acciona energia madrid information day
TRANSCRIPT
EUROGIA2020 – SPAIN Info Day
ACCIONA ENERGIA’s involvement in EUROGIA
&
Some examples of development through collaborative projects
Eugenio Guelbenzu
Madrid 18-February-2015
1
© ACCIONA – Proprietary and confidential information
1
Why EUROGIA2020 and Reasons
2
© ACCIONA – Proprietary and confidential information
3
ACCIONA’s Hystory in EUROGIA2020
ACCIONA ENERGIA is a BOARD member of the EUROGIA Cluster since 2008, appointed as the National
Representative in the Cluster, and being the chairman of the cluster from May 2011 to March 2013.
The EUROGIA Cluster is considered as the most appropriate way to promote and develop core
technology projects (R&D) with need to crystallize in short term and with high impact in the business
areas, as we are well covered by the White Book (Low Carbon Conventional Fossil Fuels technologies and
Renewable Energy).
Participation ACCIONA ENERGIA is as follows:
9 Projects presented to PO (WIFI, ADVOCAT (Cantabria presence), ILIS, CSPIMP, FLOATMET,
W2POWER, WINDMELT, EasyToConnect, V4WT) with 4 projects lead by ACCIONA
5 Projects Labelled and 4 approved for FPP
50% of Projects with other Board Members.
Total ACCIONA budget of labelled projects 4M€
Various Themes: Wind On/Offshore, PV, Materials and Composites, …
© ACCIONA – Proprietary and confidential information
4
Why EUROGIA2020 and Reasons :
• Easy preparation of documentation and access for questions and help to the Secretariat.
• Easy and understandable process for evaluation that gives the choice to explain FtF
• Industry Driven and so we feel comfortable.
• Short Time from IDEA (PO) to Start of Funded Project (Label FPP and funding).
• Easy Contract, Consortium Agreement, and IPR Discussions (Short number of partners).
• Easy to Manage, due to low number of partners.
• You work only with the one you want with and not with a group due to balancing and photo.
• Follow up and access to partnerships and knowledge.
Strong support from CDTI and other authorities (EC,..) to EUROGIA 2020
© ACCIONA – Proprietary and confidential information
5
Submission process
Always a 2 stage process: 1. PO – Project Outline
Complete and submit a Project Outline. The project coordinator is invited to present it through an oral presentation in front of the Technical Committee.
2. FPP – Full Project Proposal Applicants will be invited to fill in and submit a Full Project Proposal. Following the evaluation, the Technical Committee will give its recommendations to the eurogia+ Board, who in turn will decide to label the project. With this label, project participants can apply for funding in their respective countries.
NATIONAL FUNDING
PROJECT RUNNING & FUNDED
© ACCIONA – Proprietary and confidential information
6
Submission process
Good Idea / Project / Eureka Criteria*
Project Outline, ¿?
Evaluation and Assessment
TECHNICAL COMMITTEE MEETING: • Comprise of Research and Academia Members & Industry + PAs (Observers) • Face to Face* Meeting divided in 3 sections:
1. Project Details presentation (Project description, Budget,…)
2. Questions and Answers (Questions from TC Members + PAs)
3. TC members Consensus and Assessment (Filling the Evaluation and Propose Action: Go for FPP With/Without Recommendations; New PO; Rejected).
Also Recommendations are made during the FtF Presentation and Mentors could be assign to help the development and structuring of the project FPP and Project overview.
Always a 2 stage process: 1. PO – Project Outline
2. FPP – Full Project Proposal
© ACCIONA – Proprietary and confidential information
7
Submission process
Always a 2 stage process: 1. PO – Project Outline
2. FPP – Full Project Proposal
TECHNICAL COMMITTEE MEETING: • Comprise of Research and Academia Members & Industry + PAs (Observers) • Revision of FPP and Recommendations (if made) and fulfillment of all criteria
• TC members Consensus and Assessment (Filling the Evaluation)
• Propose Recommendation to Board: Label Project, Conditional Label, Reject / New FPP.
Project Outline - Approved
FPP
Good Idea / Project / Eureka Criteria*
© ACCIONA – Proprietary and confidential information
8
Submission process
Always a 2 stage process: 1. PO – Project Outline
2. FPP – Full Project Proposal
BOARD MEETING: • Looks to the TC evaluation and recommendations • Take final decision on: Label Project, Conditional Label, Reject / New FPP.
• Assign Project Mentor / Reviewer: Link between Cluster and Project during its life to follow the project
and assist if needed.
• Send Letter with final decision to Coordinator and request Project Consortium Agreement (PCA) to be sign between partners.
• Inform Public authorities (MS and ESE) and Liaise to facilitate funding.
Project Outline - Approved
FPP
Good Idea / Project / Eureka Criteria*
© ACCIONA – Proprietary and confidential information
2
Case Examples
9
© ACCIONA – Proprietary and confidential information
WIFI-Wind Farm Installation Vessel
+ © ACCIONA – Proprietary and confidential information
10
Case Examples: WIFI
Case Examples: WIFI
New concept of barge for the installation of offshore in-one-piece wind turbine
catamaran barge / float over method
E+ Label on the 16th of March 2009
PARTNERSHIP
Leader
French Partner
(Subcontractor for Technip)
Norwegian Partner
Spanish Partner
Technip France
Oceanide
DNV
Acciona
Project Management and Engineering
Basin tests
Rules, regulation and validation
Wind Turbine
BUDGET € Total Cost Self funded National Funding
Technip France
ACCIONA 350.000 260.000 90.000
DNV
TOTAL 1 344.512
Duration June 2009 to March 2011
11 +
© ACCIONA – Proprietary and confidential information
12
New vessels and installation procedures:
o Wet Tow avoiding some HLV usage and do commissioning onshore
o Marine operations based on floating vessels (DP2) and be independent of water depths.
Initial Concept Final Concept • Use of DSIV
• Elevating capacity = 20,000 t (96 pinions)
• Hulls = 142.5m x 25m x 12m
• Displacement = 28,000 t
• Rear door to operate
• Not really fit for purpose !
• Barge = 87 m x 18 m x 9 m, Draft = 4.60 m
• One central linking beam : 66 m x 30/16 m x 20 m
• Dynamic Positioning during installation
• Vertical handling of WTGs (heave compensation)
• Square Leg 16 m x 16 m x 84 m
• Really fit for purpose !
Wind Farm Installation Vessel*
+
© ACCIONA – Proprietary and confidential information
Case Examples: WIFI
NUEVOS CONCEPTOS: WIFI PROJECT-OBJETIVOS Y ALCANCE
© ACCIONA – Proprietary and confidential information
13 +
Case Examples: WIFI
Case Examples: ADVOCAT
Photos 3 & 4 : monolitic Laminate Repair - Workshop
ADVanced Composite Repair Tooling
for Wind Turbine Blade Maintenance
- ADVOCAT-
© ACCIONA – Proprietary and confidential information
14 +
Case Examples: ADVOCAT
Participants Competences & Role in the Project
Name(s) Type SPAIN FRANCE GERMANY
ACCIONA BLADES (Coordinator) LE
Coordinator Blade repairs technology definition and implementation
ACCIONA ENERGIA LE
Renewable Company Blade repair engineering design and technology implementation
GMI SME Aerospace composite repair technology development
LZH I Laser technology developer
TECMECA SME Steel and aluminium structures design and fabrication
Type: LE (Large Enterprise), SME (Small & Medium Sized Enterprise), I (Research Institute), U (University)
Total Costs: 2,692 M€ 1,377 M€
Expected Public Funding: 0,894 M€ 0,282 M€
© ACCIONA – Proprietary and confidential information
15 +
Case Examples: ADVOCAT
© ACCIONA – Proprietary and confidential information
16 +
Case Examples: ADVOCAT
© ACCIONA – Proprietary and confidential information
17 +
Case Examples: FLOADMET
© ACCIONA – Proprietary and confidential information
18 +
Case Examples: FLOADMET
Total Costs 6,05 M€ 2,02 M€
Duration 2012 (feb.) to 2014 (march )
© ACCIONA – Proprietary and confidential information
19 +
Case Examples: FLOADMET
© ACCIONA – Proprietary and confidential information
20 +
Case Examples: ILIS
Total Costs 5,82 M€ 2,36 M€
Duration 2010 to 2012
Innovative Lithium-Ion System Management design for MW Solar Plants
© ACCIONA – Proprietary and confidential information
21 +
Case Examples: ILIS
It’s very useful to optimize the PV and Battery system in each project in relation with the specific grid code requirements for the countries.
© ACCIONA – Proprietary and confidential information
22 +
4.68 4.7 4.72 4.74 4.76 4.78 4.8 4.82 4.84
x 104
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
x 105
Case Examples: ILIS
Electrical grid requirements
+
Energy Storage Management (SOC)
+
Weather - Power Forecast
Ebat Grid
Epv Ebat
Power Generation Smoothing
Power Generation to operator set-points
Frequency & Voltage Regulation
+
© ACCIONA – Proprietary and confidential information
23
Case Examples: ILIS
+
© ACCIONA – Proprietary and confidential information
24
Case Examples: ILIS
+
© ACCIONA – Proprietary and confidential information
25
Case Examples: ILIS
+
© ACCIONA – Proprietary and confidential information
26
PV plant controller: Power Dispatcher
SCADA to control power output of PV inverters to fulfil different Grid specifications by performing grid support services. Allows also the efficient hybridization with other technologies like diesel generators
PV + Storage plant controller: SunDispatcher
SCADA to control power output of PV plant in combination with an electric energy storage system (ESS) in order to create a dispatchable solar plant .
Products as Results of the Project
¡¡ Thank you very much !!
Muchas Gracias [email protected]
27
© ACCIONA – Proprietary and confidential information