abj presentation pp l 271008 saif

100
AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev. ABJ Engineering and Contracting Co Presentation Fabrication Services and Beyond

Upload: saifmohammed

Post on 25-Jun-2015

2.194 views

Category:

Technology


3 download

TRANSCRIPT

Page 1: Abj   Presentation Pp L 271008 Saif

AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

ABJ Engineering and Contracting Co Presentation

Fabrication Services and Beyond

Page 2: Abj   Presentation Pp L 271008 Saif

2AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Contents• Introduction• Services• Products• Prominent Clients• Certifications• Our Strength• Quality Assurance• Production Capacity• Growth• Equipment• Facility• Summary of Projects

Page 3: Abj   Presentation Pp L 271008 Saif

3AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Introduction

ABJ Engineering & Contracting Co, an ISO 9001 certified company, specialized in fabricating surface equipment for the Oil & Gas, Petrochemical, Fertilizer, Water Treatment and Desalination Plants etc. and structural fabrication services for public utility sector like Stadiums, Malls and Amusement Parks. ABJ has supplied a variety of equipment and systems to many countries around the world.

Page 4: Abj   Presentation Pp L 271008 Saif

4AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Services

• Process Equipment Fabrication

• Structural Steel Fabrication

• Pipe Fabrication and Cladding

• Corrosion Protection Services

• Process Internal equipment

Page 5: Abj   Presentation Pp L 271008 Saif

5AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Products

• Pressure vessels• Pressure piping • Tanks• Skids• Evaporators • Dehydrators• Structures• Columns• Reactors

Page 6: Abj   Presentation Pp L 271008 Saif

6AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Venders of

Registered Venders of

ARAMCO, Saudi ArabiaSABIC, Saudi ArabiaKOC, KuwaitKNPC, KuwaitPIC, Kuwait,QP, Qatar

Page 7: Abj   Presentation Pp L 271008 Saif

7AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Cliental

• Snamprogetti, Italy• Ticknor, France• Tecnimont, Italy • JGC, Japan• Daelim, S.Korea • Hyundai, S.Korea• SK Eng, S.Korea • GC Eng, S.Korea• Petrofac, UAE • Petreco, UAE• Birdair, USA

Page 8: Abj   Presentation Pp L 271008 Saif

8AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Organization Chart

Page 9: Abj   Presentation Pp L 271008 Saif

9AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Vision

Page 10: Abj   Presentation Pp L 271008 Saif

10AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Mission

Page 11: Abj   Presentation Pp L 271008 Saif

11AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Certification

INTERNATIONAL CERTIFICATION

Page 12: Abj   Presentation Pp L 271008 Saif

12AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

ISO Certification

• ISO – 9001: 2000 Certificate of Approval for Quality System

Page 13: Abj   Presentation Pp L 271008 Saif

13AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

ASME Certification

• ASME –”PP” Certificate of Authorization for Power Piping

Page 14: Abj   Presentation Pp L 271008 Saif

14AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Certification

• ASME – “U” Certificate of Authorization for Pressure Vessels

Page 15: Abj   Presentation Pp L 271008 Saif

15AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Certification

• ASME – “U2” Certificate of Authorization for Pressure Vessels

Page 16: Abj   Presentation Pp L 271008 Saif

16AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Certification

“PP”Certificate of AuthorizationFor Power Piping

Page 17: Abj   Presentation Pp L 271008 Saif

17AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Certification

ASME – “S”Certificate of AuthorizationFor Power Boilers

Page 18: Abj   Presentation Pp L 271008 Saif

18AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

NBIC Certification• NBIC – “R” Certificate of

Authorization for Repair of Pressure Vessels

• NBIC – “NB” Certificate of Authorization for Register Boilers & Vessels

Page 19: Abj   Presentation Pp L 271008 Saif

19AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Our Strength

• Quality Standards• Safety Standards• Manpower: 1,250• Modern Equipment• Resources• Investment Capability

Page 20: Abj   Presentation Pp L 271008 Saif

20AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

HEALTH, SAFETY & ENVIRONMENT

HSE

Page 21: Abj   Presentation Pp L 271008 Saif

21AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

• Good Tools & Equipments,

• Safety Hand book,

• Safety Training Passport,

• Training programme,

• Pension Scheme,

• Good living conditions

• E-learning

Safety

Page 22: Abj   Presentation Pp L 271008 Saif

22AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

• Safety News Letter, • Results communication,• Award Safe Man of Month, • Best near miss, • Corporate Magazine, • HSE bulletins, • Daily pre-job start briefings, • Daily reports to Management.

Safety Awareness

Page 23: Abj   Presentation Pp L 271008 Saif

23AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

• ABJ introduced new and more detailed audit check list

• Analysis of every accident,

• Increased Corporate Management involvement

• OHSAS 18001 certified.

Safety Audit

Page 24: Abj   Presentation Pp L 271008 Saif

24AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Quality Assurance & Control

Page 25: Abj   Presentation Pp L 271008 Saif

25AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

IMTE Calibration Laboratories

Quality Assurance & Quality Control

Quality Assurance Procedures

Quality Auditing

Quality Control

Calibrating / Testing Laboratories

Welders Training School

Six Sigma

Sulaibiya Testing Lab., Kuwait

Corporate Director

Deputy Managing Director

Quality Assurance & Control

Quality Control Setup

Page 26: Abj   Presentation Pp L 271008 Saif

26AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Current Quality Certification

ASME & National Board’s CertificationsFABRICATION FACILITIES LOCATED at

QMS : Certified ISO 9001:2000

MAB FACILTYSHU FACILITY

ASME “U” STAMP

ASME “PP” STAMP

NBIC “R” STAMP

NBIC “NB” STAMP

ASME “S” STAMP

ASME “U” STAMP

NBIC “U2” STAMP

NBIC “NB” STAMP

Page 27: Abj   Presentation Pp L 271008 Saif

27AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Production Capacity

• Pressure Vessels:500 Tons / Month• Piping:70,000 Inch- Dias / Month• Structural Steel: 500 Tons / Month

Page 28: Abj   Presentation Pp L 271008 Saif

28AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Infrastructure - WorksMena Abdulla Facility

OverviewMan power Strength: 1200 nos.Total Work Shop Area:60,000 Sq.mTotal Covered Area:150,000 Sq.m

Page 29: Abj   Presentation Pp L 271008 Saif

29AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Infrastructure - WorksMena Abdulla Facility Layout

Page 30: Abj   Presentation Pp L 271008 Saif

30AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Infrastructure - Works

OverviewMan power Strength: 800 nos.Total Work Shop Area:26,000 Sq. MtrTotal Covered Area:8000 Sq.Mtr

Shuaiba Facility

Page 31: Abj   Presentation Pp L 271008 Saif

31AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

MACHINARY & EQUIPMENTSAT A GLANCE

Infrastructure

Page 32: Abj   Presentation Pp L 271008 Saif

32AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Infrastructure – Design & Eng

Software Used

• COMPRESS• NOZZLE PRO• PVELITE • STAAD PRO• STRUCAD• STRUCTURAL DESKTOP• AUTOCAD • EX STEEL

Page 33: Abj   Presentation Pp L 271008 Saif

33AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Equipment

Rolling Machine (Up to 100mm) - 03 No.PWHT Furnace (6m x 6m x 32m) - 01 Nos.Automatic Welding Machine - 14 Nos. Bore cladding machine - 2 Nos.CNC Cutting Machine150 mm thick –03 Nos.Welding Machine - 260 Nos.Overhead Crane 20 ton - 1No.Overhead Crane 10 ton - 7No.Overhead Crane 05 ton -5 Nos.Overhead Crane 30 ton - 4 Nos.Yard Crane 10 ton - 3 Nos.Bevelling Machine - 450 mm dia - 2 Nos.

Page 34: Abj   Presentation Pp L 271008 Saif

34AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Equipment

CNC Vertical Drilling Machine - 02 NosCNC Hole Punching Machine - 01 Nos.Plasma Cutting Machine 20/50 mm -03 Nos.Shearing Machine 16 mm thick - 01 Nos.Press Brake - 01 Nos.SAW Machine - 09Nos.FCAW Machine - 05 Nos.Radial Drilling Machine - 02 NosProfile Bending Machine 150 mm - 02Nos.Hydraulic Press - 03 Nos.Circular Saw Machine. - 01 Nos.Pipe Flame cutting machine 60”Dia– 04 Nos.Lathe Machine - 04 Nos.

Page 35: Abj   Presentation Pp L 271008 Saif

35AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Equipment

Post Weld - Heat Treatment - Diesel Furnace 32 x 6 x 6 MtrTemp – 800º C

Page 36: Abj   Presentation Pp L 271008 Saif

36AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Infrastructure - Works

OverviewMan power Strength: 1250 nos.Total Work Shop Area:150,000 Sq. MtrTotal Covered Area : 26,000 Sq.Mtr

Mena Abdulla Facility

Page 37: Abj   Presentation Pp L 271008 Saif

37AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

100 MM THK x 3.0 MTRS. - WEIGHT-140 TON

Equipment

Page 38: Abj   Presentation Pp L 271008 Saif

38AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

PWHT Furnace : Size : 31.2 m Long x 6m Wide x 6m Height

Equipment

Page 39: Abj   Presentation Pp L 271008 Saif

39AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

PWHT Furnace – Inside View showing Insulation

Equipment

Page 40: Abj   Presentation Pp L 271008 Saif

40AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Nozzle Bore Cladding Machine – Automatic / Vertical (Range: from 2” to 24” NB Nozzles)

Equipment

Page 41: Abj   Presentation Pp L 271008 Saif

41AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Nozzle Bore Cladding Machine – Welding in Progress using Inconel 625 Filler wire with GMAW Process

Equipment

Page 42: Abj   Presentation Pp L 271008 Saif

42AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

6 M x 6 M LONG COLUMN & BOOM SAW MACHINE

9 Nos. - Column & Booms SAW Machines.

5 Nos. - Column & Boom FCAW Machines.

(Maximum Number of Boom and Columns in the Region)

Equipment

Page 43: Abj   Presentation Pp L 271008 Saif

43AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

PRESS BRAKE MACHINE

Equipment

Page 44: Abj   Presentation Pp L 271008 Saif

44AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

HYDRAULIC POWER PRESS (400 TON )

Equipment

Page 45: Abj   Presentation Pp L 271008 Saif

45AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

NEW LATHE MACHINE (24” x 3M LONG)

Equipment

Page 46: Abj   Presentation Pp L 271008 Saif

46AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

MULTI HEAD CNC FLAME CUTTING MACHINE WITH SIGMA NESTING SOFTWARE - (4.5 M WIDE x 18.0 M LONG x 250 MM THK.

WITH 9 TORCHES)

Equipment

Page 47: Abj   Presentation Pp L 271008 Saif

47AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

CNC CIRCULAR BANDSAW M/C (400 MM x 1.5 MTR CAPACITY)

Equipment

Page 48: Abj   Presentation Pp L 271008 Saif

48AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

CNC HOLE PUNCHING MACHINE

Equipment

Page 49: Abj   Presentation Pp L 271008 Saif

49AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

RADIAL DRILLING MACHINE ( 2 NOS)

Equipment

Page 50: Abj   Presentation Pp L 271008 Saif

50AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

BAND SAW CUTTING MACHINE-Up to 400 x 400 mm size (2 Nos.)

Equipment

Page 51: Abj   Presentation Pp L 271008 Saif

51AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

PLATE SHEARING MACHINE ( Up to 16.0 mm Thick.)

Equipment

Page 52: Abj   Presentation Pp L 271008 Saif

52AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

SUMMARY OF PROJECTS

Page 53: Abj   Presentation Pp L 271008 Saif

53AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Recent Projects SUMMARY OF PROJECTS

Job No. CLIENT PROJECT OWNER SCOPE OF WORKCONTRACT VALUE

in K.D

PERIOD

2120Flour / World

Service Intalia/ Kharafi National

Ethylene Glycol ProjectEquate

Petrochemical Company

Pre Fabrication of piping & pipe Support Work 819,115 2007

2124 - 2 NATCO-UK Korchagin IFP - 1STG

Engineering LLC

Design,Supply and Fabrication of Pressure

Vessels ( 11 Nos )690,463 2007

2128 Cameron Petreco

PNZ Eozene EOR Project – Evaporative Water

Treatment Facilities , Al Wafra, PNZ, Kuwait

Joint Operations -

Saudi Arabian Chevron Inc./

Kuwait Gulf Oil Company (PNZEOR Project)

Design, Fabrication & supply of Pressure Vessels

(4 Nos) Tank (1 No) & SKIDS

550,930 2007

2129 S.K.E.C JPME

Aromatics Complex Project

Kuwait ParaxylineProduction Company

Fabrication of Columns (8 Nos)

& Pressure Vessels (3 Nos)

596,460 2007

2130 NatcoSaudi Kayan Olefins

Plant Al Jubail, Kingdom of Saudi Arabia

KBRFabrication & Supply of

Pressure Vessels ( 8 Nos) & SKIDS 3 Nos

621,225 2007

2131 TECNIMONT, SpA.

Aromatics Complex Project

Kuwait ParaxylineProduction Company

Design, Fabrication & Supply of Carbon steel

Coloumns136,150 2007

Page 54: Abj   Presentation Pp L 271008 Saif

54AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Recent Projects

Job No. CLIENT PROJECT OWNER SCOPE OF WORKCONTRACT VALUE

in K.DPERIOD

2132 S.K.E.C

Building New Gathering Centre GC-24 at Sabriyah

Field NorhtKuwait,CONTRACT No.

32757

Kuwait Oil Company (K.O.C)

Design, Supply & Fabrication Pressure Vessels 740,000 2007

2133 BIRDAIRNELSON MANDELA BAY

Multi Purpose Stadium for South Africa

Nelson Mandela Bay Metropolitan

Municipality

Supply & Fabrication of Roof Structure & Misc. Items 2,600,000 2007

2134 BIRDAIR Green Point Stadium, Cape Town. South Africa

City of Cape Town. South

Africa

Supply & Fabrication of Roof Structure & Misc. Items 1,600,000 2007

2135 Kharafi National

Phase 1 – Airfield and Infrastructure in Central

Utility Complex – 1 (CARGO) for Dubai World

Central Project.

Kharafi NationalSupply & Fabrication of

Structural steel support for Jabel Ali Airport

227,888 2008

2136 Joint Operations Kharafi National

Large Scale Pilot (LSP) Steam Flood Project, Al

Wafra, PNZ, Kuwait

Kuwait Gulf Oil Co./ Saudi

Arabian Chevron Inc

Supply & Fabricationof Skid Packages, Structral, Piping

& Tanks1,124,437

2008 (On

Going)

Page 55: Abj   Presentation Pp L 271008 Saif

55AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Recent Projects

Job No. CLIENT PROJECT OWNER SCOPE OF WORKCONTRACT

VALUE in K.D

PERIOD

2139 Siemens Water Technologies

Membrane Biological Reactor Module

Fabrication Kuwait

Paraxylene

Production Co.(KSC)

Supply & Fabrication of Skid Packages, &

Tanks315010 2008 (On

Going)

2140The Kuwait

Styrene Co (K.S.C.C)

EBSM (OL2K)Supply & Fabrication of

Pressure Vessel & Hoppers

119,519 2008 (On Going)

2141 Fisia ItalimpantiEvoporator, Tank,

Vessels, Piping, Structure,

Ministry of Water &

Electricity

Supply & Fabrication of various equipment 8,227,808 2008 (On

Going)

Page 56: Abj   Presentation Pp L 271008 Saif

56AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

PROJECT PHOTOSAT A GLANCE

Projects

Page 57: Abj   Presentation Pp L 271008 Saif

57AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Piping Erection on Skids

Dox Unit Skid with pressure vessels Skid A & B – Piping & valve assembly

Pipe rack structure erection on Skids

Page 58: Abj   Presentation Pp L 271008 Saif

58AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Skid Fabrication at a glance

Page 59: Abj   Presentation Pp L 271008 Saif

59AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Skid Fabrication at a glance

Page 60: Abj   Presentation Pp L 271008 Saif

60AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Separator for Technimont

Page 61: Abj   Presentation Pp L 271008 Saif

61AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Crude oil Desalter

Page 62: Abj   Presentation Pp L 271008 Saif

62AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Separator Vessels for KOC.

Page 63: Abj   Presentation Pp L 271008 Saif

63AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Wet Seprator for Axsia Howmmer

Page 64: Abj   Presentation Pp L 271008 Saif

64AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Stripper for SK Engineering Co

Page 65: Abj   Presentation Pp L 271008 Saif

65AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Urea & Ammonia Plant – For Petrochemical Industries Company

Page 66: Abj   Presentation Pp L 271008 Saif

66AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Lift Gas Distributing System for KOC / SAMPROGETTI

Page 67: Abj   Presentation Pp L 271008 Saif

67AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Ardiya Waste Water Pumping Unit

Page 68: Abj   Presentation Pp L 271008 Saif

68AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Sulabiya Waste Treatment & Reclamation Plant – RO & UF Piping

Page 69: Abj   Presentation Pp L 271008 Saif

69AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Replacement of North Kuwait Crude Oil Export System

Page 70: Abj   Presentation Pp L 271008 Saif

70AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

ESDV Buffer Vessels

Page 71: Abj   Presentation Pp L 271008 Saif

71AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

HP Gas Separator KO Drum

Page 72: Abj   Presentation Pp L 271008 Saif

72AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

MEA Solution Regenerator Vessel

Page 73: Abj   Presentation Pp L 271008 Saif

73AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Surge Vessels (18 Nos.) Water Treatment Plant

Page 74: Abj   Presentation Pp L 271008 Saif

74AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Projects

Column for Technimont

Page 75: Abj   Presentation Pp L 271008 Saif

75AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Sheikh Jabber Al Ahmad International Stadium, Kuwait

Scope of Work.Compression Ring:1700 tons.Flying Mast : 180 tons.Cat Walk Structure:250 tons.Total Man hour : 212,342 mhr.

Page 76: Abj   Presentation Pp L 271008 Saif

76AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Structural work at Green Point Stadium, South Africa.

Page 77: Abj   Presentation Pp L 271008 Saif

77AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects,

Structural work at NM Stadium, Cape Town.

Page 78: Abj   Presentation Pp L 271008 Saif

78AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Graphical inside view of Al Jaber Al Ahmed Stadium

Page 79: Abj   Presentation Pp L 271008 Saif

79AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Overall view of Jaber Al Ahmed Stadium, Kuwait after erection of Compression Ring Beams

Page 80: Abj   Presentation Pp L 271008 Saif

80AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Panoramic view of Stadium before and during erection of Compression Ring Elements

Page 81: Abj   Presentation Pp L 271008 Saif

81AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Panoramic view of Jaber Al Ahmed Stadium, Kuwait during erection of Compression Ring Beams

Page 82: Abj   Presentation Pp L 271008 Saif

82AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Panoramic view of Stadium after completion of Compression Ring Beam Erection

Page 83: Abj   Presentation Pp L 271008 Saif

83AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Project

Aerial view of Jaber Al Ahmed Stadium, Kuwait after erection of Compression Ring Beams

Page 84: Abj   Presentation Pp L 271008 Saif

84AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Erection of last Compression Ring Element

Stadium Projects

Page 85: Abj   Presentation Pp L 271008 Saif

85AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Fixing of fabric

Page 86: Abj   Presentation Pp L 271008 Saif

86AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Project

Erection under process

Page 87: Abj   Presentation Pp L 271008 Saif

87AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Compression Ring Element after Erection

Page 88: Abj   Presentation Pp L 271008 Saif

88AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Compression Ring Element after Painting

Page 89: Abj   Presentation Pp L 271008 Saif

89AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Trail Assembly of Girder

Page 90: Abj   Presentation Pp L 271008 Saif

90AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Trail Assembly of Girder

Page 91: Abj   Presentation Pp L 271008 Saif

91AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Trail Assembly of Compression Ring

Stadium Projects

Page 92: Abj   Presentation Pp L 271008 Saif

92AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

DESALTER VESSELS Stage: NDT in Progress after PWHT

Trail Assembly of Compression Ring

Stadium Projects

Page 93: Abj   Presentation Pp L 271008 Saif

93AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Stadium Projects

Trail Assembly of Compression Ring

Page 94: Abj   Presentation Pp L 271008 Saif

94AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Fabrication of Side Chord

Stadium Projects

Page 95: Abj   Presentation Pp L 271008 Saif

95AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Fabrication of End Girder

Stadium Projects

Page 96: Abj   Presentation Pp L 271008 Saif

96AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Fabrication of Connecting Plates

Stadium Projects

Page 97: Abj   Presentation Pp L 271008 Saif

97AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

LOCATION MAP IN KUWAIT

Location Map

Page 98: Abj   Presentation Pp L 271008 Saif

98AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Location Map

Page 99: Abj   Presentation Pp L 271008 Saif

99AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

FOR ALL QUERIES PLEASE CONTACT

Queries

SAIF MOHAMMEDBusiness Development Manager

ABJ Engineering & Contracting CompanyP.O. Box – 10331, Shuaiba – 65454,

KuwaitTel: +965 -22259522 EXT. 6529

Fax: +965-22259523 Mob: +965-97251958E-Mail: [email protected]

Website: http://www.abjengineering.com

Page 100: Abj   Presentation Pp L 271008 Saif

100AWI 106 Attu. 8 Rev. 1 22 Sep. 2007 Date/ Rev.

Thank You

“Thank you for your time and patience”.