Shashank Arun | SPA/NS/BEM/469 | 2010-11 | Even Sem |Year 2 | SPA, New Delhi
8
RPL
has mobilized sufficient resources to sustain pre-
commissioning and commissioning a
ctivities on fast track, RPL
added.
Delive
ries of equipments are nearly co
mplete, civil construction is
complete, all major equipments inc
luding several super heavy
equipm
ents have been installed, struc
tural steel erection are at an
advanced stage and hydro-testing activities are in full swing, the
compa
ny said.
TIME & COST OPTIM
IZATIO
FOR
A
CCELERATED PROJECT DELIV
A SSSSYNOPSIS
SSSSHASHANK AAAARUN
BEM/469
FOURTH SEMESTER
Departm
ent of Building Engineering and M
School of Planning and Archite
cture, Ne
Jan-Jun 2011
RY
anagemen
Delh
![Page 2: Accelerated Project Delivery-synopsis](https://reader031.vdocuments.mx/reader031/viewer/2022021214/577d2e381a28ab4e1eaebc97/html5/thumbnails/2.jpg)
8/7/2019 Accelerated Project Delivery-synopsis
http://slidepdf.com/reader/full/accelerated-project-delivery-synopsis 2/4
![Page 3: Accelerated Project Delivery-synopsis](https://reader031.vdocuments.mx/reader031/viewer/2022021214/577d2e381a28ab4e1eaebc97/html5/thumbnails/3.jpg)
8/7/2019 Accelerated Project Delivery-synopsis
http://slidepdf.com/reader/full/accelerated-project-delivery-synopsis 3/4
Shashank Arun | SPA/NS/BEM/469 | 2010-11 | Even Sem |Year 2 | SPA, New Delhi
6
Refere
nces:
http://www.business-standard.com/in
dia/news/rpl-jamnagar-
refinery-to-be-completed-before-time/4
2857/on
Shashank Arun | SPA/NS/BEM/469 | 2010-11 | Even Sem
|Year 2 | SPA, New Delhi
3
Project acce
leration is often done by not on
ly increasing resources
(man, material & machinery) but also over
lapping various project
activities. T
his is done for various reasons & risks included are
more when a project is accelerated.
Need of Stu
dy:
The study
is needed to understand & evolve the technical,
financial &
managerial issues involved in an accelerated project
compared to any traditional project.
Aim & Objectives:
• To un
derstand the need of ac
celerating a project
incorpo
rating various issues like fin
ancial liabilities of a
project, early returns are required from a project, etc.
• To evolve a schematic for accelerating a project with the help
of technological advancement & managing resources from
start of the project to the handover.
Scope of Study:
The study shall cover advanced & m
odern techniques of
construction for accelerated project delivery.
![Page 4: Accelerated Project Delivery-synopsis](https://reader031.vdocuments.mx/reader031/viewer/2022021214/577d2e381a28ab4e1eaebc97/html5/thumbnails/4.jpg)
8/7/2019 Accelerated Project Delivery-synopsis
http://slidepdf.com/reader/full/accelerated-project-delivery-synopsis 4/4
Shashank Arun | SPA/NS/BEM/469 | 2010-11 | Even Sem |Year 2 | SPA, New Delhi
4
The s
tudy shall cover managemen
t aspects to ensure early
completion of the project (incentive/ penalty, contract type,
inception of technological & management skills at various project
stages, etc.).
I would like to focus on the economic, safety and quality aspects
of the case studies.
Metho
dology:
• To understand various aspects
of accelerating a project
th
rough literature study (published works, unpublished
w
ork, books & journals).
• Selection of appropriate case study projects (understanding
th
e projects, data collection, and analysis).
• Analysis of data shall be done to
identify aspects covered to
accelerate
the
project
(technological,
financial
&
m
anagement).
• Comparison of various tech
nologies incorporated to
accelerate the project as against of the traditional
te
chnologies (cost aspects alongw
ith quality and safety).
• To evolve a schematic for op
timizing time & cost for
accelerated project delivery.
Shashank Arun | SPA/NS/BEM/469 | 2010-11 | Even Sem
|Year 2 | SPA, New Delhi