ACCESSING MINING AND MAJOR PROJECTS CONFERENCE 2012. INTRODUCTION David Figallo – Project Manager / Site Supervisor Chris Christou – Development/Chemical Engineer BASETEC SERVICES BACKGROUND - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

ACCESSING MINING AND MAJOR

PROJECTS CONFERENCE 2012

Page 2: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

INTRODUCTIONDavid Figallo – Project Manager / Site SupervisorChris Christou – Development/Chemical Engineer

BASETEC SERVICES BACKGROUNDCorrosion and Environmental Engineering

company that specialise in Design, Manufacture, Installation and Maintenance of Fibreglass products for Mining and other Industrial Processes:FRP – Fibre Reinforced PlasticGRP – Glass Reinforced PlasticGRE – Glass Reinforced Epoxy

Page 3: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

TODAY’S PRESENTATION

Recent Major Projects and how they were successful

Benefits of Small Government and Independent Organisations

Competing on an International LevelQuality Controls and ProceduresDiversify your Product or Services

Page 4: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

FRP/ GRP/GRE

Current and Recent Projects

Licensed Holders for NOVAFLO FRP/ GRP/ GRE Technology

Page 5: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

2011 FLUOR DANIELS INC – SANTOS GLADSTONE LNG PLANT

Scope of work:

Design and Supply approximately 75 kilometers of High Pressure Novaflo GRE brine hydro carbon transfer pipe. minimum design life of 40 years The pipe is to have easy connections using API threaded connections and Key lock joints

● Threaded Connections

● Diameter : NB50 – NB400

● 30barg

Page 6: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

2011 RUHRPUMPEN USA – TEMIHI GEOTHERMAL PLANT NEW ZEALAND

Scope of work:

Design Supply and Install four Novaflo Seawater inlet Cooling Pipes and Pump Casings. Our design engineers carried out full FEA Analysis, Pipeline Stress Analysis and Seismic design.

● Pipe sizes range up to DN2100.

● Pressure rating : 6barg

● Site Installation and Butt and Strap Joints

Page 7: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

2010 LEIGHTONS / SA WATER - CHRISTIES BEACH WWTP

Scope of work:

Design Manufacture and Install Novaflo pipe and fittings, Basetec also supplied 360° support steel pipe cradles as part of the complete package. Novafast 1000 Vinylester Resin was used.

● Pipe sizes range DN50 up to DN1000.

● Pressure rating : 2barg

● Site Spooling and Installation

Page 8: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

Government and Independent Organisations

Innovate SAGovernment Grant and Funding AdviceNetworking Events

Industry Capability Network (ICN)Registering Your Companies Product and

Services on Supplier data basesPromoting and assisting local input on major

projects eg Fluor Daniels Inc

Page 9: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

South Australian Chamber of Mines and Energy (SACOME)Help promote companies with skills relevant to

current Major Mining ProjectsNetworking and business opportunities through

member conferences.

Water Industry Alliance (WIA)Tender and Project opportunities for membersSupporting and promoting local industries Eg Christies Beach WWTP

Page 10: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

Competing on an International Level

Government Incentives for the large Mining and Construction Procurement Companies for using Local Industry and Service Providers.

Small Australian Companies can compete with the large International Companies for the current Australian based Mining and Construction Projects.

Succeeding in Australian Major Mining and Construction Projects will open the door for International opportunities and place your company in a much stronger position on the International Stage.

Page 11: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

Quality Control and Procedures

Major Projects demand Products and Services that conform to the highest of Standards.

Often these project require us to meet not only Australian Standards but also stricter international standards such as American Petroleum Institute (API)British Standards (BSi) International Organization for Standardization

(ISO) etc.Be Prepared to be Audited by these Major

Construction and Procurement Companies throughout the contract periods eg; Fluor Project

Page 12: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

Diversify Your Products and Services

For example, years ago in performing market research Basetec noticed the strong possibility for a CSG (coal seam gas) boom.

The CSG boom would call for large amounts of GRE High Pressure Pipe.

Therefore, Basetec diversified its product base from FRP/GRP vessels and ducting to include GRE High Pressure Pipes, which enabled Basetec to win the Fluor/Santos Gladstone Project.

Page 13: ACCESSING MINING AND MAJOR PROJECTS CONFERENCE  2012

SUMMARY

Hopefully from today's discussions you can take away some key points to help grow your business and be a part of Mining and Major Project opportunities in Australia.