abdulghafoor m. abduljabbar north refineries company’s director general iraqi ministry of oil

19
Abdulghafoor M. Abduljabbar Abdulghafoor M. Abduljabbar North Refineries Company’s North Refineries Company’s Director General Director General Iraqi Ministry of Oil Iraqi Ministry of Oil 05/08/22 1

Upload: wallis

Post on 16-Jan-2016

47 views

Category:

Documents


0 download

DESCRIPTION

Iraq Refinery2012 International Conference and Exhibition on Refinery Industries in Iraq April 17 th -18 th , 2012 presented by. Abdulghafoor M. Abduljabbar North Refineries Company’s Director General Iraqi Ministry of Oil. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

Abdulghafoor M. AbduljabbarAbdulghafoor M. Abduljabbar North Refineries Company’s Director GeneralNorth Refineries Company’s Director General

Iraqi Ministry of OilIraqi Ministry of Oil04/21/23

1

Page 2: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

Actual situation of North Refineries Company(NRC) and our plan to meet world class

refining standards

04/21/23 2

Page 3: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

Contents

Introduction.

North Refineries Company’s Process Units and

Licensors.

North Refineries Company’s Organization

Structure.

North Refineries Company’s new projects.

Future major refineries in Iraq.

Our aims.04/21/23 3

Page 4: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

North Refineries Company (NRC)

North Refineries Company was established in 1982 and it is the largest refining company among the Iraqi Ministry of Oil companies with design capacity of 402000 BPSD. NRC employed over 8,873 employees.

The company produces over 35 different type of product such as unleaded premium gasoline, illuminating kerosene, ATK, diesel, lube oil product, spindle oil, transformer oil, Asphalt, sulfur, LPG, RT … etc.

04/21/23 4

Page 5: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

North Refineries Company consist of the following refineries and facilities;

1- 310,000 BPSD Baiji Refining Capacity.

A- Salahuddin (1) Refinery with 70000 BPSD Refining Capacity.

B-North Refinery with 150000 BPSD Refining Capacity With 20000 BPSD small Two Units.

C- Salahuddin (2) Refinery with 70000 BPSD Refining Capacity.

2- New Isomerization Unit / 20,000 BPSD, in operation since July, 2011.

3- Lube Plant (two trains): 125000 Ton of different lube stocks per train.

4- Packaging and Loading Arms facilities.

04/21/23 5

Page 6: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

5. Exterior Refineries:A. Kirkuk Refinery with 30,000 BPSD Refining Capacity.B. Siynia Refinery with 30,000 BPSD Refining Capacity. Two units in operation and one unit under construction.C. Kisik Refinery with 20,000 BPSD Refining Capacity.

One unit in operation and second under construction.D. Qaiyarah Refinery with 34,000 BPSD Refining Capacity.

Needs to extend Crude Pipe line from the Strategic Line about 60 Km.

E. Hadithah Refinery with 16,000 BPSD Refining Capacity.F. Aljazirah Refinery with 20,000 BPSD P28 Refining Capacity.

Planned to be re-engineering and reinstalling inside NRC.6. Future Projects: i. New Kirkuk Refinery with capacity of 150,000 BPSD. ii. New FCC unit with capacity of 55,000 BPSD.

04/21/23 6

Page 7: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

1- Salahuddin Refinery 1 Process Units and Summery

No. Unit Name Design Capacity

Licensor

01 Atmospheric Distillation 70,000 BPSD SNAM

02 Light Distillate HDS 29,000 BPSD SNAM

03 Light Gas Oil 12,000 BPSD SNAM

04 Reformer 8,000 BPSD SNAM

05 LPG 540 Ton/Day SNAM

06 Sulpher 51 Ton/Day SNAM

04/21/23 7

1982 was the year of operation. EPC has been done by Technoexport. The refinery operate 90% of its design capacity. 2000 M3/Day of black oil is being injected back to the crude oil. Because of the long operation life, sanctions, and wars most of the units need rehabilitation.

Page 8: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

2- North Refinery Process Units

Unit No.

Abbrev.

Service Design Capacity

Licensor

01 ADU Atmospheric Distillation 150,000 BPSD SNAM

02 VFU Vacuum Flashing 65,000 BPSD SNAM

03 NHT Naphtha Hydrotreating 41,000 BPSD UOP

04 KHT Kerosene Hydrotreating 28,000 BPSD UOP

05 GHT L.G.O. Hydrotreating 31,000 BPSD UOP

06 CRU Catalytic Reforming 22,000 BPSD UOP

07 VHC Vacuum Gas Oil Hydrocracking

38,000 BPSD UOP

08 HPU Hydrogen Production 71,860 Nm3/h KTI

09 GSU Gas Sweetening 32,600 Nm3/h SNAM

10 LPGR LPG Recovery 650 Ton/Day SNAM

11 SRU Sulfur Recovery 281 Ton/Day SNAM

12 SWS Sour Water Stripping 114 M3/h SNAM

14 CCR Reformer Catalyst Regeneration

454 Kg/h UOP

56 LPGD LPG Dehydration C 3 2.9 Ton/hC 4 26.4 Ton/h

CCEC04/21/23 8

Page 9: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

North Refinery Summery;

1983 was the year of operation. EPC has been done by CHIYODA. The refinery operate 85% of its design capacity.25,000 M3/Month of Naphtha is being injected

back with the crude oil.Because of the long operation life, sanctions,

vandalism, and wars most of the units need rehabilitation.

04/21/23 9

Page 10: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

3- Salahuddin Refinery 2 Process Units and Summery

No. Unit Name Design Capacity

Licensor

01 Atmospheric Distillation 70,000 BPSD SNAM

02 Light Distillate HDS 29,000 BPSD SNAM

03 Light Gas Oil 12,000 BPSD SNAM

04 Reformer 16,500 BPSD SNAM

05 Isomerization 20,000 BPSD SNAM

04/21/23 10

1984 was the year of operation. EPC has been done by Technoexport and TPL. The refinery operate 85% of its design capacity. 2000 M3/Day of black oil is being injected back to the crude oil. Because of the long operation life, sanctions, and wars most of the units need rehabilitation.

Page 11: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

4- Exterior Refineries Process Units and Summery

No.

Refinery Unit Name Design Capacity

Licensor

01 Kirkuk1973

Year of Operatio

n

Atmospheric Distillation unit 1Atmospheric Distillation unit 2Atmospheric Distillation unit 2

10,000 BPSD10,000 BPSD10,000 BPSD

HowbackerHowbackerHowbacker

02 Siynia1978

Year of Operatio

n

Atmospheric Distillation unit 1Atmospheric Distillation unit 2Atmospheric Distillation unit 2

10,000 BPSD10,000 BPSD10,000 BPSD

HowbackerHowbackerHowbacker

03 Kisik1982

Year of Operatio

n

Atmospheric Distillation unit 20,000 BPSD Howbacker

04 Qaiyarah1955-1983

Year of Operatio

n

A- Asphalt unit 1 Asphalt unit 2 Asphalt unit 3 Asphalt unit 4B- Atmospheric Distillation unit 1 Atmospheric Distillation unit 2

2,000 BPSD4,000 BPSD4,000 BPSD4,000 BPSD

10,000 BPSD10,000 BPSD

LummusIngecoIngecoIngeco

HowbackerHowbacker

04/21/23 11

Page 12: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

Exterior Refineries Process Units and Summery

No.

Refinery Unit Name Design Capacity

Licensor

05 Hadithah1951

Year of Operatio

n

Atmospheric Distillation unit 1Atmospheric Distillation unit 2

6,000 BPSD10,000 BPSD

FosterWeeler

Howbacker

06 Aljazirah1984

Year of Operatio

n

Atmospheric Distillation unit 2,000 BPSD Ingeco

04/21/23 12

Page 13: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

Iraqi Refineries Location

04/21/23 13

Page 14: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

North Refineries Company’s Organization Structure

04/21/23 14

Page 15: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

04/21/23

North Refinery in respect of implementing FCC (Fluid Catalytic Cracking) unit 55,000 BPSD of capacity for conversion fuel oil to light products especially of fuel oil up to 30% of the total production volume. Feasibility Study has been done by JICA. FEED and Licensor Selection will be done by JICA too.

Six new boilers- 400 Ton/Hr Capacity, under Construction, Two of them will be to start up Jun 2012.

New power generation plant/ 85 MW, contracted and site preparation. plan to be completed April 2013

Reconstruction of 54 Storage Tanks. 90% has been done & will be complet befor July 2012

New LPG Unit/ 400 Ton/day. Contracted will be start up Nov.2013.

Upgrading of Waste Water Treatment System.

New R.O. unit in Operation since 1/1/2010.

NRC has a number of projects which will contribute to the development of the North Refineries Company as follow:-

15

Page 16: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

04/21/23 16

Upgrading Existing Hydrogen production with KTI (TKT)company.

New Can production line. Contracted with a Germany Company.

Sulphur-Pelletisation unit. Received at site and under installing.

Upgrading North Refinery’s Control System by Honeywell with DCS system.

De-bottlenecking and Improving the performance of North Refinery, by Choyoda & UOP. SAL. 1 Refinery & SAL. 2 Refinery, under discussion with Chemo project.

Page 17: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

Future Major Refineries in Iraq

1. New Kirkuk Refinery in Kirkuk City ( North of Iraq) 150,000 BPSD Refining Capacity FEED will be over by jun2012

2. Maissan Refinery in Maissan City ( South of Iraq)150,000 BPSD Refining Capacity.

3. Karbala Refinery in Karbala City ( South of Iraq) 200,000 BPSD Refining Capacity. Has been awarded to Italian company for investment.

4. Nasiriya Refinery in Nasiriya City ( South of Iraq) 300,000 BPSD Refining Capacity.

04/21/23 17

Page 18: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

04/21/23

No Licensor Process Unit

1- SGSI Kerosene Hydrotreating Technology

2- SGSI Light Gas Oil Hydrodesulphurisation Technology

3- SGSI VGO Hydro-Cracking

4- HALDOR TOPSOE Hydrogen Production Unit

5- POERNER Blown Asphalt

6- UOP Fluid Catalytic Cracking Unit FCC

7- UOP Naptha Hydrodesulphurisation

8- UOP NC4 Isomerisation Unit

9- UOP Continuous Catalytic Reformer CCR

10- UOP C5/C6 Isomerisation Unit

11- MERICHEM Saturated Gas Plant LPG Treatment

12- MERICHEM Unsaturated Gas Plant LPG Treatment

13- DUPONT-STRATCO C3/C4 Alkylation

14- LURGI Sulfur Recovery and Tail Gas

15- Shaw Energy and Chemicals Atmospheric Distillation

16- Shaw Energy and Chemicals Vacuum Distillation

New Kirkuk RefineryProcess Unit’s Licensors for New Kirkuk Refinery Capacity of 150,000 BPSD

Achieved about 97 % FEED by Shaw Energy and Chemicals Limited/ UK

18

Page 19: Abdulghafoor  M.  Abduljabbar  North Refineries Company’s Director General Iraqi Ministry of Oil

04/21/23

Our primary goal is to:- Optimizing production Quantity Improving products quality.

Improving efficiency.a- Replacing North Refinery’s Control System with DCS

system.b- Upgrading Sal. 1, Sal. 2, and N.R. refinery.c- Replacing old pumps and compressor with new ones.d- Replacing old Furnace's tubs with new ones.

  e- Replacing old North Refinery’s boilers with new ones.Enhancing safety and security.

Reducing downtime.

Be green with the environment. Rehabilitation North Refinery’s Waste Water Treatments to improve water quality that is been discharged to the river.  

Thank you for your attention

NRC’s Aims

19