boupena House At

Thuampui

2. Amount : Rs.2,00,000 /-

3. Location : Thuampui

4. Status : Completed

26 | P a g e

1. Name of Work : Construction Of Steel Hand Railing at Golden

Jubilee Road,ElectricVeng

2. Amount : Rs.1,00,000 /-

3. Location : Electric Veng

4. Status : Completed-

27 | P a g e

1.Name of Work : Reparing Of Side Drain Near St. Mary Church At

Electric Veng

2. Amount : Rs.1,00,000 /-

3.Location : Electric Veng

4. Status : Completed

28 | P a g e

1. Name of Work : Repairing of Step at Electric Vengchung To

Presbyterian Churchat Electric Veng -Diverted

2. Amount : Rs.1,00,000 /-

3. Location : Electric Veng

4. Status : Completed

29 | P a g e

1. Name of Work : Construction of Step Between Pu J.Lungawia

House and PuDosavunga House At Electric Veng

Diverted

2. Amount : Rs.1,50,000 /-

3. Location : Electric Veng

4. Status : Completed

30 | P a g e

1. Name of Work : Construction Of Steel Hand Railing at

PuVanlalngena (L) House ToLalchungnunga House

At Electric Veng

2. Amount : Rs.1,00,000 /-

3. Location : Electric Veng

4. Status : Completed

31 | P a g e

1. Name of Work : Construction of Step over Drain between

J.Dengdailova House and K.Lalhmuaka House at

Electric Veng

2. Amount : Rs.3,50,000 /-

3. Location : Electric Veng

4. Status : Completed

32 | P a g e

1. Name of Work : Construction of Link Road Thlanmual To

Pi R.Zamawii Ram Mawng

2. Amount : Rs.4,00,000 /-

3. Location : Falkland

4. Status : Completed

1. Name Of Work : Construction Of Pavillion For Volleyball Court At

Falkland

2. Amount : Rs.1, 50,000 /-

3. Location : Falkland

4. Status : Completed

33 | P a g e

1. Name Of Work : Construction of RCC Slab covering of Side Drain

fromZarkawtKawn to PuLalrinawma House

atZarkawt

2. Amount : Rs.1,50,000 /-

3. Location : Zarkawt

4. Status : Completed

34 | P a g e

1. Name of Work : Construction Of Footpath With Side Drain In Front

ofPuRamhermawia House AtZarkawt

2. Amount : Rs.2,50,000 /-

3. Location : Zarkawt

4. Status : Completed

35 | P a g e

1. Name of Work : Construction Of Steel Hand Railing From Zarkawt

Kawn to PuZamliana House PwdTlang

2. Amount : Rs.1,30,000 /-

3. Location : Zarkawt

4. Status : Completed

36 | P a g e

1. Name Of Work : Construction of Drain Cover Near PuZalawma(L)

House atZarkawt

2. Amount : Rs.1,30,000 /-

3. Location : Zarkawt

4. Status : Completed

37 | P a g e

1. Name Of Work : Laying of Chequered Tile from Ahimsa Hotel to

PuThangchuanga House atZarkawt

2. Amount : Rs.1,00,000 /-

3. Location : Zarkawt

4. Status : Completed

1. Name of Work : Construction of side drain near PuRolawma's house.

2. Amount : Rs 1,50,000.00

3. Location : RamhlunVenglai

4. Status : Completed

38 | P a g e

1. Name of Work : Construction of step hand railing revelation near Pu LR

Dama's house

2. Amount : Rs 1,20,000.00

3. Location : RamhlunVenglai

4. Status : Completed

1. Name of Work : Construction of side drain near PuLalhmingliana's

house.

2. Amount : Rs 1,50,000.00

3. Location : RamhlunVenglai

4. Status : Completed

39 | P a g e

1. Name of Work : Construction of R/wall below PuVanlalsangaPachuau

house.

2. Amount : Rs 2,00,000.00

3. Location : Ramhlun Sport Complex.

4. Status : Completed

1. Name of Work : Construction of retaining wall for protection Laipuitlang

landslide at Upper lane

2. Amount : Rs 1,50,000.00

3. Location : Laipuitlang

4. Status : Completed

40 | P a g e

1. Name of Work : Construction of step between Rev.Zolawma's and Pu

Hrangchhuana's house.

2. Amount : Rs 1,50,000.00

3. Location : AizawlVenglai

4. Status : Completed

1. Name of Work :Construction of PCC florring approach road from

H.BuanaTuikhur to SL Zamveli's house.

2. Amount : Rs 2,00,000.00

3. Location : RamhlunVengthar

4. Status : Completed

BEFORE AFTER

AFTER

41 | P a g e

1. Name of Work : Repairing of Step and laying of Chequered tile near Pu

Bawichhunga house.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Construction of hand railing and step on approach to

YMA Hall near PuHrangchhuana's house.

2. Amount : Rs 3,00,000.00

3. Location : AizawlVenglai

4. Status : Completed

42 | P a g e

1. Name of Work : Repairing of Step and Laying of Chequered tile near

Zirtiri College atAizawlVenglai.

2. Amount : Rs 1,00,000.00

3. Location : AizawlVenglai

4. Status : Completed

BEFORE

AFTER

43 | P a g e

1. Name of Work : Construction of step near PuChawngzidinga's house.

2. Amount : Rs 1,00,000.00

3. Location : RamhlunVengthar

4. Status : Completed

1. Name of Work : Construction of hand railing between PuSangthanga's

house and PuLaltanpuis's house

2. Amount : Rs 1,00,000.00

3. Location : Ramhlun South

4. Status : Completed

44 | P a g e

1. Name of Work : Construction of S/M step with laying of chequered tile

and hand railing near Salvation Church.

2. Amount : Rs 1,50,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Construction of S/M retaining wall & hand railing near

PuChhuanawmatuikhur.

2. Amount : Rs 1,50,000.00

3. Location : Ramhlun South.

4. Status : Completed

45 | P a g e

1. Name of Work : Construction of R/Wall near Pi Tawii(L) house.

2. Amount : Rs 1,50,000.00

3. Location : Laipuitlang

4. Status : Completed

1. Name of Work : Continuation for construction of drain near Ramhlun

South High School.

2. Amount : Rs 4,00,000.00

3. Location : Ramhlun South.

4. Status : Completed

46 | P a g e

1. Name of Work : Construction of steel handrailing near Taxi Stand.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng

4. Status : Completed

1. Name of Work : Construction of step hand railing near Pu LR Dama's

house.

2. Amount : Rs 1,20,000.00

3. Location : RamhlunVenglai.

4. Status : Completed

47 | P a g e

1. Name of Work : Construction of footpath near Presbyterian Church.

2. Amount : Rs 3,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Construction of step over drain between PuJ.Zahaua

house to PuR.Thangzuala house.

2. Amount : Rs 3,00,000.00

3. Location : Ramhlun Sport Complex.

4. Status : Completed

48 | P a g e

1. Name of Work : Construction of side drain from PuT.Remmawia's house

to Rehabilitation Centre.

2. Amount : Rs 1,50,000.00

3. Location : Ramhlun Sport Complex.

4. Status : Completed

1. Name of Work : New construction of step between Dr.Palaia and Pu

V.Vanlawma's house.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

49 | P a g e

1. Name of Work : Retaining wall near RamtharTlangveng Taxi Stand.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Continuation for construction of Tile Pavement on

internal road.

2. Amount : Rs 9,00,000.00

3. Location : Ramhlun South Vengchhak

4. Status : Completed

50 | P a g e

1. Name of Work : Construction of step with hand railing from PC

Zonunsanga's house to H.BuanaTuikhur.

2. Amount : Rs 2,00,000.00

3. Location : RamhlunVengthar.

4. Status : Completed

51 | P a g e

1. Name of Work : Re-Construction of drain near PuLalromana’s house.

2. Amount : Rs 1,00,000.00

3. Location : Ramthar North.

4. Status : Completed

BEFORE

52 | P a g e

1. Name of Work : Laying of chequered tile from PuBiaka's house to

Edenthar area atChaltlangTatkawngveng.

2. Amount : Rs. 2,00,000.00

3. Location : Chaltlang.

4. Status : Completed.

53 | P a g e

1. Name of Work : Repairing of Chequered tile between Pu

Laldingliana’s House and Ramhlun road at

ChaltlangTatkawngVeng.

2. Amount : Rs 2,50,000.00

3. Location : Chaltlang.

4. Status : Completed.

54 | P a g e

1. Name of Work : Laying of chequered tile from Adinga's house to

ZotuiatTatkawngVeng.

2. Amount : Rs 1,00,000.00

3. Location : Chaltlang

4. Status : Completed

1. Name of Work : Construction of R/Wall below LalremlianiRalte

house atChaltlang

2. Amount : Rs1,50,000.00

3. Location : Chaltlang

4. Status : Completed

55 | P a g e

1. Name of Work : RCC balcony for widening of road near

Lalchhanhimi's house atChaltlangVenglai

2. Amount : Rs3,00,000.00

3. Location : Chaltlang

4. Status : Completed

1. Name of Work : Continuation of pedestrian footpath near

Hrangbana Petrol pump atChaltlang Lily Veng

2. Amount : Rs7,00,000.00

3. Location : Chaltlang North

4. Status : Completed

5. S

t

a

t

u

s

:

1.

56 | P a g e

1. Name of Work : Construction of step and side drain near

PuKawlhlira house Lily vengJeepable road to

Thlanmual step(Diverted)

2. Amount : Rs1,00,000.00

3. Location : Chaltlang North

4. Status : Completed

1. Name of Work : Construction of step near PuT.Siama house

atDurtlangMualVeng

2. Amount : Rs1,50,000.00

3. Location : Durtlang

4. Status : Completed

57 | P a g e

1. Name of Work : Construction of R/Wall near PuV.Manliana house

atDurtlangMualVeng(Diverted)

2. Amount : Rs2,00,000.00

3. Location : Durtlang

4. Status : Completed

58 | P a g e

1. Name of Work : Construction of step between ChhuahlamTuikhur to

Zuangtui road atSelesih

2. Amount : Rs1,20,000.00

3. Location : Selesih

4. Status : Completed

59 | P a g e

1. Name of Work : Continuation of chequered tile atZoramthara Road

atSelesih

2. Amount : Rs 1,00,000.00

3. Location : Selesih

4. Status : Completed

1. Name of Work : Laying of chequered tile between Presbyterian

Church to PWD road atSihphirVenghlun

2. Amount : Rs1,50,000.00

3. Location : SihphirVenghlun

4. Status : Completed

60 | P a g e

1. Name of Work : Construction of S/M Step between M/S -I Arpu to

PuLalramlawma house atSihphir

2. Amount : Rs2,00,000.00

3. Location : Sihphir

4. Status : Completed

61 | P a g e

1. Name of Work : Repairing of Step & drain near PuC.Liankima (L)

house atBawngkawn 'S'

2. Amount : Rs 3,00,000.00

3. Location : Bawngkawn South.

4. Status : Completed

62 | P a g e

1. Name of Work : Construction of drain cover near Vety Side Office

atBawngkawn 'S'

2. Amount : Rs50,000.00

3. Location : Bawngkawn South.

4. Status : Completed.

1. Name of Work : Construction of hand railing near Pu

CB.Thanghluta’sHouseatBawngkawn 'S'

(Diverted)

2. Amount : Rs80,000.00

3. Location : Bawngkawn South.

4. Status : Completed.

63 | P a g e

1. Name of Work : Construction of side drain near PuLalbiakthuama’s

house atBawngkawn 'S'

2. Amount : Rs1,00,000.00

3. Location : Bawngkawn South.

4. Status : Completed

64 | P a g e

1. Name of Work : Construction of step for approach to Seven day

Church atDurtlang North

2. Amount : Rs1,50,000.00

3. Location : Durtlang North.

4. Status : Completed

1. Name of Work : Construction of R/Wall near Rotlinga's house at

Durtlang North

2. Amount : Rs2,00,000.00

3. Location : Durtlang North.

4. Status : Completed

:

65 | P a g e

1. Name of Work : Laying of C.Tile between Community Hall and

College Road atRamhlun North.

2. Amount : Rs1,98,000.00

3. Location : Ramhlun North.

4. Status : Completed

1. N

ame

of

Wor

k

:

Con

stru

ctio

n of

66 | P a g e

footpath with hand railing near Pu John Biakliana's house

at Industry Mual

2. Amount : Rs63,000.00

3. Location : Ramhlun North.

4. Status : Completed

67 | P a g e

1. Name of Work : Construction of RCC footpath near Damhlia's

house at Basic Mual

2. Amount : Rs1,20,000.00

3. Location : Ramhlun North.

4. Status : Completed

68 | P a g e

1. Nameof Work : Construction of step with chequered tile near PuSapluta(L)

house at Armed veng

2. Location : Armed veng

3. Amount : Rs 80,000.00

4. Status : Completed

1. Name of Work : Construction of step and R/WallbetweenK.Liankunga

house to Phirthanga house atArmedveng

2. Location : Armed veng

3. Amount : Rs 2,00,000.00

4. Status : Completed

69 | P a g e

1.Name of Work : Reparing of Footpath and hand railing near Dawrpui

Presbyterian church atDawrpui

2.Location : Dawrpui

3.Amount : Rs 50,000.00

4.Status : Completed

1. Name of Work : Construction of s/m R/Wall from Nazareth English

School to Vengthar main road atChhingaveng

2. Location : Chhingaveng

3. Amount : Rs 1,50,,000.00

4. Status : Completed

70 | P a g e

1. Name of Work: - Laying of Chequered tile on existing step from Thangveli

house and C.Lalbiakthanga house.

2. Location :SaronVeng, Aizawl.

3. Amount :Rs. 80,000.00

4. Status : Completed.

1. Name of Work: - Repairing of Steps and side drain at P&E transformer to Pi

Sangzuali’s house.

2. Location :ChiteVeng, Aizawl.

3. Amount :Rs. 1,00,000.00

4. Status : Completed.

1. Name of Work: Construction of

R/Wall for Chhuanliana BVT road.

2. Location : Bethlehem Vengthlang, Aizawl.

71 | P a g e

3. Amount :Rs. 2,50,000.00

4. Status : Completed.

5. Name of Work : Construction of Step near JH.Rokamlova’s house.

6. Location : Tuithiang, Aizawl.

7. Amount : Rs. 1,50,000.00

8. Status : Completed.

72 | P a g e

1. Name of Work : Construction of step from VenglaiTuikhur to Upa

Vanlalsiama’s house.

2. Location :Tuithiang, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

1. Name of Work : Repairing andrenovate of tennis court bus stand at

Tuikualsouth

2.Amount : Rs 1,50,000.00

3.Location : Khatla East, Aizawl

4.Status : Complete

73 | P a g e

1.Nameof Work : Renovation of Tuichhunchhuah waiting shed at Tu8ikual

South

2.Amount : Rs 50,000.00

3.Location : Tuikual South, Aizawl

4.Status : Complete

1.Nameof Work : Re-Construction of SakhisihTuikhurat model veng, aizawl

2.Amount : Rs 2,50,000.00

3.Location : model veng, Aizawl

4.Status : Complete

74 | P a g e

1.Nameof Work : Construction off motor turning point approach to

Thlanmualatmaubawk

2.Amount : Rs 2,50,000.00

3.Location : Maubawk, Aizawl

4.Status : Complete

1.Nameof Work : Construction off R/Wall and Hand railing below CP road

near Thlanmualattuikual ‘S’

2.Amount : Rs 1,00,000.00

3.Location : Tuikual ‘S’, Aizawl

4.Status : Complete

75 | P a g e

1.Nameof Work : Re-Construction of public step near Pu Joseph L.Ralte

house atchawnpui

2.Amount : Rs 9,00,000.00

3.Location : Chawnpui, Aizawl

4.Status : Complete

1.Nameof Work : Construction of hand railing between Gosenpeng to YMA

run at Tlangnuam VT

2.Amount : Rs 1,50,000.00

3.Location : TlangnuamVt, Aizawl

4.Status : Complete

76 | P a g e

1.Nameof Work : Construction ofPCCFlooringat Rangvamual

Sairangkawnghlui near Prresbyteerian church

2.Amount : Rs 1,00,000.00

3.Location : Rangvamual, Aizawl

4.Status : Complete

1.Nameof Work : Continuation of cement concrete flooring for approach to

hlimen H/S vengchungat

2.Amount : Rs 2,50,000.00

3.Location : HLIMEN, Aizawl

4.Status : Complete

77 | P a g e

1.Name of Work : Construction of RCC slab between primary school to

middle school road atlawipu

2.Amount : Rs 1,50,000.00

3.Location : Lawipu, Aizawl

4.Status : complete

1.Nameof Work : Construction of side Drain near Zonuam Police outpost at

Zonuam

2.Amount :Rs 1,00,000.00

3.Location : Zonuam, Aizawl

4.Status : Complete

78 | P a g e

1.Nameof Work : Construction of Step below Rotuaki house atkulikawn

2.Amount : Rs 2,00,000.00

3.Location : Kulikawn, Aizawl

4.Status : Complete

1.Nameof Work : Construction of culvert with hand railing below

PuVanlawma’s house atKhatla ‘E’

2.Amount : Rs 3,00,000.00

3.Location : Khatla ‘E’, Aizawl

4.Status : Complete

79 | P a g e

1.Nameof Work : Laying of Chequered tile near Presbyterian church at

vaivakawn

2.Amount : Rs 1,00,000.00

3.Location : Vaivakawn, Aizawl

4.Status : Complete

1.Nameof Work : Construction of step from anganwadicentre to health

centreatTuikhuahtlang

2.Amount : Rs 2,00,000.00

3.Location : Tuikhuahtlang, Aizawl

4.Status : Complete

80 | P a g e

1.Nameof Work : Construction of RCC flooring between kangthelhkawn to

H.Lalruata house atchawnpui

2.Amount : Rs 1,00,000.00

3.Location : Chawnpui, Aizawl

4.Status : Complete

1.Nameof Work : Laying of Chequered tile near chawnpuivengthlang

Presbyterian church atchawnpui

2.Amount : Rs 1,00,000.00

3.Location : Chawnpui, Aizawl

4.Status : Complete

81 | P a g e

2 . Infrastructure development (Operation and Maintenance) = Rs 340.51 lakh

(i) Improvement of service level in city and Towns-Rs 285.51 lakh

(ii) Provision of e-Office/e Service-Rs 40 lakh

(iii) Furnishing of AIST Accomodation- Rs 15.00 lakh

Under Infrastucture Development ( Operation and Maintenance) various urban

infrastructures were maintained and developed, Community assets were created,

maintained, renovated and requirements were met through fund from NEDP by the

Department, with developing urban economy, transformation and increase in

population , various challenges arise in urban towns and city in Mizoram, such as

issues on urban economy, issues on urban sanitation, issues on urban poverty and

transportation etc and the Department is giving its effort to meet the needs of

urbanites and its welfare through this State Flagship programme NEDP.

Photographs of various Works implemented under Infrastructure development

(Operation and Maintenance) NEDP are as follows:

(i) Improvement of service level in city and Towns-Rs 285.51 lakh

Repair and renovation of Dumping ground atKhawzawlRs 5 lakh

82 | P a g e

Re construction of retaining wall above National Highway atPenielVeng,

Hnahthial

83 | P a g e

Improvement of Community Hall atsaitual town:

84 | P a g e

Improvement of Community Hall atElectric Veng, Hnahthialtown:

85 | P a g e

Improvement of bazaar Hall atSerchhipRs 12 lakh

86 | P a g e

Improvement of internal link Road from rev Vanlalauva’s House to Mission for

Christ Junction atdurtlangLeitan South Rs 35 lakh

87 | P a g e

Improvement of RCC elevated Public Road near PlaygroudatTlangnuam,

Aizawl (Phase –I& 1I) diversion Rs 35 lakh(2016-2017)+ Rs 35 lakh

(2017-2018) = Total Rs 70 lakh

88 | P a g e

Construction of RCC Ramp for Aizawl civil hospital ataizawlRs 18 lakh

89 | P a g e

Improvement of Approach road to BSUP site atlawipuRs 25 lakh

90 | P a g e

Improvement of Saron Road atChandmari,Aizawl Rs 12.41lakh

91 | P a g e

(iii) Provision of e-Office/e Service-Rs 40 lakh :

e-service facility and inaugurated by PuZodintluanga, Hon’ble Minister, UD&PA

on15th November, 2016. e- office was introduced in the office of Directorate of UD & PA department under operation and

maintenance, NEDP 2016-2017, The e- office is expected to benefit the department in better service

delivery, efficiency & cost reduction, besides, modern technology such as mobile apps which has

developed during the last five years has become very essential and benefits the government servants

in implementation of various National and state Missions/Schemes in a faster and effective manner.

3. Aizawl Road Junction improvement = Rs 650 lakh

92 | P a g e

Urbanization has led to an increase in business centers, various urban

constructions and moveable assets like public and private vehicles, without proper

planning and traffic management, a city become congested and cause difficultiesin

movement within the city, to resolve the issues encountered byAizawl city,

Aizawl city junction improvement project was initiated in the year 2016-2017

under NEDP.This is the pet project of hon’ble minister UD & PA department, and

the project was headed by UD & PA department, various departments such as

public Works department, Public Health Engineering Department and Service

Provider like BSNL etc are coordinating enthusiastically for the success of this

project. This project has benefitted public by resolving various traffic problems

that has emerged inaforementioned junctions.

1. Name of Work : Improvement & Widening of Venghlui to

Republic Road – Pangi Junction;

1. Amount : Rs. 95.74 lakh

2. Location : Republic veng

3. Status : Completed

93 | P a g e

1. Name of Work : Improvement of Bawngkawn Junction

2. Amount : Rs. 283.63 lakh

3. Location : Bawngkawnveng

4. Status : completed

94 | P a g e

1. Name of Work : Improvement of Vaivakawn to Hunthar junction

2. Amount : Rs. 142.20 lakh

3. Location : Huntharveng

4. Status : completed

95 | P a g e

4. Climate Change Mitigation – Sanitation and Cleanliness Drive Component -Rs

25lakh

Enormous increase in population,

urbanization and lack of awareness among

public results in an increase in urban waste,

these, without proper management and

treatment can hamper the urban health,

environment and can become very harmful for

environment and an obstacle for the growth of

the city and for future generations. This

requires an infrastructure, scientific treatment

of waste as well as an awareness among the

urbanites as cleanliness can only be achieved

through people’s participation and is a contribution everyone has to make, to tackle

this issues of major environmental concern, the department is initiating projects for

solid waste management through SBM Mission and funding from various sources and

as a means of convergence mission, Urban development and poverty alleviation

Department had instigated Sanitation and Cleanliness drive in all covered Urban

towns and Districts. Through this motive under NEDP 2016-2017, many urbanites

were educated and were made aware of environmental conservation.

Pic: Activities of Sanitation & Cleanliness drive in urban city and Towns

96 | P a g e

Permanent Hoarding displayed at various places in district headquarters/ towns :

97 | P a g e

Cleaning of Drains atChamphai and Aizawl District:

98 | P a g e

Cleaning of side drains, streams and rivers atChamphai, Lunglei and Aizawl

Districts.

99 | P a g e

Cleaning of side drains, streams and rivers atLungleiTown.

100 | P a g e

BEFORE

AFTER

ACHIEVEMENT OF NEDP 2017-2018

1. Improvement of urban Infrastructure in the city/towns (UD&PAComponents)

Rs 7500

Composite Urban Infrastructure within AizawlRs 2200 lakh

Composite urban Infrastructure in City and towns Rs 1510 lakh

Following are various developmental works and construction of basic

necessities such as Internal roads, Pediastrian footpath, Drainage, retaining wall, RCC

steps, Culverts and other Urban amenities undertaken in Urban areas in the year 2017-

2018,NEDP.

1. Name of work : Laying of chequered tile and construction of hand railing

near Primary School –I.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 2,39,700.00

4. Status : Completed

1. Name of work : Construction of Culvert near PuBiakthanga’s

house .

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 56,000.00

4. Status : Completed

101 | P a g e

BEFORE AFTER

1. Name of work : Construction of Step with hand railing near Pu

Dangpuia’s house.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 1,71,700.00

4. Status : Completed

AFTER

1. Name of work : Construction of rigid pavement near Pu

Laldailova’s house.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 4,39,000.00

4. Status : Completed

BEFORE AFTER

102 | P a g e

1. Name of work : Laying Chequered tile flooring near Pi Saibulliani’s

house to PuDawltea’s house.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 1,92,300.00

4. Status : Completed

BEFORE AFTER

BEFORE (Contd.) AFTER (Contd.)

103 | P a g e

1. Name of work : Construction of PCC pavement from Hnam Ro

Chawisang Pawl Building to PuK.Zothantluanga

(L) house - Block I.

2. Location : Dawrpui, Aizawl.

3. Amount : Rs1,27,300.00

4. Status : Completed

BEFORE AFTER

1. Name of work : Construction of PCC pavement from Hnam Ro

Chawisang Pawl Building to PuK.Zothantluanga

(L) house - Block II .

2. Location : Dawrpui, Aizawl.

3. Amount : Rs 54,300.00

4. Status : Completed.

104 | P a g e

BEFORE AFTER

1. Name of work : Construction of side drain cover for widening of

road from Pi Manliani (L) house to PuDingluaia’s

house.

2. Location : Dawrpui West, Aizawl.

3. Amount : Rs 2,24,600.00

4. Status : Completed.

BEFOREAFTER ( Drain)

AFTER (Drain cover)

105 | P a g e

1. Name of work : Laying of Chequered tile near UpaRokamlova’s

house (Church street).

2. Location : Dawrpui, Aizawl.

3. Amount : Rs 48,100.00

4. Status : Completed.

BEFORE AFTER

1. Name of work : Laying of Chequered tile & construction of steel hand

railing near PuV.Thanga (L) house.

2. Location : Dawrpui, Aizawl.

3. Amount : Rs 3,34,500.00

4. Status : Completed.

106 | P a g e

BEFORE AFTER

1. Name of work : Laying of Chequered tile on existing step from Pu

Johana’s house to TuikualSairang Road.

2. Location : Dawrpui West, Aizawl.

3. Amount : Rs 1,20,300.00

4. Status : Completed.

BEFORE AFTER

1. Name of work : Construction of R/Wall near PuHrangliana’s house

2. Location : Armed Veng, Aizawl.

3. Amount : Rs1,31,400.00

4. Status : Completed

107 | P a g e

Name of Work : Construction of R/Wall near UPS School.

Location : Chite, Aizawl.

Amount : Rs. 2,54,700.00

Status : Completed.

AFTER

BEFORE

108 | P a g e

1. Name of Work : Construction of Drain with cover from

PuBawihlawra (L) house to Lamhnaituikhur.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

AFTER

BEFORE

109 | P a g e

1. Name of Work : Construction of PCC Pavement near PuHanga

Colony road.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

BEFORE

AFTER

110 | P a g e

1. Name of Work : Construction of RCC Footpath with hand railing

near PuRobina house.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

BEFORE

111 | P a g e

1. Name of Work : Construction of Hand railing from Venghlui main

road to PuK.Lalhuma house to PuBawilawra(L)

house.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 50,000.00

4. Status : Completed.

BEFORE

BEFORE

112 | P a g e

1. Name of Work: Construction of RCC Drain near PuBiakzuala and

PuLalengkima house.

2. Location :Venghlui, Aizawl.

3. Amount :Rs. 1,50,000.00

4. Status : Completed.

AFTER

AFTER

BEFORE

113 | P a g e

1. Name of Work: Laying of Chequered tile between Vanlalhlana house to

Aizawl Central Hall.

2. Location :Venghlui, Aizawl.

3. Amount :Rs. 50,000.00

4. Status : completed

114 | P a g e

5. Name of Work: Construction of PCC Pavement BELOW PuLaldingliana

house.

6. Location :Venghlui, Aizawl.

7. Amount :Rs. 1,50,000.00

8. Status : Completed.

AFTER

BEFORE

115 | P a g e

1. Name of Work : Construction of Chequered tile near Pi Zoliani

house to Pi Vanlalsawmmi house atTuikual N’

2. Amount : ~ 60,000.00

3. Location : Tuikual N’

4. Status : Completed

116 | P a g e

1. Name of Work : Construction of side drain near PuArona

house to Pi Sangliani house atTuikual N’

(2017-2018)

2. Amount : ~ 40,000.00

3. Location : Tuikual N’

4. Status : Completed

117 | P a g e

1. Name of Work : Construction of Chequered tile near IKK (Var)

Church atTuikual N

2. Amount : ~ 40,000.00

3. Location : Tuikual N’

4. Status : Completed

118 | P a g e

1. Name of Work : Construction of Pcc Flooring from HV

Lalhmachhuana house at Salem Veng

2. Amount : ~2,00,000.00

3. Location : Salem Veng

4. Status : Completed

\

1. Name of Work : Construction of step below PuLallungmuana

house for approach to Zoremsiami house at

DawrpuiVengthar

2. Amount : ~2,00,000.00

3. Location : DawrpuiVengthar

4. Status : Completed

119 | P a g e

1. Name of Work : Construction of step and hand railing on

approach to MaipawlTuikhuratDawrpui

Vengthar

2. Amount : ~1,00,000.00

3. Location : DawrpuiVengthar

4. Status : Completed

1. Name of Work : Construction of hand railing near Zamliana house

at Mission Vengthlang (2017-2018)

2. Amount : ~1,00,000.00

3. Location : Mission Vengthlang

4. Status : Completed

120 | P a g e

1. Name of Work : Construction of PCC flooring from Lalkima

house to Huliana house at Salem Veng

2. Amount : ~2,00,000.00

3. Location : Salem Veng

4. Status : Completed

121 | P a g e

1. Name Of Work : Construction Of Hand Railing Approach To

Basketball Court Atzemabawk

2. Amount : Rs100,000/-

3. Location : Zemabawk North

4. Status : Completed

122 | P a g e

1. Name Of Work : Pcc Flooring And Construction Of Retaining Wall

Athmangaihnaveng Road Below High School Road

AtZemabawk

2. Amount : Rs500,000/-

3. Location : Zemabawk

4. Status : Completed

1. Name Of Work : Construction Of R/Wall Above Lily Veng

GraveyardAtChaltlang North

2. Amount : Rs500,000/-

3. Location : Chaltlang North

4. Status : Completed

123 | P a g e

1. Name Of Work : Construction And Repairing Of Existing

Step Between Biakdailova And

PuLalthanhawla’s House AtZarkawt

2. Amount : Rs300,000/-

3. Location : Zarkawt

4. Status : Completed

\

1. Name Of Work : Construction Of R/W Approach To

Hebraiveng, Falkland

2. Amount : Rs100,000/-

3. Location : Falkland

4. Status : Completed

124 | P a g e

5. Name Of Work : Pcc Flooring Of Internal Road Water Bank Road

6. To Thlanmual Road At Falkland

7. Amount : Rs500,000/-

8. Location : Falkland

9. Status : Completed

1. Name Of Work : Construction Of Side Drain From Pukawlsailova

House To Puchalmawii House, Galilee Veng,

Zemabawk

2. Amount : Rs150,000/-

3. Location : Zemabawk

4. Status : Completed

125 | P a g e

Continuation of Pavilion & Gallery at Rajiv Gandhi Stadium atMualpui,AizawlRs

2350.00 lakh:

In pursuance of commitment made by the Hon’ble Chief Minister to enhance

seating capacity of Rajiv Gandhi Stadium at Mualpui, The Department had pursued

the work by utilizing the service of Great Sport Infra Co. which is the leading sport

infrastructure company, the seating capacity has now wnhanced with 14570 seats

from NEDP 2016-2017.

126 | P a g e

Completion of Directorate Building UD & PA Deptt -Rs 600 lakh:

127 | P a g e

Completion of Linkages of Road from Ramhlun south YMA Hall to

main road atRamhlun South, AizawlRs 30 lakh

128 | P a g e

Construction of Road atKhatla South Vengthar (approach road to

Thlanmual via Khatla South Vengthar Presbyterian Church) Rs 28 lakh

129 | P a g e

2. Aizawl city Infrastructure Development:

Junction improvement atDinthar Junction atdawrpuivengthar

130 | P a g e

Supply and Installation of Synthetic Athletic track atSerchhip stadium-

Rs 334.80 lakh:

131 | P a g e

3. Operation and Maintenance ( Service Level) Rs 500 Lakh

Operation and Maintenanceof Crematorium atSairangRs 20 l akh

Construction of Chowkidar Quarters aand Housing for DG set

132 | P a g e

Quarters with Fencing atKhuangpuilam,Kolasib

Rs 40 lakh.

133 | P a g e

Fencing of RAY project Site at Falkland -Rs 10 lakh

134 | P a g e

3. Improvement of ATI Junction at New Secretariat Complex Rs 140lakh

135 | P a g e

5.Climate Change Mitigation Initiatives-sanitation and Cleanliness Drive

Component Rs 200 lakh

Urban Development & Poverty Alleviation Department has been working on

Cleanliness and sanitation since its existence, Under National flagship Mission

i.eSwachh Bharat Mission, which was launched in 2014, various cleanliness activities

and targets were achieved by the Department, all 23 urban towns in Mizoram were

declared ODF status and out of which 21 were certified ODF status by Quality control

of India after spot verification, the remaining two are soon to be declared too, besides,

all 23 towns were participated in SwachhSurvekshan 2018, awareness were created

through Information, education and communication activities in all the covered towns,

all missions and projects under the department were converged wherever possible for

the benefit of the people , and hence, as a means of convergence and one of

sustainable development initiatives for public welfare, the Department had purchased

public bins under NEDP 2017-2018 for district towns;this is expected to serve as

useful means for cleanliness of public places in towns.

Purchase and Installation of Public Community binsRs 100 lakh

136 | P a g e

6.Aizawl City GIS based Street zoning and signage Rs 300 lakh This project was undertaken to benefit urbanites and tourists visiting

Aizawl city as it is expected to help in identification and direction of

locality/streets and important landmarks in the city, also, it will help in

smooth functioning and movement of traffic in the city.

Name of Contractor - INNOVATIONS, N.Delhi

Project Cost (in lakh) - Rs. 300

Date of start - 5.9.2017

Scheduled date of completion - May 2018

Physical Progress - 30 %

Financial Progress - 64.30%

137 | P a g e

Major infrastructure works such as Mizoram State Convention Centre, Zodin

Multi level Car Parking etc have also been included in NEDP 2017-2018, the work is

at initial stage of implementation and the department is thriving for fast and successful

progress of the works.