acd company profile eng -...

56
COMPANY PROFILE ACD ACD Insaat Tes. Tar. Hay. San. Ve Tic. Ltd. Sti. Ceyhun Atuf Kansu Cad. No:137/4-5 Balgat – Cankaya / ANKARA-TURKEY Tel: +90 312 473 41 81/82 Fax: +90 312 473 41 83 http://www.acd-insaat.com

Upload: trandang

Post on 14-May-2018

224 views

Category:

Documents


1 download

TRANSCRIPT

COMPANY PROFILE

ACD

ACD Insaat Tes. Tar. Hay. San. Ve Tic. Ltd. Sti. Ceyhun Atuf Kansu Cad. No:137/4-5

Balgat – Cankaya / ANKARA-TURKEY Tel: +90 312 473 41 81/82 Fax: +90 312 473 41 83

http://www.acd-insaat.com

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 2 / 56

BRIEFLY ABOUT ACD

ACD is an international construction company established in 2002. The company

specialized in oil pipeline construction, gas pipeline construction, water pipeline

construction, pump station & compressor station construction, natural gas RMS station

construction, oil field development projects, process piping works, hot-tap and stopple

operations.

ACD successfully performed numerous projects for the last ten years. These projects

have been performed in four different countries and the list includes 17 pipeline

construction projects, 7 pump station & 2 compressor station construction projects, 3 oil

field development projects, 15 RMS-A station construction projects, 4 industrial & plant

piping, 2 power station piping projects and more than 50 hot-tap & stopple operations.

The company has a professional team of experts specialized in their fields and has its

own construction equipment to perform pipeline and piping works. The head office is

located in Ankara and the warehouse & equipment park is located in Haymana.

The purpose of ACD Construction Company is to complete the commitments it

undertakes, and further stand reliable and trustworthy in this competitive market. In

order to succeed these core values and missions, ACD Construction Company is

determined to become an indispensable organization by creating additional values for its

clients.

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 3 / 56

TOOLS & EQUIPMENT

Tools and Equipment Units Capacity / Model Brand

Pipelayer (Sideboom) 1 1983 / TD 25 CS

65 tons International

Pipelayer (Sideboom) 2 1992 / D7 45 tons

Caterpillar

Pipelayer (Sideboom) 5 1974 - 1986 / D6

30 – 36 tons Caterpillar

Pipelayer (Sideboom) 1 1987 / D65 A

20 tons Komatsu

Pipelayer (Sideboom) 1 1990 / D4 12 tons

Caterpillar

Hydraulic Pipe Bending Machine 1 22” – 36”

1998 CRC-Evans

Hydraulic Pipe Bending Machine 1 4” – 20”

1990 CRC-Evans

Pneumatic Internal Clamp 8 12”-14”-16”-24” 28”-30”-48”-80”

Vietz / CRC

Mobile Crane 1 1975 / LT1030

30 tons Liebherr

Boom truck (Hi-up) 1 25 Tons

2008 Hidrokon / BMC

Boom truck (Hi-up) 1 20 Tons

2005 Kocoglu / Man

Paywelder (4 welding sets) 2 2003 Vietz – Arcotrac 4

Paywelder (4 welding sets) 3 2008 2009

Volvo

Excavator 2 2012 / HMK300

30 tons Hidromek

Excavator 1 2005 / D 320L

20 tons Caterpillar

Excavator 1 2011

30 tons JCB

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 4 / 56

Tools and Equipment Units Capacity / Model Brand

Wheel Excavator 1 2012 /HMK200W

20 tons Hidromek

Bulldozer 1 D7R XR

2003 Caterpillar

Loader 1 938 H 2012

Caterpillar

Grader 1 140G 1988

Caterpillar

Dump Truck 1 2008 / 30 tons BMC

Fuel Tanker 1 2010 / 7 tons Iveco

Tractor 4x4 2 2008 Tümosan

Welding Machine (Redresor) 20 WTU 455

RKM 450 / 650 Fronius (Gedik)

Welding Machine (Redresor) 16 405 SA Lincoln

Diesel Generator 2 72 KVA Perkins (Genpower)

Diesel Generator 4 GVP 142 142 kVA

Volvo ABB (Genpower)

Hydrotest Filling Pump 1 12 bar

500 m3/h Tempo

Hydrotest Pressurizing Pump 1 160 bar 16 m3/h

HPP Italy

Total Station 2 2010 Leica

Holiday Detector 4 20 KVA SPY

External Clamp 12 Multiple sizes -

Jeep 4x4 3 2012 2009 2011

Mitsubishi Nissan Jeep

Pick-Up 4x4 6 2012 2010 2003

Mitsubishi Nissan Ford

Car 5 2012 Hyundai

Minibus 2 2005 Ford

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 5 / 56

TOOLS & EQUIPMENT

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 6 / 56

TOOLS & EQUIPMENT

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 7 / 56

REFERENCES

No Project Description

1

Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project / Turkey 24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain Valve and Relief Valve Chambers Construction (total 267 each)

2

Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project / Iraq 24” and 36” Total 60 km Pipeline Construction

3 Kırsehir / Mucur Compressor Station Construction Project / Turkey

4

Batı Raman & Raman Oil Field Development Project / Turkey 90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold Construction

5 Pendik Pig Station 30” Valve Replacement Project / Turkey 30” Hottap / Stopple and Valve Replacement

6

Yeni Elektrik 850 MWe CCGT Natural Gas Feed Line Construction / Turkey 24” x 20” Hottap and Take-Off Valve Group Construction

7

Extending Water Pipeline form Sherkozh Storage to Suli Quarter / Iraq 48” – 17 km, 24” – 3 km Pipeline & 3 each Pump Station Construction

8

Oguz - Gabala - Baku Water Pipeline Project / Azerbaijan 80” - 47 km Pipeline Construction, 3 each Flow and Pressure Control Chamber Construction

9

Sayda Province Natural Gas Pipeline Project / Algeria 8” - 25 km Pipeline Construction

10

Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project / Turkey 64” - 30 km Pipeline Construction, Pump Station Construction

11

Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipe Line / Azerbaijan 42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping Station, 1 Pigging Station, 2 Check Valve Station Construction

12

Cankırı – Gerede Natural Gas Pipeline Project / Turkey 24” - 33 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 8 / 56

No Project Description

13

Ankara - Kazan Water Pipeline Project / Turkey 28” – 36” - 28 km Pipeline Construction

14

Ingaz High Pressure Natural Gas Pipeline / Turkey 8” – 2,5 km Pipeline Construction

15 Teksem Factory Natural Gas Conversion Works / Turkey

16

Turkey – Greece Natural Gas Pipeline Project / Turkey/Greece 36” – Pipeline Critical Welding Works and Hot-taps

17

Aliaga Pigging Station - RMS Station Natural Gas Pipeline / Turkey 20” - 8 km Pipeline Construction

18

Yozgat Sugar Factory RMS Station / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction

19

PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction Project

20

Yumurtatepe - Seckoy Natural Gas Pipeline Project / Turkey 24” - 13 km Pipeline Construction

21 CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation

22

Iran Natural Gas Pipeline Project / Turkey/Iran Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works

23

Bursa Natural Gas Pipeline Project / Turkey Botas Displacement Works for 36” - 250 m

24

Botas Karacabey RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction

25

Botas M.K. Pasa RMS Station Project / Turkey 60.000 Nm3/h Natural Gas RMS-A Station Construction

26

Botas Malatya OIZ RMS Station Project / Turkey 15.000 Nm3/h Natural Gas RMS-A Station Construction

27

Botas Kahramanmaras OIZ RMS Station Project / Turkey 75.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 9 / 56

No Project Description

28

Botas Payas OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction

29

Botas Iskenderun OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction

30

Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth

Istanbul Machinery and Manufacturing Organized Industrial Zone

31

Izmit - Kosekoy Bogging Area Displacement Works / Turkey Botas Displacement Works 16” - 1250 m

32

Botas Mersin OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction

33

Botas Adana OIZ RMS Station Project / Turkey 75.000 Nm3/h Natural Gas RMS-A Station Construction

34 Botas Baser Kimya OIZ RMS Station Project / Turkey 2.000 Nm3/h Natural Gas RMS-A Station Construction

35

Botas Gaziantep OIZ RMS Station Project / Turkey 150.000 Nm3/h Natural Gas RMS-A Station Construction

36

Botas Adana West RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction

37

Botas Adana East RMS Station Project / Turkey 40.000 Nm3/h Natural Gas RMS-A Station Construction

38

Botas Mersin City OIZ RMS Station Project / Turkey 150.000 Nm3/h Natural Gas RMS-A Station Construction

39

Ingaz Inegol RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction

40

EGO Revision Works / Turkey Revision of 18 each Natural Gas RMS-A Station and Integration of Scada System

41 Turkuaz Ceramic Factory Natural Gas Conversion Project / Turkey

42 Blue Stream Pipeline Project (EGO – Ankara) / Turkey 48” x 36” Hot-Tap Works

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 10 / 56

No Project Description

43 Aksaray - Mercedes Truck Factory Natural Gas Conversion Project / Turkey

44 Anadolu Textile Factory Natural Gas Conversion Project / Turkey

45

TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution System / Turkey Construction of Pipelines from Natural Gas Wells to the Factories at Corlu and Cerkezkoy Area, 4’’-6’’-8’’-10’’, 40 km Pipeline Construction

46

EGO Natural Gas Distribution System, Ankara / Turkey 36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 11 / 56

ACD Hot-Tap & Line Stop Works Reference List / 2009 - 2012

No Work Description Owner Client Operator Company Date Location

1

40"x36"x36"x40" Line Stop / Replacement 36" By-pass line (120 meters) BOTAŞ Türkerler İnşaat TDW

October 2012 Kırşehir

2 40"x36"x36"x40" Split Body Tee / Hot-Tapping BOTAŞ Türkerler İnşaat TDW

October 2012 Kırşehir

3 16"x16"x16"x16" Split Body Tee / Hot-Tapping İZMİRGAZ Kolin İnşaat Furmanite/Ipsco July 2012 İzmir

4 30"x30"x30" Hot-tap Tee / Line Stop BOTAŞ

BOTAŞ İstanbul İşletme

Müdürlüğü Furmanite/Ipsco May 2012 İstanbul

5 22"x22"x22"x22" Split Body Tee / Line Stop ESGAZ Ulusoy İnşaat Furmanite/Ipsco April 2012 Eskişehir

6 16"x16"x16" Hot-Tap Tee / Line Stop ARMAGAZ Mekaser Tecpesa

August 2011 Yalova

7 24"x20"x20"x24" Split Body Tee / Hot-Tapping BOTAŞ

Ekon / Ansaldo Energia Furmanite/Ipsco

October 2011 Kocaeli

8 48"x24"x24"x48" Split Body Tee / Hot-Tapping BOTAŞ Fernas / OMV TDW

November 2011 Samsun

9 16"x10"x10"x16" Split Body Tee / Hot-Tapping İZMİRGAZ Kolin İnşaat Furmanite/Ipsco July 2011 İzmir

10 36"x24"x20"x36" Split Body Tee / Hot-Tapping BURSAGAZ Arsan İnşaat Tecpesa

February 2011 Bursa

11 16"x16"x16"x16" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco

December 2010 Antalya

12 12"x12"x12"x12" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco

September 2009 Adana

13 18"x18"x18"x18" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco

September 2009 Adana

14 24"x16"x16"x24" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco

September 2009 Osmaniye

15 40"x16"x16"x40" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco

September 2009 Ceyhan

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 12 / 56

CONTACT INFORMATION

Contact Person:

Enver Selim BOLUKBASI, Business Development Manager

Address and Contact Information: Head Office Address : Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – ANKARA / TURKEY Tel : +90 312 473 41 81 Mobile : +90 533 688 55 71 Fax : +90 312 473 41 83 E-mail : [email protected] Web Address : http://www.acd-insaat.com

Warehouse & Equipment Yard Address : Bumsuz Beldesi Girişi 2. km Haymana – ANKARA / TURKEY

ANNEXES

ISO 9001, ISO 14001, OHSAS 18001, EMRA – Energy Market Regulatory Authority Construction and Service Certificate

Detailed Project Description Sheets

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 13 / 56

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 14 / 56

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 15 / 56

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 16 / 56

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 17 / 56

DETAILED PROJECT DESCRIPTION Project Name: Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project

Project Location: Aksaray - Konya / Turkey

Client: BOTAS / TCC China Tianchen Engineering Corporation

Project Start Date (month/year): 05/2012

Completion Date (month/year): On going

Project Scope: 24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain Valve and Relief Valve Chambers Construction (total 225 each)

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 18 / 56

DETAILED PROJECT DESCRIPTION Project Name: Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project Project Location: Erbil / Iraq Client: KAR Group / 77 Construction - Pikaron Joint Venture Project Start Date (month/year): 06/2012

Completion Date (month/year): 12/2012

Project Scope: 24” and 36” Total 60 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 19 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Kırsehir / Mucur Compressor Station Construction Project Project Location: Kırsehir / Turkey Client: BOTAS / Turkerler Insaat A.S. Project Start Date (month/year): 08/2011

Completion Date (month/year): On Going

Project Scope: Construction of Compressor Station with 2 Turbocompressor / Turbine Sets

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 20 / 56

DETAILED PROJECT DESCRIPTION Project Name: Batı Raman & Raman Oil Field Development Project Project Location: Batman / Turkey Client: Turkish Petroleum Corporation (TPAO) Project Start Date (month/year): 09/2011

Completion Date (month/year): 10/2012

Project Scope: 90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 21 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Extending Water Pipeline from Sherkozh Storage to Suli Quarter Project Location: Suleymaniah / Iraq Client: Pikaron - Zozik Joint Venture Project Start Date (month/year): 03/2010

Completion Date (month/year): 02/2011

Project Scope: 48” - 17 km , 24” – 3 km Pipeline Construction 3 each Pump Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 22 / 56

DETAILED PROJECT DESCRIPTION Project Name: Oguz – Gabala – Baku Water Pipeline Project Project Location: Oguz – Gabala – Baku / Azerbaijan Client: Azersu (Project Owner) / HTG JV (Turan Haznedaroglu – Tekser – Gence Korpu Joint Venture) Project Start Date (month/year): 03/2008

Completion Date (month/year): 06/2010

Project Scope: 80” - 47 km Pipeline Construction Flow Control Chamber, Pressure Control Chamber & Pressure Break Chamber Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 23 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Sayda Province Natural Gas Pipeline Project Project Location: Sayda City / Algeria Client: Sarl Nafco – Sonelgaz Project Start Date (month/year): 04/2008

Completion Date (month/year): 08/2008

Project Scope:

8” - 25 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 24 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project Project Location: Ivedik - Ankara / Turkey Client: ASKİ (Ankara Water and Sewage Administration) Project Project Start Date (month/year): 05/2007

Completion Date (month/year): 04/2008

Project Scope:

64” - 30 km Pipeline Construction, Pump Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 25 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipeline Project Project Location: Baku - Azerbaijan Client: BP – BOTAS Consortium Project Project Start Date (month/year): 05/2004

Completion Date (month/year): 08/2005

Project Scope:

42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping Station, 1 Pigging Station, 2 Check Valve Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 26 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Cankırı – Gerede Natural Gas Pipeline Project Project Location: Gerede - Bolu / Turkey Client: BOTAS Project Project Start Date (month/year): 08/2007

Completion Date (month/year): 12/2007

Project Scope:

24” - 33 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 27 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Ankara - Kazan Water Pipeline Project Project Location: Kazan – Ankara / Turkey Client: ASKI (Ankara Water and Sewage Administration) Project Project Start Date (month/year): 03/2007

Completion Date (month/year): 12/2007

Project Scope: 28” – 36” - 28 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 28 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Ingaz High Pressure Natural Gas Pipeline Project Location: Inegol - Bursa / Turkey Client: Ingaz Inc. Project Start Date (month/year): 01/2007

Completion Date (month/year): 03/2007

Project Scope: 8” – 2,5 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 29 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Teksem Factory Natural Gas Conversion Works Project Location: Cerkezkoy - Corlu / Turkey Client: TEKSEM Inc. Project Start Date (month/year): 01/2007

Completion Date (month/year): 03/2007

Project Scope: Teksem Factory all natural gas conversion works.

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 30 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Turkey – Greece Natural Gas Pipeline Project Project Location: Kesan / Turkey Client: BOTAS - Atilla Dogan Inc. Project Start Date (month/year): 12/2006

Completion Date (month/year): 02/2007

Project Scope: 36” – Pipeline Critical Welding Works and Hot-taps

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 31 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Aliaga Pigging Station - RMS Station Natural Gas Pipeline Project Location: Aliaga -Izmir / Turkey Client: BOTAS – Atilla Dogan Inc. Project Start Date (month/year): 09/2006

Completion Date (month/year): 01/2007

Project Scope: 20” - 8 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 32 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Yozgat Sugar Factory RMS Station Project Location: Bogazlıyan - Yozgat / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 09/2006

Completion Date (month/year): 10/2006

Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 33 / 56

DETAILED PROJECT DESCRIPTION

Project Name: PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction Project Project Location: Aliaga - Izmir / Turkey Client: Petkim – Tokar Inc. Project Start Date (month/year): 08/2006

Completion Date (month/year): 12/2006

Project Scope: Construction works for conversion of solid fuel to natural gas with turbine piping works.

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 34 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Yumurtatepe - Seckoy Natural Gas Pipeline Project Project Location: Yumurtatepe - Seckoy – Bursa / Turkey Client: BOTAS – Atilla Dogan Inc. Project Start Date (month/year): 07/2006

Completion Date (month/year): 12/2006

Project Scope: 24” - 13 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 35 / 56

DETAILED PROJECT DESCRIPTION

Project Name: CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation Project Location: Eskisehir / Turkey Client: BOTAS Project Start Date (month/year): 07/2006

Completion Date (month/year): 09/2006

Project Scope: Revision of 16“ – 36” natural gas pipeline filters, additional cyclone filtering installation and commissioning works.

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 36 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Iran Natural Gas Pipeline Project

Project Location: Ardahan / Turkey

Client: BOTAS

Project Start Date (month/year): 03/2006

Completion Date (month/year): 05/2006

Project Scope: Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 37 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Karacabey RMS Station Project Project Location: Karacabey – Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 04/2006

Completion Date (month/year): 05/2006

Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 38 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas M.K. Pasa RMS Station Project Project Location: M. K. Paşa – Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 04/2006

Completion Date (month/year): 05/2006

Project Scope: 60.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 39 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Malatya OIZ RMS Station Project Project Location: Malatya / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 04/2006

Completion Date (month/year): 05/2006

Project Scope: 15.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 40 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Kahramanmaras OIZ RMS Station Project Project Location: Kahramanmaras / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 02/2006

Completion Date (month/year): 03/2006

Project Scope: 75.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 41 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Payas OIZ RMS Station Project Project Location: Payas – Iskenderun / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 02/2006

Completion Date (month/year): 03/2006

Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 42 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Iskenderun OIZ RMS Station Project Project Location: Iskenderun / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 01/2006

Completion Date (month/year): 02/2006

Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 43 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth Istanbul Machinery and Manufacturing Organized Industrial Zone

Project Location: Gebze – Kocaeli / Turkey Client: Palgaz Inc. Project Start Date (month/year): 01/2006

Completion Date (month/year): 12/2006

Project Scope: Natural gas utility piping works.

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 44 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Mersin OIZ RMS Station Project

Project Location: Mersin / Turkey

Client: BOTAS, Kale Kalıp Inc.

Project Start Date (month/year): 10/2005

Completion Date (month/year): 11/2005

Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 45 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Adana OIZ RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 10/2005

Completion Date (month/year): 11/2005

Project Scope: 75.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 46 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Baser Kimya OIZ RMS Station Project

Project Location: Osmaniye / Turkey

Client: BOTAS, Kale Kalıp Inc.

Project Start Date (month/year): 09/2005

Completion Date (month/year): 10/2005

Project Scope: 2.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 47 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Gaziantep OIZ RMS Station Project

Project Location: Gaziantep / Turkey

Client: BOTAS, Kale Kalıp Inc.

Project Start Date (month/year): 08/2005

Completion Date (month/year): 10/2005

Project Scope: 150.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 48 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Adana West RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 07/2005

Completion Date (month/year): 08/2005

Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 49 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Adana East RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 07/2005

Completion Date (month/year): 08/2005

Project Scope: 40.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 50 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Botas Mersin City OIZ RMS Station Project Project Location: Mersin / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 06/2005

Completion Date (month/year): 08/2005

Project Scope: 150.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 51 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Ingaz Inegol RMS Station Project Project Location: Inegol - Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 05/2006

Completion Date (month/year): 06/2006

Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 52 / 56

DETAILED PROJECT DESCRIPTION

Project Name: EGO Revision Works Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): 01/2005

Completion Date (month/year): 01/2006

Project Scope: Revision of 18 each Natural Gas RMS-A Station and Integration of Scada System

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 53 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Blue Stream Pipeline Project (EGO – Ankara) Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): 12/2003

Completion Date (month/year): 01/2004

Project Scope: 48” x 36” Hot-Tap Works and equipment installation

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 54 / 56

DETAILED PROJECT DESCRIPTION

Project Name: Aksaray - Mercedes Truck Factory Natural Gas Conversion Project Project Location: Aksaray / Turkey Client: Troya Limited Company Project Start Date (month/year): 03/2004

Completion Date (month/year): 05/2004

Project Scope: Mercedes Truck Factory all natural gas conversion works construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 55 / 56

DETAILED PROJECT DESCRIPTION

Project Name: TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution System Project Location: Corlu / Turkey Client: Troya Limited Company Project Start Date (month/year): 06/2004

Completion Date (month/year): 06/2005

Project Scope: Construction of Pipelines from Natural Gas Wells to the Factories at Corlu and Cerkezkoy Area, 4’’-6’’-8’’-10’’, 40 km Pipeline Construction

ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520

Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82

Fax: +90 312 473 41 83 http://www.acd-insaat.com

Company Profile 56 / 56

DETAILED PROJECT DESCRIPTION

Project Name: EGO Natural Gas Distribution System Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): 07/2002

Completion Date (month/year): 12/2003

Project Scope: 36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction