abdul barek road
TRANSCRIPT
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 1
Nokia Siemens Networks, All rights reserved. Version: 1.4
TECHNICAL SITE SURVEY REPORT
Axiata (Bangladesh) Ltd [AKTEL]
Bangladesh
NSN PO: 01
SITE NAME: Abdul Barek Road
SITE ID: CTG0015
SITE ADDRESS: Hazi Nurul Alam, S/o: late Abdul Wadud, Nur Bhaban, Abdul Barek Road, P.S:
Pahartoli, Chittagong.
DATE OF SURVEY 25th March 2010
NMC CONTACT +88-01817181186
PARTICIPANT
NAME COMPANY CONTACT E-Mail Signature
Md. Nahidul Alam AXIATA 01819310065 [email protected]
Md. Faruk NSN 01732268710 [email protected]
Md. Ismail Hossain CEBL 01922278479 [email protected]
Approved By Axiata:
Name:
Signature:
Date:
Approved By NSN:
Name:
Signature:
Date:
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 2
Nokia Siemens Networks, All rights reserved. Version: 1.4
TABLE OF CONTENTS:
A. BTS swap summary report ……………………………………………………………………………………………………..3
B. Material requisition ………………………………………………………………………………………………………………..4
C. Standard Tools List For BTS Swap (Indoor) ……………………………………………………………………………..5
1.1. PURPOSE.....................................................................................................................................6
1.2. SCOPE .........................................................................................................................................6
1.3. SITE INFORMATION ....................................................................................................................6
1.4 Equipment Transportation and Handling……………………………………………………………………..…………6
1.5 BTS Room.....................................................................................................................................6
2. Network architecture from BTS to MSC with the location & transmission media ....................... 7
2.1 Type of transmission for existing BTS...........................................................................................7
3. Existing BTS Information...............................................................................................................8
3.1. Measurement for proposed BTS.........................................................................……………………...8
3.2. Antenna and Feeder cable Configuration....................................................................................9
3.3. Cable Tray....................................................................................................................................9
4. Power system details....................................................................................................................10
4.1. Details of existing DC power (Rectifier) supply system.............................................................10
4.2. Details of battery backup...........................................................................................................10
5. Space Requirements for NSN Equipment.....................................................................................11
5.1. Power requirements............................................................................................................11
5.2. Upcoming Power system (Rectifier) details...............................................................................11
6. Existing Deficiency: ................................................................................................................12
7. Indoor and outdoor Photograph................................................................................................13-16
8. Swap instruction...........................................................................................................................17
9. Observation & Recommendation................................................................................................17
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 3
Nokia Siemens Networks, All rights reserved. Version: 1.4
A. BTS swap summary report:
BTS details: ERICSSON 900 MHz 1800 MHz
Existing site configuration (Base Rack 1) 4/4/4 N/A
Existing site configuration (Base Rack 2) N/A N/A
Existing site configuration (Base Rack 3) N/A N/A
Existing site configuration (Base Rack 4) N/A N/A
Planned site configuration (NSN) (Base Rack 1) 4/4/4 N/A
Planned site configuration (NSN) (Base Rack 2) N/A N/A
Planned site configuration (NSN) (Base Rack 3) N/A N/A
Planned site configuration (NSN) (Base Rack 4) N/A N/A
Action Point Summery Responsibility
Total no. of existing transmission link (Live link) 01 AXB
Hot swap is required No( Cold Swap) NSN
Difficulties in Equipment lifting NO NSN
House owner objection at night work NO Axiata
Indoor grounding issue NO Axiata
Outdoor grounding issue No Axiata
Maintenance time for swap BTS Based on agreed swap methodology Axiata
Traffic down time of power source change MW links Based on agreed swap methodology Axiata/NSN
Physical damage of any feeder cable NO Axiata
Confirmation of feeder marking OK Axiata
Lighting / Cooling isn’t proper NO Axiata
Immediate equipment transfer required after swap as no space is available at BTS room
NO NSN
Feeder Cable marking OK AXB/NSN
AXB ASSISTENCE:
1. PCM information data is required----AXB
2. Site access key is required----AXB
3. Physical/Logical parameter is required---- AXB
4. Emergency light is required —AXB.
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 4
Nokia Siemens Networks, All rights reserved. Version: 1.4
B. Material requisition
SL No Item description Quantity Base Unit Responsibility
1 PCM & Alarm DDF(10M&10M) 1 Pc NSN
2 Battery Rack N/A Pcs NSN
3 AC Power Cable (MDB To Rectifier) 10 Mtr NSN
4 50 rm Blue DC Power Cable (Battery loop & Rectifier Conn.)
17 Mtr NSN
5 50 rm Black DC Power Cable (Battery loop & Rectifier Conn.)
17 Mtr NSN
6 Circuit Breaker in Rectifier with rating(63A) 2 Pcs NSN
7 Circuit Breaker in DCDB(6A) 3 Pcs NSN
8 Circuit Breaker in MDB(40A) 1 Pc NSN
9 Grounding Cable 44 Mtr NSN
10 Feeder Jumper Cable (3 m) N/A Pcs NSN
11 Feeder Jumper Cable (4m) N/A pcs NSN
12 Feeder Jumper Cable (6m) 6 Pcs NSN
13 PCM Cable (120 Ώ) 10m(4Pair) 1 Pc NSN
14 BTS Ext. Alarm Cable(10m) 1 Pc NSN
15 DCDB 1 Pc NSN
16 Ladder No Need Mtr AXB
17 Cable lux 25 rm 15 Pcs NSN
18 Cable lux 6 rm 15 pcs NSN
19 Cable lux 6 rm 10 pcs NSN
20 Cable Tie 4”, 6”, 10” 9 packets NSN
21 Cable Tie 12” 3 packets NSN
22 FCIA Cabinet(Capacity 24 TRX) 1 Pc NSN
23 Required TRX 12 Pcs NSN
24 Hit Sink Tube Black & Blue 12 Pcs NSN
25 White Channel 3” No Need Mtr NSN
26 25 rm Blue DC Power Cable (RBS & Rectifier Conn.) 12 Mtr NSN
27 25 rm Black DC Power Cable (RBS & Rectifier Conn.) 12 Mtr NSN
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 5
Nokia Siemens Networks, All rights reserved. Version: 1.4
C. Standard Tools List For BTS Swap (Indoor)
TOOLS REQUIRED FOR BTS INSTALLATION Brand Importance Remarks
1 Site Master Standard Major
2 Digital Camera Standard Major
3 Digital Multi Meter Standard Major
4 Heat Gun Standard Major
5 Vacuum cleaner Standard Major
6 Krone puncher Standard Major
7 Water Level Meter Standard Major
8 Measuring Tape Standard Major
9 SPANNER:- 6-8,10-11,12-13,14-15,16-17,18-19,20-22,24-26,32-36. Standard Major
10 TIE CUTTER Standard Major
11 CABLE CUTTER Standard Major
12 KNIFE Standard Major
13 SCREW DRIVER SET Standard Major
14 NOTCH PLUS Standard Major
15 CUTTING PLUS Standard Major
16 COMPUS Standard Major
17 SLIDING Wrench Standard Major
18 Allen KEYS(FULL SET) Standard Major
19 HAMMER Standard Major
20 Torque Wrench (FULL SET) Standard Major
21 FILE Standard Major
22 HACKSAW Standard Major
23 Drill Machine with Hammering & Iron Bit Standard Major
24 T10 Standard Major
25 T20 Standard Major
26 T25 Standard Major
27 Crimping tools set for cable lugs Standard Major
28 Soldering Iron Standard Major
29 Cable Stripper Standard Major
30 Earth Tester Standard Minor
31 Multi Plug with extension cable Standard Major
32 LAN RJ45 puncher Standard Major
33 Tester, Scissor, Marker Pen etc. Standard Major
34 Anti static-wrist strap Standard Major `
35 Feeder Connector Making tool Standard Major
36 Flashlight/ Necessary Lighting arrangement Standard Major
37 Socket Wrench Set Standard Major
38 Protective gloves Standard Major
39 Ladder Standard Major
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 6
Nokia Siemens Networks, All rights reserved. Version: 1.4
1.1 Purpose: This document describes the present conditions on the site at the time of the survey date and defines the needed changes.
1.2 Scope: This report covers only the Flexi BTS network equipments and power system.
1.3 Site information:
1.4 Equipment Transportation and Handling
Roads to the site suitable for transportation Yes No
Equipment easy access at site Yes No
Room available for equipments delivery/ storage Yes No
BTS Access Stairs Goods Lift
Others
Unpacking can be done inside Yes No
Remarks:
1.5 BTS room
Is there a raised floor? Yes No
Raised floor dimensions Length: cm Width: CM
Lighting requirements: Yes No
All the light working properly
Yes No
Emergency light available Yes No
Fire fighting system available
Yes No
Remarks: Emergency light is required for swap night.
GPS Co-ordinates N: 22.35872 E: 091.78765
Site Location: Abdul Barek Road, P.S: Pahartoli, Chittagong.
Building type: 4 Stored
Existing type of site with tower height (m):
GF: GFRT:
Rooftop Others:
Building + Tower height (m) 16+6=22m
Property Owner: +88
Security guard available: Yes No Yes
Keys and permits from: Local Key is needed and Permission is taken
from Regional Office (Aktel), Akteruzzaman center, Chittagong
+88 01
Other contact persons: +88 01
Non - Working hour restrictions: Yes No
Remarks:
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 7
Nokia Siemens Networks, All rights reserved. Version: 1.4
2. Network architecture from BTS to MSC with the location & transmission media:
2.1. Type of transmission for existing BTS.
Optical fiber multiplexer Microwave radio others……………………
Transmission for BTS Base Rack 1,900/1800 Base Rack 2, 900/1800 Base Rack 3, 900/1800 Base Rack 4, 900/1800
Manufacturer Alcatel-1
Capacity (Terminated in DDF)
16E1
Capacity Available 15E1
Interface (120/75Ω) 120 Ohm
E1 with Site name for BTS PCM related
DDF
1st E1: Abdul Barek Road-
Sarai para 1
st E1: 1
st E1: 1
st E1:
2nd E1: 2nd
E1: 2nd
E1: 2nd
E1:
3rd
E1: 3rd
E1: 3rd
E1: 3rd
E1:
4th
E1: 4th
E1: 4th
E1: 4th
E1:
5th
E1: 5th
E1: 5th
E1: 5th
E1:
6th
E1: 6th
E1: 6th
E1: 6th
E1:
7th
E1: 7th
E1: 7th
E1: 7th
E1:
8th
E1: 8th
E1: 8th
E1: 8th
E1:
Remarks
Proper marking on Transmission equipments Yes No Others
Number Of Existing Transmission Links (Only Live links) 1
Traffic down time of power source change MW links Based on agreed swap methodology
MSC ID: CM14
Location:
Akteruzzaman
center
MSC ID:CM14
Location:
Akteruzzaman
center
BSC ID: CB47
Location:
MW with
Monsurabad
MW with
South Pahartoli
MW with
Pahartoli
MW with
Saraipara
BTS With
Abdul Barek
Road
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 8
Nokia Siemens Networks, All rights reserved. Version: 1.4
3. Existing BTS Information
Manufacturer BTS type/ Model Serial Number Configuration BTS Dimension (H x D x W)mm
Power Consumption
Comments (mention the Base rack)
Ericsson RBS 2216 /900 A535008173 4/4/4 950x520x600 +24V/250A Base rack-1
Ericsson/ Huawei/ Alcatel
………..…….……900
………………….1800
Ericsson/ Huawei/ Alcatel
………..…….……900
………………….1800
Ericsson/ Huawei/ Alcatel
………..……….…900
…………….……1800
3.1. Measurement for proposed BTS:
(All cable measurement must be through cable ladder)
BTS 900 BTS 900/ 1800 BTS 900/ 1800 BTS 900/ 1800
Ladder available above the proposed BTS cabinet: Yes No Yes No Yes No Yes No
Indoor feeder connector to Proposed BTS length : 6M
Length from GB to proposed BTS: 12M
Length from proposed BTS to Rectifier: 12M
Proposed DDF to BTS length: 10M
Length of GB to proposed DDF: 10M
Distance between transmission existing DDF to proposed DDF:
10M
Distance between Alarm DDF to Proposed BTS: 10M
Remarks:
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 9
Nokia Siemens Networks, All rights reserved. Version: 1.4
3.2. Antenna and Feeder cable Configuration:
Description Antenna type
Antenna height
(m)
Azimuth (Magnetic
North)
Tilt Feeder Cable size
Indoor Jumper
cable size
Indoor Jumper cable length
Cable damaged
Labeling
Sector 1, 900 Single Band 23m 80º 6º 7/8” ¼” 5m NO OK
Sector 2, 900 Single Band 23m 180º 6º 7/8” ¼” 5m NO OK
Sector 3, 900 Single Band 23m 280º 6 º 7/8” ¼” 5m NO OK
Sector 1, 900 extra
N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 2, 900 extra
N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 3, 900 extra
N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 1, 1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 2, 1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 3, 1800 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 1,1800 extra
N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 2,1800 extra
N/A N/A N/A N/A N/A N/A N/A N/A N/A
Sector 3,1800 extra
N/A N/A N/A N/A N/A N/A N/A N/A N/A
Remarks:
(Mention required indoor jumper cable length for new BTS)
6 Pcs 6m 1/2" jumper cable need for new Flexi BTS (900)
3.3. Cable Tray:
Re- use the existing cable tray Yes No
Remarks:
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 10
Nokia Siemens Networks, All rights reserved. Version: 1.4
4. Power system details
Incoming AC mains Phases: 3 Φ MCB rating: 63 A
Spare circuit breaker in MDB (3 Φ) No
Required circuit breaker in MDB 40 A-1 Pc
Main grounding Yes No
Generator Available: Yes No
Remarks
4.1. Details of existing DC power (Rectifier) supply system
Rectifier 1 Rectifier 2 Rectifier 3
Manufacturer Ericsson PBC-6500
DC output voltage (V) +24V,-48V
No. of installed Module 05
Option available for additional module
11
Module rating 1200 W
Existing output current (A) [From display]
No Display
Load capacity (Including Batt. Charging)
No Display
% set for Batt. charging 10 A (10%),15.5A(10%)
Capacity available No Display
Spare circuit breaker/ Fuse with rating
No
Required circuit breaker in rectifier 63 A-2 Pcs
Required circuit breaker in DCDB CB-6 A(3Pcs)
Remarks
4.2. Details of battery backup
For Rectifier 1 For Rectifier 2 For Rectifier 3
Manufacturer Northstar, Compact Power
Battery capacity (Ah) 9100 Ah,12V),(155Ah,6V)
No of Banks 3+3=6
Distance between GB to proposed rectifier through cable ladder
12M
Distance between GB to proposed DCDB through cable ladder
10M
Distance between battery to proposed rectifier
15M
Distance between MDB to proposed rectifier
10M
Remarks
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 11
Nokia Siemens Networks, All rights reserved. Version: 1.4
5. MEASUREMENT OF NSN EQUIPMENT
Element Name Qty Dimension (H x D x W) Weight (KG) Comments
Flexi BTS Cabinet 1 1800 x 600 x 600 62 Only cabinet
Flexi BTS module 1 133 x 422 x 447 9.3 System Module
Flexi BTS 2/2/2 1 1800 x 600 x 600 138 Including FCIA Cabinet
Flexi BTS 4/4/4 1 1800 x 600 x 600 171 Including FCIA Cabinet
Flexi BTS 8/8/8 1 1800 x 600 x 600 247 Including FCIA Cabinet
Property Required Clearance
Front of the BTS cabinet 900 mm (35.4 in.)
Behind the BTS cabinet 50 mm (2.0 in.)
Behind the BTS cabinet (with maintenance space in the back) 500 mm (19.7 in.) with side access
Above the BTS cabinet 300 mm (11.8 in.)
Front of the Rectifier cabinet 500 mm (19.7 in.)
Behind the Rectifier cabinet (with maintenance space in the back) 50 mm (2.0 in.)
5.1. Power requirements
Element Name Configuration Power (W) Consumption
Voltage (V) DC Breakers (A)
Comments
Flexi BTS 900 2/2/2 1055 -48v 32A
4/4/4 2120 -48V 50A
Flexi BTS 1800 2/2/2 1160 -48v 32A
4/4/4 2360 -48v 63A
5.2. Upcoming Power system (Rectifier) details:
Manufacturer ELTEK
Model Flatpack2 HE
Rectifier Configuration -48V, 16KW (Max.)
Configuration per module 2000W, 41.7A, 48Vdc
Efficiency Up to 96.5%
Module offered 4 module
Total module capacity 8 modules.
MCBs/Fuses to connect battery bank 4 × 250A
Circuit Breaker in LLVD (Load low voltage disconnect) 5 × 100A SP FUSE/MCB 1 × 63A SP FUSE/MCB
Circuit Breaker in BLVD (Battery low voltage disconnect 2 x 63A SP Fuse/MCB 2 x 32A SP Fuse/ MCB
2 x 10A SP Fuse/ MCB
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 12
Nokia Siemens Networks, All rights reserved. Version: 1.4
6. EXISTING DEFICIENCY:
Outdoor grounding cable available Yes No Comments:
Indoor grounding cable available Yes No Comments:
Tube light working properly Yes No Comments:
All modules in rectifier is working Yes No Comments:
AC is functioning Yes No Comments
Main power is available Yes No Comments:
Site Access at night Yes No Comments:
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 13
Nokia Siemens Networks, All rights reserved. Version: 1.4
7.1. Photograph as seen facing side A- Side B corner
7.2. Photograph as seen facing side B – Side C corner
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 14
Nokia Siemens Networks, All rights reserved. Version: 1.4
7.3. Photograph as seen facing side C – Side D corner
7.4. Photograph as facing side D (entrance) - Side A corner
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 15
Nokia Siemens Networks, All rights reserved. Version: 1.4
7.5. Indoor Pictures:
Proposed
Flexi BTS In
Place of
Ericsson RBS
Proposed
DDF
Existing
Ericsson
RBS2216
Proposed
DCDB
Feeder with
jumper
connector
Proposed
Rectifier
MDB
Breakes
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 16
Nokia Siemens Networks, All rights reserved. Version: 1.4
7.6. Outdoor Pictures:
8. Swap instructions:
PBC 6500
Rectifier Modules
Battery
Bank
Battery
Bank
Customer: Axiata (Bangladesh) Ltd [AKTEL] SWAP BTS Technical Site Survey Report Site Name: Abdul Barek Road
PAGE: 17
Nokia Siemens Networks, All rights reserved. Version: 1.4
Step 1:
Before entering inside the BTS room, inform the NMC about entrance and write down the names of all the team members with designations, ID, Mobile numbers, In time, signatures etc in the site register.
Step 2:
As this will be a Cold swap, first of all unpack & put the new NSN flexi BTS on the floor near the proposed place and install DDF to the proposed locations. Here are two existing Ericsson BTS cabinets (900 & 1800) and the new NSN Flexi BTS will be replaced with Ericsson 1800 cabinet. So, disconnect the jumpers from 1800 cabinet and take the values of VSWR and DTF. Then we Connect jumper cable With new flexi BTS. After Install the BTS we should install new rectifier in the proposed place, then battery connection will be made using the existing Battery. Every battery bank will contain 4 batteries in series to make a 48 volt batteries bank. Then we install the DCDB in the proposed place & connect the power cable from Rectifier to DCDB. After install the DCDB & Rectifier, we remove MW power from the Existing rectifier and this connection will be install in DCDB.
Step 3:
Connect all the PCM and alarm cables (new BTS – new DDF and existing TX Rack - new DDF). Switch on the new BTS and configure the new Flexi BTS will go to operational mode.
Step 4:
Now disconnect the jumpers cables from Ericsson 900 cabinet and take the values of VSWR and DTF. Do the necessary configurations of NSN Flexi BTS for 900 part. Now the both parts of 900 & 1800 of new BTS are in operational mode.
Step 5:
Remove the existing Ericsson BTS 900 & 1800 carefully and place the new NSN Flexi BTS there. After completing the installation work, pack the dismantled equipments and clean the BTS room properly.
Step 6:
Turn off the lights, turn on the AC if it was turned off during work, write down Out-time in the site register book, lock the BTS room, inform the NMC and then leave the site.
9. Observation & Recommendation
1. Emergency Light is required at Swap Period.
2. Required Circuit Breaker in Rectifier –63 A(2Pcs)
3. Required Circuit Breaker in DCDB—6 A (3 Pcs)
4. Required Circuit Breaker in MDB—40A (1 Pc)